Flow Improvement through the Implementation of Station Concept in SFS

download Flow Improvement through the Implementation of Station Concept in SFS

of 10

description

The production industry has been experiencing a competitive environment and striving hard to find methods to reduce manufacturing cost, waste and improve quality. Flow improvement concepts are used by the industries to reduce work in progress inventories and also to reduce the waste for competing in the global market. Facilities layout is a systematic and functional arrangement of different departments, machines, equipments and services in a manufacturing industry. It is essential to have a well-developed plant layout for all the available resources in an optimum manner and get the maximum out of the capacity of the facilities. The efficiency of production depends on how well the various machines, services production facilities and employee’s amenities are located in a plant. This research paper aims to study and improve the current plant layout.. An Attempt is made to evaluate the current layout and to propose newshop layout. The ultimate goal is to speed up the process, there by increasing productivity through a proper utilization of man and machine. In a manufacturing industry, the layout and material flow in the shop floor decides its productivity. Material handling system also plays a key role in influencing productivity, throughput time and cost of the product. This research work has been carried out as a flow improvement through the application of station concept in production industry with the objective of time reduction. Efforts are made to reduce the motion waste in the shop floor. The problems in the current layout are identified and analyzed. Then the layout is required to be modified and the results to be compared with the current layout. The results will be an improvement in productivity. A new material handling system has to be designed and to be developed to reduce the motion wastes and unwanted transportation.

Transcript of Flow Improvement through the Implementation of Station Concept in SFS

  • IJSTE - International Journal of Science Technology & Engineering | Volume 2 | Issue 02 | August 2015 ISSN (online): 2349-784X

    All rights reserved by www.ijste.org

    51

    Flow Improvement through the Implementation

    of Station Concept in SFS

    Anil A. Mahale Prof. P.M.Ravanan

    M.Tech Scholar Associate Professor

    Department of Production Engineering Department of Production Engineering

    Veermata Jijabai Technological Institute Matunga , Mumbai

    400019

    Veermata Jijabai Technological Institute Matunga , Mumbai

    400019

    Abstract

    The production industry has been experiencing a competitive environment and striving hard to find methods to reduce

    manufacturing cost, waste and improve quality. Flow improvement concepts are used by the industries to reduce work in

    progress inventories and also to reduce the waste for competing in the global market. Facilities layout is a systematic and

    functional arrangement of different departments, machines, equipments and services in a manufacturing industry. It is essential

    to have a well-developed plant layout for all the available resources in an optimum manner and get the maximum out of the

    capacity of the facilities. The efficiency of production depends on how well the various machines, services production facilities

    and employees amenities are located in a plant. This research paper aims to study and improve the current plant layout.. An Attempt is made to evaluate the current layout and to propose newshop layout. The ultimate goal is to speed up the process, there

    by increasing productivity through a proper utilization of man and machine. In a manufacturing industry, the layout and material

    flow in the shop floor decides its productivity. Material handling system also plays a key role in influencing productivity,

    throughput time and cost of the product. This research work has been carried out as a flow improvement through the application

    of station concept in production industry with the objective of time reduction. Efforts are made to reduce the motion waste in the

    shop floor. The problems in the current layout are identified and analyzed. Then the layout is required to be modified and the

    results to be compared with the current layout. The results will be an improvement in productivity. A new material handling

    system has to be designed and to be developed to reduce the motion wastes and unwanted transportation.

    Keywords: Flow Improvement, Stations Concept, Flow Line Layout, SAW Arrangement

    ________________________________________________________________________________________________________

    I. INTRODUCTION

    Industry Challenges A.

    The manufacturing industry faces numerous challenges in todays marketplace. Some significant challenges are global competition, finding and keeping skilled labour, handling cost pressures, and adapting to different consumer needs.Among the

    options for competition are price (cost), quality, delivery, service, and flexibility. Efficiency of industrial production lines is

    crucial as it results in an improved production and utilization of available resources. Factors contributing to production line

    efficiency are manpower utilization and machine efficiency. Measuring the machine efficiency and man power utilization should

    be on-line, accurate and truthful. The management should be able to look for relevant production data and to accurately interpret

    these data in order to identify the various faults at production level and to immediately take steps to improve efficiency.

    However, faults are overwritten and reports are retouched with inaccurate information. An accurate and on line data management

    system can ensure that these problems are overcome.

    A production line is a set of sequential process established on an industrial shop floor. A production process or a

    manufacturing process is the transformation of raw materials or components into finished products. The stages in a production

    process involve procurement, fabrication, assembly, testing, packaging and distribution. The production or manufacturing lines

    in industries can be categories into three types i.e. automated production lines, semi-automated production lines and manual production lines.The nature of a production line depends on the complexity of the manufacturing parts, the production volume,

    the sensitivity of the product and cost. Industries management plan and layout their production lines according to specific production requirements.

