Fire Dept Project Sheets

11
CONTACT  John Babcoc k, F ormer Chairma n Board o Fire Commissioners 845.249.6180 BUDGET $4.9M SCHEDULE Completed August 2009 SERVICES Architecture Engineering Construction Management QUASSAICK BRIDGE FIRE STATION NEW WINDSOR, NEW YORK The original Quassaick Bridge Fire Station was constructed in 1939, with later additions in the 1950s and 60s. The District retained CSArch to complete a easibility study evaluating the current station’s ability to meet the needs o its community. The study presented options to expand and renovate the existing station or construct a new station on an expanded site. Upon completion o the study, the Board o Fire Commissioners recommended construction o a new 15 ,000 square oot station, and the community voted to approve. The District was interested in creating an aesthetically pleasing design complementar y to its surrounding neighborhood. O particular interest was a design ecient in its use o the available site, as well as in the layout o all required unctions. The new station is separated into two distinct and ecient areas. One area contains our apparatus bays with related re-matic support includin g a decontamination room, air room, oam room and storage. The other area provides space or administrative and public unctions including a main event hall, members lounge, training room, toileting, department and commissioner oces and a kitchen. The building ts well with the adjacent properties; both sides are scaled in relation to the neighborhood. At the completion o the project, the existing station was razed to provide additional parking, and a portion o the existing structure’ s oundation used or a memorial. NEW HOME FOR QUASSAICK BRIDGE   Expansion and Renovation Options   Four Apparatus Bays   New Oces   Additional Parking

Transcript of Fire Dept Project Sheets

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 1/10

CONTACT John Babcock, Former ChairmanBoard o Fire Commissioners845.249.6180

BUDGET$4.9M

SCHEDULECompleted August 2009

SERVICESArchitectureEngineeringConstruction Management

QUASSAICK BRIDGE FIRE STATIONNEW WINDSOR, NEW YORK

The original Quassaick Bridge Fire Station was constructed in 1939, with later additionsin the 1950s and 60s. The District retained CSArch to complete a easibility studyevaluating the current station’s ability to meet the needs o its community. The studypresented options to expand and renovate the existing station or construct a newstation on an expanded site.

Upon completion o the study, the Board o Fire Commissioners recommendedconstruction o a new 15,000 square oot station, and the community voted to approve.

The District was interested in creating an aesthetically pleasing design complementaryto its surrounding neighborhood. O particular interest was a design ecient in its useo the available site, as well as in the layout o all required unctions.

The new station is separated into two distinct and ecient areas. One area containsour apparatus bays with related re-matic support including a decontamination room,air room, oam room and storage. The other area provides space or administrativeand public unctions including a main event hall, members lounge, training room,toileting, department and commissioner oces and a kitchen. The building ts wellwith the adjacent properties; both sides are scaled in relation to the neighborhood.

At the completion o the project, the existing station was razed to provide additionalparking, and a portion o the existing structure’s oundation used or a memorial.

NEW HOME FOR QUASSAICK BRIDGE  Expansion and Renovation Options

  Four Apparatus Bays

  New Oces

  Additional Parking

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 2/10

CONTACTThomas Kissane, Board o Fire Commissioners845.735.6351

COST$9.8m

SCHEDULEFeasibility Report completed 12/08Public Reerendum 11/11

Construction begins 3/13

SERVICESArchitectureEngineeringConstruction Management

SOUTH SPRING VALLEY FIRE DISTRICTCHESTNUT RIDGE, NEW YORK

EXPANSION AND INNOVATION

Recognizing the current and uture growth potential o the Village o ChestnutRidge, the members o the Board o Fire Commissioners realized their acilitywould need to grow in order to properly serve the community. With the existingsite severely restricted in its size and ability to expand, the Board approved thepurchase o a nearby vacant plot o land with the intent to ocus their eortson providing or the greatest level o improvement to rematic unctions byconstruction o a new acility.

CSArch was retained to conduct a easibility study to evaluate options or a newlyconstructed, state-o-the-art acility to meet the current and long term needs o the

District. A new 20,000 SF building at the vacant site was recommended by theBoard and approved by the public in November 2011.

