450 – 1 Street SW Calgary, Alberta T2P 5H1 Tel: (403) 920-2174 Fax: (403) 920-2347 Email: [email protected] March 3, 2020 Filed Electronically Canada Energy Regulator Suite 210, 517 Tenth Avenue SW Calgary, AB T2R 0A8 Attention: Ms. L. George, Secretary of the Commission Dear Ms. George: Re: NOVA Gas Transmission Ltd. (NGTL) Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition (Project) Project Notification In accordance with the Canada Energy Regulator (CER) Interim Filing Guidance and Early Engagement Guide, please see the attached Project Notification for the Project. If the CER requires additional information with respect to this filing, please contact me by phone at (403) 920-2174 or by email at [email protected]. Yours truly, NOVA Gas Transmission Ltd. Original signed by Roselyn Chou Regulatory Project Manager Regulatory Facilities, Canadian Natural Gas Pipelines Enclosure

Transcript of Enclosure - docs2.cer-rec.gc.ca

Page 1: Enclosure - docs2.cer-rec.gc.ca

450 – 1 Street SW Calgary, Alberta T2P 5H1

Tel: (403) 920-2174 Fax: (403) 920-2347 Email: [email protected]

March 3, 2020

Filed Electronically

Canada Energy Regulator Suite 210, 517 Tenth Avenue SW Calgary, AB T2R 0A8

Attention: Ms. L. George, Secretary of the Commission

Dear Ms. George:

Re: NOVA Gas Transmission Ltd. (NGTL) Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition (Project) Project Notification

In accordance with the Canada Energy Regulator (CER) Interim Filing Guidance and Early Engagement Guide, please see the attached Project Notification for the Project.

If the CER requires additional information with respect to this filing, please contact me by phone at (403) 920-2174 or by email at [email protected].

Yours truly, NOVA Gas Transmission Ltd.

Original signed by

Roselyn Chou Regulatory Project Manager Regulatory Facilities, Canadian Natural Gas Pipelines

Enclosure

Page 2: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 1 of 10

PROJECT NOTIFICATION FORM TO THE CANADA ENERGY REGULATOR

PROPOSED PROJECT

Company Legal Name: NOVA Gas Transmission Ltd.

Project Name: Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition (Project)

Expected Application Submission Date: May 5, 2020

COMPANY CONTACT

Project Contact: Roselyn Chou

Email Address: [email protected]

Title (optional): Regulatory Project Manager

Address: 450 – 1 Street SW Calgary, AB T2P 5H1

Phone: (403) 920-2174

Fax: (403) 920-2347

PROJECT DETAILS

The Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition (collectively, the Project) consists of two components. The following information provides the proposed location, scope, timing and duration of construction for the Project.

The Saturn Section consists of approximately 23 km of NPS 42 pipe, located on 58% Crown and 42% freehold land from a tie-in location within NW 21-080-20 W6M and ending within NW 02-079-19 W6M, approximately 5 km northeast of Groundbirch, British Columbia. The Project will require new permanent land rights and temporary work space is anticipated to be required for the construction of the Project.

Anticipated construction start: 12/2021

Anticipated construction completion: 10/2022

Planned in-service date: 11/2022

The Saddle Hills Compressor Station B4 Unit Addition (Saddle Hills CS) component of the Project is located on Crown land in Alberta at SE 05-079-09 W6M on NGTL’s

Page 3: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 2 of 10

existing Saddle Hills Compressor Station site, approximately 11 km east of Gordondale, Alberta. The installation consists of one 30 MW unit addition and yard piping up to NPS 48. The Saddle Hills CS will also require a temporary camp on previously disturbed freehold land located within NGTL’s existing lease at SW 16-079-09 W6M.

Anticipated construction start: 07/2021

Anticipated construction completion: 10/2022

Planned in-service date: 11/2022

PROJECT MAP(S)

Please see Attachment 1 – Global and Regional Maps.

POTENTIALLY AFFECTED PARTIES

The following tables provide a preliminary list of potentially affected Indigenous groups and other potentially affected persons and communities for the Project, based upon the guidance for Step 1 in the CER’s Early Engagement Guide.