    The plant layout redesign for increase in efficiency is considered necessary because of the following reasons:1) Improper

    material flow through the shop floor i.e., the current plant layout was not designed according to the process flow. 2) Extended

    transportation time for material transfer.

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    52

    II. INDUSTRY OVERVIEW

    (L&T Heavy Engineering) A.

    L&T Heavy Engineering manufactures and supplies custom designed equipment to critical process industries such as fertilizer,

    chemical, refinery, petrochemical, and oil & gas, as well as to sectors such as nuclear power, aerospace and defence.

    Fabrication

    Welding

    Machining

    Qa & Inspection

    III. LITERATURE REVIEW

    Efficiency of a plant layout can be increased by redesigning the plant layout using String diagram and Systematic layout

    planning. These fundamental guidelines, when designing a plant layout are to be considered. It is the basic set of guidelines to be

    followed during layout design and redesign. It provides basic details about the flow of material through the shop floor and the

    interrelation of various activities. It also explains about the material flow and layout design using string diagram. [1]

    One such research explains about the planning methods and procedures for various types of production facility. The type of

    layout designs to be adopted and implemented during layout design and has also provided the key elements for layout design.

    The type of flow of material and the requirement of basic process of redesign is also explained. [2] Many industries use activity

    relationship charts (ARC) and diagrams for layout redesign and layout planning. The use of activity relationship diagram in

    designing a layout has provided a basic step for layout planning. [3] Another research focuses on the problems occurred during designing flexible plant layouts for manufacturing facilities where

    product demands are subject to variability. A flexible layout is one that maintains low material handling costs despite

    fluctuations in the product demand levels. [4]

    A research conducted in an industry explains about the warehouse redesign of a manufacturing plant Layout and also the

    problems faced during the redesign of the layout. [5]

    IV. SHELL FABRICATION SHOP (SFS)

    In this shop, shells are manufactured with longitudinal seam welding. The shells are then transferred to other shops for further

    fabrication of specific project.

    Fig 1: Shell fabrication shop

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    53

    Fig 2: Layout of SFS

    The shop is divided into different stations as follows:

    CNC Area

    Rolling Area

    Press Area

    Gas Cutting Area

    Shell setup and fabrication Facilities available at the shop

    Hydra

    Loading-Unloading Trailer

    10 & 25 Ton capacity cranes

    Evner Beam

    V. WHAT IS SHELL?

    Shell is the main body of pressure vessel.

    Shells are of two types.

    Cylindrical

    Spherical Here in this shop, cylindrical shells are manufactured.

    Fig 3: Shell

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    54

    VI. PROCEDURE OF SHELL MAKING IN SFS

    1) Plate cutting and WEP preparation 2) Edge Breaking 3) Rolling of plate 4) Longitudinal seam setup 5) Production Test Coupon Run in and run out 6) Preheating of long seam 7) Inter pass temperature:- 8) Post heating 9) Tack welding 10) Long seam setup inspection 11) Welding

    Complete welding is done after tack welding. Root run and hot pass welding is generally a SMAW process. After proper depth

    of welding is attained, SAW process is carried out. This happens outside of the shell. 3-4 mm bead is maintained above the shell

    level thickness. After outside welding, chip back grinding is carried out from inside. Its MT or PT is done. Then the long seam

    from inside of the shell is ready for chip back SAW process. Inside flush grinding is done on long seam whenever necessary.

    Run in, run out and PTC are cut after welding process is completed. Now the shell is ready for after welding inspection.

    Fig. 4: Root & Hotpass SMAW

    Fig 5: SAW (Top view)

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    55

    Table - 1

    Time for SFS activities

    Sr no. Activies Time required for each activity (Approximate)

    1 Unloading of plates on floor space 45 minutes

    2 Marking on plates 1 hour

    3 Edge pressing 2-3.5 hours

    4 Gas cutting and grinding for WEP preparation 2-3 hours

    5 Rolling of plate 1-3 hours

    6 Long seam Setup of shell 1-2 hours

    7 Tack welding 1.5 hour

    8 SAW arrangement 2 hours to 6 hours

    9 Root and hot pass SMAW 3 hours

    10 SAW 4 hours

    11 Chip back gauging and grinding 3 hours

    12 Chip back PT/MT hour

    13 Chip back SAW arrangement 2-5 hours

    14 Chip back SAW 2.5 hours

    15 Cutting of Run in and run outs and grinding 1-2 hours

    16 Rerolling of shell 2 hours

    17 Dimension QC inspection 2-3hours

    18 Visual testing of long seam hour

    19 PT/MT of final welding hour

    20 Loading on trailer for RT enclosure 1-2 hours

    21 Radiography Testing 1-3 hours

    22 Removal from RT enclosure 1 hour

    23 Wire brush grinding hour

    24 Ultrasonic Testing 2-3 hours

    Total (When all facilities and manpower available-for one shell) 56 Hours

    VII. SAW PROCESS AND ITS ARRANGEMENT

    Submerged Arc Welding A.

