Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.

download Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.

If you can't read please download the document

Transcript of Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.

  • Slide 1
  • Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015
  • Slide 2
  • Outer conductor halves 4 halves in QA 2 Double Quarter-Wave
  • Slide 3
  • 3 Top cake pans 2 in QA Double Quarter-Wave
  • Slide 4
  • 4 Bottom cake pans 2 in QA
  • Slide 5
  • Double Quarter-Wave 5 Cake pan assemblies
  • Slide 6
  • 6 Bowls Complete Ready for NbTi tuner attachment welds Double Quarter-Wave
  • Slide 7
  • 7 Cake pan & bowl stackup Double Quarter-Wave
  • Slide 8
  • 8 Outer conductor halves 4 in QA RF Dipole
  • Slide 9
  • 9 Small HOM Box Side Port 2 in QA (4 halves)
  • Slide 10
  • 10 End cap: Niobium stamping in progress RF Dipole
  • Slide 11
  • 11 FPC & HOM Box Port Halves Waiting for finalization of end cap prototype RF Dipolecopper prototypes
  • Slide 12
  • 12 Bowl: Machined copper for stackup RF Dipolecopper prototypes
  • Slide 13
  • 13 Stiffener: Machined for stackup RF Dipolecopper prototypes
  • Slide 14
  • 14 Bowl Stiffener Outer Conductor