Transcript of ENERGISE Communication Infrastructure Strategies for Smart Grid Applications
1st ENERGISE WorkshopCommunications Infrastructure Strategies for Smart Grid Applications
01. October 2015 - Brussels
Overview
Introduction to the project Current status of the project Aims and means of the workshop
03/05/2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
2
Project ENERGISE
General Overview - ENERGISE
Framework: CSA – Coordination and Support Action for the Horizon 2020 Call on Low Carbon Energy LCE 7 - 2014
- Distribution grid and retail markets
General Topic: ICT infrastructure deployment for smart grid Will the future ICT infrastructure be dedicated or shared between the communication and electricity
sector?
Timeline: Start: 01/2015 – end: 03/2017 Duration: 27 months Total PM: 113
Partners: TÜV Rheinland Consulting WIK
ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
3 03.05.2023
Project Objectives
Core questions:- Own infrastructure or third party
infrastructure?- Which parameters apply for setting up
these systems? Based on the experiences and best-practice
approaches Cost Benefit analysis for various options for
establishing ICT Infrastructure Support for future ICT infrastructure projects
in the energy sector
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
4
Own Infrastructure?
?
Cost / benefit
Regulation
Technicalrequirements
Business model
Third partyInfrastructure?
Decision making tool with individual modes of co-operation between providers of telecommunication and energy infrastructure
Scale and Scope of the Project – Organizational View
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
5
Addressed stakeholders:Surveyed regions:
Project Phases
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
6
Stakeholder Identification Survey Design Community building Use case field survey
Use case analysis
Deduction of a theoretical rationale
Model development
Consultation and validation
Adaption and finalization
Initialization Analysis and Deduction Modelling
Stakeholder Information Publication of preliminary and final results Workshops, On-Site-Visits, Discussions, etc.
What has been done so far
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
7
Identification of Stakeholders
List of contacts involved in the topic is the main asset for the project Only through high-quality input from a wide range exploitable results are possible
Manufacturers / Research
TSOs / DSOs
Associations
NRAs / Ministries
22
174
57
135
8
1,293
61
70
personal contact non-personal contactStakeholder contactsCategories
What has been done so far
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
8
Short survey (5 questions) for TSOs & DSOs on general considerations regarding ICT usage.
26 complete + 50 incomplete responses Confirmation of a high demand for cooperation between grid
operators and telco companies
Survey 1:
Survey for policy makers, NRAs and ministries on fact-finding regarding smart-grid-related activities in Europe.
27 complete + 46 incomplete responses
Full survey for TSOs, DSOs & Telco companies on smart-grid use cases and interaction between sectors
Requirement and boundaries for co-operations Existing and future modes for co-operations
Survey 2:
Survey 3 (planned):
What has been done so far
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
9
Has your organisation been involved, or is it currently involved in a smart grid roadmap or deployment plan?
I don't know
No
Yes
0 2 4 6 8 10 12 14 16 18 20
I don't know
No
Yes
0 2 4 6 8 10 12 14 16 18 20
Has your organisation been involved, or is it currently involved in a smart grid working group or task force?
What has been done so far
Personal interviews with a selected experts Background in the European associations regarding energy and telecommunication
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
10
Conducted and planned expert interviews
Aims of the workshop
03.05.2023 ICT-based ENERgy Grid Implementation – Smart and Efficient (ENERGISE)
11
InfrastructureShared Dedicated
Co-operation modes and synergies between energy and telco sector
Technical and operational framework for practical solutions
Parameters influencing decisions:
• internal – external• technical – organisational • financial – regulatory• energy – telecommunication