ESO and the ELT
Roberto TamaiESO’s ELT Programme Manager
![Page 2: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/2.jpg)
• Intergovernmental Organisation• International Convention (1962), between 5 countries• Now 16 Member States• Annual Budget: ~ 200 million €
![Page 3: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/3.jpg)
ESO and the ELT, 6th June 2019 3
Mission (Convention):Build and operate world-class ground-based astronomical facilitiesFoster collaboration in Astronomy
ESO enables:Scientific discoveries & understanding of the UniverseOther: Development of new technologies, impact in economy, international
cooperation
Complementing other ground & space facilitiesIn collaboration with scientists, institutes and industry
The ESO Mission
![Page 4: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/4.jpg)
Study of all that is "beyond" the earthObjects that are far away, therefore small and weakWith limited information about their natureNeed for large instruments: resolution and sensitivity
The combination of different types of observations is crucial Images / spectra / time-series
The field of visible, infrared and radio waves is accessible from land-based telescopes
Astronomy
ESO and the ELT, 6th June 2019 4
![Page 5: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/5.jpg)
ESO and the ELT, 6th June 2019 5visible infrared
Orio
n N
ebul
a
![Page 6: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/6.jpg)
![Page 7: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/7.jpg)
ESO and the ELT, 6th June 2019 7
Excellent conditions in the Atacama Desert Extremely dry90% clean skyLow turbulenceVery limited light pollution
Excellent vision to the Southern Hemisphere
Why the ESO Observatories are in Chile?
Poor site Chile
(Chajnantor)
(Paranal)
![Page 8: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/8.jpg)
ESO and the ELT, 6th June 2019
ESO in Chile
La Silla Observatory (1960’s)
Paranal Observatory (1998)
ALMA Observatory(2013)
+ … Armazones (ELT)(…2025)
Administration, Science & ALMA Officesand Guest House
8
![Page 9: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/9.jpg)
ESO and the ELT, 6th June 2019
Largest optical/infrared telescope in the world 39m diameter, primary mirror, 798 high precision segments Science: exo-earths, deep universe, resolved populations, open window to the unknowns System Design complete – Construction on going on Cerro Armazones
• As integral part of the Paranal Observatory (‘one more telescope’) Timeline 2014-2025 ESO cost:
• Capital cost: ~1175 MEUR incl. manpower, instruments and contingency• Operation cost: ~50 MEUR / year
The ESO’s Extremely Large Telescope (ELT)
9
![Page 10: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/10.jpg)
One top goal of the E-ELT is to find and to characterise exo-planets...
... it is the first telescope ever that can explore Earth-twins...
... with ultimately the chance to find life beyond the Solar system.
ESO and the ELT, 6th June 2019 10
![Page 11: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/11.jpg)
ESO and the ELT, 6th June 2019
Spectacular Resolution
Hubble Space Telescope
VLT+AO
E-ELT
11
![Page 12: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/12.jpg)
Required sensitivity
ESO and the ELT, 6th June 2019 12
![Page 13: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/13.jpg)
To put it in perspective…
ESO and the ELT, 6th June 2019 13
![Page 14: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/14.jpg)
M1 – As seen from above
Max M1 dia. 39146
Min M1 dia. 9418
ESO and the ELT, 6th June 2019
How does it optically work ?Powered mirrors
collect and focus the light Flat mirrors
redirect the light towards the focal plane
Primary Mirror (M1)39-m diameter, 798 near-hexagonal segments
re-aligned to ~ 0.0001 mm in real-time
Focal plane is fed to science
instruments
Light is precious – light waves must be preserved to a small fraction of their wavelength (0.0005 mm) and their direction preserved to a small fraction of one arc second
14
![Page 15: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/15.jpg)
ESO and the ELT, 6th June 2019 15
![Page 16: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/16.jpg)
ESO and the ELT, 6th June 2019
