ENI OCTP PROJECT - swanhunter.comswanhunter.com/.../uploads/2017/07/SH_PROJECT_EMAS.pdf · Project...

2
www.swanhunter.com 4500Te 26m OD x 10m H Basket Carousel Loading Tower c/w 10Te Vercal 2 Track Tensioner 2 x 2m project specific loading tower extension secons Underbender Chute for lay operaons with vessel MLS ENI OCTP PROJECT CLIENT I I VESSEL EMAS CHIYODA SUBSEA LEWEK CONSTELLATION EQUIPMENT PROVIDED © SWAN HUNTER. Project Informaon Page 1 of 2. The ENI OCTP (Offshore Cape Three Points) block is located Offshore Ghana in 130-1380 meters of water depth and about 60km from the coast. The ENI OCTP oil and gas field shall be produced from five main regions (NE, SE, SW, NW and Gye Nyame) with the FPSO moored above the Sankofa Canyon at a water depth of 980m. Swan Hunter were contracted to provide Equipment, Project Management, and Engineering Services to EMAS Chiyoda Subsea for the installaon of flexible riser and flowlines in the development of the ENI OCTP Development Project. 4” RISER - 376MM OD, 189KG/M 4” FLOWLINE - 358MM OD, 177KG/M 10” RISER - 482MM OD, 280KG/M 10” FLOWINE - 466MM OD, 280KG/M PROJECT OVERVIEW PRODUCT DETAILS

Transcript of ENI OCTP PROJECT - swanhunter.comswanhunter.com/.../uploads/2017/07/SH_PROJECT_EMAS.pdf · Project...

www.swanhunter.com

4500Te 26m OD x 10m H Basket Carousel

Loading Tower c/w 10Te Vertical 2 Track Tensioner

2 x 2m project specific loading tower extension sections

Underbender Chute for lay operations with vessel MLS

ENI OCTP PROJECTCLIENT I

IVESSEL

EMAS CHIYODA SUBSEA

LEWEK CONSTELLATION

EQUIPMENT PROVIDED

© SWAN HUNTER. Project Information Page 1 of 2.

The ENI OCTP (Offshore Cape Three Points) block is located Offshore Ghana in 130-1380 meters of water depth and about 60km from the coast. The ENI OCTP oil and gas field shall be produced from five main regions (NE, SE, SW, NW and Gye Nyame) with the FPSO moored above the Sankofa Canyon at a water depth of 980m.

Swan Hunter were contracted to provide Equipment, Project Management, and Engineering Services to EMAS Chiyoda Subsea for the installation of flexible riser and flowlines in the development of the ENI OCTP Development Project.

4” RISER - 376MM OD, 189KG/M

4” FLOWLINE - 358MM OD, 177KG/M

10” RISER - 482MM OD, 280KG/M

10” FLOWINE - 466MM OD, 280KG/M

PROJECT OVERVIEW

PRODUCT DETAILS

www.swanhunter.com

© SWAN HUNTER. Project Information Page 2 of 2.

+44 (0) 191 295 0295 [email protected]

SWAN HUNTER’S SCOPE OF WORK

Provision of 26m Diameter x 10m Height 4500Te Basket

Carousel and new build Loading Tower combined

with new build 10Te Tensioner

Project management and engineering of

equipment design / fabrication

Design engineering for deck integration and sea fastening

Co-ordination of equipment transport to

Lewek Constellation vessel

Responsibility for equipment loadout mobilisation /

demobilsation and provision / management

of associated subcontractors

Equipment commissioning workscope and provision /

management of associated subcontractors

Equipment Operators and Project Engineering support

DETAILED ANALYSIS

Swan Hunter utilised several project specific solutions to

enable an efficient equipment mobilisation period, and

increased operability infield including:

Preinstalled (pre-mob) carousel interface grillage beams

between vessel deck and rigid reel skid rails

Dual position loading tower interface grillages installed

during mobilisation. Bolted connections allow for swift

tower repositioning operations between the multiple

spooling and laying campaigns

Product specific underbender chute utilised to provide

lay interface between Swan Hunter Loading Tower and

the Lewek Constellation MLS (Multi Lay System)

top aligner wheel

Engineering design verification for carousel basket volume

increase due to large product OD’s of up to 500mm