Enrique S. Camarena Elementary School
description
Transcript of Enrique S. Camarena Elementary School
![Page 1: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/1.jpg)
INFORMATION ON PROPOSITION E
SCHOOL FACILITIES IMPROVEMENT DISTRICT (SFID)
GENERAL OBLIGATION BOND2012
![Page 2: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/2.jpg)
Enrique S. CamarenaElementary School
Opening July 2013.
![Page 3: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/3.jpg)
Chula Vista Elementary School DistrictAcademic Performance Index
2006 2007 2008 2009 2010 2011 2012700
800
900
767782
811833
848861 870
![Page 4: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/4.jpg)
SFID No.1 Boundary for CVESDThe SFID boundary will:
• Encompass31 elementary schools on most of the western portion of CVESD.
• Exclude all Mello-Roos parcels.
![Page 5: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/5.jpg)
31 SFID School Sites
![Page 6: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/6.jpg)
Ultimate Goals of the SFID GO Bond Program• Improvements only at
the 31 school siteslocated within the SFID.
• Enhance educational facilities to create a safe and sustainable environment supportiveof 21st century teaching and learning.
• Install infrastructure to sustain schools for next 30 years.
• Enhance energy efficiency of facilities. • Provide wireless technology to sites.
![Page 7: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/7.jpg)
Facilities Needs Assessment
• 31 of 44 school sites assessed by Architect.– 31 schools built primarily from 1938 to 1975
without Mello-Roos funds.– Remaining 13 schools built with CFD/Mello-
Roos funds since 1990 were not assessed.• Assessment includes summary cost
estimate for each site.
![Page 8: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/8.jpg)
SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs
SchoolYear
ConstructedYear
Modernized
SFID GO BondEstimated
Improvement Cost
2013
RICE ELEMENTARY SCHOOL 1938 1996 $5,903,031CASTLE PARK ELEMENTARY SCHOOL 1952 1996 $5,052,767ROSEBANK ELEMENTARY SCHOOL 1952 1996 $4,241,000VISTA SQUARE ELEMENTARY SCHOOL 1953 1996 $3,892,330HILLTOP DRIVE ELEMENTARY SCHOOL 1943 1997 $4,167,007ALLEN ELEMENTARY SCHOOL 1947 1997 $4,140,208
Modernization in 1996 and 1997 was minimal scope and excluded the following major items: Underground Utilities; Window Replacements; Asphalt Resurfacing; Heating, Ventilation, and Air-Conditioning (HVAC) Replacements; Irrigation Upgrades; Interior Finishes; and Cafeteria/Food Services.
![Page 9: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/9.jpg)
SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs
SchoolYear
ConstructedYear
Modernized
SFID GO BondEstimated
Improvement Cost
2015
FEASTER CHARTER SCHOOL 1950 1997 $5,377,678MONTGOMERY ELEMENTARY SCHOOL 1950 1997 $3,034,323HARBORSIDE ELEMENTARY SCHOOL 1953 1997 $4,633,558KELLOGG ELEMENTARY SCHOOL 1958 1997 $4,301,308SUNNYSIDE ELEMENTARY SCHOOL 1959 1997 $3,392,582COOK ELEMENTARY SCHOOL 1954 1999 $2,388,962PALOMAR ELEMENTARY SCHOOL 1959 1999 $1,063,663HALECREST ELEMENTARY SCHOOL 1961 1999 $1,295,723MUELLER CHARTER SCHOOL 1955 2000 $3,359,170LAUDERBACH ELEMENTARY SCHOOL 1956 2000 $3,541,449
Modernization in 1996 and 1997 was minimal scope and excluded the following major items: Underground Utilities; Window Replacements; Asphalt Resurfacing; Heating, Ventilation, and Air-Conditioning (HVAC) Replacements; Irrigation Upgrades; Interior Finishes; and Cafeteria/Food Services.
![Page 10: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/10.jpg)
SchoolYear
ConstructedYear
Modernized
SFID GO BondEstimated
Improvement Cost
2018
JUAREZ-LINCOLN ELEMENTARY SCHOOL 1970 2000 $2,102,422FINNEY ELEMENTARY SCHOOL 1961 2001 $3,043,887VALLE LINDO ELEMENTARY SCHOOL 1967 2002 $1,229,493SILVER WING ELEMENTARY SCHOOL 1968 2002 $2,059,944VALLEY VISTA ELEMENTARY SCHOOL 1969 2002 $1,152,128PARKVIEW ELEMENTARY SCHOOL 1970 2002 $1,405,804LOS ALTOS ELEMENTARY SCHOOL 1971 2002 $2,489,021ROGERS ELEMENTARY SCHOOL 1962 2003 $1,532,474LOMA VERDE ELEMENTARY SCHOOL 1964 2004 $2,829,665ROHR ELEMENTARY SCHOOL 1965 2004 $3,089,122OTAY ELEMENTARY SCHOOL 1975 2005 $1,246,342TIFFANY ELEMENTARY SCHOOL 1975 2005 $1,029,693CHULA VISTA HILLS ELEMENTARY SCHOOL 1989 -- $1,580,768CHULA VISTA LEARNING COMMUNITY CHARTER SCHOOL 2001 -- $3,111,466CLEAR VIEW ELEMENTARY SCHOOL 1991 -- $1,526,053
TOTAL (All 31 Sites) $89,213,041
Modernization from 1999 through 2005 was from 1998 Proposition JJ funds but excluded the following major items: Asphalt, Concrete, Partial Window Replacements, HVAC Replacements, and Cafeteria/Food Services.
SFID Facilities By Year Constructed,Year Modernized, and Estimated Costs
![Page 11: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/11.jpg)
Major Categories for Improvement
• Infrastructure Improvements (electrical, sewer, water and storm drains, roofs, fire alarms, electrical closets, and structural).• Energy Enhancements/Other Areas
(HVAC, window replacements,energy efficient site lighting,classroom upgrades, ADA compliance, and other upgrades).• Wireless Technology Upgrades
(wireless hardware, network cabling, and equipment).
Allen Elementary School
![Page 12: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/12.jpg)
Infrastructure upgrades would include:• Relocating above-
ground electrical conduits underground.
• Electrical closets.• Sewer systems/drains.
Infrastructure Improvements
Castle ParkElementary School
![Page 13: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/13.jpg)
Rosebank Elementary School(Wood Frame Single Pane Windows)
Energy Enhancements/Other Improvements(HVAC, Window Replacements, Energy Efficient Lighting, ADA Compliance, and Other Upgrades)
![Page 14: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/14.jpg)
Proposed Wireless Infrastructure
• Wireless technology minimizing cabling and allowing incorporation of a variety of mobile devices: laptops, tablets, readers, etc. (Short-term mobile devices, equipment, and fixtures will not be purchased with bond funds.)
• Workstations thatare ergonomically designed and that encourage cooperative project-based learning.
![Page 15: Enrique S. Camarena Elementary School](https://reader036.fdocuments.us/reader036/viewer/2022062813/5681661d550346895dd96f44/html5/thumbnails/15.jpg)
SFID GO Bond Assumptions
• $90 million authorization.• 55 percent voter approval.• Three financings: 2013, 2015, and 2018.• 30-year amortization.• No Capital Appreciation Bonds (CABs).• Approximately $29 per $100,000 of assessed
valuation per year. • No assessments on CFD/Mello-Roos parcels.• No funds for salaries or pensions.