    ENGR. MARIANO V JOSEPHChief, Fire Safety Enforcement Division

    BFP-National Headquarters

    FALAR 2

    Fire and Life-safety AssessmentReport Part 2

  • 8/9/2019 Falar 2 and 3

    2/41

    DOCUMENTATION SUBMITTED BY THE CONTRACTOR AND

    THE CONSTRUCTION MANAGER CERTIFYING THAT THE

    CONSTRUCTION WAS IN ACCORDANCE WITH THE FALAR 1

    AND AUTHORIZED CHANGES.

  • 8/9/2019 Falar 2 and 3

    3/41

    What We’d Like to see In FALAR

    Submission ?

    This is a compilation report of all approved submittals, test and acceptance forms of all fire protection and life safety features and shall  

    form part of the as-built documents turned over by the contractor to the building owner.

  • 8/9/2019 Falar 2 and 3

    4/41

    A. Short Description of Project

    B. Objectives of the Report

    C. Enforcing Authorities

    D. Standards used for Authorized Changes

  • 8/9/2019 Falar 2 and 3

    5/41

    1. Building classification and construction - a statement saying there is no deviation from FALAR 1.

    2. Hazards of content and combustible loadings -  description of authorized changes from FALAR 1. If none, a statement saying none.

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    6/41

    3. Occupant characterization- description of any changes from FALAR 1. If none, a statement saying none.

    4. Structural requirements and separation of building  spaces and description of authorized changes from FALAR 1.

    a. Calculations ( for changes and variances)

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    7/41

    5. Exit and Egress 

    a. Description of authorized major changes to FALAR 1.

    b. Egress calculation for variances from coderequirements.

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    8/41

    6. Fire Suppression Systems 

    a. Description of authorized major changes to FALAR 1.

    b. Calculations for major changes (maybe included inappendices)

    c. Testing, commissioning and acceptance data includingfire and jockey pumps.

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    9/41

    7. Fire detection, alarm, communication and evacuation systems 

    a. Description of authorized major changes.

    b. Calculation for major changes.

    c. Testing, commissioning and acceptance data of thefire alarm and detection system.

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    10/41

    8. Smoke Control Management 

    a. Description of Authorized Changes

    b. Calculation for major changes

    c. Testing, commissioning and acceptance data forsmoke exhaust and pressurization blowers

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    11/41

    9. Emergency Power Supply 

    a. Description of authorized changes

    b. Calculation for major changes

    c. Testing, commissioning and acceptance data

    of the generator set.

    .

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    12/41

    10. Other issues including testing and commissioning of the elevator recall system.

    E. Fire Protection and Life Safety Issues

  • 8/9/2019 Falar 2 and 3

    13/41

    THANK YOU

  • 8/9/2019 Falar 2 and 3

    14/41

    ENGR. MARIANO V JOSEPHChief, Fire Safety Enforcement Division

    BFP-National Headquarters

    FALAR 3

    Fire and Life-safety AssessmentReport Part 3

  • 8/9/2019 Falar 2 and 3

    15/41

    WHAT WE”D LIKE TO SEE IN FALAR 3

    SUBMISSIONS

    This is a compilation of the maintenance and  testing records kept by the buildings engineering 

    maintenance departments.

  • 8/9/2019 Falar 2 and 3

    16/41

    MAINTENANCE AND TESTING

    -System or any other features required for

    compliance.

    -Any non-required system 

    -Existing life safety features 

    -Equipment requiring periodic testing oroperation 

    -Maintenance and Testing shall be undersupervision of a responsible person 

  • 8/9/2019 Falar 2 and 3

    17/41

    OBJECTIVES OF FALAR 3

    To document maintenance and testing done on thebuilding’s fire protection and life safety systems

    mandated by RA 9514 (Fire Code of the Philippinesof 2008) 