Landowners/Land Users and Other Potentially Affected Parties

Potentially Affected Party

Organization Name and/or Number of Potentially Affected Parties

GBML Loop Saturn Section

Saddle Hills Compressor Station Unit

Addition

Landowner(s) – Freehold 13 0

Landowner(s) – Crown 1 – British Columbia Oil and Gas Commission (BCOGC)

1 – Alberta Environment and Parks (AEP)

Occupant(s) 6 1

Adjacent/Nearby Landowner(s) 35 1

Land User(s) 15 1

Page 4: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 3 of 10

Indigenous Groups1

Indigenous Group

GBML Loop Saturn Section

Saddle Hills Compressor Station Unit

Addition

First Nations, Treaty 6 Enoch Cree Nation X

O'Chiese First Nation X

First Nations, Treaty 8 Blueberry River First Nations X

Doig River First Nations X X

Duncan's First Nation X

Halfway River First Nation X

Horse Lake First Nation X X

McLeod Lake Indian Band X

Saulteau First Nations X

Sucker Creek First Nation X

West Moberly First Nations X

Non-Treaty First Nations Kelly Lake Cree Nation X X

Kelly Lake First Nation X X

Métis Organizations, Settlements, and Locals

British Columbia Métis Federation X

Buffalo Lake Métis Settlement X

Dawson Creek Métis Federation X

East Prairie Métis Settlement X

Elizabeth Métis Settlement X

Fishing Lake Métis Settlement X

Gift Lake Métis Settlement X

Kelly Lake Métis Settlement Society X X

Kikino Métis Settlement X

Métis Nation of Alberta X

Métis Nation of Alberta Region 6 X

Métis Nation of British Columbia X

Métis Settlements General Council X

Mocassin Flat Métis Society X

North East Métis Association X

Paddle Prairie Métis Settlement X

Peavine Métis Settlement X

Note: 1. This list includes the CER’s preliminary list of potentially impacted Indigenous groups for the Project. NGTL

received this list from the CER on January 17, 2020.

Page 5: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 4 of 10

Government Authorities

Potentially Affected Party

Organization Name and/or Number of Potentially Affected Parties

GBML Loop Saturn Section

Saddle Hills Compressor Station Unit

Addition

Municipalities and/or Counties Peace River Regional District (British Columbia) City of Dawson Creek

District of Chetwynd

City of Fort St. John

Saddle Hills County (Alberta) Settlement of Bay Tree

Settlement of Gordondale

Hamlet of Woking

Federal and/or Provincial Government(s)

BC Ministry of Energy, Mines and Petroleum

BC Ministry of Forests, Lands, Natural Resources, Operations and Rural Development

BC Agricultural Land Commission

BC Oil and Gas Commission

BC Ministry of Transportation and Infrastructure (MOTI)

Environment and Climate Change Canada

Fisheries and Oceans Canada

Alberta Environment and Parks (AEP)

Alberta Culture, Multiculturalism and Status of Women (ACMSW)

Environment and Climate Change Canada

Page 6: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 5 of 10

POTENTIAL IMPACTS RELATED TO THE PROJECT

The following potential impacts related to the Project have been identified by NGTL and have been or may be communicated to potentially affected persons and communities:

Project Activity Potential Impacts

Construction Temporary workspace and access

Noise and visual impacts

Traffic management

Watercourse crossings

Workforce accommodation planning

Environmental Matters Soil quality/terrain

Vegetation

Water quality and wetland function

Fish habitat

Wildlife

Species at risk

Air quality and GHG emissions

Community Matters Traffic management

Potential effects on community infrastructure and resources

Potential effects on recreational land user groups

Indigenous Matters Potential effects on Indigenous rights and interests

Economic Matters Local contracting and hiring opportunities

Local economic spend within the community

Land Matters Land acquisition

Third party considerations

Planned land use after construction

Emergency Response Pipeline integrity and monitoring

Emergency preparedness and response

Page 7: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 6 of 10

ISSUES RAISED BY POTENTIALLY AFFECTED PARTIES AND STATUS

NGTL’s approach to ongoing consultation and engagement with stakeholders, landowners and Indigenous groups is designed to inform and to address issues or disputes to reach a mutual resolution or mitigate effects. NGTL’s preferred method for addressing the concerns of stakeholders, landowners and Indigenous groups is through direct and respectful discussion. Issues received or identified during these discussions are systematically tracked and followed up on to promote mutual resolution and positive interest-based outcomes.

