Fit for Acceptance - gov.uk...128-L2 Long Itchington Wood North Portal In le t C u lv e rt A s h B e...
Transcript of Fit for Acceptance - gov.uk...128-L2 Long Itchington Wood North Portal In le t C u lv e rt A s h B e...
Scale H 1:10000 V 1:1000Profile
127-L1 Long Itchington Wood Tunnel
Wood Cutting
128-L1 Ufton
Embankment
129-L1 Welsh Road 130-L1 Offchurch Cutting132-L3 River Leam Embankment20
30
40
50
60
70
80
90
100
110
120
20
30
40
50
60
70
80
90
100
110
120
Chainage
127+500
127+600
127+700
127+800
127+900
128+000
128+100
128+200
128+300
128+400
128+500
128+600
128+700
128+800
128+900
129+000
129+100
129+200
129+300
129+400
129+500
129+600
129+700
129+800
129+900
130+000
130+100
130+200
130+300
130+400
130+500
130+600
130+700
130+800
130+900
131+000
131+100
131+200
131+300
131+400
131+500
131+600
131+700
131+800
131+900
132+000
132+100
132+200
132+300
132+400
132+500
132+600
132+700
132+800
132+900
133+000
133+100
133+200
133+300
133+400
133+500
133+600
133+700
133+800
133+900
Horizontal Alignment L=3765.0
R=13000.0L=230
.0L=6372.3
Vertical Alignment
G=-0.68
%L=
1558.0
R=-56000.0
L=268.8
G=-0.20%
L=714.4
R=-56000.0
L=476.2
G=0.65%
L=1658.0
R=38750.0
L=798.1
G=-1.41%
L=744.4
R=-56000.0
L=2001.5
Existing Level
Proposed Level 72.7
72.0
71.3
70.8
70.4
70.1
69.9
69.7
69.5
69.3
69.1
68.9
68.7
68.7
68.8
69.1
69.6
70.2
70.9
71.5
72.2
72.8
73.5
74.1
74.8
75.4
76.1
76.7
77.4
78.0
78.7
79.3
80.0
80.6
81.2
81.4
81.5
81.2
80.7
80.0
78.9
77.7
76.3
74.8
73.4
72.0
70.6
69.2
67.8
66.4
65.2
64.1
63.3
62.6
62.1
61.7
61.6
61.6
61.8
62.2
62.8
63.5
64.4
65.5
66.8
Cut and Fill
Design Speed: 400km/h
96.6
99.2
101.9
104.6
106.2
107.9
109.4
110.0
110.1
105.9
88.0
83.5
79.7
77.1
75.7
75.4
67.0
65.5
64.8
64.5
64.0
64.2
64.1
64.6
66.6
68.3
69.4
70.2
71.7
74.6
78.2
82.1
90.2
100.2
100.1
95.2
92.4
93.8
93.0
91.6
97.6
97.3
93.1
88.7
87.1
84.3
80.7
77.4
74.1
70.5
67.3
63.6
62.2
62.8
61.5
60.4
60.1
60.3
60.4
60.4
60.6
59.4
57.0
54.5
56.6
+2.6
+4.7
+6.1
+7.0
+8.2
+8.6
+9.4
+9.5
+8.2
+7.1
+6.7
+6.5
+5.7
+3.4
+0.5
+0.5
+1.1
+0.6
+1.3
+1.5
+1.3
+1.4
+1.8
+2.2
+4.1
+7.4
+11.0
+10.2
-23.9
-27.2
-30.6
-33.8
-35.8
-37.8
-39.5
-40.3
-40.6
-36.6
-18.9
-14.6
-11.0
-8.4
-6.9
-6.3
-2.8
-10.2
-19.6
-18.9
-13.8
-10.9
-12.6
-12.3
-11.6
-18.7
-19.6
-16.8
-13.9
-13.7
-12.3
-10.1
-8.2
-6.3
-4.1
-2.1
-0.2
Route Element ID
360km/h
129-L3 Grand Union Canal Embankment
HS2 Alignment
Ground Level
Closure
Itchin
gto
n R
oad
131-S
2 L
ong
133-L1 River Leam Viaduct
132-S
5 Offchurc
h E
FA
TS
Way O
verbridge
131-S
1 B
4455 F
osse
Road & E
2994
BP A
ccess - W
els
h
Road O
verbridge
132-S
2 H
unnin
gha
m
Gre
en O
verbridge
131-S
3 Offchurc
h Gre
en
way
Underbridge
130-S
1 W
els
h R
oad
Overbridge
132-S
4 F
ootp
ath W
129y
128-L2 Long Itchington Wood North Portal
Inlet
Culvert
Ash B
eds Dro
p
132-S
3
132-L2 Ash Beds Cutting
132-L1 Ash Beds Embankment 129-L2 Longhole Viaduct
60.0m
60.0
m
60.0
m60.0
m
60.0m
60.0
m
60.0
m
60.0
m
60.0m
60.0m
60.0m
60.0
m
60.0m
60.0m
60.0
m
60.0
m
60.0
m
60.0
m
60.0
m
60.0
m
60.0
m
60.0
m
70.0
m
70.0
m
70.0m
70.0m
70.0
m
70.0
m
70.0
m
70.0
m
70.0m
70.0m
70.0
m
70.0
m
70.0
m
70.0
m
70.0m
70.0m
70.0
m
70.0
m
70.0
m
70.0
m
70.0
m
70.0
m
70.0m
70.0
m
80.0
m
80.0
m
80.0
m
80.0
m
80.0
m
80.0
m
80.0m
80.0
m
80.0
m
80.0
m80.0
m
80.0
m
80.0
m
80.0m
80.0
m
80.0
m
80.0
m
80.0
m
80.0m
80.0
m
80.0m
80.0
m
90.0m90.0
m
90.0
m
90.0
m
90.0
m
90.0
m90.0
m
90.0
m
90.0
m
90.0
m
90.0
m
90.0m
90.0
m90.0
m
90.0
m
90.0
m90.0
m
90.0m
90.0m
90.0m
90.0
m
90.0
m
90.0
m
90.0
m
90.0m
90.0
m
90.0
m
90.0
m
100.0
m
100.0m
100.0m
100.0m
100.0m
100.0
m
100.0
m
100.0m
100.0m
100.0m
100.0
m
100.0m
100.0m
110.0
m
110.0
m
110.0m
110.0
m
110.0m
110.0
m
110.0
m
110.0
m 127+000
128+000
129+000
130+000
131+000
132+000
133+000
134+000
A112/01/2015
NOR
Country North
NOR
