Exhibit C- Project Assignment Page 1 of 4 EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR DESIGN/BUILD SERVICES/RFQ #17-Q-078-DR BY AND BETWEEN THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Phone: (321) 631-1911 Fax: (321) 633-4646 AND CANAVERAL CONSTRUCTION CO., INC. FOR THE CONSTRUCTION OF: SCHOOL: Plant Operations and Maintenance PROJECT: Fuel Tank Upgrade

Transcript of EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019...

Page 1: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

Exhibit C- Project Assignment Page 1 of 4

EXHIBIT C

GUARANTEED MAXIMUM PRICE

TO THE CONTINUING CONTRACT FOR

DESIGN/BUILD SERVICES/RFQ #17-Q-078-DR

BY AND BETWEEN

THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA

2700 Judge Fran Jamieson Way

Viera, Florida 32940-6601

Phone: (321) 631-1911

Fax: (321) 633-4646

AND

CANAVERAL CONSTRUCTION CO., INC.

FOR THE CONSTRUCTION OF:

SCHOOL: Plant Operations and Maintenance

PROJECT: Fuel Tank Upgrade

Page 2: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

Exhibit C- Project Assignment Page 2 of 4

ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP)

1.1.1 Guaranteed Maximum Price (GMP): Design Builder guarantees that it shall not exceed a Guaranteed Maximum Price (GMP) of Three Hundred Ninety-Six Thousand, Five Hundred Fifty-One Dollars ($396,551.00) for the identified Sub-Project. 1.2 Basis of the GMP: 1.2.1 Construction Documents: The Scope of Work for the GMP shall be as defined in the

Construction Documents, prepared by Stillwater Technologies, titled Plant Operations-Petroleum Storage and Distribution System Upgrade Plans and dated February 12, 2019.

1.2.2 List of Contract Documents attached as Exhibit C-1. 1.2.3 Exceptions, Clarifications and Exclusions: The Scope of Work defined in the Contract

Documents shall be modified and/or clarified as shown in attached Exhibit C-2. 1.2.4 Truth-In-Negotiation: The Design Builder certifies that the wage rates and other factual

unit costs supporting the compensation are accurate, complete and current at the time of execution of each Sub-Project of which this certificate is a part. The original price and any additions thereto shall be adjusted to exclude any significant sums by which the Owner determines the Sub-Project amount was increased due to inaccurate, incomplete or non-current wage rates and other factual unit costs and that such original Sub-Project adjustments shall be made within one year following the end of the Agreement.

ARTICLE 2. PROJECT TIME 2.1 Substantial Completion Date: Substantial Completion of the Work as defined in Article 6.1.2 of the

General Conditions to the Continuing Contract for Design Build Services shall be achieved by October 23, 2019.

2.2 Final Completion Date: Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Design Build Services shall be achieved by December 22, 2019.

2.3 Project Schedule: Attached to this Amendment will be a schedule identifying the above noted completion times and intermediate milestone dates estimated for the Project. The proposed schedule shall be integrated into the Design Builder's CPM Schedule upon approval of its Guaranteed Maximum Price Amendment.

ARTICLE 3. DESIGN BUILD FEE 3.1 Design Build Fee: The Design Builder Fee for the Project shall be either a ☒Lump Sum or ☐Not-

To-Exceed Fee (Check Correct Type – Reference Sub-Project Work Request (Exhibit B) which identifies the Fee type) of Thirty-Nine Thousand, Eight Hundred Twenty-Three Dollars ($39,823.00).

Page 3: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

Exhibit C- Project Assignment Page 3 of 4

ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS 4.1 General Conditions: General Conditions costs for the Project shall not exceed Sixty-Two Thousand,

Four Hundred Twenty-Seven Dollars ($62,427.00). General Conditions costs shall be reimbursed at Design Builder's negotiated lump sum for Projects with a GMP under $1,000,000. General Condition costs shall be in compliance with the General Conditions to the Design Build Contract (Exhibit A) and are identified in the attached document, prepared by the Design Builder titled POM Fuel Tank Upgrade and dated March 8, 2019.

ARTICLE 5. LIQUIDATED DAMAGES 5.1 Substantial Completion: Design Buildershall pay Owner One Thousand Dollars ($500.00) as

liquidated damages for each day that Substantial Completion extends beyond the Substantial Completion Date.

5.2 Final Completion: Design Buildershall pay Owner Five Hundred Dollars ($250.00) as liquidated damages for each day that Final Completion extends beyond the Final Completion Date.