The new acility will include ve apparatus bays (three pull-through) with relatedrematic support including a decontamination and laundry room, SCBA room,tool/equipment room, hose room, and general storage. Administrative and publicunctions will provide or a generous meeting and event hall, training room,department and commissioner oces, toilets and a commercial-style kitchen.The building includes ecient radiant foor heat at signicant administrativeand public spaces and the apparatus bays, with ront and rear aprons eaturingembedded snow melt systems.

NEW FACILITY  State-o-the-Art Facility

  Five Apparatus Bays (incl. three pull-through)

 

Increased Parking

  New Oces

  Training Rooms

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 3/10

CONTACTRobert DurivagePresident518.286.3612

COST$5M Estimate

SCHEDULE2013 Estimate

DEFREESTVILLE FIRE DEPARTMENTNORTH GREENBUSH, NEW YORK

CSArch is working with the Dereestville Fire Department to replace its currentlyundersized existing acility. A new station is proposed on a more centrally locatedsite within the re district that provides adequate space or parking, on-sitetraining, and room or uture expansion.

A 22,000 square oot proposed building has taken shape. The building includesve drive-through equipment bays; a community meeting room; trainingand conerence space; members’ room, locker rooms and exercise area; andequipment maintenance and storage space on the lower level. There are ocesor the department on a mezzanine level overlooking the equipment bays.

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 4/10

CONTACTFrank Valdina, Board o Fire Commissioners845.565.4428

ESTIMATED COST$6.5m

SCHEDULEFeasibility Report completed

 June 2009

SERVICESArchitectureEngineering

GOOD WILL FIRE DISTRICTNEWBURGH, NEW YORK

PRESENT AND FUTURE NEEDS EVALUATED

The Good Will Fire District inhabits buildings originally constructed in the late1940s and renovated/retrotted in the early 1960s that have remained largelyunchanged.

The Board o Commissioners retained CSArch to complete a easibility studyevaluating the current re station’s ability to meet present and uture needs o theDepartment and provide multiple options to address long-range operational andservice goals. Working with the Board, the study ndings identied options rangingrom major renovations to the existing buildings, to construction o a new acilityon the existing site.

The existing acility was surveyed or existing conditions and code compliance, andthree options were ultimately proposed or consideration by the Board. Two o theoptions included project phasing which would allow the apparatus bays to remainoperational or the majority o the project. One option addressed the possibilityo a gut renovation o the existing buildings with an addition to accommodateexpanded services. All options provided greatly expanded administrative unctions,training and exercise rooms and an additional apparatus bay.

Ater evaluation o the options provided in the study including construction costs,scheduling dierences and the need or temporary acilities, the option or a newtwo-story building phased or continued operation o the existing apparatus bayswas selected or urther consideration. Given current economic considerations, theBoard o Commisioners has not set a date or public reerendum.

FEASIBILITY STUDY  Addition and New Building Options

  Phased Construction

  Temporary Accommodations

  New Oces

  Training Rooms

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 5/10

GREENWOOD LAKE FIRE DEPARTMENTGREENWOOD LAKE, NEW YORK

PRESENT AND FUTURE NEEDS EVALUATED

The Greenwood Lake Fire Department is currently housed in a building owned by theVillage o Greenwood Lake and shared by both as a multiple occupancy structure.

The Department retained CSArch to complete a easibility study evaluating the currentre station’s ability to meet present and uture needs and provide multiple options toaddress those needs. Working with the Department’s Building Committee, the studyndings identied options ranging rom major renovations and additions, as well asconstruction o a new re station on a purchased site.

The Village was supportive o the Department’s needs and participated in the easibilitystudy, as options to reorganize the existing building also aected their use and

operation. In this regard, the study looked at the reorganization o the Village oceareas and presented options to build an addition to accommodate their changingspace needs as well as the potential or the Village to relocate their oce unctionsand sell the current building to the Fire Department. Each o these conceptual optionswere evaluated based upon total project cost, scheduling dierences, impacts to thelocal taxpayer share and bonding limitations, as well as requirements or temporaryaccommodations to support the re operations during renovation or construction.

Upon the completion o the study, the Board o Fire Commissioners recommendedtwo o the options identied or urther review and consideration. These include anoption or renovation and additions to the existing building, and an option or newconstruction on a recently purchased site.