  • 8/9/2019 Falar 2 and 3

    18/41

    BUILDING’S DESCRIPTION

    Location 

    Building height 

    Building gross floor area 

    Owners and Administration 

    Tenant’s Classification 

  • 8/9/2019 Falar 2 and 3

    19/41

    ENFORCEMENT

    National

    Building Code

    ⁃City/Municipal Building Official 

    ⁃ City/ Municipal Engineer 

    Fire Code of the Philippines of 2008

    ⁃ City/Municipal Fire Marshal 

    ⁃ District Fire Marshal 

  • 8/9/2019 Falar 2 and 3

    20/41

    STANDARD USED

    International Standards

    ASME American Society of Mechanical Engineers

    ASTM American Standard of Testing of Materials

    ISOInternational Standard Organization

    NFPA National Fire Protection Association

    ANSI American National Standard Institute

  • 8/9/2019 Falar 2 and 3

    21/41

    STANDARD USED

    Local Standards

    ⁃PEC 

    ⁃PSME 

    ⁃PS 

    Propriety Standards

    ⁃In -house standards 

  • 8/9/2019 Falar 2 and 3

    22/41

    DISCUSSIONS ON ISSUES

    BUILDING CLASSIFICATION AND

    CONSTRUCTION

    Class

    Combustible

    Non-combustible

    Limited Combustible

  • 8/9/2019 Falar 2 and 3

    23/41

    DISCUSSIONS ON ISSUES

    BUILDING CLASSIFICATION AND

    CONSTRUCTION

    Class

    Fire Resistive

    1 hr 3hr 

    2hr 4hr 

  • 8/9/2019 Falar 2 and 3

    24/41

    BUILDING CLASSIFICATION AND

    CONSTRUCTION

    Construction

    Walls

    Structural members

    Floors

    Roof

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    25/41

    DISCUSSIONS ON ISSUES

    HAZARDS

    Hazardous Content

    ⁃Fuel oil storage 

    ⁃LPG storage 

     Combustible Liquids 

    Transformer 

    Laboratories 

    ⁃ Plastic 

    ⁃ Others

  • 8/9/2019 Falar 2 and 3

    26/41

    HAZARDS

    Combustible Loads

    ⁃Plastic 

    ⁃Furniture 

     

    Furnishing ⁃ Interior finishes 

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    27/41

    OCCUPANCY CLASSIFICATION

    Number of Occupants

    Occupant Mobility

    ⁃Assisted evacuation 

    ⁃Un -assisted evacuation 

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    28/41

    OCCUPANCY CLASSIFICATION

    Main use

    ⁃Assembly  ⁃Mercantile 

    ⁃Residential ⁃ Others 

    ⁃Business 

    Mixed-use

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    29/41

    FIRE SEPARATION

    Construction

    Walls

    Structural members

    Floors

    Roof

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    30/41

    EXIT AND EGRESS

    No. of active exits

    Rated doors

    Non-rated doors

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    31/41

    EXIT AND EGRESS

    Maintenance Records

    Doors 

    Door closers 

    Stairways 

    Exit signs

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    32/41

    EXIT AND EGRESS

    Attach photograph

    Statement if maintenance is or not

    Attach copy of maintenance records

    Door closers 

    Panic hardware

    Removal of obstructions to egress path 

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    33/41

    FIRE SUPPRESSION

    DISCUSSIONS ON ISSUES

    a. Maintenance and testing records done on firepumps, sprinkler system, portableextinguishers, standpipes and other firesuppression systems.

    b. Submit results of annual fire pump flow tests,annual main drain tests, and water flow testsfor standpipe, submit other test results asappropriate.

  • 8/9/2019 Falar 2 and 3

    34/41

    FIRE DETECTON ALARM COMMUNICATION

    AND EVACUATION SYSTEM

    DISCUSSIONS ON ISSUES

    Testing and maintenance records done on thecomponents of the detection and alarm system

    including the fire alarm control panel.

  • 8/9/2019 Falar 2 and 3

    35/41

    SMOKE CONTROL MANAGEMENT

    DISCUSSIONS ON ISSUES

    Maintenance and testing records of the variouscomponent of the smoke management system.

    Include test records for pressurization fans forflows and fan controls.

  • 8/9/2019 Falar 2 and 3

    36/41

    EMERGENCY POWER SUPPLY

    DISCUSSIONS ON ISSUES

    Maintenance and testing records of the systemcomponents of the emergency power supply.

  • 8/9/2019 Falar 2 and 3

    37/41

    BUREAU OF FIRE PROTECTION ACCESS

    DISCUSSIONS ON ISSUES

    Description and location of street hydrants andnearest BFP station.

  • 8/9/2019 Falar 2 and 3

    38/41

    FIRE SAFETY PROGRAM

    Fire Safety Maintenance

    Fire Safety Manual (FSM)FSM shall be provided to provide clear and concise procedures to the building administrator and staff so that they can maintain a high standard of fire safety in 

    the building. : 

    DISCUSSIONS ON ISSUES

  • 8/9/2019 Falar 2 and 3

    39/41

    • Fire Safety Manual (FSM) includes the following:

    •   Management Organization

    Emergency and Contingency Plan

    Periodic Fire Fighting and Evacuation DrillPlanned Maintenance Procedures for Fire ProtectionSystems

    Staff Training

      Housekeeping Practices

    DISCUSSIONS ON ISSUES

    FIRE SAFETY PROGRAM

  • 8/9/2019 Falar 2 and 3

    40/41

    OTHERS

    DISCUSSIONS ON ISSUES

    Other Issues not discussed above including elevator recall and use of elevators for  

    evacuation 

  • 8/9/2019 Falar 2 and 3