Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project...
Transcript of Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project...
![Page 1: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/1.jpg)
Facilities Planning & Construction
September 13, 2018
![Page 2: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/2.jpg)
2
Facilities Planning & Construction
![Page 3: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/3.jpg)
3
Planning Overview
Planning at a Glance
• Space Management/Reporting
• University Architect
• In‐house Engineering Team
• Interior Design Team (FF&E)
• Project Planning
![Page 4: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/4.jpg)
Planning Overview
Space Management (UH Campus Only)
• Curator of current space allocations
• Curator of UH building floor plans
• THECB space reporting
• Developing “Campus Space Policies”
![Page 5: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/5.jpg)
Planning Overview
University Architect
• Master Planning
• Master Specs & Guidelines
• Design Reviews
• Campus Sustainability
![Page 6: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/6.jpg)
Planning Overview
Mechanical & Electrical Engineers
• Master Specs and Guidelines
• Design Reviews
• Site Inspections
• Trouble Shooting
• Optimization
![Page 7: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/7.jpg)
Planning Overview
Interior Design Services
• Design Reviews
• Finish Standards (Guidelines & Master Specs)
• Space Standards
• Furniture Selections & Procurement
![Page 8: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/8.jpg)
Planning Overview
Project Planning
![Page 9: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/9.jpg)
9
Planning Overview
SYSTEM
SYSTEM
SYSTEM
Work Request Arrival
![Page 10: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/10.jpg)
Work RequestFIXIT
“Triage”
Planning
General Maintenance
• Project Development for MPP & Capital Projects
MIC
• Scope Development• Budget • Construction
• Scope Development• Work Billed Hourly
Planning Overview
FPCPlanning
Project Assignment
![Page 11: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/11.jpg)
Planning Overview
Project Development• Planner Assigned
Scope
PM Assignment (collaboration)
Budget (estimator)
Funding Approval & Transfer of Funds
Turned over to the Project Management Team
![Page 12: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/12.jpg)
Project Management
Owner Representative for all Capital Projects• Procurement
Collaborative with Purchasing
• Design
Collaborative with Customer, other departments
(i.e. IT, Safety)
• Construction
Coordinated with Customer, other departments,
external agencies
![Page 13: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/13.jpg)
Project Management
Project Management Structure• <$1M –Minor Planned Projects Team
Design varies
JOC, CSP, In‐house
• >$1M – Project Management Team
Full design
CMAR, CSP
Sub Teams ‐ $1‐$10M; >$10M; component
campuses
![Page 14: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/14.jpg)
Future Project Overview
Future Projects • Core Projects
• Health 3
• Melcher Renovation
• Graduate College of Social Work
• Law Center
![Page 15: Facilities Planning & Construction · FIXIT “Triage” Planning General Maintenance • Project Development for MPP & Capital Projects MIC • Scope Development • Budget • Construction](https://reader034.fdocuments.us/reader034/viewer/2022042811/5fa7bb256148c75cd362da4d/html5/thumbnails/15.jpg)
Questions