Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

14
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015

Transcript of Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

Page 1: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

Fabrication Progress for LHC Superconducting Crab Cavities

July 10, 2015

Page 2: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

• Outer conductor halves– 4 halves etched, fixtured, and ready for weld

2

Double Quarter-Wave

Page 3: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

3

• “Top cake pans”– 2 etched, and ready for weld

Double Quarter-Wave

Page 4: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

4

Double Quarter-Wave

• “Bottom cake pans”– 2 etched, and ready for weld

Page 5: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

Double Quarter-Wave

5

• Cake pan assemblies: Ready for weld

Page 6: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

6

• “Bowls”– Complete– NbTi tuner

attachment welds completed

Double Quarter-Wave

Page 7: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

7

• Outer conductor halves– Gages being fabricated for profile measurements

RF Dipole

Page 8: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

8

• Bowls: 4 stamped, final machining today

RF Dipole

Page 9: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

9

• Stiffener: Niobium Stamped (machining in progress)

RF Dipole

Page 10: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

10

• End cap: Niobium stamping in progress

RF Dipole

Page 11: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

11

RF Dipole

• Small HOM Box Side Port– 2 in QA (4 halves)

Page 12: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

12

• FPC & HOM Box Port Halves• All niobium parts stamped, trimmed,

and QA’d.

RF Dipole

Page 13: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

13

• RFD Beamtube with pickup port tube• DQW Beamtube with

pickup port tube• Tubes have been welded • Trim to length still need

to be completed.

RFD & DQW Tubes

Page 14: Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

14

RFD & DQW Tubes

• 16 flange assemblies preparing for braze• 12 tube assemblies being

welded