Armazones and Paranal
VLT
ELT
Seen through clean atmosphere(distance: 200 km)
25km
16
![Page 17: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/17.jpg)
ESO and the ELT, 6th June 2019
How are we organised to build itESO as “Prime” or “System Architect”Defines the top-level scientific and technical requirementsDevelops the system (observatory) concept and subsystem requirementsSubcontracts to (ESO Member States) industry for the constructionAssembles the subsystems together on-site (AIV)
ESO Member States IndustryDetailed design and manufacturing of the subsystems based on requirements
following competitive Call-for-Tenders
Consortia of Scientific InstitutesDetailed design and manufacturing of the scientific instruments based on
(collaborative) agreements
17
![Page 18: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/18.jpg)
ESO and the ELT, 6th June 2019
ELT Dome & Main Structure (DMS)
~52
m (H
oriz
on)
54 m
18
Contract placed with ACe, Consortium of Cimolai and AstaldiPDR of the Dome donePDR of the Main Structure mostly completedManufacturing startedOn site activities in progress
![Page 19: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/19.jpg)
ESO and the ELT, 6th June 2019 19
Dome & Main Structure Manufacturing phase has started for: Enclosure structure
• Part 3 (first ring in green in the picture here below) is manufactured, pending sand blasting and painting• Steel purchased and inspected by ESO, manufacturing on going (part 4)
Seismic Isolators of Dome and Aux. Building• First units manufactured and tested. Waiting for Contractor confirmation• Interface plates for embedding in foundation shipped to site
Enclosure rotating mechanism design completed• production of first unit started
DMS manufacturing activities in Europe 1/3
![Page 20: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/20.jpg)
ESO and the ELT, 6th June 2019 20
DMS manufacturing activities in Europe 2/3
![Page 21: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/21.jpg)
ESO and the ELT, 6th June 2019 21
DMS manufacturing activities in Europe 3/3
![Page 22: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/22.jpg)
![Page 23: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/23.jpg)
ESO and the ELT, 6th June 2019 23
![Page 24: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/24.jpg)
ESO and the ELT, 6th June 2019 24
![Page 25: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/25.jpg)
ESO and the ELT, 6th June 2019 25
![Page 26: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/26.jpg)
ESO and the ELT, 6th June 2019 26
M1 Segment BlanksFirst M1 Segment Blank (tests) completed by
SCHOTT end of August.Ready for delivery to REOSC as part of the first
delivery set.
M2 BlankTechnically accepted in Dec’18Delivered to Safran/Reosc Jan’19
M3 BlankCastedChecking the ceramization
Mirror Blanks
![Page 27: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/27.jpg)
M1 Segments Polishing
4000 m2 production facilities in SAFRAN Poitiers (France)
FacilitizationValidation (x 18)
Pre-Series (x 81)Series (x 832)
2017 20242018 2019 2020 2021 2022 2023
About 1 segment/day after ramp-up
ESO and the ELT, 6th June 2019 27
![Page 28: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/28.jpg)
Introduction to the ELT, April 2019 28
M2 blank from SCHOTT to ESO to SAFRAN-Reosc
![Page 29: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/29.jpg)
ESO and the ELT, 6th June 2019 29
M1 Segment Support (M1SS) Series production Since Kick-Off with VDL (May’18), nominal progress (until April’19) Held Manufacturing Readiness Review (MRR) for Pre-series (18 Supports) Design contract deliverables (5 QM segment support + handling tools) for Reosc are ready for
shipment.
M1 Segment Support
![Page 30: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/30.jpg)
ESO and the ELT, 6th June 2019 30
M1 Edge Sensors (Contract with FAMES, FR-DE)Design and performance are now under controlPreliminary Design Review in Jan’19 was succesful42 Qualification Models (QMs) producedTotal to be produced: 4566 pcs.
M1 Position Actuators (Contract with PI, DE)Qualification Test Review held (Jan’19), Preliminary Design Review in Mar’195 QM’s manufacturedTotal to be produced: 2418 pcs.