Landowners/Land Users and Other Potentially Affected Parties

NGTL’s initial engagement with potentially affected landowners and occupants began in August 2019, when it conducted one-on-one meetings to obtain survey access for preliminary investigations of the areas. Though Project specifics were not finalized at the time, early engagement and understanding of stakeholder concerns and feedback was gathered and incorporated into Project planning. During early investigation of pipeline routing in the Peace River Regional District, NGTL contacted the municipal office in October 2019 and provided a message to be posted on the municipality’s social media page, to notify the community of the presence of early survey crews working in the area. NGTL provided contact information for stakeholders to contact NGTL with questions.

NGTL began to distribute early information packages and Project information to potentially affected stakeholders in the fourth quarter of 2019. In the first quarter of 2020, NGTL began public engagement for the Project using project information packages that included a Project Fact Sheet, Project overview maps, and additional TC Energy brochures. NGTL followed up with key stakeholders and offered one-on-one meetings with potentially affected landowners, occupants and stakeholders to review Project specifics.

Indigenous Groups

NGTL’s initial engagement with Indigenous groups began in November 2019 by providing an early information package to those Indigenous groups identified by NGTL as potentially affected by the Project. During the first quarter of 2020, NGTL sent a Project information package to all Indigenous groups identified in the preceding table, including Indigenous groups identified by the CER as potentially affected by the Project. The information package included an introductory letter, a Project Fact Sheet and Project overview maps, TC Energy’s Indigenous Relations Policy brochure, TC Energy informational brochures, as well as information on the CER’s process for project applications that do not involve a hearing. In addition to sharing the information noted

Page 8: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 7 of 10

above, engagement to date has also included one-on-one meetings with Indigenous groups to review Project specifics and address any questions.

List of Issues Raised

The following tables provides a list of the issues, questions or concerns raised by potentially affected landowners, stakeholders and Indigenous groups with respect to the Project to date by Project component.

Saturn Section

Description of Issues/Topics Raised Status of Resolution

Workforce Accommodation Planning – camps versus Live Out Allowance (LOA) Model in Dawson Creek

NGTL will share workforce accommodation plans with City of Dawson Creek once determined by Prime Contractor.

Disturbance to wetland and watercourse crossings, including potential impacts to medicinal plants

NGTL is working with the interested Indigenous groups to schedule review(s) of the proposed route and facilitate field studies for areas of interest. As engagement continues, NGTL will provide its responses to these concerns and proposed mitigation measures and offer to answer questions or discuss any remaining concerns.

Cumulative effects NGTL will continue to engage with Indigenous groups to learn more about concerns and follow up with appropriate mitigations. Cumulative effects are considered in the Environmental and Socio-Economic Assessment.

Saddle Hills Compressor Station B4 Unit Addition

Description of Issues/Topics Raised Status of Resolution

Workforce Accommodation Planning - Camp NGTL will share workforce accommodation plans with Saddle Hills County once determined by Prime Contractor.

Clubroot mitigation NGTL will further discuss clubroot mitigation concerns with Saddle Hills County.

DESCRIPTION OF LAND ACQUISITION PROCESS

NGTL will acquire the required freehold land rights using right-of-way agreements, beginning in the second quarter of 2020. NGTL will apply to both the BCOGC and AEP for the Crown land rights. NGTL will continue ongoing discussions with tenure holders and landowners to finalize the necessary agreements/consents.

NGTL confirms that the land acquisition process for the Project will comply with the applicable sections of the CER Act, including sections 321 and 322. Landowners will be

Page 9: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 8 of 10

notified of the timing of the section 214 Application and their ability to participate in the CER process, consistent with the information contained in the section 322 notice.

In addition, temporary work space (TWS) is anticipated to be required for construction of the Project. Within British Columbia, for any TWS on Crown land, NGTL will obtain approval under Section 39 of the Land Act (British Columbia) and will obtain TWS Agreements with freehold landowners. Should TWS be required for the Saddle Hills Compressor Station Unit addition, outside of NGTL’s existing disposition, a Temporary Field Authorization will be obtained from AEP.

To date, no issues or concerns have been raised, with respect to the land acquisition for the Project. NGTL will acquire the necessary land rights prior to the scheduled commencement of construction.

