OFFER SHEET Page : of
PROJECT : Saadiyat DCP3 / ADC - Carbon Steel (Rev3) Date :
To : Al Jaber Precision Engineering Offer No : EnE/AJPE-11059
Attn : Mr. Michel Khoury PIC : Sunggun Kwon / Project Manager
Dear Messrs,
In compliance with your esteemed inquiry, we are pleased to offer the under-mentioned article(s) as per terms
and conditions described in detail as follows;
Validity Period : One (1) Months from issue date.
Payment : T/T in 30 days from invoice date.
Delivery : To be discussed later
TES Tank Information
Storage Capacity : 18,600 RT.Hr Peak Rate : 3,100 RT
Internal Diameter : 21.1 m Shell Height : 22.5 m Water Level : 22.0 m (Normal)
Diffuser Pipe Line : 18" (450 mm) Temperature : 4.44oC Supply & 13.33
oC Return
Unit :AED
SN Item Number / Description Unit
1 1
July 12, 2011
Quantity Unit Price Amount
Internal Flow Distributor for Chilled Water TES
Design and Engineering of Diffuser
Supply of Diffuser and Internal Piping Material
Site Supervision for Diffusers Installation
Site Supervision for Insulation Works
Test & Commissioning
Note : Material Delivery Condition
- CIF condition to UAE port excluding any import duty, local tax, and local transportation cost
Supervision Service & Duration
- Two (2) calendar months' supervision services shall be provided for site supervision of installation work for diffuser and
test & commissioning including performance test with field instruments
- After two (2) calendar months from requested date or actual dispatch date which ever comes later, AED 2,000 / MANDAY for
normal working day and AED 3,000 / MANDAY for Public Holiday shall be charged to AJPE
- Additional overtime charge (1.5 times of normal rate) shall be applied for more than 8 hours work in a same day
- Non-working day due to access problem etc which cannot be attributed to EnE's responsibility shall be counted as working
day and accumulated to supervision period
Only the sum of UAE Dirham Total Amount :
Five Hundred Seventeen Thousand Only *********************************************************************
Note :
- Any design calculation and detail drawings shall not be submitted.
- Pipe material is "Electric Arc-Welded Steel Pipe"
(ASTM A53 Gr. A ERW sch XS or equivalent JIS STPG370 ERW sch 40)
Kwon Sunggun
AED 517,000
1
Lot 1
1
387,000
Lot 40,000 40,000
50,000 50,000
Lot 1 387,000
-
Lot 40,000 1 40,000
Lot Out of Scop -
Project Manager