ARTICLE 6. PROJECT REPRESENTATIVES 6.1 Owner’s Representative: Owner designates the individual listed below as its Owner’s

Representative to provide direct interface with Design Builder with respect to Owner’s responsibilities:

David Martin, Owner’s Project Manager. 6.2 Design Builder's Representative: Design Builderdesignates the individual listed below as its Design

Builder's Representative to provide direct interface with Owner with respect to Design Builder's responsibilities:

Mike Harkcom, Design Builder's Project Manager.

(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)

Page 4: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 5: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

______________________________________________________________________________ Canaveral Construction Co., Inc. •PO Box 799, 3475 N. US Highway 1, Mims, FL 32754

Phone: 321-269-4011 • Fax: 321-269-5905 • www.canaveralconstruction.com

Drawings List

Plant Operations – Petroleum Storage and Distribution System Upgrade Plans Prepared by Stillwater Technologies – February 12, 2019

1. GO1 – Cover Sheet2. PE01 – Overall Site and Work Area Plan3. PE02 – Demolition Plan4. PE03 – New Petroleum System Installation Plan5. PE04 – Dimension Plan, Elevation Plan and Equipment Plan6. PE05 – Petroleum System Installation Details7. PE06 - Petroleum System Wind Load and Additional Details8. E01 - Electrical Conduit and Layout9. E02 – Electrical Details

EXHIBIT C1

Page 6: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

EXCEPTIONS, CLARIFICATIONS AND EXCLUSIONS TO CONTRACT DOCUMENTS.

1) We have not included the cost of new fuel.2) There is no asbestos or hazardous material contemplated on the project, therefore no costs have

been included for removal.3) We have not included costs required for code issues not identified in the contract documents.4) Temporary power and water is provided by SBBC.5) Fee will be included in all Contingency Use Requests.6) The cost of staff identified in the General Conditions not stationed on site but working on the

project exclusively shall be reimbursed by the SBBC.7) We have not included code required upgrades to existing installations, equipment and systems

beyond allowances mentioned above.8) All Material testing to be done by Owner.9) Any work not listed above or on the GMP spreadsheet.

EXHIBIT C2

Page 7: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 8: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

CANAVERAL CONSTRUCTION COMPANY, INC Start 04/01/19 Duration: Days: 70

Finish 06/10/19 Weeks: 10

BID SPREADSHEET Addendum: Months: 3.00

DESCRIPTIONBASE BID

TOTALDIV 1 GENERAL CONDITIONS

Duration Unit Unit Rate Labor Material Equipment OtherPROJECT EXECUTIVE 10 hrs 82.26 823SUPERINTENDENT 10 week 2,362.40 23,624PROJECT MANAGEMENT (1/4 time) 10 week 911.70 9,117PROJECT ENGINEER 2 week 1,379.20 2,758PROJECT ACCOUNTANT 40 hrs 64.74 2,590LOCATES 1 lpsm 2,000.00 2,000AS-BUILT DOCUMENTS / CLOSEOUTS / FINAL SURVEY 1 lpsm 2,500.00 2,500DOCUMENT REPRODUCTION 1 lpsm 250.00 250PHONES 3.0 month 79.85 240SUPERINTENDENT VEHICLE (full time) 3.0 month 847.00 2,541PROJECT MANAGEMENT VEHICLE (1/4 time) 3.0 month 211.75 635MISC SUPPLIES 3.0 month 100.00 300RAKEN DAILY LOG SERVICE 3.0 month 50.00 150TESTING (BY OWNER)

38,912 250 3,176 5,190 47,527$

DIV 1 GENERAL REQUIREMENTS Duration Unit Unit Rate Labor Material Equipment Other

BUILDERS RISK INSURANCE 1 lpsm see below see belowPERMIT ALLOWANCE 1 lpsm

CPM SCHEDULE 3 month 100 300PROJECT SIGN lpsm 1,200 0JOB SITE PHOTOS month 110 0TEMP FENCING lnft 3.00 0JOB TRAILER / SET UP (OTHER) month 400 0JOB TRAILER RAMP/STAIRS lpsm 550 0PORTOLETS 3 month 120 360CONNEX BOX (1 each) 3 month 110 330DUMPSTER PULLS/TRAILER 3 pulls 500 1,500SMALL TOOLS 3 month 100 300SITE SAFETY / PPE / FIRST AID SUPPLIES 3 month 100 300TEMP ELECTRICITY (by owner) month 300FINAL ELECTRICITY (by owner) month 300DAILY CLEAN UP 24 hrs 40.00 960FINAL CLEAN 1 lpsm 1,000 1,000DESIGN TEAM - CONTRACT ADMINISTRATION (STILLWATER) 1 lpsm 1,690