DESCRIPTION OF ROUTE /SITE SELECTION METHODOLOGY

For both pipeline route and facility site selection, NGTL employs a systematic and thorough route selection process using a variety of tools, such as:

desktop studies

helicopter reconnaissance

ground verification and field surveys

engineering, geotechnical and environmental field studies

This selection process takes into account the objectives of minimizing the total route length or land requirements, meeting applicable regulatory requirements and reducing the environmental footprint, while carefully assessing overall cost and constructability, and meeting customer demands. Feedback received through the early engagement phase with stakeholders, landowners and Indigenous groups informs the assessment of proposed routes and sites.

Facility Sites – Compressor Station

The desktop and field studies completed for the Project by NGTL to date included consideration of the following factors:

existing road access and proximity to utility power

third-party infrastructure (rights-of-way, facilities, residences, etc.)

natural features (rivers, water bodies, clearings, vegetation, slopes, etc.)

considerations for customer pipe routing

proximity of the site to nearby communities

Page 10: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 9 of 10

environmental sensitivities of the geographical area (Restricted Activity Periods, Key Wildlife Buffer Zones, migratory bird windows, wetlands, etc.)

connections to existing pipeline mainlines and/or laterals

proximity to noise receptors

Facility Sites Within Existing Disposition

Based upon NGTL’s assessment of system and engineering requirements, the location of the proposed compressor station unit addition will be located within NGTL’s existing disposition.

Pipeline Routing

Specific to pipeline route selection, NGTL’s route selection process considers and balances several criteria when evaluating route options, including the following, where practical or feasible:

minimizing length to reduce overall environmental and socio-economic footprint

ensuring pipeline sections and facilities are economical to construct and operate

paralleling existing linear disturbances

ensuring public safety

minimizing the number, and ensuring the construction feasibility, of watercourse, road, rail and utility crossings

considering and avoiding sensitive environmental features

avoiding terrain subject to geotechnical issues such as areas of unstable slopes, problem soils, or known seismic activity

avoiding lands of designated status, such as parks, protected areas, cemeteries and historic, archaeological or heritage sites

avoiding concentrated areas of rural residences and urban developments

considering input received from potentially affected landowners, stakeholders and Indigenous groups through various engagement activities

FEEDBACK RECEIVED ON ROUTE SELECTION DURING EARLY ENGAGEMENT

To date, potentially affected landowners, occupants and other stakeholders have not provided feedback specific to pipeline routing; however, NGTL will continue to engage with these groups to resolve any issues that may arise.

Page 11: Enclosure - docs2.cer-rec.gc.ca

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

CER Project Notification Section 214 Application

March 2020 Page 10 of 10

Early engagement with Indigenous groups has resulted in general feedback regarding watercourse crossings, wetlands, and medicinal plants. NGTL will continue to finalize the Project footprint in the coming months and delineate survey information to determine Project specifics. As information pertinent to these issues become available to NGTL, NGTL will continue to engage with Indigenous groups to provide greater detail on Project specifics, and resolve identified issues and offer mitigations where applicable.

Page 12: Enclosure - docs2.cer-rec.gc.ca

#*

Alberta

BritishColumbia

Northwest Territories

Saskatchewan

MEDICINE HAT

EDMONTON

CALGARY

FORTMCMURRAY

GRANDEPRAIRIE

¯Global 0

NAD 1983 UTM Zone 11N IFU

PROPOSED SADDLE HILLSCOMPRESSOR STATION

UNIT ADDITION

0 50 100 150 200 25025 km

FILE NAME:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

REVIEWER:

APPROVER:

CARTOGRAPHER: EWNJNJ

20-01-08 20-01-08 20-01-08

20-01-08

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

T_0228_0003_01_00_SaddleHills_CS_Unit_Add_Fig1_.mxd

#* Saddle Hills CSExisting NGTL PipelineCity / Town

PROPOSED SADDLE HILLSCOMPRESSOR STATION

UNIT ADDITION55.815, -119.366

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Map (Saddles Hills Compressor Station)

March 2020 Page 1 of 3

Page 13: Enclosure - docs2.cer-rec.gc.ca

#

#

#

#

#

#

#

#

#

#

"

"

"

"

"

"

"

"

"

"

"

"

""

"

!

!

!!

!

!

!

!

!

!

!

!

! !!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

"

!

!

!

!

!

!"

"

!

!!!!!""

!"

"

!"

"

"

"

"

"

"

"

"

!

!

"

"

!

"

"

"

"

"

! !!

!

!!