M1 Edge Sensors and Position Actuators
![Page 31: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/31.jpg)
ESO and the ELT, 6th June 2019 31
M1 Position Actuators
![Page 32: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/32.jpg)
ESO and the ELT, 6th June 2019 32
M2/M3 Cell (SENER, ES)Preliminary Design Review held in 2018Qualification of Hexapod on-going
Prefocal Station (IDOM, ES)Design on-going, PDR held in Apr ’19
M2 Cell and PFS
![Page 33: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/33.jpg)
ESO and the ELT, 6th June 2019
Adaptive Optics
33
![Page 34: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/34.jpg)
Credit: NASA
ESO and the ELT, 6th June 2019 34
![Page 35: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/35.jpg)
ESO and the ELT, 6th June 2019 35
Contract placed with Consortium AdOptica ADS and Microgate, ITFDR passedIn advanced manufacturing stageESO is delivering the mirror shells
M4 Unit
![Page 36: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/36.jpg)
ESO and the ELT, 6th June 2019 36
M4 ShellsFour (out of twelve) thin Shells accepted, two delivered to
Adoptica for integration into M4 Unit3rd and 4th shells being delivered to ADS 12th June
M4 Adaptive UnitFinal Design passedManufacturing in progress
• Most components for the adaptive mirror actuators (more than 5300 actuators!) ordered and many received (~ 50%)
• All 6 SiC petals for reference body completed and brazed• M4 Test Tower, manufacturing in progress
M4 Unit
![Page 37: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/37.jpg)
ESO and the ELT, 6th June 2019 37
Telescope Control System Instrument Control System Framework SW alpha release delivered to Consortia. Time Reference System technologies, verification and failure modes being studied. Core Integration Infrastructure software first release imminent (testing on-going). M1 Electronics Cabinets (final prototype) integrated and ready for thermal testing. First software release for M1 Local Control System (LCS); on-track and comfortably
exceeding performance requirements for baseline Edge Sensor control loop. Central Control System (CCS) requirements specification released. M1 Warping Harness (WH) Controller entered serial production RTC Toolkit: WP commencing mid-2019 to provide SW for MIMO controller applications
in the telescope (M1, TREx) and INS AO applications.
Telescope Control System
M1 Warping Harness Controllers in Chassis M1 SegC Cabinet M1 SecD Cabinet
![Page 38: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/38.jpg)
ESO and the ELT, 6th June 2019
ELT First set of Instruments
METIS
MAORY
MICADO
HARMONI
38
![Page 39: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/39.jpg)
ESO and the ELT, 6th June 2019 39
ELT Top Level Schedule
2025
Today
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Telescope First Light
11/24
ARM Site Preparation (Platform, Road, Trenches)
DMS - Design Phase
DMS - Manufacturing and Pre-Assembly
DMS - On-site Erection and Commissioning
M1 Segment Assemblies - Design and Production
M2 Unit - Design and Production
M3 Unit - Design and Production
M4 Unit - Design and Production
M5 Unit - Design and Production
Optical Control Units (PFS, Calibration Coarse Metrology, Test Camera)
Telescope Control
AIV
HARMONI - Available on-site
METIS - Available on-site
MAORY - Available on-site
MICADO - Available on-site
DMS Provisional Acceptance
5/23
2025
Today
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
DMS Provisional Acceptance
5/24
Telescope First Light
11/25
ARM Site Preparation (Platform, Road, Trenches)
DMS - Design Phase
DMS - Manufacturing and Pre-Assembly
DMS - On-site Erection and Commissioning
M1 Segment Assemblies - Design and Production
M2 Unit - Design and Production
M3 Unit - Design and Production
M4 Unit - Design and Production
M5 Unit - Design and Production
Optical Control Units (PFS, Calibration Coarse Metrology, Test Camera)
Telescope Control
AIV
HARMONI - Available on-site
METIS - Available on-site
MAORY - Available on-site
MICADO - Available on-site
![Page 40: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/40.jpg)
ESO and the ELT, 6th June 2019 40
ELT Programme – Commitment Evolution
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
100,000,000
200,000,000
300,000,000
400,000,000
500,000,000
600,000,000
700,000,000
800,000,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
EUR
(Mix
ed e
.c.)