    Submerged arc welding is an arc welding process that fuses together the parts to be welded by heating them with one or more

    electric arcs between one or more bare electrodes and the work piece. The submerged arc welding process utilizes the heat of an

    arc between a continuously fed electrode and the work. The heat of the arc melts the surface of the base metal and the end of the

    electrode. The metal melted off the electrode is transferred through the arc to the workpiece, where it becomes the deposited

    weld metal

    SAW Arrangement for Long Seam Welding in the shop B.

    The scaff holding arrangement is done in the shop with the use of pipes and clamps. 2-4 riggers required for this job depending

    upon size of the shell/cone. Also it depends on the available resources in the shop. Time for SAW scaffholding and track

    arrangement is min of 2 hours to a whole day.

    Fig. 6: General SAW arrangement for outside welding (Front view)

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    56

    Problems Facing in SFS C.

    Fig. 7: Flow process of shell making

    Where At

    1) Unloading and marking of plates take place 2) Edge pressing takes place 3) Edge breaking and WEP preparation takes place at this alternative positions depending upon availability of space and

    manpower.

    4) Rolling of plate to shell take place 5) Fabrication of shell

    VIII. FLOW OF MATERIAL THROUGH DIFFERENT STATIONS IN THE SHOP (IN DETAIL)

    1) Trailer comes with a plate in the shop. The plate is unloaded in a plate cutting area near press machine, where a marking on a plate is done. Also WEP of cir-seam is done here. Punching on plate is also carried out here.

    2) The plate is then taken for edge pressing on press machine for 3-4 hours depending on thickness and length. 3) After edge pressing, the plate is taken to plate cutting area for long seam WEP. 4) The plate is then transferred on rolling machine where plate is rolled to make shell. 5) Rolled plate is then taken for welding of long seam in shell fabrication area. Where welding and all inspection activities

    are carried out.

    6) Then shell is then loaded on trailer or hydra to transfer in RT enclosure.

    Problems in Flow line of Stations A.

    It was observed that the floor condition was in a haphazard situation.

    Materials used to travel large distance from input receiving to cartooning.

    The line supervisors were not strict enough to control the quality right at the first time.

    Process is carried out at random stations.

    It is not a single line flow.

    Rolling machine is idle for many times.

    Random placing of plates in the plates in the shop due to improper spacing of other materials.

    Space problem for placing the material in the shop sometimes.

    Unused area of around 3m x 5m in between rolling and press machine.

    Wastage of time due to random placing and handling the materials in the shop.

    Crane problem due to engagement on particular job for specific period. So, a smooth, streamlined and continuous flow is really necessary to avoid all such unexpected occurrence.

    Table 2 wastage of time due delay in activities

    Sr. no Activities Wastage of time Delay reason

    1 Unloading of plates 1-3 hours

    Manpower unavailability,

    Unavailability of space,

    Worker rest pauses,

    Previous load on machine,

    2 Marking on plates 1-2 hours

    3 Edge pressing 1-2 hours

    4 WEP gas cutting & grinding 1-2 hours

    5 Rolling of plate 1-2 hours

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    57

    6 Set up of long seam 1-3 hours

    Gas cutter unavailability,

    Crane unavailability,

    Shift change,

    Electricity stoppage,

    Transportation,

    Inspection delay,

    Material handling,

    7 Tack welding 1 hour

    8 Inspection activity 1-3 hours

    9 SAW arrangement 1-6 hours

    10 SMAW & SAW welding 1 hour

    11 Run in Run out cutting & grinding 1-2 hours

    12 Rerolling of shell 1-2 hours

    13 Dimension inspection 1-3 hours

    14 MT/PT 1-2 hours

    15 Wire brush grinding 1 hour

    16 RT 1-6 hours

    17 UT 1-3 hours

    Total possible delay for single shell 44 hours

    Fig. 9: General breakdown of a production shift

    In SFS,

    Table - 3

    Working and non-working durations 1 Planned shift length 12 hours

    2 Planned operation time 10 hours

    3 Planned downtime 2 hours

    4 Actual operation time 9 hours

    5 Unplanned downtime 1 hour

    Wastage of Time for SAW Arrangement B.