2,260 600 1,830 2,050 6,740$

DIV # DESCRIPTION QUAN UNIT CCCI SUBS SUBS SUBS SUBS SUBS SUBS SUBS SUBS SUBS

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 2A SITEWORK Quan Unit 0 -$

POM Fuel CompoundRockledge, FL

Takeoffs

TRADE PRICING

3/8/2019 Spreadsheet Template

Page 9: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

Sub-Total 0 0 0 0 0Stockpile Unused Subgrade Material on Site INC INC No Bid No BidAsphalt Milling Transitions (Material Provided by Owner) INC INC

CCCIDIV 2B FENCING Quan Unit 2,000 0 0 2,000$

Sub-Total 2,000 0 0 06 Galvanized Chain Link Fence w/ Gate (6'x6') 1 lpsm 2,000

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 3A CONCRETE Quan Unit -$ Sub-Total 0 0 0 0Concrete Sub - Complete 1 lpsm INC INC No Bid No BidConcrete Fueling Drive Slab INC INCConcrete Service Slab INC INCTank Saddle Foundations INC INCTransition Slab INC INCPipe Bollard Install / Concrete 32 each INC INC

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 5A STRUCTURAL STEEL Quan Unit -$ Sub-Total 0 0 0 0Pipe Bollards (6" sch 40) 32 each INC INC No Bid No Bid

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 7A JOINT SEALERS / WATERPROOFING Quan Unit 1,500 0 1,500$ Sub-Total 1,500 0 0 0Caulking @ Concrete Joints 1,500

CCCI AllowanceRC Development Guardian ABA-Con Fuel Tech

DIV 9A PAINTING Quan Unit 3,000 3,000$ Sub total 3,000 0 0 0 0Paint Bollards INC INC No Bid No BidMisc Steel 1 lpsm 3,000 NIC NIC

Takeoffs

Takeoffs

Takeoffs

Takeoffs

Takeoffs

3/8/2019 Spreadsheet Template

Page 10: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 10A FUELING TANKS and EQUIPMENT Quan Unit 1,000 267,215 0 0 268,215$ Sub-Total 1,000 267,215 283,746 0 0New Fuel System Complete 267,215 283,746 No Bid No Bid

Combination 12K Gallon Gasoline & 5K Gallon Diesel Tank (UL-2085) INC INCDiesel Dispenser - Two hose INC INCGasoline Dispenser - Two hose INC INCTank Fills & Piping INC INCClock Gauges & Sensors INC INCFuel Master Card Reader System / RE-USE EXISTING INC INCVeeder-Root Tank Monitor System INC INCFull Lenghth Catwalk w/ Access Ladders INC INCKamvalok Adapter Assembly INC INCE-Stop INC INC20Lb Fire Extinguisher INC INCStart Up INC INC

Regulatory Permit and Registration Fees to FL DEP 1 ALLOW 1,000

CCCIRC Development Guardian ABA-Con Fuel Tech

DIV 16A ELECTRICAL Quan Unit 0 -$ Sub-Total 0 0 0 0Electrical Complete INC INC No Bid No BidNew PP-1 Subpanel INC INCModify Existing Electrical Rack INC INCConduit, High/Low Voltage Wiring INC INCGrounding INC INCSurge Suppression INC INCLightning Protection Counterpoise INC INC

SUB TOTAL COST SUB-TOTAL 328,983$

GENERAL LIABILITY 0.525% 1,727

BUILDERS RISK 0.35% 1,151SUBTOTAL 331,862$

PROFIT 12% 39,823

SUBTOTAL 371,685$

CONTINGENCY 5% 19,584

BOND 1.35% 5,282

BID ITEM TOTAL 396,551$

Takeoffs

OH & PROFIT

Takeoffs

SUB-TOTAL

BOND

BID TOTAL

BUILDERS RISK

CONTINGENCY

GENERAL LIABILITY

SUB-TOTAL

3/8/2019 Spreadsheet Template

Page 11: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 12: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

File: 19-036 Canaveral Constr - Brev Schls Rockledge PM Page 1 of 3

March 4th, 2019

Proposal #19-036 Mr. J. David Nash via E-Mail to [email protected] President Canaveral Construction Co., Inc. 3475 North US Highway 1 Mims, Florida 32754 RE: Professional Services Proposal – Petroleum Plans Development