ELT Commitment Evolution
Contracts - Amount (EUR)
Contracts - Cumulative Amount (EUR)
![Page 41: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/41.jpg)
ESO and the ELT, 6th June 2019 41
ELT Programme – Commitment EvolutionNr. of Contracts
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
2
4
6
8
10
12
14
16
18
20
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Cum
ulat
ive
nb. o
f Maj
or C
ontr
act A
ppro
ved
Nb.
of M
ajor
Con
trac
t App
rove
dELT Commitment Evolution
Nr. Of Major Contracts (>= 0.5 MEUR)
Contracts - Cumulative Amount (%)
![Page 42: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/42.jpg)
ELT – On-Going Contracts
ESO and the ELT, 6th June 2019 42
Concluded/Ongoing Contracts Description of Work Contract Signature Date Contractor Contract Responsible Forecast Completion Date (w/o Options) Status
PJ42.01 Project Office PA Consultancy Services Jan-16 ISQ H. Kurlandczyk Dec-18 On-goingISVV Consultancy Services Jan-16 Critical Software H. Kurlandczyk Dec-18 On-goingConstruction All Risks Insurance Mar-18 SCOR B. Koehler Mar-26 On-going
PJ42.02 DMS Consultancy Support Jun-13 Ramboll R. Tamai May-18 On-goingDM&S Design and Construction Contract May-16 ACe Consortium S. Stanghellini May-23 On-going
PJ42.03 Optomechanics M4 Phase 1 Preliminary Design May-12 AdOptica N/A Jan-15 ClosedM4 Unit Final Design and Manufacturing Jun-15 AdOptica E. Vernet Jan-23 On-goingM1 Segment Supports - Qual. Units Jan-15 VDL O. Sqalli Jul-17 On-goingM1 Segment supports - Qual. Units Feb-15 CESA F. Derie Oct-17 ClosedM4 Mirror Shells Supply Jul-15 Safran Reosc E. Vernet Nov-23 On-goingM2 Mirror and Auxiliary Equipment Supply Jul-16 Safran Reosc C. Haupt Feb-24 On-goingM2 Blank Supply Jan-17 Schott O. Sqalli Jan-19 On-goingM3 Blank Supply Jan-17 Schott O. Sqalli Jul-19 On-goingM3 Mirror and Auxiliary Equipment Supply Feb-17 Safran Reosc C. Haupt Sep-23 On-goingM2 and M3 Cell Design and Manufacturing Jan-17 Sener M. Mueller Jul-22 On-goingM1 Edge Sensors Design and Manufacturing Jan-17 FAMES C. Lucuix May-22 On-goingM1 Mirrors Polishing May-17 Safran Reosc A. Foerster Jun-23 On-goingM1 Blanks Supply May-17 Schott O. Sqalli Sep-22 On-goingM1 Position Actuators Jun-17 PI L. Pettazzi Sep-22 On-goingM1 Segment supports - Production Apr-18 VDL O. Sqalli May-22 On-goingM5 Blank Supply + Polishing Mar-19 Safran Reosc E. Vernet Sep-24 On-going
PJ42.04 Control Core Integration Infrastructure Jul-17 Cosylab AB N. Kornweibel Jun-20 On-goingPJ42.05 Civil Infrastructure Road and Platform Dec-13 ICAFAL C. Cabrera Feb-17 Closed
Paranal ELT Technical Facility Design and Construction Mar-18 Abengoa C. Cabrera Jul-19 On-goingPJ42.06 Support Infrastructure Supply, and installation of ABC Power Substations (23kV + 0.4 kV) Oct-16 SIEMENS D. Kalaitzoglou Jul-17 On-going
M1 Coating Plants Supply Jun-18 AGC P. Sansgasset /V. Heinz Nov-21 On-goingPJ42.09 Science Data Ops Dataflow Software Components for ELT Nov-18 Etamax M. Sterzik Nov-22 On-goingPJ18.10 Instrumentation MICADO Construction Oct-15 MPE F. Kerber Mar-25 On-going
HARMONI Construction Oct-15 STFC S. Egner Apr-26 On-goingMETIS Construction Oct-15 NOVA C. Haupt Mar-26 On-goingMAORY Construction Feb-16 INAF F. Kerber Aug-25 On-goingIR Detectors for HARMONI, MICADO, METIS Jul-18 Teledyne D. Ives Jan-23 On-goingC-RED Cameras for MAORY Jul-18 FLI E. Marchetti Sep-20 On-goingCCD-220 Detect. for MAORY, MICADO, HARMONI, PFS-A Apr-19 Teledyne P. Amico Jun-20 On-goingMUSE type detectors for HARMONI June-19 TBC Teledyne E. George Mar-21 On-going
PJ42.11 Optical Control PFS-A Main system Design and Manufacture Apr-18 IDOM S. Lewis Feb-24 On-goingLaser Sources Dec-17 Toptica S. Lewis Dec-22 On-going
![Page 43: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/43.jpg)
ESO and the ELT, 6th June 2019
The Programme is in full construction!33 large contracts plus agreements>90% of material cost committedOn-site progress (e.g. Dome foundations at Armazones, Technical building at