FEASIBILITY STUDY  Renovation and Addition options

  Reorganization o Oce Areas

  Temporary Accommodations

CONTACTSteve DeFeo, Board o FireCommissioners845.477.2236

SCHEDULEFeasibility Report completedOctober 2008; no vote date set

SERVICESArchitectureEngineering

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 6/10

CONTACT Joseph McCormich, ChairmanBoard o Directors845.446.2040

SCHEDULEFeasibility Report completedDecember 2008; no vote date set

SERVICESArchitectureEngineering

HIGHLAND FALLS FIRE DEPARTMENT

FEASIBILITY AND COST STUDYRecognizing the need to maintain the highest standards in re protection, the memberso the Board o Directors realized their aging acility needed improvements to meetthe changing needs o volunteer training, rematic support, apparatus maintenanceand compliance with current codes and standards. The Board commissioned CSArchto conduct a easibility study to evaluate options or these improvements.

It became quickly apparent the existing re station would not meet all the identiedneeds. With a site severely restricted in size and ability to expand, recommendationsocused on providing the greatest level o improvement to rematic support unctions,as well as improvements to basic re operations. Undersized apparatus bays wouldneed to be expanded, as well as adequate o-foor spaces or rematic support –including decontamination, gear storage, tool and equipment storage, hose dryingand storage, dispatch, department oces, conerencing, training, general storage and

toileting. The study conrmed that improvements could not be handled on the rstfoor without serious impacts to existing meeting space. The study also determinedthe existing site as inadequate or expansion at the rst foor level.

CSArch developed ve comprehensive reconstruction options, o which the Boardselected two or urther renement and consideration. Budgeting or these options wasprepared, including required costs or temporary relocation during any reconstruction.

FACILITY IMPROVEMENTS  Firematic Operations

Code Compliance

  Additional Oces and Storage Areas

  Reconstruction Options

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 7/10

CONTACT Joe Walters, Board o Fire Commissioners845.986.3473

SCHEDULEFeasibility Report in progress

SERVICESArchitectureEngineering

WARWICK FIRE DISTRICTWARWICK, NEW YORK

FUTURE NEEDS EVALUATED

The Warwick Fire District Engine Company #3 Fire Station inhabits a building originallyconstructed in 1961. Following the construction o a new building at Station #2, theBoard o Commissioners recognized that the existing Engine Company #3 building isinadequate to ull the District’s continued operational and service goals.

The Board o Commissioners retained CSArch to complete a easibility study or theconstruction o a new building on the existing site. Working with the Board, the studyndings identied options including a station with pull-through bays, a three-storybuilding, and a single-story building with an oce mezzanine at the apparatus bay.The Board expressed its goal to build a LEED certied station or Engine Company#3, and this was considered in the study.

The option or a single story building was selected by the Board. The existing siteaces constraints or wetlands buer zones. The Board is awaiting discussion withthe NYS Department o Environmental Conservation or urther evaluation, prior toproceeding with unding authorization.

FEASIBILITY STUDY  New Building Options

  LEED Certication

 

Temporary Accommodations

  New Oces

  Training Rooms

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 8/10

CONTACT Bill FergusonFormer Director o Buildings & Grounds518.848.4205

COST$6M

SCHEDULECompleted August 2006

SERVICESArchitectureEngineeringConstruction Management

GLOVERSVILLETRANSPORTATION FACILITYGLOVERSVILLE, NEW YORK

This is a new acility to house the Buildings and Grounds and Transportationdepartments. Prior to occupying this acility, the District leased a one-stall pole barnto perorm the vehicle maintenance and all buses were parked outdoors.

The building is constructed on a 110 acre undeveloped site. The water, sanitary, power,gas and communication utilities were brought in to this site. The site developmentincludes an access drive, paved area or bus circulation, sta parking, ueling station,salt storage area and storm water system with two retention ponds.

The 43,470 square oot building, consisting o a ground foor and partial second foor,encompasses a bus storage area, administrative oces, vehicle service area, drive-

thru vehicle wash bay and District storage. The building is constructed o concreteslab-on-grade, single-wythe load bearing masonry, steel roo trusses and EPDM roo system. The single wythe masonry system was chosen to keep the steel tonnage downdue to rising steel costs.

