Equipment and Tools Management (444) Business Process Documentation'

220
EHP4 for SAP ERP 6.0 September 2010 English Equipment and Tools Management (444) SAP AG Business Process Documentation

description

Equipment and Tools Management (444) Business Process Documentation'

Transcript of Equipment and Tools Management (444) Business Process Documentation'

Page 1: Equipment and Tools Management (444) Business Process Documentation'

EHP4 for SAP ERP 6.0

September 2010

English

Equipment and Tools Management (444)

SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany

Business Process Documentation

Page 2: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Copyright

© 2010 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

© SAP AG Page 2 of 214

Page 3: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

External Process

Business Process Alternative/Decision Choice

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include Field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

© SAP AG Page 3 of 214

Page 4: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Contents

1 Purpose........................................................................................................................................ 6

2 Prerequisites................................................................................................................................ 6

2.1 Master Data and Organizational Data...................................................................................6

2.2 Roles..................................................................................................................................... 7

3 Process Overview Table...............................................................................................................8

4 Process Steps............................................................................................................................ 15

4.1 Time Based Equipment Process.........................................................................................15

4.1.1 Creating ETM Requisition Note....................................................................................15

4.1.2 Creating Acquisition Shipping Document in CL002......................................................16

4.1.3 Assigning Equipment and Creating Shipping Document..............................................18

4.1.4 Returning Equipment back to the Construction Yard/Warehouse................................19

4.1.5 CEM Sales Order Settlement (Creating Sales Order)..................................................20

4.1.6 Logging for CEM SD Settlement..................................................................................21

4.1.7 Internal Cost Allocation................................................................................................22

4.1.8 External Cost Allocation...............................................................................................24

4.2 Time-Based Equipment Process Including Third-Party Rental Equipment..........................26

4.2.1 Creating ETM Requisition Note....................................................................................26

4.2.2 Creating Purchasing Requisition for Rental Equipment................................................27

4.2.3 Converting Purchase Requisitions to Purchase Order.................................................28

4.2.4 Posting Goods Receipt.................................................................................................29

4.2.5 Invoice Verification.......................................................................................................30

4.2.6 Creating Equipment.....................................................................................................31

4.2.7 Creating Equipment BOM............................................................................................32

4.3 Performance Based Equipment Process.............................................................................33

4.3.1 Creating ETM Requisition Note....................................................................................33

4.3.2 Assigning Requisition Note to Equipment....................................................................35

4.3.3 Creating PBE Document..............................................................................................36

4.3.4 Document List for PBE.................................................................................................37

4.3.5 Creating Sales Order....................................................................................................38

4.3.6 Logging for CEM SD Settlement..................................................................................39

4.3.7 Internal Cost Allocation................................................................................................40

4.3.8 External Invoice............................................................................................................42

4.4 ETM Non-Consumable Material Process............................................................................44

© SAP AG Page 4 of 214

Page 5: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.4.1 Initial Stock Posting for Non-Consumable Material......................................................44

4.4.2 Stock Overview in MM..................................................................................................46

4.4.3 Current Stock for Material in ETM................................................................................46

4.4.4 Creating First ETM Shipping Document for Acquisition................................................47

4.4.5 Displaying Shipping Document....................................................................................48

4.4.6 Stock Overview in MM..................................................................................................49

4.4.7 Current Stock for Material in ETM................................................................................49

4.4.8 Creating Second ETM Shipping Document for Acquisition..........................................50

4.4.9 Displaying Shipping Document....................................................................................51

4.4.10 Stock Overview in MM..................................................................................................52

4.4.11 Current Stock for Material in ETM................................................................................53

4.4.12 Creating Sales Order....................................................................................................54

4.4.13 Logging for CEM SD Settlement..................................................................................55

4.4.14 Internal ETM Material Sales.........................................................................................56

4.4.15 External ETM Material Sales........................................................................................58

4.4.16 Internal ETM Material Repurchasing............................................................................60

4.4.17 External ETM Material Repurchasing...........................................................................62

4.5 ETM Consumable Material Process....................................................................................64

4.5.1 Initial Stock Posting for Consumable Material..............................................................64

4.5.2 Stock Overview in MM..................................................................................................65

4.5.3 Current Stock for Material in ETM................................................................................66

4.5.4 Creating ETM Shipping Document for Acquisition.......................................................67

4.5.5 Displaying Shipping Document....................................................................................68

4.5.6 Stock Overview in MM after Acquisition.......................................................................69

4.5.7 Current Stock for Material in ETM................................................................................70

5 Follow-up Processes.................................................................................................................. 70

5.1 Project Reporting for Engineering and Construction...........................................................70

© SAP AG Page 5 of 214

Page 6: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Equipment and Tools Management

© SAP AG Page 6 of 214

Page 7: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

1 PurposeThis scenario deals with the complexities of Equipment and Tools Management (ETM). ETM addresses the unique requirements of:

self performing construction companies

building contractors

equipment distributors (only restricted)

by handling industry-specific business processes such as equipment planning, -processing, -settlement, and evaluation of resources (equipment and materials) including performance measurement. By using ETM, customer can:

improve the visibility of profitability, TCO, and return on asset and equipment

improve the availability and tracking of equipment

manage the increasing administrative workload

reduce handling and administration cost

introduce most flexible prices and account determination

optimize equipment utilization

2 Prerequisites

2.1 Master Data and Organizational DataDefault ValuesEssential master and organizational data was created in your ERP system in the implementation phase, such as the data that reflects the organizational structure of your company and master data that suits its operational focus, for example, master data for materials, vendors, and customers.

The business process is enabled with this organization-specific master data, examples are provided in the next section.

Operational FocusSAP Best Practices delivers standard values for more than one operational focus area, such as Services, Trade or Manufacturing. This means that you may find more than one master data table below. Use the master data that matches the operational focus of your company (Service, Manufacturing, or Trading).

Additional Default ValuesYou can test the scenario with other SAP Best Practices default values that have the same characteristics.

Check your SAP ECC system to find out which other material master data exists.

Using Your Own Master Data

© SAP AG Page 7 of 214

Page 8: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

You can also use customized values for any material or organizational data for which you have created master data. For more information on how to create master data, see the Master Data Procedures documentation.

Use the following master data in the process steps described in this document:

Org. Structure Value Comment

Controlling area Controlling area (1000) Controlling Area 1000

Company Code Company Code (1000) Company Code 1000

Plant Plant 1 (1000) Production Plant 1000

Sales organization Sales Org. 1 (1000) Sales Org. 1000

Distribution channel 10 Direct Sales

Division 10 Product Division 01

Purchase organization Purchasing Org 1 (1000) Purchasing Org. 1000

Storage Loc 1040 Finished Products

Equipment C00013 Tower crane SK-C 200

Equipment C00041 Mobile excavator C00041

Non-Consumable material CG0072 Aluminum standing ladder (2m)

Consumable Material CV0018 Metal blade for saw

© SAP AG Page 8 of 214

Page 9: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2.2 Roles

UseThe following roles must have already been installed to test this scenario in the SAP Netweaver Business Client (NWBC). The roles in this Business Process Documentation must be assigned to the user or users testing this scenario. You only need these roles if you are using the NWBC interface. You do not need these roles if you are using the standard SAP GUI.

PrerequisitesThe business roles have been assigned to the user who is testing this scenario.

Business Role Technical Name Process Step

Warehouse Clerk SAP_NBPR_WAREHOUSECLERK-S

Project Manager ECO (DIMP) SAP_NBPR_PROJMNGR_ECO_DIMP-M

Project Manager ECO SAP_NBPR_PROJECTMANAGER_ECO-M

ECO Equipment Administrator (DIMP)

SAP_NBPR_EQUIPADMIN_ECO_DIMP-S

© SAP AG Page 9 of 214

Page 10: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3 Process Overview Table

© SAP AG Page 10 of 214

Page 11: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Time Based Equipment Process

Create Requisition Note(Availability check is taken through Hit button)

Project Manager ECO (DIMP)

/SAPCEM/BEDARF01

Requisition Note for Equipment is created

If Equipment is available, execute step- Assign requisition note to Equipment

Or execute Optional step

Create an Acquisition Shipping document in CL002 for Equipment (C00013)

ECO Equipment Administrator (DIMP)

J3GH Sender is empty

Receipt is the first location that contains your equipment.

For example CL002, Activity type is 03

Assign Requisition Note to Equipment

Create Shipping Document Automatically

ECO Equipment Administrator (DIMP)

/SAPCEM/PT01

Shipping document is created automatically

Sender is the first location

Receipt is the location defined in the requisition note

For example from CL002 to CA002

Return Equipment back to the Construction Yard/Warehouse

ECO Equipment Administrator (DIMP)

J3GH Shipping document created. Not for settlement

Create SD Order- Periodical Settlement Run

ECO Equipment Administrator (DIMP)

J3GZ SD Order created for settlement run

Log for CEM SD Settlement

ECO Equipment Administrator

/SAPCEM/

SD Order numbers noted

© SAP AG Page 11 of 214

Page 12: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

(DIMP) SD_PROT(shall set the criteria among this step)

© SAP AG Page 12 of 214

Page 13: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Internal Cost Allocation

Display SD Order

ECO Equipment Administrator (DIMP)

/SAPCEM/SD_PROT

SD Order displayed

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Material and Accounting documents displayed

External Invoice

Display SD Order

ECO Equipment Administrator (DIMP)

/SAPCEM/SD_PROT

Display SD Order

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Material and Accounting documents displayed

Time-Based Equipment Process Including 3rd Party Rental Equipment

Create Requisition Note(Availability check is taken through Hit button)

Project Manager ECO (DIMP)

/SAPCEM/BEDARF01

Requisition Note for Equipment is created

Create Purchase Requisition for 3rd party equipment (Optional)

ECO Equipment Administrator (DIMP)