Paranal)
A fantastic endeavor with many technical challenges but all currently “under control”
Very tight TimelineAll contracts signed for First Light 2024 (delays appearing at contractors level),
new baseline foresee First Light in 2025.Go to Details for next procurementsGo to movie
Conclusion
43
![Page 44: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/44.jpg)
On-going Procurement
![Page 45: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/45.jpg)
ESO and the ELT, 6th June 2019 45
1. M1 Manipulator
Next Procurements
![Page 46: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/46.jpg)
ESO and the ELT, 6th June 2019 46
1. M1 Manipulator2. M5 Cell
Next Procurements
![Page 47: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/47.jpg)
ESO and the ELT, 6th June 2019 47
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping
Next Procurements
![Page 48: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/48.jpg)
ESO and the ELT, 6th June 2019 48
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools
Next Procurements
![Page 49: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/49.jpg)
ESO and the ELT, 6th June 2019 49
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors
Next Procurements
![Page 50: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/50.jpg)
ESO and the ELT, 6th June 2019 50
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors6. Laser Beam Projection subunits
Next Procurements
![Page 51: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/51.jpg)
ESO and the ELT, 6th June 2019 51
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors6. Laser Beam Projection subunits7. M1 LCS Cabinets
Next Procurements
![Page 52: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/52.jpg)
ESO and the ELT, 6th June 2019 52
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors6. Laser Beam Projection subunits7. M1 LCS Cabinets8. 5m Coating unit
Next Procurements
![Page 53: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/53.jpg)
ESO and the ELT, 6th June 2019 53
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors6. Laser Beam Projection subunits7. M1 LCS Cabinets8. 5m Coating unit9. Network Infrastructure
Next Procurements
![Page 54: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/54.jpg)
ESO and the ELT, 6th June 2019 54
1. M1 Manipulator2. M5 Cell3. M1 Washing and Stripping4. Coarse Metrology and alignment tools5. Cameras for detectors6. Laser Beam Projection subunits7. M1 LCS Cabinets8. 5m Coating unit9. Network Infrastructure10. RTC (Real Time Computing) Infrastructure
Next Procurements
![Page 55: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/55.jpg)
ESO and the ELT, 6th June 2019 55
Description of Work Forecast FC Approval DateM5 Mirror February-19 MUSE Type CCD for HARMONI February-19CCD220 Detectors for MAORY, MICADO, HARMONI, PFS-A February-19M5 Cell September-19M1 Manipulator November-19 (TBC)Mirror Washing Stripping unit November-19 (TBC)Coarse Metrology and Alignment November-19 (TBC)
Plan for 2019-2020(Large Procurements)
Laser Beam Projection SubUnits Feb-20 (TBC)Cameras for LVSM, CCD220 May-20Transportation Service Contract May-20M1LCS Cabinets Procurement May-20Mirror Coating Unit (5m) November-20Telescope Test Unit November-20 (TBC)Network Infrastructure* November-20M1LCS Network infrastructure Equipment* November-20
Go to movie
![Page 56: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/56.jpg)
ESO and the ELT, 6th June 2019
Annual Turn-over Categories
Category Annual Turn-over
Low <3 M€
Medium 3 to 15 M€
Large >15 M€
56
![Page 57: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/57.jpg)
Scope: Design, construction and testing of high-precision, 4-axis,
fail-safe handling tool with gripper to remove the M1 segment assembly from the telescope
Expected Contract Duration: ~ 1.5 years
Turn-over: Low Timeline:
ESO and the ELT, 6th June 2019 57
M1 Segment Assembly - Manipulator