"

"

#*

18 17 16 15 14 13

71

73

75

77

79

81

83

85

87

89

69

70

72

74

76

78

80

82

84

86

88

90

68

ROLLA

KELLYLAKE

GROUNDBIRCH

SUNSETPRAIRIE

ARRAS

CLAYHURST

SHEARERDALE

GOODLOWCHARLIELAKE

POUCECOUPEDAWSON

CREEK

TAYLOR

FORT ST.JOHN

BritishColumbia

EUREKARIVER

SPIRITRIVER

ELMWORTH

SADDLEHILLS

CARDINALLAKE

ALCESRIVER C/S

PIPESTONECREEK C/S

ALCESRIVER B

ST2

ST40

ST668ST724

ST667

ST676

ST721

ST677

ST689

ST667

ST677

ST40

ST730

ST735

ST725

ST680

ST726

ST732

ST671

ST677

ST727

ST666

ST724

ST719

ST737

ST729

ST731

ST722

ST682

ST717

ST723 ST2

ST681

ST64

ST724

ST736

ST666ST40

ST59

ST734

ST43

ST733

ST685

ST672

ST49

ST2

ST64

HALCOURT

POPLAR HILL

BEAR CANYON

NORTHMARK

BRAINARD

CLEAR PRAIRIE

BRIDGEVIEW

BELLOY

SYLVESTER

CHERRY POIINT

WORSLEY

BAD HEART

DEER HILL

EUREKA RIVER

DEMMITT

MOUNT VALLEY

DEBOLT

BLUESKYFAIRVIEW

RIO GRANDE

SMOKY HEIGHTS

SILVERWOOD

SILVER VALLEY

GRANDE PRAIRIE

BAY TREE GORDONDALE

WOKING

CLAIRMONT

VALHALLA CENTRE

BEZANSON

LEIGHMORE

WANHAM

BROWNVALE

HAZELMERE

PEORIA

CLEARDALE

GOODFARE

GLEN LESLIEGOODWIN

GROVEDALE

HAYFIELD

FITZSIMMONSNIOBEBUFFALO LAKE

HOMESTEAD

TEEPEE CREEK

HYTHE

WEMBLEY

BEAVERLODGE

RYCROFTSPIRIT RIVER

SEXSMITH

HINES CREEK

MARINA

WAPITI

CLEARHILLS 152C

DUNCANS 151A

HORSELAKES152B

M. D. OFGREENVIEW

NO. 16

COUNTY OFNORTHERN

LIGHTS

M. D. OFPEACENO. 135

BIRCH HILLSCOUNTY

SADDLEHILLS

COUNTY

M. D. OFSPIRIT RIVER

NO. 133

M. D. OFFAIRVIEW

NO. 136

CLEARHILLS

COUNTY

COUNTY OFGRANDE

PRAIRIE NO. 1

251

357911

13 262468

1012

SILVER VALLEYECOLOGICAL

RESERVE

BEAR LAKE PARK KLESKUNHILL PARK

DUNVEGANWEST

WILDLAND PARK

BEARHILL

PARK

O'BRIENPROVINCIAL

PARK

MOONSHINE LAKEPROVINCIAL

PARK

DUNVEGANPROVINCIAL

PARK

SASKATOONMOUNTAIN

BIGMOUNTAIN

CREEK

OLE'SLAKE

DEMMIT

HOMMY

SASKATOON ISLAND

SANDLAKE

FIGUREEIGHT LAKE

PEACERIVER

SULPHURLAKE

STONEYLAKE

RUNNING LAKE

PROPOSED SADDLE HILLSCOMPRESSOR STATIONUNIT ADDITION

REVIEWER:

APPROVER:

CARTOGRAPHER:

¯#* Saddle Hills CS# Compressor Station" Delivery Meter Station! Receipt Meter Station

TCEnergy Pipeline

RailwayPrimary HighwaySecondary Highway

River / LakeProtected AreaCity / TownFirst Nation LandsMetis SettlementMilitary ReserveCounty

0IFU

Regional

MAP NUMBER:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

Not all legend elements may appear on the map

20-01-08 20-01-08 20-01-08

NAD 1983 UTM Zone 10N 20-01-08

T_0228_0003_02_00_SaddleHills_CS_Unit_Add_Fig1_.mxd

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

EWNJNJ

0 10 20 30 405 km

55.815, -119.366

PROPOSED SADDLE HILLSCOMPRESSOR STATION

UNIT ADDITION

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Map (Saddles Hills Compressor Station)

March 2020 Page 2 of 3

Page 14: Enclosure - docs2.cer-rec.gc.ca

REVIEWER:

APPROVER:

CARTOGRAPHER:

"

"

!