ME51N Purchase requisition is created

Create Purchase Order for 3rd party

ECO Equipment Administrator

ME21N Copy from previous Purchase

© SAP AG Page 13 of 214

Page 14: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

equipment(Optional)

(DIMP) requisition

Posting Goods Receipt

Warehouse Clerk

MIGO Material document XXXXXXXX posted

Enter Invoice Verification

ECO Equipment Administrator (DIMP)

MIRO Invoice and account document were created

Create Equipment

ECO Equipment Administrator (DIMP)

IE01 Create the equipment in the system for second time run time-based scenario or Time-based Third-party rental equipment

Create Equipment BOM

ECO Equipment Administrator (DIMP)

J3GSL01

Create the equipment in the system for second time run time-based scenario or Time-based Third-party rental equipment

Performance based Equipment Process

Create Requisition Note(Availability check is taken through Hit button)

Project Manager ECO (DIMP)

/SAPCEM/BEDARF01

Requisition Note for Equipment is created

Assign Requisition Note to Equipment

Create the first Shipping Document

ECO Equipment Administrator (DIMP)

/SAPCEM/PT01

Create shipping document through the same TA

Create PBE Document

ECO Equipment Administrator (DIMP)

J3G$ PBE document created

Document List for PBE

ECO Equipment

J4GQ PBE documents

© SAP AG Page 14 of 214

Page 15: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Administrator (DIMP)

displayed

© SAP AG Page 15 of 214

Page 16: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Create SD Order ECO Equipment Administrator (DIMP)

J3GZ Periodical Settlement run started

Log for CEM SD Settlement

ECO Equipment Administrator (DIMP)

/SAPCEM/SD_PROT

SD Order numbers noted

Internal Cost Allocation

ECO Equipment Administrator (DIMP)

Display SD Order

ECO Equipment Administrator (DIMP)

/SAPCEM/SD_PROT

SD Order displayed

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Material and Accounting documents displayed

External Invoice ECO Equipment Administrator (DIMP)

Display SD Order

ECO Equipment Administrator (DIMP)

VA03 SD order displayed

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Material and Accounting document displayed

ETM Non-Consumable Material Process

Initial Stock Warehouse MIGO Material

© SAP AG Page 16 of 214

Page 17: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Posting for Non-Consumable Material

Clerk document xxxxxxxx posted

Stock in MM, ETM increased

Stock Overview in MM

Project Manager ECO

MMBE Material stock displayed in MM

Current Stock for Material in ETM

ECO Equipment Administrator (DIMP)

J4GM Material stock displayed in ETM

Create First ETM Shipping Document for Acquisition

ECO Equipment Administrator (DIMP)

J3GH First shipping document created

Display First Shipping Document

ECO Equipment Administrator (DIMP)

J3GJ Shipping document displayed

Stock Overview in MM

Project Manager ECO

MMBE Material stock in MM displayed

Current Stock for Material in ETM

ECO Equipment Administrator (DIMP)

J4GM Material stock displayed in ETM

Create Second ETM Shipping Document for acquisition

ECO Equipment Administrator (DIMP)

J3GH Second shipping document created

Display Second Shipping Document

ECO Equipment Administrator (DIMP)

J3GJ Shipping document displayed

Stock Overview in MM

Project Manager ECO

MMBE Material stock in MM displayed

Current Stock for Material in ETM

ECO Equipment Administrator (DIMP)

J4GM Material stock displayed in ETM

Create SD Order ECO Equipment Administrator (DIMP)

J3GZ Periodical settlement run started

Log for CEM SD ECO / Note down the SD

© SAP AG Page 17 of 214

Page 18: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Settlement Equipment Administrator (DIMP)

SAPCEM/SD_PROT

order numbers

Internal ETM Material Sale

ECO Equipment Administrator (DIMP)

Display SD Order

ECO Equipment Administrator (DIMP)

/SAPCEM/SD_PROT

SD Order displayed

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Material and Accounting documents displayed

External ETM Material Sale

ECO Equipment Administrator (DIMP)

Display SD Order

ECO Equipment Administrator (DIMP)

VA03 Check SD Order created

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Display Material and Accounting documents

Internal ETM Material Repurchase

ECO Equipment Administrator (DIMP)

Displaying SD Order

ECO Equipment Administrator

VA03 Check SD order created

© SAP AG Page 18 of 214

Page 19: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

(DIMP)

© SAP AG Page 19 of 214

Page 20: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Display Material and Accounting documents

External ETM Material Repurchase

ECO Equipment Administrator (DIMP)

Display SD Order

ECO Equipment Administrator (DIMP)

VA03 Check SD order created

Create Billing Document

ECO Equipment Administrator (DIMP)

VF01 Billing run started

Display Billing Document

ECO Equipment Administrator (DIMP)

VF03 Display Material and Accounting documents

Consumable Material Process

Initial Stock for Consumable Material

MIGO Initial Stock make

Stock Overview in MM

Project Manager ECO

MMBE Initial stock noted

Stock Overview in ETM

ECO Equipment Administrator (DIMP)

J4GM ETM stock updated

Create ETM Shipping Document for acquisition

ECO Equipment Administrator (DIMP)

J3GH Shipping document created

Display Shipping Document

ECO Equipment Administrator (DIMP)

J3GJ Material and Accounting documents displayed

Stock Overview in MM after

Project MMBE Stock updated

© SAP AG Page 20 of 214

Page 21: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Process step External process reference

Business condition

Business role (not technical role for BP)

Transaction code

Expected results

acquisition Manager ECO

Stock Overview in ETM

ECO Equipment Administrator (DIMP)

J4GM ETM stock updated

© SAP AG Page 21 of 214

Page 22: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4 Process Steps

4.1 Time Based Equipment Process

PurposeYou use this business process to plan, dispatch, and settle time based equipment. Time based equipment can be single- or multipart equipment, which are shipped via an ETM shipping document and are settled due to time/days they have been on a recipient/location and its quantity. The shipping document allows the tracking of each equipment (single- and multipart). A time-based equipment is settled periodically with a fixed price, whereas it is not relevant, how often equipment has been used (in operation). A typical time-based equipment is a crane.

The time based equipment process starts with an equipment request of a project manager or foreman, who needs a crane with a certain specification (for example, Hook high max. 20 mtr.) for a certain period. The project manager or foreman can either enter an ETM requisition note directly by himself or he calls the equipment manager/administrator (responsible for all equipment) and he then enters the requirement in the system. After the equipment manager has assigned the request to equipment, it is sent out to the project. Typically month end the settlement and billing run takes place.

4.1.1 Creating ETM Requisition Note

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction data Planning Requisition Note Create

Transaction code /SAPCEM/BEDARF01

© SAP AG Page 22 of 214

Page 23: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Purchasing Manager (DIMP)

(SAP_NBPR_PURCHMGR_ECO_DIMP-M)

Business role menu Equipment and Tools Management Transaction Data Requisition Note Create Requisition Note

© SAP AG Page 23 of 214

Page 24: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Requisition Note screen, make the following entries:

Field name Description User action and values Comment

Recipient CA002

Period Today’s date

Today’s date + 10days

Enter today’s date in from field

Enter today’s date + 10 days into to field

© SAP AG Page 24 of 214

Page 25: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Create Requisition Note: Requirements overview screen, make the following entries:

Field name Description User action and values Comment

Short text Demo Requisition Note

Reqmts Overview screen

Class CEM_CRANE_TOP

Quantity 1

U/M NOS

© SAP AG Page 25 of 214

Page 26: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Choose Value assignment on the top of the screen.

6. On the Item %000000001/00010:Characteristic Value Assignment screen, make the following entries in the tab screen Characteristic value assignment:

Characteristic description Value

Hook high max. > 10 m

© SAP AG Page 26 of 214

Page 27: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Choose Back twice.

8. On the Create Requisition Note: Requirements overview screen, choose item 10 and choose Hit list.

9. On the Equipment Hit List screen, all equipment matching the requirement is displayed. Choose Exit.

10. On the Create Requisition Note: Requirements overview screen, choose Save (Ctrl + S).

11. On the Create Requisition Note screen, note down the requisition number displayed at the bottom of the screen.

12. Choose Back.

4.1.2 Creating Acquisition Shipping Document in CL002

UseTo have the equipment for the next step on recipient CL002 available, create a shipping document (without requirement) which returns the equipment to the warehouse.

If the Equipment is not available as mentioned in step 9 of section 4.1.1, use a dummy equipment number that represents equipment rented from a third party.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Create

Transaction code J3GH

© SAP AG Page 27 of 214

Page 28: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Create Shipping Documents

© SAP AG Page 28 of 214

Page 29: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Shipping document: Initial Screen, enter Document type C1 and choose Enter.

3. On the Create SHIPPING DOCUMENT: Item Data screen, enter the following values:

Field name Description User action and values Comment

Document date Today’s date

Sender

Recipient CL002 Warehouse

© SAP AG Page 29 of 214

Page 30: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. On the Create SHIPPING DOCUMENT: Item Data screen, choose Equipment tab and make the following entries:

Field name Description User action and values Comment

Equipment C00013 Use steps 4.2.6 and 4.2.7 to create a new equipment and BOM if C00013 has been used already

Quantity <enter quantity> For example: 1

Activity Type 03

© SAP AG Page 30 of 214

Page 31: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If the system indicates the equipment is already under recipient CL002, please ignore this step and go to 4.1.3.

If the system indicates the equipment is under other recipient (for example, CA002), than the CL002, please input the other recipient (for example, CA002) in the Sender field mentioned in step 3 above.

5. Save your entries.

6. Choose Back and return to SAP Easy Access screen.

This shipping document is not used for further processing; the activity type 03 is not relevant for settlement.

ResultShipping Document is created.