Request for Information Oct 2018 Preliminary Inquiry Jan 2019 Release Call for Tender May 2019 Closing date Sep 2019 FC Approval Nov 2019 (TBC)
![Page 58: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/58.jpg)
ESO and the ELT, 6th June 2019 58
Specialties for potential (sub)contractors: Design, construction and testing of robotics armMechatronics, Automation engineering, Industrial handling
M1 Segment Assembly - Manipulator
By M
itsub
ishi
for T
MT
![Page 59: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/59.jpg)
Scope: Design, manufacturing and installation on-site of the washing-stripping units
for M1 Segments
Expected Contract Duration: ~ 2-4 years
Turn-over: Medium Timeline:
ESO and the ELT, 6th June 2019
Washing & Stripping Unit (M1)
RFI Mar – Apr 2018 PI Jan 2019 CfT May 2019 FC Approval Nov 2019 (TBC)
59
![Page 60: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/60.jpg)
ESO and the ELT, 6th June 2019 60
Specialties for potential (sub)contractors: Design, manufacturing and installation on-site of the washing-stripping units for
M1 SegmentsChemical coating removalProcess automationSafety standards
Washing & Stripping Unit (M1)
![Page 61: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/61.jpg)
ESO and the ELT, 6th June 2019 61
Scope: Procurement of standard tools and design, fabrication of
high-accuracy long-range metrology network to monitor relative positions of telescope mirrors [long-range (tens of m) non-contact, micron-accuracy optical sensing in industrial environment]
Expected Contract Duration: ~ 3 years
Turn-over: Low Timeline:
Coarse Metrology and Alignment System
Start procurement process Q4 2019 (TBC) Closing date Q2 2020 (TBC) FC Approval (TBC)
![Page 62: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/62.jpg)
ESO and the ELT, 6th June 2019 62
Scope: Manufacture, Verification and Delivery of different types of Wavefront Sensing
Cameras for Adaptive Optics applications at the ELTThe cameras consist of the detector (ESO furnished) and its mount, read-out
Front-End board, Main Control board, Power Regulator board, Peltier Controller/Cryostat, main structure and cooling system
Expected Contract Duration: ~ 2 years
Turn-over: Low Timeline:
Cameras for LVSM and CCD220
Request For Information Q4 2018
Release Preliminary Inquiry Q3 2019
Release Call for Tender Q4 2019 (TBC)
Closing date TBD
FC Approval May 2020 (TBC)
![Page 63: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/63.jpg)
ESO and the ELT, 6th June 2019 63
Specialties for potential (sub)contractor: Manufacturing and testing of small mechanicsManufacturing and testing of low-noise electronics Minimum understanding of optics
Cameras for LVSM and CCD220
![Page 64: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/64.jpg)
Scope: Design, fabrication, testing of ~400mm diameter
telescope, relay optics, beam steering & focus mechanism
Expected Contract Duration: ~ 4 years
Turn-over: Medium Timeline:
ESO and the ELT, 6th June 2019
Laser Beam Projection Subunits
Request for Information Q4 2019 (TBC) Preliminary Inquiry Q4 2019 (TBC) Release Call for Tender Q1 2020 (TBC) Closing date Q2 2020 (TBC) FC Approval Nov 2020 (TBC)
64
![Page 65: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/65.jpg)
ESO and the ELT, 6th June 2019 65
Specialties for potential (sub)contractors: Large precision optics and mechanisms and
athermalisationPolarisation analysisOptical and mechanical alignmentPerformance verification of large precision opto-
mechanical and electro-mechanical systems specified for varying environmental and operational loads (temperature, gravity vector, laser thermal load)
Laser Beam Projection Subunits
![Page 66: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/66.jpg)
Scope: Production of 132 electronic cabinets
equipped with cooling heat exchanger, low power supply consumption, front-end electronics for Edge Sensors, PACTS, Warping Harness, COTS components.
