Estimate File

1
ITEMS Price per Unit TOTAL Tilestar 0.5 (mm) 96.19 linear meter 667/m 64,158 15 pcs Spanish gutter 24” 765/pc 11,475 7 pcs flashing gutter 24” 765/pc 5,355 9 pcs ridge roll 16” 465/pc 4.185 10 pcs Facia 12” 397/pc 3,970 2 pcs Valley cover 6” 238/pc 476 100m insulation foam 6000/roll 12,0000 Subtotal 101,619 Accessories ( texscrew, blind rivets, sealant) 1,650 Labor charge 18,000 Freight and Handling 4,500 Crating Charge 4,000 Subtotal 129,769 Transport from Ormoc to Albuera 3,000 GRAND TOTAL 132,769 8 sheet textured lawanit 4,800 Labor 3,500 Repainting 12,000 Subtotal 20,300 23 pcs Marine Plywood ¼” 9,890 Labor Charge 6,500 Painting Materials 32,000 Labor Charge 18,000 Subtotal 86,690 Glass/installation charge 12,000 GRAND TOTAL 98,690

description

For lime business

Transcript of Estimate File

Page 1: Estimate File

ITEMS Price per Unit TOTALTilestar 0.5 (mm)96.19 linear meter

667/m 64,158

15 pcs Spanish gutter 24” 765/pc 11,4757 pcs flashing gutter 24” 765/pc 5,3559 pcs ridge roll 16” 465/pc 4.18510 pcs Facia 12” 397/pc 3,9702 pcs Valley cover 6” 238/pc 476100m insulation foam 6000/roll 12,0000

Subtotal 101,619Accessories ( texscrew, blind rivets, sealant) 1,650Labor charge 18,000Freight and Handling 4,500Crating Charge 4,000

Subtotal 129,769Transport from Ormoc to Albuera 3,000

GRAND TOTAL 132,769

8 sheet textured lawanit 4,800Labor 3,500Repainting 12,000

Subtotal 20,30023 pcs Marine Plywood ¼” 9,890Labor Charge 6,500Painting Materials 32,000Labor Charge 18,000

Subtotal 86,690Glass/installation charge 12,000

GRAND TOTAL 98,690