4.1.3 Assigning Equipment and Creating Shipping Document

UseThis step is to assign the Equipment to the Requisition Note and create the shipping document to the graphical planning board.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Planning Requirements Overview Graphical Planning Board - Change

Transaction code /SAPCEM/PT01

© SAP AG Page 31 of 214

Page 32: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document ETM Planning Board - Change Mode

© SAP AG Page 32 of 214

Page 33: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the CEM: planning board screen, make the following entries:

Field name Description User action and values Comment

Evaluation period From: Today’s date

To: Today’s date +1 month

Class Type 002

Class CEM_CRANE_TOP

Planning period From: Today’s date

To: Today’s date +1 month

© SAP AG Page 33 of 214

Page 34: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Execute.

4. On the CEM Planning Board: Change mode screen, you can find the Equipment on the upper half and Recipient on the lower half of the screen.

5. Find your recipient and on the right side of the screen in line of your recipient you can find your requirement created in step 4.1.1.

6. Select your Requirement and assign it with drag and drop to Equipment used in step 4.1.2 one day after the document date of the first shipping document created in the prior step.

7. Choose Save and refresh (Ctrl + F2).

8. On the ETM Planning Board: Change mode screen, choose the Requirement and choose Shipping for creating the shipping document.

9. In the Generate Shipping Document: Enter Parameters dialog box, enter Document type C1 and choose Default Activity Type then choose Continue (Enter).

10. Choose Enter to confirm the message for the shipping document creation.

11. Note down the Shipping Document number at the bottom of the screen _____________

12. Choose Back twice and return to SAP Easy Access screen.

ResultPlanning board is updated and the requirement is now assigned to the Equipment and the first shipping document had been created.

4.1.4 Returning Equipment back to the Construction Yard/Warehouse

UseTo have the equipment for the next step on recipient CL002 available, create a second shipping document (without requirement) which returns the equipment to the warehouse.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Create

Transaction code J3GH

© SAP AG Page 34 of 214

Page 35: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Create Shipping Documents

© SAP AG Page 35 of 214

Page 36: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Shipping document: Initial Screen, enter Document type C1 and choose Enter.

3. On the Create SHIPPING DOCUMENT: Item Data screen, enter the following values:

Field name Description User action and values Comment

Document date Today’s date+12days

Sender CA002

Recipient CL002

© SAP AG Page 36 of 214

Page 37: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. On the Create SHIPPING DOCUMENT: Item Data screen, choose Equipment tab and make the following entries:

Field name Description User action and values Comment

Equipment C00013

Quantity <enter quantity> For example: 1

Activity Type 03

© SAP AG Page 37 of 214

Page 38: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Save your entries.

6. Choose Back twice and return to SAP Easy Access screen.

This shipping document is not used for further processing; the activity type 03 is not relevant for settlement.

ResultShipping Document is created.

4.1.5 CEM Sales Order Settlement (Creating Sales Order)

UseTo be able to settle/invoice the rental fee for a period of time, SD orders must be created.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Create SD Orders

Transaction code J3GZ

© SAP AG Page 38 of 214

Page 39: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Settlement SD Order Create SD Orders Job Split (INPUT)

© SAP AG Page 39 of 214

Page 40: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Input CEM Sales Orders with Job Split in SD screen, make the following entries:

Field name Description User action and values Comment

Document no. First shipping document number

Noted in the step 4.1.3

Settlement date Today‘s date + 12days

Program starts as: Test Run

Program starts as: Upd. Run X

Settle equipment performance X

© SAP AG Page 40 of 214

Page 41: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If test run is marked, the transaction J3GZ can be executed several times with the same document number. This can be used to test the customize settings during implementation of ETM (CEM).

3. Choose Execute.

4. Choose Back. Choose Enter to confirm the message External job J3GNACHBEARBEITUNG started with serial number xxxxxxxx.

If you are running transaction via J3GZ, please choose Back to confirm the message, and then exit the screen. Otherwise, the system is blocked during next J3GZ run. In case the transaction is blocked, please execute transaction code J3GN, choose the Refresh data option then choose Execute to unlock.

5. Choose Back and return to SAP Easy Access screen.

4.1.6 Logging for CEM SD Settlement

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Settlement Log

Transaction code /SAPCEM/SD_PROT

© SAP AG Page 41 of 214

Page 42: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator(DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Settlement Log for ETM SD Settlement

© SAP AG Page 42 of 214

Page 43: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. Double-click the latest protocol entry.

<Date> Upd. run <User Name>

3. All Messages to this settlement run are displayed on the right screen.

4. Double-click the text SD order created of message 332.

5. All messages of this settlement run are displayed at the bottom of the screen under SD Order as shown below:

Sales Doc. Sold-to party Sender Recipient Resource ATyp ShipDocNo.

5000AAA CI002 CL002 CA002 C00013 02 XXX

5000BBB CE030 CA002 CA002 C00013 02 XXX

© SAP AG Page 43 of 214

Page 44: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

SD order 5000AAA (document type J3G1) created for internal cost allocation.

SD order 5000BBB (document type J3G2) created for external invoice.

Double-click the shipping document number or master data recipient/resource) the selected document or master data is displayed.

6. Note the SD-order numbers. The data is now ready for the cost allocation via invoice.

The creation of SD order documents is usually done once at the end of the period for all documents.

7. Choose Back and return to SAP Easy Access screen.

4.1.7 Internal Cost Allocation

4.1.7.1 Displaying SD Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 44 of 214

Page 45: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 45 of 214

Page 46: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order 5000AAA Order number displayed in line 1

© SAP AG Page 46 of 214

Page 47: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM cost settlement 5000AAA: Overview screen, choose the line item 10 and choose Document at the button of the screen.

4. On the Display CEM cost settlement 5000AAA: Item Data screen, choose the tab Object data for CEM and view the equipment relevant data.

5. On the Display CEM cost settlement 5000AAA: Item data screen, choose the tab Document data for CEM and view the document relevant data.

6. Choose Exit and go back to SAP Easy Access screen.

4.1.7.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 47 of 214

Page 48: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

2. On the Create Billing Document screen, enter the sales document number 5000AAA in the document field and choose Enter.

3. On the CEM internal (J3G1) Create: Overview of Billing Items screen, save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit and go back to SAP Easy Access screen.

4.1.7.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

2. On the Display Billing Document screen, enter the billing document number created in previous step in the Billing document field and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting document number and choose Choose.

4. On the Display Document: Data Entry View screen, you can view and note the bookings of the Accounting document. Choose Cancel.

5. In the List of Documents in Accounting dialog box, choose Controlling Document and choose Choose.

6. On the Display Actual Cost Documents screen, you can view the booking of Cost Accounting document.

© SAP AG Page 48 of 214

Page 49: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Documents are generated.

4.1.8 External Cost Allocation

4.1.8.1 Displaying Sales Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 49 of 214

Page 50: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 50 of 214

Page 51: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order 5000BBB Order number displayed in line 2

© SAP AG Page 51 of 214

Page 52: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM cost settlement 5000BBB: Overview screen, select the line item 10 and choose Document at the button of the screen.

4. On the Display CEM cost settlement 5000BBB: Item Data screen, choose the tab Object data for CEM and view the equipment relevant data.

5. On the Display CEM cost settlement 5000BBB: Item data screen, choose the tab Document data for CEM and view the document relevant data.

6. Choose Exit and go back to SAP Easy Access screen.

4.1.8.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 52 of 214

Page 53: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 53 of 214

Page 54: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number 5000BBB in the Document field and choose Enter.

3. On the CEM internal (J3G2) Create: Overview of Billing Items screen, save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit and go back to SAP Easy Access screen.

ResultThe system generates an invoice for billing.

4.1.8.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 54 of 214

Page 55: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 55 of 214

Page 56: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the field Billing Document and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting number and choose Choose.

4. On the Display Document: Data Entry View screen, you can view and note the bookings of the Accounting document. Choose cancel.

5. In the List of accounting documents dialog box, choose Cost Accounting doc and choose Choose.

6. On the Display Actual Cost Document screen, you can view at the booking of Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

Financial Posting:

Material Debited Accounts

Credited Accounts Cost Element / CO Object

CE030 (16443100)

38000100 Depr. + intrst calc. for time-bsd equi.

38000120 Repair costs flat rate time-bsd equi.

18141101 Service tax provision on services-HO

WBS CA002

© SAP AG Page 56 of 214

Page 57: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If you run above business case for the second time, execute steps 4.2.4 to 4.2.5 for creating the equipment and equipment BOM firstly and then execute steps 4.1.1 to 4.1.8 for all the rest.

4.2 Time-Based Equipment Process Including Third-Party Rental Equipment

4.2.1 Creating ETM Requisition Note

UseIn this activity, you create an ETM requisition note.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Planning Requisition Note Create

Transaction code /SAPCEM/BEDARF01

© SAP AG Page 57 of 214

Page 58: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO (DIMP)

(SAP_NBPR_PROJMNGR_ECO_DIMP-M)

Business role menu Equipment and Tools Management Transaction Data Requisition Note Create Requisition Note

© SAP AG Page 58 of 214

Page 59: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Requisition Note screen, make the following entries:

Field name Description User action and values Comment

Recipient CA002

Period Today’s date

Today’s date + 10days

Enter today’s date in from field

Enter today’s date + 10 days into to field

© SAP AG Page 59 of 214

Page 60: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Create Requisition Note: Requirement overview screen, make the following entries:

Field name Description User action and values Comment

Short text Demo Requisition Note

Requirement Overview screen

Class CEM_CRANE_TOP

Quantity 1

U/M NOS

© SAP AG Page 60 of 214

Page 61: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Choose Value assignment on the top of the screen.

6. On the Item %000000001/00010:Characteristic Value Assignment screen, make the following entries in the tab screen Characteristic Value Assignment:

Characteristic description Value

Hook high max > 10 m

© SAP AG Page 61 of 214

Page 62: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Choose Back twice.