Expected Contract Duration: ~ 2 years
Turn-over: Medium Timeline:
ESO and the ELT, 6th June 2019
M1 LCS Cabinet Procurement
Release Call for Tender Q3 2019 Closing date Q4 2019 FC Approval May 2020
66
![Page 67: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/67.jpg)
Scope: Design, manufacturing and installation on-site of the
coating unit for the large mirrors (M2, M3, M5, M6)
Expected Contract Duration: ~ 2 years
Turn-over: Medium Timeline:
ESO and the ELT, 6th June 2019
Coating Unit (5m)
Release Call for Tender Q2 2020
Closing date Q3 2020
FC Approval Nov 2020
67
![Page 68: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/68.jpg)
Specialties for potential (sub)contractors: Design, manufacturing and installation on-site of coating units for
4m class mirrorsControl systemsThin-film coating technologiesvacuum system (pumps)
ESO and the ELT, 6th June 2019
Coating Unit (5m)
68
![Page 69: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/69.jpg)
Scope: Supply of network devices hosted in Computer room (multilayer data center
switches) and in the SCP-B cabinet (ruggedized industrial switches)
Expected Contract Duration: ~ 3 years (+2 years possible extension)
Turn-over: Low-Medium Timeline:
ESO and the ELT, 6th June 2019
Network Infrastructure
69
Release Call for Tender Q1 2020 Closing date Q2 2020 FC Approval Nov 2020
![Page 70: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/70.jpg)
ESO and the ELT, 6th June 2019 70
Scope: Design & development of high performance computing cluster for reliable &
deterministic computation of Adaptive Optics corrections to M4 and M5Delivery: High Performance computing cluster HW, SW & network infrastructure
Expected Contract Duration: ~ 3 years
Turn-over: Low Timeline:
Real Time Control (RTC) Infrastructure
Release Call for Tender TBD Closing date TBD FC Approval May ‘21
![Page 71: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/71.jpg)
Specialties for potential (sub)contractor: Design, manufacture & testing of fast tip-tilt actuatorsFast nanometer-precision frictionless actuators and tip-tilt mechanism (Piezo,
Flex pivot, stiff structure)Cutting-edge dynamic control system technology
ESO and the ELT, 6th June 2019
M5 Cell – CfT closed, but…
71
![Page 72: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/72.jpg)
ESO and the ELT, 6th June 2019 72
Description of Work Forecast FC Approval DateM5 Mirror February-19 MUSE Type CCD for HARMONI February-19CCD220 Detectors for MAORY, MICADO, HARMONI, PFS-A February-19M5 Cell September-19M1 Manipulator November-19 (TBC)Mirror Washing Stripping unit November-19 (TBC)Coarse Metrology and Alignment November-19 (TBC)
Plan for 2019-2020(Large Procurements)
Laser Beam Projection SubUnits Feb-20 (TBC)Cameras for LVSM, CCD220 May-20Transportation Service Contract May-20M1LCS Cabinets Procurement May-20Mirror Coating Unit (5m) November-20Telescope Test Unit November-20 (TBC)Network Infrastructure* November-20M1LCS Network infrastructure Equipment* November-20
![Page 73: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/73.jpg)
ESO and the ELT, 6th June 2019 73
Plan for 2019-2020(Small Procurements)
JOB Activity Desc.Common Lift., Handl. and Transp. Equipment 40ton truck heavy duty 6x6 with 100mt Palfinger type crane - Supply
