Falar 2 and 3
Transcript of Falar 2 and 3
-
8/9/2019 Falar 2 and 3
1/41
ENGR. MARIANO V JOSEPHChief, Fire Safety Enforcement Division
BFP-National Headquarters
FALAR 2
Fire and Life-safety AssessmentReport Part 2
-
8/9/2019 Falar 2 and 3
2/41
DOCUMENTATION SUBMITTED BY THE CONTRACTOR AND
THE CONSTRUCTION MANAGER CERTIFYING THAT THE
CONSTRUCTION WAS IN ACCORDANCE WITH THE FALAR 1
AND AUTHORIZED CHANGES.
-
8/9/2019 Falar 2 and 3
3/41
What We’d Like to see In FALAR
Submission ?
This is a compilation report of all approved submittals, test and acceptance forms of all fire protection and life safety features and shall
form part of the as-built documents turned over by the contractor to the building owner.
-
8/9/2019 Falar 2 and 3
4/41
A. Short Description of Project
B. Objectives of the Report
C. Enforcing Authorities
D. Standards used for Authorized Changes
-
8/9/2019 Falar 2 and 3
5/41
1. Building classification and construction - a statement saying there is no deviation from FALAR 1.
2. Hazards of content and combustible loadings - description of authorized changes from FALAR 1. If none, a statement saying none.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
6/41
3. Occupant characterization- description of any changes from FALAR 1. If none, a statement saying none.
4. Structural requirements and separation of building spaces and description of authorized changes from FALAR 1.
a. Calculations ( for changes and variances)
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
7/41
5. Exit and Egress
a. Description of authorized major changes to FALAR 1.
b. Egress calculation for variances from coderequirements.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
8/41
6. Fire Suppression Systems
a. Description of authorized major changes to FALAR 1.
b. Calculations for major changes (maybe included inappendices)
c. Testing, commissioning and acceptance data includingfire and jockey pumps.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
9/41
7. Fire detection, alarm, communication and evacuation systems
a. Description of authorized major changes.
b. Calculation for major changes.
c. Testing, commissioning and acceptance data of thefire alarm and detection system.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
10/41
8. Smoke Control Management
a. Description of Authorized Changes
b. Calculation for major changes
c. Testing, commissioning and acceptance data forsmoke exhaust and pressurization blowers
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
11/41
9. Emergency Power Supply
a. Description of authorized changes
b. Calculation for major changes
c. Testing, commissioning and acceptance data
of the generator set.
.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
12/41
10. Other issues including testing and commissioning of the elevator recall system.
E. Fire Protection and Life Safety Issues
-
8/9/2019 Falar 2 and 3
13/41
THANK YOU
-
8/9/2019 Falar 2 and 3
14/41
ENGR. MARIANO V JOSEPHChief, Fire Safety Enforcement Division
BFP-National Headquarters
FALAR 3
Fire and Life-safety AssessmentReport Part 3
-
8/9/2019 Falar 2 and 3
15/41
WHAT WE”D LIKE TO SEE IN FALAR 3
SUBMISSIONS
This is a compilation of the maintenance and testing records kept by the buildings engineering
maintenance departments.
-
8/9/2019 Falar 2 and 3
16/41
MAINTENANCE AND TESTING
-System or any other features required for
compliance.