8. On the Create Requisition Note: Requirements overview screen, select item 10 and choose Hit list.

9. On the Equipment Hit List screen, all equipment matching the requirement is displayed.

10. If no equipment is available, we shall rent the equipment from the third-party company then process the following step for Chapter 4.2.2.

11. Choose Back and not save the requisition note, choose back and confirm the message to go back to SAP Easy Access screen.

4.2.2 Creating Purchasing Requisition for Rental Equipment

UseThis step is only required if there is no equipment available when executing the previous step.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Purchasing Purchasing Requisition Create

Transaction code ME51N

© SAP AG Page 62 of 214

Page 63: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Purchasing Purchase Requisition Create Purchase Requisition

© SAP AG Page 63 of 214

Page 64: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Purchasing Requisition screen, choose NB Purchasing Requisition and make the following entries:

Field name Description User action and values Comment

Item Overview Choose Expand Items if the collapsed

AK

Account Assignment Category – Project

Short Text Rental of Crane - 10 mtr.

Quantity 1

Unit NOS

Delivery Date Today+10days

Purchasing Group 100

Material Group YBF01

Plant 1000

Choose Enter

Valuation Price 500 Under tab Valuation

G/L account 49999100 Under tab Account Assignment

CC 1801 Under tab Account Assignment

© SAP AG Page 64 of 214

Page 65: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Save your entries.

4. Choose Back to SAP Easy Access screen.

4.2.3 Converting Purchase Requisitions to Purchase Order

UseOnce the purchase requisitions have been generated, the Purchasing agent can then generate a list of the requisitions that fall under their responsibility and then convert them to POs.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Purchasing Purchase Order Create Vendor/Supplying Plant Known

Transaction code ME21N

© SAP AG Page 65 of 214

Page 66: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Purchasing Purchase Order Create Purchase Order

© SAP AG Page 66 of 214

Page 67: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If the help window displays on the left side of the screen, choose Close.

2. If the Document overview window is not displayed, choose Document overview on.

3. In the Document Overview window, choose Selection Variant on the left of the screen, and then choose Purchase Requisitions.

4. On the Purchasing Requisitions screen, make sure all fields are blank. In the Purchasing Group field, enter 100 and choose Execute. The requisitions are listed in the Document Overview pane on the Create Purchase Order screen.

5. Choose the requisition you noted in the previous step that correspond to the following materials: (Use the shift key to select a range of requisitions).

6. Choose Adopt on the left pane.

7. Enter Vendor 300000, Purch. Org. 1000.

8. Expand the Item Overview and Item Details if they are collapsed, then enter quantity 1 and tax code S1 for each item.

9. Save your entries.

10. Choose Back and go back to SAP Easy Access screen.

4.2.4 Posting Goods Receipt

UseOnce the purchase requisitions have been generated, the Purchasing agent can then generate a list of the requisitions that fall under their responsibility and then convert them to POs.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Inventory Management Goods Movement Goods Movement(MIGO)

Transaction code MIGO

© SAP AG Page 67 of 214

Page 68: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Warehouse Clerk

(SAP_NBPR_WAREHOUSECLERK-S)

Business role menu Warehouse Management Consumption and Transfers Other Goods Movement

© SAP AG Page 68 of 214

Page 69: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If the help window displays on the left side of the screen, choose Close.

2. On the Goods Receipt Purchase Order - <User> screen, make the following entries and choose Execute:

Field name Description User action and values Comment

Executable Action in Transaction

Goods Receipt

Reference Document Purchase Order

Purchasing Document number

Purchase Order Number created in previous step

© SAP AG Page 69 of 214

Page 70: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Select the Item OK checkbox at the bottom of the screen, choose Enter.

4. On the Excise Invoice tab, at Header Data, make the following entries.

Field name Description User action and values Comment

Excise Action No Excise Entry Choose No Excise Entry from dropdown list

© SAP AG Page 70 of 214

Page 71: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Choose Post.

6. Confirm any warning message, then choose Back and go back to SAP Easy Access screen.

4.2.5 Invoice Verification

UseEnter the invoice for this Purchase order.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Logistics Invoice Verification Document Entry Enter Invoice

Transaction code MIRO

© SAP AG Page 71 of 214

Page 72: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Invoice Enter Incoming Invoice

© SAP AG Page 72 of 214

Page 73: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Field name Description User action and values Comment

Transaction Invoice Choose entry from the input help.

Invoice Date <enter date dd.mm.yyyy> For example: current date

PO number <purchase order number from previous steps>

On tab PO reference in lower screen area

© SAP AG Page 73 of 214

Page 74: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. With the purchase order information displayed, enter the invoice amount including taxes, and select the Calculate Tax checkbox. Choose the same tax code S1 in the purchase order.

5. Choose Post to save your entries.

6. Choose Back and go back to SAP Easy Access screen.

ResultThe system generates a logistics invoice and an accounting document.

Financial postings:

Material Debited Accounts

Credited Accounts Cost Element / CO Object

300000 Vendor domestic 00

18729001 Provisional liability-Vendor-Materials-GR/IR

26364211 Service tax on hold on services-BP 21

26364216 ECS on hold on services-BP 21

26364218 SEC on hold on services-BP 21

none

© SAP AG Page 74 of 214

Page 75: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.2.6 Creating Equipment

UseIn this activity, you create equipment.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Master Data Equipment Create

Transaction code IE01

© SAP AG Page 75 of 214

Page 76: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Master Data Equipment Create Equipment

© SAP AG Page 76 of 214

Page 77: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Equipment: Initial Screen, make the following entries:

Field name Description User action and values Comment

Equipment C00015

Valid On 01.01.2010

Equipment Category 1

Reference Equipment C00013

© SAP AG Page 77 of 214

Page 78: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Copy Equipment screen, mark all fields and choose Continue.

5. Save your entries to create the new equipment.

6. Choose Exit and go back to SAP Easy Access screen.

4.2.7 Creating Equipment BOM

UseIn this activity, you process the Time Based scenario for the second time or process this business case with rental equipment from a third-party company.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Master Data Catalogs Bill of Material Create

Transaction code J3GSL01

© SAP AG Page 78 of 214

Page 79: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Master Data Catalog - Bill of Material Create Catalog BOM

© SAP AG Page 79 of 214

Page 80: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create ETM BOM: Initial Screen, make the following entries:

Field name Description User action and values Comment

Equipment C00015

Catalog BGL91

No.in catalog 2125-0200

Valid From 01.01.2010

© SAP AG Page 80 of 214

Page 81: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Create ETM BOM: Detail screen, make the following entries:

Field name Description User action and values Comment

No. in catalog 2125-0200

© SAP AG Page 81 of 214

Page 82: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Choose the Value assignment for item, accept the message as Do you want to change the existing values with Yes.

6. Choose Back.

7. Choose Save and activate (F7).

Execute steps 4.1.1 to 4.1.8 for the remaining steps from creating the requisition notes to billing document generation.

8. Choose Exit and go back to SAP Easy Access screen.

4.3 Performance Based Equipment Process

PurposeThis business scenario is used to record performed equipment hours, used amount of fuel and oil (for example, liter), amount of kilometers, and so on, for a project and to settle performance based equipment (PBE). PBEs are settled due to its performed hours respectively its quantity. Performance based equipment - mostly very expensive single equipment – are send out to a construction side via a shipping document (for tracking), but parallel to this a performance based equipment document (PBE document) is entered to control the usage of single equipment. A typical performance based equipment is an excavator.

The performance based equipment process starts analogous to the time based equipment process with an equipment request of a project manager or foreman, who needs an excavator with a certain specification (for example, Power 100kw) for a certain period. The project manager can either enter an ETM requisition note directly by himself or he calls the equipment manager/administrator (responsible for all equipment) and he then enters the requirement in the system. After the equipment manager has assigned the request to equipment, it is sent to the project.

On either a daily or weekly basis, the performed equipment hours are entered on a PBE document to the project or recipient. After the PBE documents are entered for the period, settlement is run, which recognizes that a PBE document and a shipping document exist and that they are interdependent.

After the settlement list has been created and checked for its correctness through the project manager or foreman the billing run takes place.

4.3.1 Creating ETM Requisition Note

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Planning Requisition Note Create

Transaction code /SAPCEM/BEDARF01

© SAP AG Page 82 of 214

Page 83: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO (DIMP)

(SAP_NBPR_PROJMNGR_ECO_DIMP-M)

Business role menu Equipment and Tools Management Transaction Data Requisition Note Create Requisition Note

© SAP AG Page 83 of 214

Page 84: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Requisition Note screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Recipient CA002

Period Today’s date until Today’s date

Enter today’s date in both from and to fields

© SAP AG Page 84 of 214

Page 85: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Create Requisition Note: Requirements overview screen, make the following entries:

Field name Description User action and values Comment

Short text Demo Requisition Note

Requirement Overview screen

Class CEM_EX_WHEELS

Quantity 1

U/M NOS

© SAP AG Page 85 of 214

Page 86: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. Choose Value assignment on the top of the screen.

5. On the Item %000000001/00010:Characteristic Value Assignment screen, make the following entries in the tab screen Characteristic Value Assignment:

Characteristic description Value

Power kw < 100 KW

© SAP AG Page 86 of 214

Page 87: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

6. Choose Back twice.

7. On the Create Requisition Note: Requirements overview screen, select item 10 and choose Hit list.

8. On the Equipment Hit List screen, all Equipment matching the requirement is displayed.

9. Choose Exit.

10. On the Create Requisition Note: Requirements overview screen, save your entries.

11. On the Create Requisition Note screen, note down the requisition number displayed at the bottom of the screen.

12. Choose Exit and go back to SAP Easy Access screen.

4.3.2 Assigning Requisition Note to Equipment

UseIn this activity, you assign the requisition note to the equipment.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Planning Requirements Overview Graphical Planning Board - Change

Transaction code /SAPCEM/PT01

© SAP AG Page 87 of 214

Page 88: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document ETM Planning Board - Change Mode

© SAP AG Page 88 of 214

Page 89: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the CEM: planning board screen, make the following entries:

Field name Description User action and values Comment

Evaluation Period From: Today’s date

To: Today’s date +1 month

Class Type 002

Class CEM_EX_WHEELS

Planning board From: Today’s date

To: Today’s date +1 month

© SAP AG Page 89 of 214

Page 90: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Execute.