10ton truck - SupplyInstrumentation Infrastructure Procurement of lab. equipment for Inst lab - 2020
Procurement of handling equipment for Inst lab - 2019M1 Unit M1 Segment Assembly - StandsWashing and Coating Mirror Washing/Stripping unit (5m) ProcurementSupporting Equipment PAR Supporting Equipment - ETF Chiller ManufacturingInterlock and Safety Purchase development environment (GAR) - (TCS-ILS)ELT Laser Guide Star Units LGS - Cooling System - ProcurementM1 In-Situ Cleaning Development Segment Assembly - In situ cleaning Studies
![Page 74: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/74.jpg)
ESO and the ELT, 6th June 2019 74
Plan for 2020-2021(Small Procurements)
JOB Activity Desc.Common Lift., Handl. and Transp. Equipment ELT Road transporters - 3ton Van - Supply
Forklifts - 2 ton (x2) - SupplyForklifts - 5 ton - SupplyForklifts - 10 ton - SupplyForklifts - 1.5 ton (x2) - Supply
M1 Unit M1 Cell Auxiliary SensorsWFRTC Purchase SW Development Environment - AO app SW
![Page 75: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/75.jpg)
Overview of Specialities involved in Main Procurements
![Page 76: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/76.jpg)
ESO and the ELT, 6th June 2019
Specialities for potential (sub)contractorsProcurement Planned FC
ApprovalSpecialities
M5 Cell Sep’19• Fast nanometer-precision frictionless actuators and tip-tilt mechanism (Piezo, Flex
pivot, stiff structure)• Cutting-edge dynamic control system technology
M1 Manipulator Sep/ Nov’19 • mechatronics, automation engineering, industrial handling
Laser Beam Projection SubUnits Nov’19 • Precision opto-mechanics and control, • Lens polishing and laser coating
Mirror Washing Stripping unit Nov’19• Chemical coating removal• Process automation• Safety standards
Coarse Metrology and Alignment Nov’19 (TBC) • Long-range (tens of m) non-contact, micron-accuracy optical sensing in industrial environment
76
![Page 77: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/77.jpg)
ESO and the ELT, 6th June 2019
Specialities for potential (sub)contractorsProcurement Planned FC
ApprovalSpecialities
Cameras for LVSM, CCD220 May’20 • Manufacturing and testing of small mechanics• Manufacturing and testing of low-noise electronics
M1LCS Cabinet Procurement Nov’20 • Low-power consumption electronics, power supply, cabinet cooling (heat exchanger), COTS components
Mirror Coating Unit (5m) Nov’20
• Design, manufacturing and installation on-site of coating units for 4m class mirrors• Control systems• Thin-film coating technologies, • vacuum system (pumps),
Telescope Test Unit (TBC) Nov’20 (TBC) • Opto-mechanical design and manufacture• Detectors
Network Infrastructure Nov’20 • Network components (Routers, Switches, Firewall, WLAN Controller, etc.)
M1LCS Network infrastructure Equipment Nov’20 • network devices including multilayer data center switches
• ruggedized industrial switches.
77
![Page 78: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/78.jpg)
![Page 79: ESO and the ELT - Agenda (Indico) · Adoptica for integration into M4 Unit 3 rd and 4 th shells being delivered to ADS 12 June M4 Adaptive Unit Final Design passed Manufacturing in](https://reader034.fdocuments.us/reader034/viewer/2022042203/5ea4be21f083cc599b3e59e9/html5/thumbnails/79.jpg)
ESO and the ELT, 6th June 2019 79