Old North Davis Neighborhood Association
Whats wrong with 5th Street
What we can do about it
And how it has worked in other communities
2-14-09 V 2.0
-
8/14/2019 Fifth Street Project
2/38
24 bicyclists and pedestrians have been hit by cars in under
4 years since the signal timing was changed at F and G.
We have a serious safety problem that affects all users of the street.10% of all the accidents in the entire City of Davis happenon the 5th Street corridor between A Street and L Street.
YEAR 2004 2005 2006 2007 2008 TOTAL
CITYWIDE (on street) 547 510 383 347 348 2,135
Injuries 256 233 238 228 233 1,188
Fatalities 1 1 0 1 1 4
Bicycle 75 64 55 56 86 336
Pedestrian 18 12 12 16 12 70
City Bike & Ped Total 93 76 67 72 98 406
5th ST CORRIDOR 79 40 35 35 30 219
Injuries 38 20 19 22 19 118
Bicycle 9 4 7 2 6 28
Injuries 9 3 6 2 6 26
Pedestrian 5 2 0 1 2 10
Injuries 5 2 0 1 2 10
5th Bike/Ped 14 6 7 3 8 38Injuries 14 5 6 3 8 36
-
8/14/2019 Fifth Street Project
3/38
Probabilityof death
Probability of Pedestrian Fatalityvs
Vehicle Speed Upon Impact
25 mph 35 mph
Risk offatality
Impact speed (KPH)
Survive
Die
-
8/14/2019 Fifth Street Project
4/38
QuickTime and adecompressor
are needed to see thi s picture.
Adopted General PlanPrimary Bicycle
Network Map
5th Street bike lanes
on the map, but
not on the street!
-
8/14/2019 Fifth Street Project
5/38
Quic kT im e and ade comp ressor
are needed to see this picture.
Two-lane truckroutes in Davis.
Adopted General PlanTruck Route Map
-
8/14/2019 Fifth Street Project
6/38
Other Arterial Streets in Davis with a Similar DesignCarrying Ten Thousand Vehicles a Day (ADT) or More
--One through lane in each direction--Center left turn lanes or left turn pockets at intersections--Bike lanes on both sides--(Some with and some without curbside parking)
5th Street15,400 ADT4,000 ft long
35 crashes in 2007
B Street15,100 ADT2,000 ft long
7 crashesIn 2007
Anderson Rd11,000 ADT3,500 ft long
11 crashesIn 2007
Cowell Blvd
16,100 ADT--2,800 ft long3 crashes in 2007
Pole Line Rd12,000 ADT--3,400 ft long
10 crashes in 2007,8 of them at 5th Street
-
8/14/2019 Fifth Street Project
7/38
The Solution?Get the turning cars out of the stream of traffic. This is done by eliminating one lane in eachdirection, and creating a median with room for left turn pockets. Bike lanes can fill the edgesof the street. Initially this can be done by simply repainting the street. It all fits between the
existing curbs. A second phase could introduce raised and landscaped medians, whichwould extend to the crosswalks to improve pedestrian safety.
No ramp from sidewalk into the crosswalkNo painted crosswalk for blocksNo respect from driversAfter waiting several minutes, she pushed
the stroller 600 feet to a signal
How the street could beimproved, just with paint
-
8/14/2019 Fifth Street Project
8/38
4-lane street, the car waiting to
turn left is hit from the rear
X
Three crash types can be reduced by going from4 lanes to 3 lanes: The first rear end collisions
3-lane street, the car waiting to
turn left is safe in the turn lane
-
8/14/2019 Fifth Street Project
9/38
Aftermath of rear-end collisions on 5th Street
-
8/14/2019 Fifth Street Project
10/38
-
8/14/2019 Fifth Street Project
11/38
Aftermath of a lane change collision between C and D Streets
-
8/14/2019 Fifth Street Project
12/38
X
Three crash types can be reduced by going from4 to 3 lanes: Third left turn & crossing broadsides
4-lane street, the stopped red carblocks the view of the yellow car
3-lane street, turning cars face eachother and oncoming cars are visible
-
8/14/2019 Fifth Street Project
13/38
Turn and crossing accidents at 5th and E Streets
-
8/14/2019 Fifth Street Project
14/38
The aftermath of an unsafe crossing at 5th and J StreetThis was the second wreck on 5th Street in an hour
-
8/14/2019 Fifth Street Project
15/38
Sample 4 lane to 3 lane reductions in Seattle(Six out of two dozen conversions to date)
Note that the converted streets carry more traffic
Roadway Date ADT ADT Collision
Location Change Before After Reduction
Greenwood Ave N
N 80th St to N 50th
N 45th Street
Wallingford Area
8th Ave NW
Ballard Area
Martin Luther King Jr W
North of I 90
Dexter Ave N
Queen Ann Area
24th Ave NW
NW 85th to NW 65thOct-95 9727 9754
14 to 10
28%
Jun-91 13606 1494919 to 16
59%
Jan-94 12336 13161
15 to 6
60%
Jan-94 10549 1185818 to 7
61%
Dec-72 19421 2027445 to 23
49%
Apr-95 11872 1242724 to 10
58%
16%
-
8/14/2019 Fifth Street Project
16/38
Prev ious ly 4 lane Cal i forn ia St reet in
Mounta in V iew, a f te r a lane reduc t ion
-
8/14/2019 Fifth Street Project
17/38
La Jo l la Boulevard, in t he B i rd RockComm uni ty o f the C i ty o f San Diego
--ADT w as 23,000 w hen c onver t ed
78Feet
Before
After
14feet
Pedes t r i an c ross ing
-
8/14/2019 Fifth Street Project
18/38
Widened s idew alk s and safer c ross ings are
popula r w i th shop ow ners , cyc l i s ts . ..