4. On the CEM Planning Board: Change mode screen, you can find the Equipment on the upper half and Recipient on the lower half of the screen.

5. Find your Recipient and on the right side of the screen in line of your recipient you can find your requirement created in step 4.3.1.

6. Select your Requirement and assign it with drag and drop to Equipment C00041 (or a new equipment created if C00041 has been used already).

7. Choose Save and Refresh.

8. On the ETM Planning Board: Change mode screen, choose your requirement and then choose Shipping.

9. On the Generate Shipping Document: Enter Parameters screen, enter Document type C1 and Default Activity Type, then choose Enter.

If the system raise error message as Equipment CXXXXX already at recipient CA002, please use transaction code J3GH to move the equipment CXXXXX from CA002 to CL002. You may refer to step 4.1.4 Returning Equipment back to the Construction Yard/Warehouse for the details. Then execute the step 8-9.

10. Confirm the message.

11. Note down the Shipping Document number at the bottom of the screen _____________

12. Choose Back twice to return to SAP Easy Access screen.

ResultPlanning board is updated and the requirement is now assigned to the Equipment and the first shipping document had been created.

4.3.3 Creating PBE Document

UseIn this activity, you create the PBE document.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents PBE Documents Enter

Transaction code J3G$

© SAP AG Page 90 of 214

Page 91: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data PBE Document Create PBE Document

© SAP AG Page 91 of 214

Page 92: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create PBE Document: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Document Type C6

© SAP AG Page 92 of 214

Page 93: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the PBE DOCUMENT (MACHINES) Create Header and Item Data: Detail screen, maintain following entries and choose Enter:

Field name Description User action and values Comment

Period Today’s date – Today’s date

In both fields from and to, enter today’s date

Recipient CA002

Equipment C00041

© SAP AG Page 93 of 214

Page 94: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. When you choose Enter, Item data screen is displayed. Maintain the following values on Item data screen:

Field name Description User action and values Comment

Activity Type02

Choose Enter after entering the activity type.

mm/dd/yy (today’s date) 8

Specify working hours

© SAP AG Page 94 of 214

Page 95: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Save your entries.

6. Choose Exit and go back to SAP Easy Access screen.

ResultPBE document is created.

4.3.4 Document List for PBE

UseIn an operation system it is not necessary to run this transaction, because the following transaction J3GZ is executed once per month and the selection is made per settlement date or ship-to party.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents PBE Documents Document List for PBE Document List for PBE

Transaction code J4GQ

© SAP AG Page 95 of 214

Page 96: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data PBE Document Document List for PBE

© SAP AG Page 96 of 214

Page 97: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the List of Created PBE Documents screen, enter the following values and choose Execute (F8).

Field name Description User action and values Comment

Date of activity output Today’s date

Equipment C00041

© SAP AG Page 97 of 214

Page 98: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the List of created PBE documents screen, make a note of the external document number: __________

4. Choose Back twice and return to SAP Easy Access screen.

4.3.5 Creating Sales Order

UseIn this activity, to settle or invoice the rental fee for a period of time, you create SD orders.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Create SD Orders

Transaction code J3GZ

© SAP AG Page 98 of 214

Page 99: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Settlement SD Order Create SD Orders Job Split (INPUT)

© SAP AG Page 99 of 214

Page 100: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Input CEM Sales Orders with Job Split in SD screen, make the following entries:

Field name Description User action and values Comment

Document noPBE document number

Noted in the previous step

Settlement date Today‘s date

Program starts as: Test Run

Program starts as: Upd. Run X

Settle equipment performance X

© SAP AG Page 100 of 214

Page 101: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If test run is marked, the transaction J3GZ can be executed several times with the same document number. This can be used to test the customize settings during implementation of ETM (CEM).

3. Choose Execute.

4. Choose Back. Choose Enter to confirm the message External job J3GNACHBEARBEITUNG started w serial number 12xxxxxx.

If you are running transaction via J3GZ, please choose Back to confirm the message, and then exit the screen. Otherwise, the system is blocked during next J3GZ run. In case the transaction is blocked, execute transaction code J3GN, choose the Refresh data option to unlock.

5. Choose Exit and go back to SAP Easy Access screen.

4.3.6 Logging for CEM SD Settlement

UseIn this activity, you check a settlement log.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Settlement Log

Transaction code /SAPCEM/SD_PROT

© SAP AG Page 101 of 214

Page 102: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Settlement Log for ETM SD Settlement

© SAP AG Page 102 of 214

Page 103: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. Double-click the latest protocol entry.

<Date>Upd.run<Name>

3. All Messages to this settlement run are displayed.

4. Double-click the text SD order created of message 332.

5. All messages of this settlement run are displayed at the bottom of the screen under SD Order as shown below:

Sales doc. Sold-to pt Sender Recipient Resource ATyp Document No

5000AAA CI002 CA002 C00041 02 200000XXX

5000BBB CE030 CA002 CA002 C00041 02 200000XXX

© SAP AG Page 103 of 214

Page 104: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

SD order 5000AAA (document type J3G1) created for internal cost allocation

SD order 5000BBB (document type J3G2) created for external invoice

Double-click the document number (shipping document) or master data recipient/resource) the selected document or master data is displayed.

6. Note the SD order numbers. The data is now ready for the cost allocation via invoice.

The step of creating SD order documents is usually done once at the end of the period for all documents collectively.

7. Choose Exit and go back to SAP Easy Access screen.

4.3.7 Internal Cost Allocation

4.3.7.1 Displaying Sales Order

UseIn this activity, you display the sales order.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 104 of 214

Page 105: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 105 of 214

Page 106: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose enter:

Field name Description User action and values Comment

Order 5000AAA Order number displayed in line 1

© SAP AG Page 106 of 214

Page 107: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM cost settlement 5000AAA: Overview screen, select the line item 10 and choose Document at the bottom of the screen.

4. On the Display CEM cost settlement 5000AAA: Item data screen, choose the tab Object data for CEM and view the equipment relevant data.

5. On the Display CEM cost settlement 5000AAA: Item data screen, choose the tab Document data for CEM and view the document relevant data.

6. Choose exit and go back to SAP Easy Access screen.

4.3.7.2 Creating Billing Document

UseIn this activity, you create the billing document.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 107 of 214

Page 108: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 108 of 214

Page 109: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number 5000XXX in the document field and choose Enter.

3. On the CEM internal (J3G1) Create: Overview of Billing Items screen, save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit and return to SAP Easy Access screen.

ResultThe billing document is created.

4.3.7.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 109 of 214

Page 110: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 110 of 214

Page 111: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the field Billing Document and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting number and choose Choose.

4. On the Document Overview screen, you can view and note the bookings of the Accounting document. Choose cancel.

5. In the List of accounting documents dialog box, choose Cost Accounting doc and choose Choose.

6. On the Display Actual Cost Document screen, you can view ate booking of Cost Accounting document.

7. Choose Back and confirm the message to return to SAP Easy Access screen.

ResultAccounting Document is generated.

4.3.8 External Invoice

4.3.8.1 Displaying SD Order

UseIn this activity, you display the sales order.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 111 of 214

Page 112: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 112 of 214

Page 113: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order 5000BBB Order number displayed in line 2

© SAP AG Page 113 of 214

Page 114: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM cost settlement 5000BBB: Overview screen, select the line item 10 and choose Document button at the button of the screen.

4. On the Display CEM cost settlement 5000BBB: Item Data screen, choose the tab Object data for CEM and view the equipment relevant data.

5. On the Display CEM cost settlement 5000BBB: Item data screen, choose the tab Document data for CEM and view the document relevant data.

6. Choose Exit and go back to SAP Easy Access screen.

4.3.8.2 Creating Billing Document

UseIn this activity, you create the billing document.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 114 of 214

Page 115: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 115 of 214

Page 116: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number 5000YYY in the document field and choose Enter.

3. On the CEM external (J3G2) Create: Overview of Billing Items screen, save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit and go back to SAP Easy Access screen.

4.3.8.3 Displaying Billing Document

UseIn this activity, you display the billing document.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 116 of 214

Page 117: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 117 of 214

Page 118: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the field Billing Document and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting number and choose Choose.

4. On the Document Overview screen, you can view and note the bookings of the Accounting document. Choose cancel.

5. In the List of accounting documents dialog box, choose Cost Accounting doc and choose Choose.

6. On the Display Actual Cost Document screen, you can view ate booking of Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

4.4 ETM Non-Consumable Material Process

PurposeThis business scenario uses standard material, called non-consumable material for example, site facilities, ladders, and so on.

has to be sent out from a warehouse to a recipient (debtor master with enhanced ETM view) together with equipment in one ETM shipping document

or

has to be taken out of a magazine

In both ways, non-consumable material is given back to the magazine or the warehouse via ETM shipping document after it has been used. This saves time and costs for transports and administrative effort. Magazines are a kind of little project warehouses on large construction sites/projects.

The process in ETM is called sales and repurchase of non consumable material to and from a recipient/project - to and from a warehouse. This means, construction sides buy non consumable material for a fixed price and after the non consumable material is given back to either the magazine or the warehouse a reduced value is credited to the project (automated repurchase process).