-Any non-required system
-Existing life safety features
-Equipment requiring periodic testing oroperation
-Maintenance and Testing shall be undersupervision of a responsible person
-
8/9/2019 Falar 2 and 3
17/41
OBJECTIVES OF FALAR 3
To document maintenance and testing done on thebuilding’s fire protection and life safety systems
mandated by RA 9514 (Fire Code of the Philippinesof 2008)
-
8/9/2019 Falar 2 and 3
18/41
BUILDING’S DESCRIPTION
Location
Building height
Building gross floor area
Owners and Administration
Tenant’s Classification
-
8/9/2019 Falar 2 and 3
19/41
ENFORCEMENT
National
Building Code
⁃City/Municipal Building Official
⁃ City/ Municipal Engineer
Fire Code of the Philippines of 2008
⁃ City/Municipal Fire Marshal
⁃ District Fire Marshal
-
8/9/2019 Falar 2 and 3
20/41
STANDARD USED
International Standards
ASME American Society of Mechanical Engineers
ASTM American Standard of Testing of Materials
ISOInternational Standard Organization
NFPA National Fire Protection Association
ANSI American National Standard Institute
-
8/9/2019 Falar 2 and 3
21/41
STANDARD USED
Local Standards
⁃PEC
⁃PSME
⁃PS
Propriety Standards
⁃In -house standards
-
8/9/2019 Falar 2 and 3
22/41
DISCUSSIONS ON ISSUES
BUILDING CLASSIFICATION AND
CONSTRUCTION
Class
Combustible
Non-combustible
Limited Combustible
-
8/9/2019 Falar 2 and 3
23/41
DISCUSSIONS ON ISSUES
BUILDING CLASSIFICATION AND
CONSTRUCTION
Class
Fire Resistive
1 hr 3hr
2hr 4hr
-
8/9/2019 Falar 2 and 3
24/41
BUILDING CLASSIFICATION AND
CONSTRUCTION
Construction
Walls
Structural members
Floors
Roof
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
25/41
DISCUSSIONS ON ISSUES
HAZARDS
Hazardous Content
⁃Fuel oil storage
⁃LPG storage
Combustible Liquids
Transformer
Laboratories
⁃ Plastic
⁃ Others
-
8/9/2019 Falar 2 and 3
26/41
HAZARDS
Combustible Loads
⁃Plastic
⁃Furniture
Furnishing ⁃ Interior finishes
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
27/41
OCCUPANCY CLASSIFICATION
Number of Occupants
Occupant Mobility
⁃Assisted evacuation
⁃Un -assisted evacuation
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
28/41
OCCUPANCY CLASSIFICATION
Main use
⁃Assembly ⁃Mercantile
⁃Residential ⁃ Others
⁃Business
Mixed-use
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
29/41
FIRE SEPARATION
Construction
Walls
Structural members
Floors
Roof
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
30/41
EXIT AND EGRESS
No. of active exits
Rated doors
Non-rated doors
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
31/41
EXIT AND EGRESS
Maintenance Records
Doors
Door closers
Stairways
Exit signs
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
32/41
EXIT AND EGRESS
Attach photograph
Statement if maintenance is or not
Attach copy of maintenance records
Door closers
Panic hardware
Removal of obstructions to egress path
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
33/41
FIRE SUPPRESSION
DISCUSSIONS ON ISSUES
a. Maintenance and testing records done on firepumps, sprinkler system, portableextinguishers, standpipes and other firesuppression systems.
b. Submit results of annual fire pump flow tests,annual main drain tests, and water flow testsfor standpipe, submit other test results asappropriate.
-
8/9/2019 Falar 2 and 3
34/41
FIRE DETECTON ALARM COMMUNICATION
AND EVACUATION SYSTEM
DISCUSSIONS ON ISSUES
Testing and maintenance records done on thecomponents of the detection and alarm system
including the fire alarm control panel.
-
8/9/2019 Falar 2 and 3
35/41
SMOKE CONTROL MANAGEMENT
DISCUSSIONS ON ISSUES
Maintenance and testing records of the variouscomponent of the smoke management system.
Include test records for pressurization fans forflows and fan controls.
-
8/9/2019 Falar 2 and 3
36/41
EMERGENCY POWER SUPPLY
DISCUSSIONS ON ISSUES
Maintenance and testing records of the systemcomponents of the emergency power supply.
-
8/9/2019 Falar 2 and 3
37/41
BUREAU OF FIRE PROTECTION ACCESS
DISCUSSIONS ON ISSUES
Description and location of street hydrants andnearest BFP station.
-
8/9/2019 Falar 2 and 3
38/41
FIRE SAFETY PROGRAM
Fire Safety Maintenance
Fire Safety Manual (FSM)FSM shall be provided to provide clear and concise procedures to the building administrator and staff so that they can maintain a high standard of fire safety in
the building. :
DISCUSSIONS ON ISSUES
-
8/9/2019 Falar 2 and 3
39/41
• Fire Safety Manual (FSM) includes the following:
• Management Organization
Emergency and Contingency Plan
Periodic Fire Fighting and Evacuation DrillPlanned Maintenance Procedures for Fire ProtectionSystems
Staff Training
Housekeeping Practices
DISCUSSIONS ON ISSUES
FIRE SAFETY PROGRAM
-
8/9/2019 Falar 2 and 3
40/41
OTHERS
DISCUSSIONS ON ISSUES
Other Issues not discussed above including elevator recall and use of elevators for
evacuation
-
8/9/2019 Falar 2 and 3
41/41
THANK YOU