FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B...

14
[email protected] | www.flidar.com | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS

Transcript of FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B...

Page 1: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

[email protected] | www.flidar.com | April 2015

FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

RESULTS

Page 2: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

FLiDAR Technology Overview

2

Page 3: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

FLiDAR technology Overview

3

• WindCube on gimbal system

• Motion of LiDAR decoupled

from buoy motion

Data quality independent from

buoy movement

Possible to validate

independent from sea state

Buoy structure no influence

on measurements

V0.9 Buoy

Replaced with

V1.0 Buoy

Unchanged

Gimbal

Unchanged LiDAR

& Software version

Page 4: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

FLiDAR technology Overview

Design Improvements from V0.9 to V1.0

4

• Buoy structure changed to a Mobilis platform:

• Significant weight reduction (~ 6 Ton)

• Improved handling during O&M, symmetrical hull

• 4 independent floating compartments

• Faster/cheaper multi-cat crane deployment (<10 ton)

• Uses two point mooring:

• Adds redundancy in case of failure

• Keeps the buoy aligned on a N-S axis = more

efficient use of PV panels, less yaw compensation

• Switch to Li-Ion batteries:

• Increased capacity by 70%

• No changes to core measurement system (LiDAR,

software algorithm & gimbal mechanical compensation)

V0.9

V1.0

Page 5: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

MRP-NNG campaign & FLiDAR technology Overview

Design Improvements V1.1

5

• Symmetrical design

• Upgraded energy system

• Increased PV production by 70%

• Added 1 extra WTG

• Possible to install Fuel Cell

• Increased redundancy and reliability

on sensor and PC loggers

• Upgraded satellite and GPRS

systems

Page 6: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

MRP-NNG campaign & FLiDAR technology Overview

FLiDAR construction

6

Month 1 2 3 4 5

Buoy structure construction

Electrical systems installation

Communication system installation

Sensor configuration and commissioning

Factory Acceptance Test (FAT)

Page 7: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Phase 1: Validation Results

7

Page 8: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Pre-Validation System & Data Availability

8

• Data availability (Light Green)

unaffected up to met mast top

(103m), >85% at 200m

• Easily exceeds roadmap acceptance

Roadmap Acceptance Criteria

Availability Type Monthly Overall

System Availability ≥ 90% ≥ 95%

Data Availability ≥ 80% ≥ 85%

Page 9: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Campaign phase 1: Pre-Validation

Accuracy – 103m Wind Speed & Direction

9

Roadmap Guidance Actual

Results Key Performance Indicator Best Practice Minimum

Mean Wind Speed - Slope X

4 to 16 m/s0.98 – 1.02 0.97 – 1.03 1.008

Mean Speed – Coefficient R2

4 to 16 m/s>0.98 >0.97 0.992

Wind Direction – Coefficient R2 >0.97 >0.95 0.999

Page 10: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Campaign phase 1: Pre-Validation

Accuracy – Wind Speed & direction

10

Page 11: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Phase 1 results (3 months) DNV validation report

Pre-Validation Metocean Conditions Experienced

11

• Waves (Hs) up to 4.2m Wave Period 2 -9 seconds

• Tidal range +/-3m

• Wave steepness up to 0.08

• Low current flow up to 0.8 m/s

• Dominant Wave Direction Parallel to coast line - long fetch waves

• Wide range of wave climates typical of North Sea Conditions

• No Discernable Trends for Wind speed or TI Error vs wave period, steepness, Hs

Page 12: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Phase 3 results (1 month) DNV validation report

Campaign phase 3: Post-Validation

12

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

MRP-NNG Post Validation Campaign

Data Quality System Availability

Phase 3 Availability

Availability Type Monthly

System Availability 99.3%

Data Availability 94.5%

• High Availability for the 1 month

Page 13: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

Q & A (3 mins)

13

Page 14: FLiDAR - Neart na Gaoithe (NNG) Validation Campaign: RESULTS for web/SMI S Presentasjonar/B St… · Sales@flidar.com | | April 2015 FLiDAR - Neart na Gaoithe (NNG) Validation Campaign:

[email protected] | www.flidar.com | April 2015

Thank you!