When the periodically settlement takes place, projects get debited for the received material and credited for the returned material. So the project pays a kind of provision fee for the usage of the material.

Generally the settlement of non consumable material is based on quantity and not on the time period like time based equipment.

The cost charging and automated repurchase of non-consumable material is fully automated handled via ETM.

4.4.1 Initial Stock Posting for Non-Consumable Material

Use

© SAP AG Page 118 of 214

Page 119: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

In this step, you receive the material both in MM and ETM stock. After the goods receipt posting, the stock in MM and ETM increase with the same quantity.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Inventory Management Goods Movement Goods Movement(MIGO)

Transaction code MIGO

© SAP AG Page 119 of 214

Page 120: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Warehouse Clerk

(SAP_NBPR_WAREHOUSECLERK-S)

Business role menu Warehouse Management Consumption and Transfers Other Goods Movement

© SAP AG Page 120 of 214

Page 121: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Initial Screen, make the following entries:

Field name Description User action and values Comment

Action Goods Receipt First top-left frame

Reference Other Second top-left frame

Movement type 501

Special Stock Indicator

© SAP AG Page 121 of 214

Page 122: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Material tab, make the following entries:

Field name Description User action and values Comment

Material CG0072

© SAP AG Page 122 of 214

Page 123: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. On the Quantity tab, make the following entries:

Field name Description User action and values Comment

Qty in Unit of Entry <Required quantity> 100

© SAP AG Page 123 of 214

Page 124: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

6. On the Where tab, make the following entries:

Field name Description User action and values Comment

Plant 1000

Storage Location 1040

Choose Enter

© SAP AG Page 124 of 214

Page 125: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Select the Items OK check box.

8. Choose Post.

9. Choose Exit and go back to SAP Easy Access screen.

ResultInitial stock for the consumable materials was posted.

4.4.2 Stock Overview in MM

UseThis step is carried out to note down the initial stock (stock before creating a shipping document) in the SAP Plant.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Environment Stock Stock Overview

Transaction code MMBE

© SAP AG Page 125 of 214

Page 126: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO

(SAP_NBPR_PROJECTMANAGER_ECO-M)

Business role menu Project Management Material Stock Stock Overview

© SAP AG Page 126 of 214

Page 127: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock Overview: Company Code/ Plant/ Storage Location/ Batch screen, enter the following values and choose Execute (F8):

Field name Description User action and values Comment

Material CG0072 <Material Number>

Plant 1000 <Plant>

Storage Location 1040 <Stor. Loc>

© SAP AG Page 127 of 214

Page 128: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the quantity of Material in Unrestricted Use column ___________. This is the quantity of material in Plant/ Storage Location before any delivery.

4. Choose Exit and go back to SAP Easy Access screen.

ResultMaterial Stock in Storage Location is noted _______

4.4.3 Current Stock for Material in ETM

UseThe current stock for material can be noted down for the recipients CL002, CA002, and CP002.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Environment Current Stock J4GM – Material Stock

Transaction code J4GM

© SAP AG Page 128 of 214

Page 129: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Material Stock Current Stock for Material

© SAP AG Page 129 of 214

Page 130: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock List Current Stock screen, enter following values and choose Execute.

Field name Description User action and values Comment

Material stock Checked

Choose Enter

Material Number CG0072 <Material Number>

© SAP AG Page 130 of 214

Page 131: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the stock quantity of Material for Recipients CL002, CA002, and CP002.

4. Choose Back twice to return to SAP Easy Access screen.

ResultMaterial Stock is noted for Recipients.

4.4.4 Creating First ETM Shipping Document for Acquisition

UseThe shipping document is created to transfer material from warehouse CL002 (recipient 1) to CA002 (recipient 2).

PrerequisitesThere should be enough stock in the warehouse.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Create

Transaction code J3GH

© SAP AG Page 131 of 214

Page 132: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Create Shipping Documents

© SAP AG Page 132 of 214

Page 133: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Shipping document: Initial Screen, enter Document type C1 and choose Enter.

3. On the Create SHIPPING DOCUMENT: Item Data screen, enter the following values:

Field name Description User action and values Comment

Document date Today’s date

Sender CL002

Recipient CA002

© SAP AG Page 133 of 214

Page 134: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. On the Create SHIPPING DOCUMENT: Item Data screen, choose Material tab and make the following entries:

Field name Description User action and values Comment

Material CG0072

Quantity <enter quantity> For example: 5

Activity Type 20

© SAP AG Page 134 of 214

Page 135: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. Save your entries.

6. Note down the Shipping Document number at the bottom of the screen _____________

7. Choose Back and return to SAP Easy Access screen.

ResultShipping Document is created.

4.4.5 Displaying Shipping Document

UseThis activity displays Material documents.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Display

Transaction code J3GJ

© SAP AG Page 135 of 214

Page 136: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Display Shipping Documents

© SAP AG Page 136 of 214

Page 137: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Shipping document: Initial Screen, enter the shipping document number noted in the previous step in the Document number field. Choose Enter.

3. On the Display SHIPPING DOCUMENT: Item Data screen, in the Header data area, you can see the material document number in the Mat. Doc. field.

4. Double-click the field material document number in Mat. Doc. field.

5. On the Display Material Document XXXXXXXXXX: Overview screen, the system displays the material document that is automatically created via shipping document.

6. Choose Back to return to SAP Easy Access screen.

4.4.6 Stock Overview in MM

UseThis step is carried out to note down the stock after acquisition of material.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Environment Stock Stock Overview

Transaction code MMBE

© SAP AG Page 137 of 214

Page 138: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO

(SAP_NBPR_PROJECTMANAGER_ECO-M)

Business role menu Project Management Material Stock Stock Overview

© SAP AG Page 138 of 214

Page 139: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock Overview: Company Code/ Plant/ Storage Location/ Batch screen, enter the following values and choose execute:

Field name Description User action and values Comment

Material CG0072 <Material Number>

Plant 1000 <Plant>

Storage Location 1040 <Stor. Loc>

© SAP AG Page 139 of 214

Page 140: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the quantity of Material in Unrestricted Use column ___________. This is the quantity of material in Plant/ Storage Location after delivery.

4. Choose Exit and go back to SAP Easy Access screen.

ResultMaterial Stock in Storage Location is reduced by 5 units.

4.4.7 Current Stock for Material in ETM

UseThe current stock for material can be noted down for the recipients CL002 and CA002 after delivery document is created.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Environment Current Stock J4GM – Material Stock

Transaction code J4GM

© SAP AG Page 140 of 214

Page 141: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Material Stock Current Stock for Material

© SAP AG Page 141 of 214

Page 142: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock List Current Stock screen, enter following values and choose Execute.

Field name Description User action and values Comment

Material Stock Checked

Choose Enter

Material Number CG0072 <Material Number>

© SAP AG Page 142 of 214

Page 143: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the stock quantity of Material for Recipients CL002, CA002, and CP002.

4. Choose Back twice to return to SAP Easy Access screen.

ResultThe stock of recipient (1) Warehouse CL002 is now 5 pieces less and the stock of recipient (2) CA002 is increased by 5 pieces.

4.4.8 Creating Second ETM Shipping Document for Acquisition

UseThe shipping document is created to transfer material form (recipient 2) CA002 to (recipient 3) CP002.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Create

Transaction code J3GH

© SAP AG Page 143 of 214

Page 144: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Create Shipping Documents

© SAP AG Page 144 of 214

Page 145: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Shipping document: Initial Screen, enter Document type C1 and choose Enter.

3. On the Create SHIPPING DOCUMENT: Item Data screen, enter the following values and choose Enter:

Field name Description User action and values Comment

Document date Today’s date

Sender CA002

Recipient CP002

© SAP AG Page 145 of 214

Page 146: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. In the Choose PSP element (personal value list) dialog box, choose WBS element XSUBCON00213.

5. Choose Enter.

6. On the Create SHIPPING DOCUMENT: Item Data screen, choose Material tab and make the following entries:

Field name Description User action and values Comment

Material CG0072

Quantity <enter quantity> For example: 5

Activity Type 20

© SAP AG Page 146 of 214

Page 147: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Save your entries.

8. Note down the Shipping Document number at the bottom of the screen _____________

9. Choose Back twice and return to SAP Easy Access screen.

ResultShipping Document is created.

4.4.9 Displaying Shipping Document

UseThis activity displays generated documents.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Documents Shipping Documents Display

Transaction code J3GJ

© SAP AG Page 147 of 214

Page 148: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Display Shipping Documents

© SAP AG Page 148 of 214

Page 149: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Shipping Document: Initial Screen, enter the shipping document number noted in the previous step in the Document Number field. Choose Enter.

3. On the Display Shipping Document: Item Data screen, you can view the shipping document generated.

4. The field Material document is empty because the shipping document was generated from recipient (2) CA002 to Recipient (3) CP002.

The intermediate recipient (header data) field displays Warehouse CL002 (recipient (1). In the SD order, a position is automatically generated for the repurchase from recipient (2) CA002 to the Warehouse CL002 recipient (1).

5. Choose Exit and go back to SAP Easy Access screen.

4.4.10 Stock Overview in MM

UseThis step is carried out to note down the stock after acquisition of material.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Environment Stock Stock Overview

Transaction code MMBE

© SAP AG Page 149 of 214

Page 150: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO

(SAP_NBPR_PROJECTMANAGER_ECO-M)

Business role menu Project Management Material Stock Stock Overview

© SAP AG Page 150 of 214

Page 151: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock Overview: Company Code/ Plant/ Storage Location/ Batch screen, enter the following values and choose Execute.

Field name Description User action and values Comment

Material CG0072 <Material Number>

Plant 1000 <Plant>

Storage Location 1040 <Stor. Loc>

© SAP AG Page 151 of 214

Page 152: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the quantity of Material in Unrestricted Use column ___________. This is the quantity of material in Plant/ Storage Location after second delivery.