!

!

!

!

!!

!"

"

#

BLUEBERRYMOUNTAIN

GORDONDALE¥¥49

¥¥680

¥¥725

¥¥49

VALHALLA SALES

BLUEBERRY HILL

PROGRESS

PROGRESS EAST

WHITBURN

BLUEBERRY HL E.

WHITBURN EASTWHITBURN EAST SALES

PROGRESS SALES

MoonshineLake

DIVISIONNO. 19

Ksituan Lake

Moonshine Lake

¯#* Saddle Hills CS# Compressor Station" Delivery Meter Station! Receipt Meter Station

TCEnergy Pipeline

RailwayGravel RoadPrimary HighwaySecondary Highway

City / TownRiver / LakeFirst Nation LandMetis SettlementProtected AreaMilitary ReserveCounty

IFU0 63 km

Detail

MAP NUMBER:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

Not all legend elements may appear on the map

PROPOSED SADDLE HILLSCOMPRESSOR STATION

UNIT ADDITION

20-01-08 20-01-08 20-01-08

NAD 1983 UTM Zone 11N 20-01-08

T_0228_0003_03_00_SaddleHills_CS_Unit_Add_Fig1_.mxd

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

EWNJNJ

PROPOSED SADDLE HILLSCOMPRESSOR STATION

UNIT ADDITION055.815, -119.366

#*

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Map (Saddles Hills Compressor Station)

March 2020 Page 3 of 3

Page 15: Enclosure - docs2.cer-rec.gc.ca

Alberta

BritishColumbia

Northwest Territories

Saskatchewan

MEDICINE HAT

EDMONTON

CALGARY

FORTMCMURRAY

GRANDEPRAIRIE

¯Global 0

NAD 1983 UTM Zone 11N IFU

PROPOSED GROUNDBIRCHMAINLINE LOOP

(SATURN SECTION)

0 50 100 150 200 25025 km

FILE NAME:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

REVIEWER:

APPROVER:

CARTOGRAPHER: EWNJNJ

20-01-08 20-01-08 20-01-08

20-01-08

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

T_0228_0003_01_00_Saturn_Loop_Fig1_.mxd

Proposed PipelineExisting NGTL PipelineCity / Town 55.889, -120.989

PROPOSED GROUNDBIRCHMAINLINE LOOP

(SATURN SECTION)

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Maps (Saturn Section)

March 2020 Page 1 of 3

Page 16: Enclosure - docs2.cer-rec.gc.ca

"

"

"

"

"

"

"

!

!

!!

!

!

!

!

!

!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!"

!

!!

!!!"

!

"

"

!"!

"

"

"

!

!

"

"

"

! !!

!

!!

"

!