    1) Every time the size of shell is not same. So scaff holding arrangement for SAW is changed every time. 2) The scaffholding arrangement takes time of minimum 2 hrsupto a day. 3) Whole day can be taken for SAW arrangement. Because manpower availability is necessary for this. Minimum 2

    Riggers are required for this job.

    4) Pipes are arranged and fitted as support. 5) Loose arrangement results in accident and welding defects.

    Fig 10: Top view of SAW arrangement.

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    58

    Fig 11: Side view of SAW arrangement

    IX. FUTURE WORK IN IMPROVEMENT OF LINE FLOW AND SAW ARRANGEMENT

    For Flow Improvement A.

    1) Line improvement (Redesign layout)of flow of product through different stations with flexible time. 2) Avoiding waiting time because of delay in previous process and able to start other work within that time. 3) Making solution on space management on floor. 4) Making automated SAW arrangement system with the use of available resources in the shop.

    For SAW Arrangement B.

    For SAW arrangement, scaffholding & track can be avoided, which takes lot of time upto a day. Instead automated beam

    arrangement on pillers/column can be done. The arrangement would be adjustable up and down. Also rope will help to bend the

    beam. SAW track will be made on beam where SAW trolly cab be put. Also small chair arrangement on beam can be done.

    Otherwise separate adjustable beam for sitting welder can be done.

    Fig 12: Suggestive SFS layout

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    59

    Fig. 13: Suggestive SAW arrangement (Front view)

    Fig. 14: Suggestive SAW arrangement (Side view)

    Table - 4

    Scope of Improvement

    Sr.no. Present situation Wastage Target

    (After improved flow layout) Minimum/Nill wastage

    1. Total possible time wastage for one shell

    making 44 hours

    Less delayfor one shell

    making Within 10 hours

    2 Not a continuous flow. 1-2 hours for every activity Continuous flow Within 1 hour

    3 Placing of plates at random places due

    unavailability of space and other reasons

    Large Floor space. (twice to

    thrice of actual space)

    Placing of plates at

    particular place.

    Only required space

    will be taken.

    4 Crane unavailability due to improper

    material flow. 2-3 hours

    Crane availability due to

    proper material flow Within 15 minutes

    5 SAW arrangement time

    And space requirement

    More Manpower + Time

    uptoone day + arrangement

    material

    Automated SAW arrangement

    Manpower only 1

    person + Time

    reducedupto 1 hour

    6 Material handling time within shop 2-3 hours Reduced material handling

    time. hour

    X. RESULTS AND DISCUSSIONS

    This study has provided a good exposure to facility planning and layout designs for the improvement of the efficiency. The

    choice of which type of facility layout to adopt can have a significant impact on the long-term success of a SFS. Instead of

    criterion of minimizing total distance travelled, one may wish to minimize the total distance of the material travelled.

    Applying the new workstation design will improve the productivity significantly. By improving flow line, production process

    will be continuous. Wastage of time will be reduced. Less attention will be required after this improvement. Shop can avoid

  • Flow Improvement through the Implementation of Station Concept in SFS (IJSTE/ Volume 2 / Issue 02 / 009)

    All rights reserved by www.ijste.org

    60

    more manpower and skilled labour. The potential benefits from the implementation and utilization of a flexible line flow and

    SAW arrangement will results in:

    Less Waste

    Fewer Workstations

    Quicker Changes of Tools, Dies, and Stamping Machinery

    Reduced Downtime

    Better Control Over Quality

    Reduced Labour

    More Efficient Use of Machinery

    Work-In-Process Inventory Reduced

    Increased Capacity

    Increased Production Flexibility

    REFERENCES

    [1] R Muther, Systematic Layout planning, McGraw, 1955 [2] S. Tenwong et al., Productivity improvement for the lamp manufacturing, a dissertation for Masters degree in Manufacturing Systems Engineering,

    School of Engineering, King Mongkuts University of Technology Thonburi, 1991. [3] S. Yookkasemwong, S. Pitchaya-anankul and AreeratBussarakamwadee, Process Improvement for increasing efficiency of Cable Box Process, a project

    for Bachelors degree in Industrial Engineering, School of Engineering, King Mongkuts University of Technology Thonburi, 2005. [4] M. Khansuwan and C. Poowarat, A Study on Plant Layout Improvement: A Case Study at Kritchai Mechanical Company Ltd., a project for Bachelors

    degree in Industrial Engineering, Faculty of Engineering, Thammasat University, 1999. [5] T. Sucharitkul et al., The feasibility study and aluminium foundry plant layout design : a case study : Sathien Plastic and Fibre, a dissertation for Masters

    degree in Manufacturing Systems Engineering, School of Engineering, King Mongkuts University of Technology Thonburi, 1999.