School Board of Brevard County – Unit Maintenance Facility 1254 Florida Avenue South, Rockledge, Florida 32955 Property Appraiser Parcel ID # 24-36-04-00-7 FDEP FID # 8622709

Dear Mr. Nash: Stillwater Technologies, Inc. (Stillwater) is pleased to provide this proposal for professional services associated with the installation of a new AST fueling system at the captioned site followed by the removal of the existing UST fueling system. Phase VI – Bid and Construction Phase Stillwater has not included extensive Bid and Construction Phase services in this proposal. Only items 1, 5 and 6 as enumerated below are included. Typical services offered are listed below and can be cost estimated if desired by Client. 1) Answering questions asked by the bidders as forwarded by Client and issuing

responses to Client. 2) Conducting site visits to confirm completion of sanitary, water, grading elevations and

drainage improvements prior to laying asphalt. 3) Conducting site visits during the course of construction to observe progress of

construction. 4) Conducting a site visit after construction to prepare a “punch list” or certify other

completed work. 5) Review of shop drawings and submittals.

6) Review of Progress Payment Applications Phase VII – Certificates of Completion – “As-Builts” Stillwater has included Certifications and/or As-Built services in this proposal based on the assumption that the owner, Client or some agency will require same. 1) Based on information from an as-built survey (if performed) and the contractor,

Stillwater will prepare plans reflecting any modifications during construction.

Stillwater Technologies, Inc. 203 Hillcrest Street Orlando, Florida 32801 tele: (407) 206-7222 fax: (407) 206-7223 web: stillwatertech.com

Page 13: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

03/04/19 Stillwater Technologies, Inc. Page 2 of 3 File: 19-036 Canaveral Constr - Brev Schls Rockledge PM

2) Submit Certificates of Completion and certified record drawings to the following: • Owner • Client • Permitting Authority or Other Agency • Review and Approve Final Application For Payment Fees: The total lump sum fees for the requested professional services are detailed in the following table:

Cost Phase VI – Bid and Construction Phase $910 Phase VII – Certification of Completion – (Lump Sum) $780 TOTAL: $1,690

ADDITIONAL SITE VISITS OR MEETINGS: No additional site visits or meetings of any kind are included in this proposal. Should client desire Stillwater to conduct a site visit or attend a meeting of any kind, there shall be an additional $650.00 charge per occurrence assuming “on site” time does not exceed three hours. EXCLUDED ITEMS: Items excluded from this proposal are listed below along with assumptions made. • Redesign created by client following client approval of site plans; • Any land surveys of any nature including subdivisions, platting, easement sketch and legal descriptions,

donations, etc.; • Geotechnical services; • Environmental studies, wetland studies, endangered species studies, ecological studies, or related permit

procurement; • Governmental or Impact fees as may be required; • Permit submittal fees; • Extra work as may be required due to changes in laws, rules, regulations, ordinances, codes or orders of

governmental authorities subsequent to the preparation of plans, permits and construction beyond the engineer’s control;

• Any special off-site sewer interconnection with central sewer design or permitting, other than that specified herein;

• Any special off-site water interconnection design or permitting, other than that specified herein; • Architectural or structural plans; • Electrical plans of any kind; • Structural engineering needed for retaining wall design. • Geotechnical Study – It is assumed due to the existence of structures and underground systems at the

facility, and to the assumption that subsurface problems have not been encountered in the past, that a site-specific geotechnical will not be required;

Page 14: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT

03/04/19 Stillwater Technologies, Inc. Page 3 of 3 File: 19-036 Canaveral Constr - Brev Schls Rockledge PM

Stillwater proposes to provide these services on Lump Sum basis as described above. Out-of-scope items will be addressed in accordance with our Standard Rate Schedule (Attachment ‘A’). Attached also, please find our Standard Services Agreement (Attachment ‘B’). If this proposal is acceptable, please sign the Services Agreement for the Phase I services and return it to us. Should you have any questions or require additional information, please do not hesitate to call me at 407-206-7222 x 208. Best Regards, STILLWATER TECHNOLOGIES, INC.

Richard Hall Frederick A. Blecha, P.E. Project Manager Principal Engineer Attachments: ‘A’ – Stillwater Rate Schedule

‘B’ – Services Agreement

Cc: Stillwater Proposal File

Page 15: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 16: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 17: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT
Page 18: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING …eagendatoc.brevardschools.org/03-26-2019 School Board... · 2019-04-15 · GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT