![Page 1: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/1.jpg)
A Case Study: Evaluation of Flame Retardant Coatings for Aerospace Applications
John HarrisMaterial and Process Technology
Boeing Commercial Airplanes
![Page 2: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/2.jpg)
• Flammability• Cost• Aesthetics
• Mechanical• Weight• Processing
Materials being developed for aerospace applications must meet a large set of engineering requirements:
MATERIALS DEVELOPMENT IN AEROSPACE
Some requirements often work against others.
![Page 3: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/3.jpg)
What’s the problem ?Defining the best set of engineering
requirementsCommercially available materialsOptimal methods of characterization• Flammability / environmental / physical durability
Development schedule/Cost
OPTIMIZING MATERIALS FOR AEROSPACE APPLICATIONS
![Page 4: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/4.jpg)
Problem: In-Service Investigations• Flammability, contamination, aging
Flammability testing• Q-tip, Bunsen burner, radiant panel
Highly variable test results• Burn length/self-extinguishing time
Flammability properties impacted by aging and/or contamination ?
CASE STUDY: IN-SERVICE INSULATION BLANKETS
![Page 5: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/5.jpg)
SOLUTION STRATEGY
Spray-on flame retardant (FR) coating• Compatible with customer process
o Ease of useo Equipment compatible
• Suitable for complex surface• Low material cost• Weight neutral with remove & replace
Reconstitute material flame retardant properties
![Page 6: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/6.jpg)
PHASE I: EVALUATE COMMERCIAL FLAME RETARDANT COATINGS
Engineering Requirements for coating:Good adhesionFlammability requirements
Low smoke & toxic gas emissionRadiant panel test
Physically durable and flexibleConsistent mechanical / flammability properties with aging
Water resistant and non-absorbent over time
Non-conductive and non-corrosive
Minimal weight impact
Relative ease of application and cure
![Page 7: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/7.jpg)
INTUMESCENT COATINGS Constituents
Acid source, blowing agent, and carbon source
AdvantagesWeight and volume savingsCompetitive costsGood insulation against static heat sourceCommercially availableHazmat/Toxicity
DisadvantagesNon-durable intumescent foamNon-uniform coating thicknessEquipment/process requirements
![Page 8: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/8.jpg)
KEY TEST REQUIREMENT: RADIANT PANEL
≤ 3 sec After Burn
≤ 3 in Burn length
Video Deleted
![Page 9: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/9.jpg)
Commercial FR coating applied to in-service insulation blanket
CONSISTENT RADIANT PANEL RESULTS OBTAINED
![Page 10: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/10.jpg)
PHASE I SUMMARYProperty Requirements met:
Radiant panel & smoke emission requirementsWater soluble & non-toxicHVLP spray applicationNon-conductive & non-corrosiveMinimal weight impact
Property Requirements NOT met:Water resistant only after long cure (> 1 month)Loses some flexibility with agingElevated temperature cure
![Page 11: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/11.jpg)
PHASE II: USE 3 PART COATING SYSTEM TO COMPLETE PROPERTY REQUIREMENTS
Adhesion promoter• Latex-based, flame retarded adhesive
Active coating• Spray-on Intumescent
Barrier coating• Provides resistance to moisture and durability
Coverage/configuration control addressed by coloration
Barrier coating (solvent-based)Active coating (water-based)Adhesion promoter (water-based)
All 3 componentsapplied separatelywith HVLPspray gun or brush
Insulation blanket cover film
![Page 12: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/12.jpg)
After Burn 12 seconds Burn Length 11.6 inches
Barrier Coating EvaluationsTough meeting both water resistance and radiant panel
![Page 13: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/13.jpg)
ENCOURAGING RESULTS WITH ACRYLIC BARRIER
Quick drying, completely water resistant, & flexibleConsistent Q-tip and flaming block test results
![Page 14: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/14.jpg)
FR-COATED INSULATION BLANKETS: POST-FIRE
![Page 15: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/15.jpg)
3 PART FR COATING CRITICAL ISSUES Active coating: Elevated Temperature Cure is costly
New version FX-100 cures at room temperatureBarrier coating: Inconsistent radiant panel test results
![Page 16: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/16.jpg)
PHASE II SUMMARY
Acceptable coating propertiesWater resistanceDurabilityNon-conductive / non-corrosiveCost / weightSmoke density & toxicity
Unacceptable coating propertiesInconsistent radiant panel test resultsElevated temperature cureMultiple spray processes
![Page 17: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/17.jpg)
PHASE III TWO-PART FR COATING SYSTEM
Consistent customer pull for key coating properties• Easy / flexible application method• Short cure times / no elevated temperature cure• Haz Mat concerns: Low toxicity
Key Engineering requirements• Radiant panel, smoke density & toxicity requirements• Durable / flexible / low aging impact• Water resistant
Barrier coating: water or solvent basedActive coating: water-based
HVLPor Brush Application
Insulation blanket cover film
![Page 18: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/18.jpg)
Radiant Panel Testing Results: 2-Coat SystemSpray-on coating system: inconsistent radiant panel results
Video Deleted
![Page 19: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/19.jpg)
BARRIER COATING ISSUES
Water-Based formulations• Low toxicity• Meets radiant panel requirements• Questionable water resistance
Solvent-based formulations• Good water resistance• Flexible• Inconsistent radiant panel results
o Entrapped volatiles ?
![Page 20: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/20.jpg)
REFORMULATED BARRIER COATING Consistent Radiant Panel Results
Video Deleted
![Page 21: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/21.jpg)
COATING FLEXIBILITY EVALUATION
Twist / Flex Test Method
![Page 22: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/22.jpg)
10,000 cycles / 180o Testing Control
Both insulation blankets coated at the same time with 2 coat system
COATING FLEXIBILITY EVALUATION
![Page 23: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/23.jpg)
ACCELERATED AGING: 26,000 FREEZE-HEAT CYCLES
Sprayed daily with water
-50 F – 150 F
Thermal cycling study of FR coating (2 part)
![Page 24: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/24.jpg)
AGED COATINGS EXHIBITS CRACKING
26,500 heat-Freeze cycles
![Page 25: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/25.jpg)
Engineering requirements met:Ease of application, cure temp/timeNon-conductive, non-corrosive, water resistanceSmoke density & toxicity, radiant panelLow weight, cost
Engineering requirements NOT met:Cracking / chipping still an issue
• Twist and flex• Environmental aging
TWO PART FR COATING SUMMARY
![Page 26: FAA Fire Safety - A Case Study: Evaluation of Flame ...FR-COATED INSULATION BLANKETS: POST-FIRE 3 PART FR COATING CRITICAL ISSUES 4Active coating: Elevated Temperature Cure is costly](https://reader034.fdocuments.us/reader034/viewer/2022050601/5fa8d883d65da61b29674290/html5/thumbnails/26.jpg)
FUTURE DEVELOPMENTAL WORK
New formulations: • Barrier• Active
Further research with suppliersSingle application coating