4. Choose Exit twice and go back to SAP Easy Access screen.

ResultThere is no change in quantity.

4.4.11 Current Stock for Material in ETM

UseThe current stock for material can be noted down for the recipients CL002 and CA002 after delivery document is created.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Environment Current Stock J4GM – Material Stock

Transaction code J4GM

© SAP AG Page 152 of 214

Page 153: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Material Stock Current Stock for Material

© SAP AG Page 153 of 214

Page 154: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock List Current Stock screen, enter following values and choose Execute.

Field name Description User action and values Comment

Material stock Checked

Choose Enter

Material Number CG0072 <Material Number>

© SAP AG Page 154 of 214

Page 155: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the stock quantity of Material for Recipients CL002, CA002, and CP002.

4. Choose Back twice to return to SAP Easy Access screen.

ResultThe stock of recipient (2) CA002 is now 5 pieces less and the stock of recipient (3) CP002 is increased by 5 pieces.

4.4.12 Creating Sales Order

UseAn SD order must be created to settle/ invoice the rental fee for a period of time.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Create SD Orders

Transaction code J3GZ

© SAP AG Page 155 of 214

Page 156: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Settlement SD Order Create SD Orders Job Split (INPUT)

© SAP AG Page 156 of 214

Page 157: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Input CEM Sales Orders with Job Split in SD screen, enter the following values and choose Execute:

Field name Description User action and values Comment

Document no. From: First Shipping document created

To: Second shipping document

Settlement Date Today’s date

Program start as Upd. Run X

Program start as Test run

Settle material deliveries X

© SAP AG Page 157 of 214

Page 158: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

If test run is marked, the transaction J3GZ can be executed several times with the same document number. This can be used to test the customize settings during implementation of ETM (CEM).

3. Choose Back, choose Enter to confirm the message External job J3GNACHBEARBEITUNG started w serial number 12xxxxxx.

If you are running transaction via J3GZ, choose Back to confirm the message, and then exit the screen. Otherwise, the system is locked during next J3GZ run. In case the transaction J3GZ is blocked, execute transaction code J3GN, choose the Refresh data option to unlock.

4. Choose Back to return to SAP Easy Access screen.

4.4.13 Logging for CEM SD Settlement

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Settlement SD Orders Settlement Log

Transaction code /SAPCEM/SD_PROT

© SAP AG Page 158 of 214

Page 159: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Settlement Log for ETM SD Settlement

2. Double-click the latest protocol entry.

<Date>Upd.run<Name>

3. All Messages to this settlement run are displayed.

4. Double-click the text SD order created of message 332.

5. SD Orders are created and displayed as overview at the bottom of the screen as shown below:

Sales doc.

Sold-to pt Sender Recipient Resource ATyp ShipDocNo

5000AAA CI002 CL002 CA002 20 XXX (first shipping doc)

5000BBB CI002 CL002 CP002 20YYY(second shipping doc number)

5000CCC CI002 CA002 CL002 21YYY(second shipping doc number)

5000DDD CE030 CA002 CA002 20 XXX (first shipping doc)

5000EEE CE030 CA002 CA002 21YYY(second shipping doc number)

Shipping Document number XXX (first shipping document number)

Sender recipient (1) CL002 to recipient (2) CA002

Line 1:Internal Selling of Material from CL002 to CA002

Line 4: External Selling of Material to debtor CE030 on behalf of CA002

Shipping Document number YYY (second shipping document number)

Line 3: Internal Purchasing of material from recipient (2) CA002 to recipient (1) CL002

© SAP AG Page 159 of 214

Page 160: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Line 5: external repurchasing of material from debtor CE030 on behalf of recipient (2) CA002

Line 2: internal selling of material from recipient (1) CL002 to recipient (3) CP002

The SD orders on lines 3, 4, and 5 are automatically created due customizing settings. With double-click the document number (sales-/shipping document) or master data (recipient/resource) the selected document or master data is displayed.

6. Make a note of the SD Order numbers: __________ __________ __________ __________

7. Choose Exit and go back to SAP Easy Access screen.

ResultSD orders are created and the data is now ready for cost allocation via invoice.

4.4.14 Internal ETM Material Sales

4.4.14.1 Displaying Sales Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 160 of 214

Page 161: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 161 of 214

Page 162: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order SD Order no. (Line 1), for example: 5000AAA

Order number displayed in line 1, for cost allocation

© SAP AG Page 162 of 214

Page 163: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM mat. sales int.5000AAA: Overview screen, select the line item 10 and choose Item Details at the button of the screen.

4. On the Display CEM mat. sales int.5000AAA: Item Data screen, choose the tab Document data for CEM and view the document data.

5. Choose ETM Material Sales/ Repurchase tab and review the sales and repurchase data for material.

6. Choose cancel twice to go back to SAP Easy Access screen.

4.4.14.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 163 of 214

Page 164: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 164 of 214

Page 165: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number in the document field and choose Enter.

3. On the CEM invoice list int (J3G3) Create: Overview of Billing Items screen, check the order quantity, delivery date, and activity. Save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit and go back to SAP Easy Access screen.

ResultThe billing document is created.

4.4.14.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 165 of 214

Page 166: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 166 of 214

Page 167: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the billing document number created in previous step in the Billing Document field and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting number and choose Choose.

4. On the Display Document: Data Entry View screen, you can view and note the bookings of the accounting document. Choose Cancel.

5. In the List of Documents in Accounting dialog box, choose Controlling Document line and choose Choose.

6. On the Display Actual Cost Documents screen, you can view the booking of Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

Financial Posting:

Debited Accounts Credited Accounts Note

33112900 Sal-Dom-Dir-Svc 33112900 Sal-Dom-Dir-Svc

© SAP AG Page 167 of 214

Page 168: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.4.15 External ETM Material Sales

4.4.15.1 Displaying SD Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 168 of 214

Page 169: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 169 of 214

Page 170: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order SD Order no. (Line 2), for example: 5000BBB

Order number displayed in line 2, for cost allocation

© SAP AG Page 170 of 214

Page 171: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM mat. Sales int.5000BBB: Overview screen, select the line item 10 and choose Item Details at the button of the screen.

4. On the Display CEM mat. Sales int.5000BBB: Item data screen, choose the tab Document data for CEM and view the document data.

5. Choose cancel twice to go back to SAP Easy Access screen.

4.4.15.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 171 of 214

Page 172: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 172 of 214

Page 173: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number in the document field and choose Enter.

3. On the CEM invoice list int (J3G3) Create: Overview of Billing Items screen, check the order quantity, delivery date, and activity. Save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose Exit to go back to SAP Easy Access screen.

ResultThe billing document is created.

4.4.15.3 Displaying Billing Document for External

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 173 of 214

Page 174: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 174 of 214

Page 175: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the Billing Document field and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting document line and choose Choose.

4. On the Display Document: Data Entry View screen, you can view and note the bookings of the Accounting document. Choose Cancel.

5. In the List of Documents in Accounting dialog box, choose Controlling Document and choose Choose.

6. On the Display Actual Cost Documents screen, you can view the Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

Financial Posting:

Debited Accounts Credited Accounts Note

33112900 Sal-Dom-Dir-Svc 33112900 Sal-Dom-Dir-Svc

© SAP AG Page 175 of 214

Page 176: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.4.16 Internal ETM Material Repurchasing

4.4.16.1 Displaying SD Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 176 of 214

Page 177: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 177 of 214

Page 178: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order SD Order no. (Line 3), for example: 5000CCC

Order number displayed in line 3, for cost allocation

© SAP AG Page 178 of 214

Page 179: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM mat. repur. int.5000CCC: Overview screen, select the line item 10 and choose Item Details at the button of the screen.

4. On the Display CEM mat. repur. int.5000CCC: Item Data screen, choose the tab Document data for CEM and view the shipping document relevant data.

5. Choose Cancel twice and go back to SAP Easy Access screen.

4.4.16.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 179 of 214

Page 180: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 180 of 214

Page 181: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number in the document field and choose Enter.

3. On the CEM mat repur. int (J3G4) Create: Overview of Billing Items screen, check the order quantity, delivery date, and activity. Save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

5. Choose cancel and go back to SAP Easy Access screen.

ResultThe billing document is created.

4.4.16.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 181 of 214

Page 182: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 182 of 214

Page 183: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the Billing Document field and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting number and choose Choose.

4. On the Document Overview screen, you can view and note the bookings of the Accounting document. Choose cancel.

5. In the List of accounting documents dialog box, choose Cost Accounting doc and choose Choose.

6. On the Display Actual Cost Document screen, you can view ate booking of Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

Financial Posting:

Debited Accounts Credited Accounts Note

33112900 Sal-Dom-Dir-Svc 33112900 Sal-Dom-Dir-Svc

© SAP AG Page 183 of 214

Page 184: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.4.17 External ETM Material Repurchasing

4.4.17.1 Displaying SD Order

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Sales Order Display

Transaction code VA03

© SAP AG Page 184 of 214

Page 185: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Sales Order Display Sales Order

© SAP AG Page 185 of 214

Page 186: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Sales Order: Initial Screen, make the following entries and choose Enter:

Field name Description User action and values Comment

Order SD Order no. (Line 4), for example: 5000DDD

Order number displayed in line 4, for cost allocation

© SAP AG Page 186 of 214

Page 187: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. On the Display CEM mat. sales ext. 5000DDD: Overview screen, select the line item 10 and choose Item Details at the button of the screen.

4. On the Display CEM mat. sales ext. 5000DDD: Item data screen, choose the tab Document data for CEM and view the document data.

5. Choose cancel twice and go back to SAP Easy Access screen.

4.4.17.2 Creating Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Create

Transaction code VF01

© SAP AG Page 187 of 214

Page 188: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Create Billing Document

© SAP AG Page 188 of 214

Page 189: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Billing Document screen, enter the sales document number in the document field and choose enter.