The bus storage area allows the District to store 14 buses indoors. The administrativearea has oces, a training room, locker rooms, break room or Buildings and Groundsand driver’s lounge or the Transportation department. The service area consists o 5 vehicle maintenance bays with 2 vehicle lits. Support spaces or the service areainclude a parts storage room, bulk liquid storage room and compressor room. Thesecond foor o the acility includes 7,000 square eet o District central storage andmechanical equipment rooms.

TRANSPORTATION FACILITY

 

Site Development  Bus Storage Area

 

Vehicle Service Area  Administrative Oces

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 9/10

CONTACTTom Mele, AssistantSuperintendent518.583.4700

COST$8.6M

SCHEDULECompleted March 2004

SERVICESArchitectureEngineering

SARATOGA TRANSPORTATION FACILITYSARATOGA SPRINGS, NEW YORK

This 40,000 square oot acility consolidates the district’s transportation departmentand acilities & operations department under one roo. Its construction has permittedthe district to abandon an antiquated inner-city bus garage / storage site.

Both departments share a common public entry that directs visitors to individualreception and oce areas. The acilities side includes oces or administrative andsupport sta, conerence space, records storage room, sign shop, key shop, andsupplies storage space served by a loading dock designed to accommodate largebulk shipments.

The transportation side includes oces or administrative support sta, the busdispatcher and radio operator, driver training and conerence rooms, drivers’ loungeand locker acilities, mechanics’ lounge and locker acilities, and extensive space or

bulk storage o records and vehicle maintenance supplies and parts, including a largeopen mezzanine over the mechanics’ and parts storage areas.

The maintenance garage provides 8 service bays that accommodate ull sized buses;our o these bays have lits. In addition, there is a bus paint preparation bay, buspainting booth, and an automated bus wash. At the northern end o the building arestorage bays or up to eight van-sized vehicles. The maintenance bays are heatedby an in-foor radiant system and are served by retractable service or maintenancefuids, compressed air, and exhaust.

The 15 acre site is in an industrial park. It provides paved parking or approximately150 automobiles and 100 buses (with block heaters), plus adequate space or thedistricts’ ueling acility and yard storage. Both the site and the building are designedto permit uture expansion.

TRANSPORTATION / FACILITIES AND OPERATION  Site Design

  Common Public Entrance

  Eight Service Bays

  Administrative Oces

7/27/2019 Fire Dept Project Sheets

http://slidepdf.com/reader/full/fire-dept-project-sheets 10/10

UNIVERSITY AT ALBANY –SERVICE BUILDING COMPLEX

The new Service Building A Annex and Mechanical Repair building serves as the

University’s headquarters or its ve-quad Ambulance Corp, campus maintenance

crews, and bus repair and operations acility. The Mechanical Repair building is

13,500 square eet, plus a 5,000 square oot exterior equipment storage shed.

Included are vehicle service bays, an oversized equipment/truck bay, a drive

through bus/equipment wash, a abrication and storage bay, welding and machine

shops and oce support and storage spaces. Each bay includes automated lits,

pull down compressed air, lubrication and power services and integral vehicle

exhaust systems. Other eatures include an adjustable 10,000 lb. inground lit, an

operating crane gantry, radiant heat slab and energy-recovery ventilation.

OFFICE AND MANAGEMENT CONSOLIDATION

With departments such as Oce o Campus Planning, Architecture/Engineering/ Construction Management, and Physical Plant & Facilities Services spread out over

the University at Albany’s campus, these departments will now be housed in a

single oce structure. The existing building was gutted and two foors o oces,

support spaces and work rooms were created to oster collaboration between all

departments, while also creating separate areas or each. A central staircase with

skylight eature ties the two foors together. Daylighting and open circulation routes

are key components o the oce layout.

AMBULANCE CORP / MECHANICAL REPAIR / BUS OPERATIONS COMPLEX

The project is on track to receiveLEED Gold-level Certiication

CONTACTUniversity at AlbanyDavid LaComb, RA/CEO518.442.3434

COSTEstimated $7.5M (on budget)

SCHEDULE January 2013

SERVICESArchitectureEngineeringInteriorsConstruction Site Representation