-
8/14/2019 Fifth Street Project
19/38
. ....pedest r ians, res id ent s and v is i t ors
-
8/14/2019 Fifth Street Project
20/38
Aggressive Speeding on Edgewater Drive, Orlando FloridaBefore and After Conversion from 4 Lanes to 3 Lanes
Aggressive speeding dropped in all sections of the corridor
-
8/14/2019 Fifth Street Project
21/38
34% Reduction146 per yr
87 per yr
Edgewater Dr, Orlando, FL
Reduction in vehicle accidents
Crash Rate declined by 34 percent
-
8/14/2019 Fifth Street Project
22/38
68% Reduction
1 injury every
9 days
1 injury every30 days
Injury Rate per Million Vehicle Miles on Edgewater Drive
Reduced speeds produced a huge injury rate decline
-
8/14/2019 Fifth Street Project
23/38
23% Increase
Edgewater Drive: Change in Pedestrian Count
-
8/14/2019 Fifth Street Project
24/38
30% Increase
Edgewater Drive: Impact of Lane Reduction
Increase in Bicycle Traffic
-
8/14/2019 Fifth Street Project
25/38
Avoid Spillover Traffic in Neighborhoods YES
Reduce Speeding on Edgewater Dr YES
Increase Bicyclist Volumes YES
Increase Pedestrian Volumes YES
Reduce Crashes YES
Increase On-Street Parking Use Rates YES
Increase Pedestrian Satisfaction (Residents) YES
Increase Pedestrian Satisfaction (Merchants) NO
Edgewater Drive, Orlando, FL
Before/After Studies: Evaluation Matrix
The following lane reduction case studies
-
8/14/2019 Fifth Street Project
26/38
The following lane reduction case studiesshown here with permission are from the
-
8/14/2019 Fifth Street Project
27/38
-
8/14/2019 Fifth Street Project
28/38
-
8/14/2019 Fifth Street Project
29/38
-
8/14/2019 Fifth Street Project
30/38
-
8/14/2019 Fifth Street Project
31/38
-
8/14/2019 Fifth Street Project
32/38
-
8/14/2019 Fifth Street Project
33/38
-
8/14/2019 Fifth Street Project
34/38
-
8/14/2019 Fifth Street Project
35/38
-
8/14/2019 Fifth Street Project
36/38
Preliminary, partial list of 4 lane to 3 lane conversions in the U.S.
COM M UN I TY ST A TE ST R EET A DT A FTER
Seattle WA California Avenue
N 45th Street 19,400 22,800
Eastlake Avenue E 15,600 15,000
Delridge Way 18,600 14,700
Dexter Avenue N 13,600 15,000W Gov't Way/Gilman Ave W 12,900 14,300
8th Avenue NW 10,500 12,300
Martin Luther King Jr Way 12,300 13,300
Madison Street 17,000 17,800
California Ave Extension 15,500 14,500
24th Avenue NW 9,700 9,800
12th Avenue 11,800 12,100
Greenwood Avenue 11,900 12,400
Alaskan Wy SE/Marginal Wy 10,200 10,900
Beacon Avenue S 11,300 10,600
E Pike Street 13,000
Kirkland WA Lake Washington Boulevard 20,000
King County WA Rainier Avenue South
University Place WA Bridgeport Way
Vancouver WA 4th Plain Avenue 17,000
Baker City OR Campbell Street 10-11,000
Portland OR Tacoma Street 30,000+
7th Avenue
NE GlisanSalem OR Front Street/Hwy 22 35,000 (6to4)
San Francisco CA Valencia Street 22,000
Polk Street
Oakland CA High Street 22-24,000
Emeryville CA 40th St/Shellmound Bridge
Berkeley CA Marin Avenue
Mountain View CA California Street
El Cajon CA East Main Street
San Diego CA La Jolla Blvd (Bird Rock) 23,000
Woodland CA Main Street
-
8/14/2019 Fifth Street Project
37/38
-
8/14/2019 Fifth Street Project
38/38
Old North Davis Neighborhood Associationwww.oldnorthdavis.net
Presentation by Steve Tracy -- email [email protected]