#

#

25 24 23 22 21 20 19 18 17 16 15 14 13

SADDLEHILLS

COUNTY

CLEARHILLS

COUNTY

ALCES RIVER CS

SADDLE HILLS CS

LONEPRAIRIE

EASTPINE

SUNDANCE

ROLLA

KELLYLAKE

GROUNDBIRCH

SUNSETPRAIRIE

ARRASWABI

PINEVALLEY

HULCROSSFALLS

CLAYHURST

SHEARERDALE

GOODLOW

ATTACHIE

BEARFLAT

MURDALE

BUICKWONOWON

CHARLIELAKE

TUMBLERRIDGE

POUCECOUPE

CHETWYND

DAWSONCREEK

HUDSON'SHOPE

TAYLOR

FORT ST.JOHN

ST681

ST721

ST59

ST671

ST719

ST717ST64

ST49

ST43

BEAR CANYON

BRAINARD

CLEAR PRAIRIE

SYLVESTER

CHERRY POIINT

DEMMITT

MOUNT VALLEY ELMWORTHRIO GRANDE

BAY TREE

LEIGHMORE

HAZELMERE

CLEARDALE

GOODFARE

HAYFIELD

AlbertaBritishColumbia

HORSELAKES152B

UV97

UV2

UV2

UV97

UV29

UV97

UV97

UV97

UV52

UV52

UV29

76

77

78

79

80

81

82

83

84

85

86

8788

94 - A - 13

94 - A - 5

94 - A - 4

94 - A - 14

94 - A - 11

94 - A - 15 94 - A - 16

94 - A - 9

94 - B - 15

94 - B - 10

94 - B - 16

94 - B - 9

94 - B - 8

93 - I - 13 93 - I - 14 93 - I - 15 93 - I - 1693 - J - 16

93 - P - 1

93 - P - 12

93 - P - 5

93 - P - 4

93 - P - 6

93 - P - 3

93 - P - 10

93 - P - 7

93 - P - 2

93 - P - 8

93 - O - 1

93 - O - 16

93 - O - 9

93 - O - 8

94 - B - 1

SILVER VALLEYECOLOGICAL

RESERVE

DUNVEGAN WESTWILDLAND PARK

OLE'SLAKE

DEMMIT

HOMMY

PROPOSED GROUNDBIRCHMAINLINE LOOP(SATURN SECTION)

REVIEWER:

APPROVER:

CARTOGRAPHER:

¯Proposed Pipeline

# Compressor Station" Delivery Meter Station! Receipt Meter Station

TCEnergy Pipeline

RailwayPrimary HighwaySecondary Highway

River / LakeProtected AreaCity / TownFirst Nation LandsMetis SettlementMilitary ReserveCounty

0IFU

Regional

MAP NUMBER:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

Not all legend elements may appear on the map

20-01-08 20-01-08 20-01-08

NAD 1983 UTM Zone 10N 20-01-08

T_0228_0003_02_00_Saturn_Loop_Fig1_.mxd

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

EWNJNJ

0 10 20 30 405 km

PROPOSED GROUNDBIRCHMAINLINE LOOP

(SATURN SECTION)55.889, -120.989

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Maps (Saturn Section)

March 2020 Page 2 of 3

Page 17: Enclosure - docs2.cer-rec.gc.ca

REVIEWER:

APPROVER:

CARTOGRAPHER:

!

!"

!

!

GROUNDBIRCH

SATURN SATURN SALES

GROUNDBIRCH EAST

SATURN NO.2

KiskatinawRiver

UV97

PEACERIVER

BritishColumbia

GROUNDBIRCH

SUNSETPRAIRIE

Kiskatinaw River

Kiskatinaw River

Pine River

Stewart Lake

Scott Lake

Norrie Lake

Wilde LakeSloane Slough

77 - 18 - W6M77 - 19 - W6M77 - 20 - W6M77 - 21 - W6M

78 - 18 - W6M78 - 19 - W6M78 - 20 - W6M78 - 21 - W6M

79 - 18 - W6M

79 - 19 - W6M79 - 20 - W6M79 - 21 - W6M

80 - 18 - W6M80 - 19 - W6M80 - 20 - W6M

80 - 21 - W6M

81 - 18 - W6M81 - 19 - W6M81 - 20 - W6M81 - 21 - W6M

¯Proposed Pipeline

# Compressor Station" Delivery Meter Station! Receipt Meter Station

TCEnergy Pipeline

RailwayGravel RoadPrimary HighwaySecondary Highway

City / TownRiver / LakeFirst Nation LandMetis SettlementProtected AreaMilitary ReserveCounty

IFU0 63 km

Detail

MAP NUMBER:

ISSUE PURPOSE:

LOCATION:

COORDINATE SYSTEM:

ISSUED DATE:REVISION:

Not all legend elements may appear on the map

PROPOSED GROUNDBIRCHMAINLINE LOOP

(SATURN SECTION)

20-01-08 20-01-08 20-01-08

NAD 1983 UTM Zone 11N 20-01-08

T_0228_0003_03_00_Saturn_Loop_Fig1_.mxd

TERMS OF USE: The datasets used to create this map have been gathered from various sources for a specific purpose. TC Energy provides no warranty regarding the accuracy or completenessof the datasets. Unauthorized or improper use of this map, including supporting datasets is strictly prohibited. TC Energy accepts no liability whatsoever related to any loss or damages resulting from proper, improper, authorized or unauthorized use of this map and associated datasets and user expressly waives all claims relating to or arising out of use of or reliance on this map.

EWNJNJ

PROPOSED GROUNDBIRCHMAINLINE LOOP

(SATURN SECTION)055.889, -120.989

NOVA Gas Transmission Ltd. Groundbirch Mainline Loop (Saturn Section) and Saddle Hills Compressor Station B4 Unit Addition

Attachment 1 Global and Regional Maps (Saturn Section)

March 2020 Page 3 of 3