Fire Exting Inspection Log
-
Upload
muhammad-masood-abbas -
Category
Documents
-
view
214 -
download
0
Transcript of Fire Exting Inspection Log
-
8/18/2019 Fire Exting Inspection Log
1/1
AYED EI OSAIMI ENGINEERING CONSULTING OFFICE
Ayed Al Osaimi Eng ineering ConsultingOffice- Al Khobar
Document Number Revision No. Effective Date Page Sequence
GS-04 00 Jan.07,2014 Page 1 of 1
FIRE EXTINGUISHER INSPECTION LOG
MONTH:
……AUGUST……
YEAR:
…………2016
Prepared
by:
Signature:
Date:
Sr. #
Fire Exting
ID # Type Pressure
Tag Validity Comments Location
01 1 DCP 15 OK 8th
Feb.17 Good Condition Office Recep. Area
02 2 DCP 15 OK 8th
Feb.17 Good Condition Phy. Lab.
03 3 DCP 16 OK 8th
Feb.17 Good Condition Phy. Lab.
04
4
DCP
16
OK
8th
Feb.17
Good
Condition
Chem.
Lab.
05 5 DCP 15 OK 8th
Feb.17 Good Condition Lab. Gallery
06 6 DCP 15 OK 8th
Feb.17 Good Condition Material test Lab.
07 7 DCP 16 OK 8th
Feb.17 Good Condition Conc. ST Area
08 8 DCP 17 OK 8th
Feb.17 Good Condition Workshop
09 9 CO2 16 OK 8th
Feb.17 Good Condition Workshop
10 10 DCP 15 OK 8th
Feb.17 Good Condition Office 1st
Floor
11
11
DCP
15
OK
8th
Feb.17
Good
Condition
Office
1st
Floor
12 12 DCP 15 OK 8th
Feb.17 Good Condition Office 2nd
Floor
13 13 DCP 15 OK 8th
Feb.17 Good Condition Office 2nd
Floor
14 14 DCP 14 OK 8th
Feb.17 Good Condition Office 2nd
Floor
15
16
17
18