Capita Symonds Ineco JV
Country North Design
PlanScale 1:10000
Civil
Bridge Profiles indicated at FRL to HS2 track
Note:
OFFCHURCH
Lower Grange
Long Itchington Wood
Ufton Wood
Grand Union Canal
River Leam
Main Line
Chainage 127+500 to 133+900
Tunnel Portal Area
Access Road to
Around Top of Portal
Pedrestian Access
Maintenance and
Accommodation Access
for HS2 Construction Vehicles and
Existing Access Track to be Improved
Bridleway W129a
C223-CSI-CV-DPP-030-000003-FPD
Sheet 36
For
Continuation R
efer
To S
heet 35
For
Continuation R
efer
To S
heet 37
1:10000
AHNOR
P01
P01
22/01/16
FINAL PRELIMINARY DESIGN
Final Preliminary Design
Issued for Condition B
10/10/15
AH
22/01/16
GW
Drawn Checked Approved
Drawing No.
Date Scale Size
Rev.
DrawnRev Description
Project/Contract
Discipline/Function
Zone
Creator/Originator
Legends/Notes:
Drawing Title
Design Stage
HS2 AppCon AppChecked
Scale with caution as distortion can occur.
may be used for legal or other official purposes.
Only an official copy of a title plan or register obtained from the Land Registry
sold or published without the formal permission of Land Registry.
This material was last updated on 2015 and may not be copied, distributed,
Registry under delegated authority from the Controller of HMSO.
© Crown Copyright material is reproduced with the permission of Land
Ordnance Survey Licence number 100049190
© Crown Copyright and database right 2015. All rights reserved.
or if it is issued in part or issued incompletely in any way.
the reproduction of this document after alteration, amendment or abbreviation
HS2 accepts no responsibility for any circumstances which arise from
London, E14 5AB
One Canada Square,
Registered office:
Registration No. 06791686
Registered in England
Tunnel portalDitches - new
Tunnels external extentWoodland habitat creation
Wetland habitat creation
Grassland habitat creation
Ecological mitigation pond
HS2 Access road
Watercourse diversion
Electricity substation
Balancing pond
Noise fence barrier
Replacement floodplain storage
Land drainage area (scrub / woodland)
Landscape mitigation planting Main utility works
County boundary
Borough / District boundary
Community forum boundary
Rail alignment
Rail alignment formation
Landscape earthworks
Engineering earthworks
10+000
Stopped-up PRoW
Hedgerow habitat creation
Grassed areas
Sustainable placement
Public realm
(PRoW)
Existing public right of way
PRoW
New, diverted or realigned (e.g. 10+000)
Chainage
Existing watercourseor portal building
Depot, station, headhouse
development use
Returned to suitable
Welsh Road Underbridge Longhole Viaduct
River Leam Viaduct
Wood Tunnel
Long Itchington
Hunningham Road Overbridge
Overbridge
B4455 Fosse Way
Diversion Overbridge
Footpath W129y
Green Overbridge
Offchurch Greenway
Wood North Portal
Long Itchington
Buildings
Tunnel Portal
Welsh Road
Realignment of
Fosse Way
Realigned B4455
Road
Realigned Welsh
Diversion
Footpath W128
Hunningham Road
Realigned Footpath SM19
Realigned
Ridgeway Lane Centenary Way
Footpath W125
Abutment
Diverted around Viaduct
Watercourse to be
Stopped up
Existing Access
Stopped up
Existing Access
Footpath W128
Footpath W192
Greenway
Offchurch
Greenway over HS2
Common Structure with Offchurch
Footpath W192 Diverted onto
Footpath W129c
Footpath W129b
Bridleway W129x
Footpath W129y
Beds Woodland
Offset Severance of Ash
Woodland Planting Link to
Towpath
Grand Union Canal
to National Cycle Route 41)
Itchington Road (to connect
Cycle Path Link to Long
Cycle Bridge
Offchurch Greenway
Offchurch Greenway
Footpath W192 Link to
Auto-Transformer Station
Offchurch Express Feeder
Road and Welsh Road
Between Long Itchington
Revision of Junction
0 500200100 1000
@ 1:10000METRES
0 100502010
@ 1:1000METRES
Fit for Acceptance
Code 1
- Acc
epted