3. On the CEM mat. repur. ext. (J3G9) Create: Overview of Billing Items screen, check the order quantity, delivery date, and activity. Save your entries.

4. Note the Billing document number displayed at the bottom of the screen.

ResultThe billing document is created.

4.4.17.3 Displaying Billing Document

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Sales and Distribution Billing Billing Document Display

Transaction code VF03

© SAP AG Page 189 of 214

Page 190: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Sales Billing Display Billing Document

© SAP AG Page 190 of 214

Page 191: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Billing Document screen, enter the Billing document number created in previous step in the Billing Document field and choose Accounting.

3. In the List of Documents in Accounting dialog box, choose the Accounting document line and choose Choose.

4. On the Display Document: Data Entry View screen, you can view and note the bookings of the Accounting document. Choose Cancel.

5. In the List of Documents in Accounting dialog box, choose Controlling Document and choose Choose.

6. On the Display Actual Cost Document screen, you can view ate booking of Cost Accounting document.

7. Choose Back and return to SAP Easy Access screen.

ResultAccounting Document is generated.

Financial Posting:

Material Debited Accounts Credited Accounts Note

CE030 33112900 Sales-Dom-Direct-Services

18141101 Service tax provision on services-HO

© SAP AG Page 191 of 214

Page 192: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4.5 ETM Consumable Material Process

PurposeYou use this business process to send out standard material, called consumable material (for example, concrete or nails) together with equipment in one ETM shipping document to reduce transport- and handling costs for projects in construction industry.

The cost charging is done by SAP standard Sales and Distribution (SD) and Material Management (MM). ETM only overtakes - logistically seen - the delivery of consumable material.

No settlement takes place in ETM for consumable materials.

4.5.1 Initial Stock Posting for Consumable Material

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Inventory Management Goods Movement Goods Movement(MIGO)

Transaction code MIGO

© SAP AG Page 192 of 214

Page 193: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Warehouse Clerk

(SAP_NBPR_WAREHOUSECLERK-S)

Business role menu Warehouse Management Consumption and Transfers Other Goods Movement

© SAP AG Page 193 of 214

Page 194: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Goods Receipt Other - <User> screen, make the following entries:

Field name Description User action and values Comment

Action Goods Receipt First top-left frame

Reference Other Second top-left frame

Movement type 501

Special Stock Indicator

© SAP AG Page 194 of 214

Page 195: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Choose Enter.

4. On the Material tab, make the following entries:

Field name Description User action and values Comment

Material CV0018

© SAP AG Page 195 of 214

Page 196: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

5. On the Quantity tab, make the following entries:

Field name Description User action and values Comment

Qty in Unit of Entry <Required quantity> 100

© SAP AG Page 196 of 214

Page 197: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

6. On the Where tab, make the following entries:

Field name Description User action and values Comment

Plant 1000

Storage Location 1040

Choose Enter

© SAP AG Page 197 of 214

Page 198: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Select the Items OK checkbox.

8. Save your entries.

9. Choose Back and return to SAP Easy Access screen.

ResultInitial stock for the consumable materials was posted.

4.5.2 Stock Overview in MM

UseThis step is carried out to note down the initial stock (stock before creating a shipping document) in the SAP Plant.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Environment Stock Stock Overview

Transaction code MMBE

© SAP AG Page 198 of 214

Page 199: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO

(SAP_NBPR_PROJECTMANAGER_ECO-M)

Business role menu Project Management Material Stock Stock Overview

© SAP AG Page 199 of 214

Page 200: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock Overview: Company Code/ Plant/ Storage Location/ Batch screen, enter the following values and choose Execute:

Field name Description User action and values Comment

Material CV0018 <Material Number>

Plant 1000 <Plant>

Storage Location 1040 <Stor. Loc>

© SAP AG Page 200 of 214

Page 201: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the quantity of Material in Unrestricted Use column ___________. This is the quantity of material in Plant/ Storage Location before any delivery.

4. Choose Back and return to SAP Easy Access screen.

ResultMaterial Stock in Storage Location is noted _______.

4.5.3 Current Stock for Material in ETM

UseThe current stock for material can be noted down for the recipients CL002 and CA002 after delivery document is created.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Environment Current Stock J4GM – Material Stock

Transaction code J4GM

© SAP AG Page 201 of 214

Page 202: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Material Stock Current Stock for Material

© SAP AG Page 202 of 214

Page 203: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock List Current Stock screen, enter following values and choose Execute.

Field name Description User action and values Comment

Material Stock Checked Choose Enter

Material Number CV0018 <Material Number>

© SAP AG Page 203 of 214

Page 204: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the stock quantity of Material for Recipients CL002.

4. Choose Back and return to SAP Easy Access screen.

ResultThe stock of recipient CL002 is increased.

4.5.4 Creating ETM Shipping Document for Acquisition

UseThe shipping document is created to transfer material from warehouse CL002 (recipient 1) to CP002 (recipient 2).

PrerequisitesThere should be enough stock in the warehouse.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Construction Equipment Management Transaction Data Documents Shipping Documents Create

Transaction code J3GH

© SAP AG Page 204 of 214

Page 205: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Create Shipping Documents

© SAP AG Page 205 of 214

Page 206: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Create Shipping document: Initial Screen, enter Document type C1 and choose Enter.

3. On the Create SHIPPING DOCUMENT: Item Data screen, enter the following values and choose Enter:

Field name Description User action and values Comment

Document date Today’s date

Sender CL002

Recipient CP002

© SAP AG Page 206 of 214

Page 207: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

4. In the Choose PSP element (personal value list) dialog box, choose WBS element XSUBCON00213.

5. Choose Enter.

6. On the Create SHIPPING DOCUMENT: Item Data screen, choose Material tab and make the following entries:

Field name Description User action and values Comment

Material CV0018

Quantity <enter quantity> For example: 5

Activity Type 20

© SAP AG Page 207 of 214

Page 208: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

7. Save your entries.

8. Note down the Shipping Document number at the bottom of the screen _____________

9. Choose Back twice and return to SAP Easy Access screen.

ResultShipping Document is created.

4.5.5 Displaying Shipping Document

UseThis activity displays Material and Accounting and Cost Accounting Documents.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Construction Equipment Management Transaction Data Documents Shipping Documents Display

Transaction code J3GJ

© SAP AG Page 208 of 214

Page 209: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Shipping Document Display Shipping Documents

© SAP AG Page 209 of 214

Page 210: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Display Shipping document: Initial Screen, enter the shipping document number noted in the previous step in the Document Number field. Choose Enter.

3. On the Display SHIPPING DOCUMENT: Item Data screen, in the Header data display, you can see the Material Document number.

4. Double-click the Material Document number field.

5. On the Display Material Document XXXXXXXXXX: Overview screen, the system displays the material document that is automatically created via shipping document.

6. Choose the Accounting Document tab.

7. In the List of Documents in Accounting dialog box, select the Accounting Document and choose Choose.

8. On the Document Overview screen, note down the account postings.

9. Choose Back.

10. In the List of Documents in Accounting dialog box, select the Cost accounting doc. Choose Choose.

11. On the Display Actual Cost Documents screen, you can see that the WBS element XSUBCON00213 of the Recipient CP002 is credited.

12. Choose Back twice to return on the SAP Easy Access screen.

4.5.6 Stock Overview in MM after Acquisition

UseThis step is carried out to note down the stock after acquisition of material.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Materials Management Environment Stock Stock Overview

Transaction code MMBE

© SAP AG Page 210 of 214

Page 211: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role Project Manager ECO

(SAP_NBPR_PROJECTMANAGER_ECO-M)

Business role menu Project Management Material Stock Stock Overview

© SAP AG Page 211 of 214

Page 212: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

2. On the Stock Overview: Company Code/ Plant/ Storage Location/ Batch screen, enter the following values and choose Execute:

Field name Description User action and values Comment

Material CV0018 <Material Number>

Plant 1000 <Plant>

Storage Location 1040 <Stor. Loc>

© SAP AG Page 212 of 214

Page 213: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

3. Note the quantity of Material in Unrestricted Use column ___________. This is the quantity of material in Plant/ Storage Location after delivery.

4. Choose Back and return to SAP Easy Access screen.

ResultMaterial Stock in Storage Location is reduced by 5 units.

4.5.7 Current Stock for Material in ETM

UseThe current stock for material can be noted down for the recipients CL002 and CA002 after delivery document is created.

Procedure1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Equipment and Tools Management Transaction Data Environment Current Stock J4GM – Material Stock

Transaction code J4GM

© SAP AG Page 213 of 214

Page 214: Equipment and Tools Management (444) Business Process Documentation'

SAP Best Practices Equipment and Tools Management (444): BPD

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role

Business role ECO Equipment Administrator (DIMP)

(SAP_NBPR_EQUIPADMIN_ECO_DIMP-S)

Business role menu Equipment Administration Transaction data Material Stock Current Stock for Material

2. On the Stock List Current Stock screen, enter following values and choose Execute:

Field name Description User action and values Comment

Material Stock Checked Choose Enter

Material Number CV0018 <Material Number>

3. Note the stock quantity of Material for Recipients CL002 and CP002.

4. Choose Back twice and return to SAP Easy Access screen.

ResultThe stock of recipient CL002 is decreased and the stock of recipient CP002 is increased.

5 Follow-up Processes

5.1 Project Reporting for Engineering and Construction

External Process

UseThe project budget report shows basically the cost situation, forecast, and profitability at a glance.

ProcedureTo execute this activity, see process step 4.1 in BPD 448 (Project Reporting for Engineering and Construction), using the master data given below.

Steps to process from scenario Project Structure Setup(448)

Report Name Project Budget Report

Transaction Code CJE0

© SAP AG Page 214 of 214