EMMA 2 Public Launch 20 th April 2006 Malpensa
description
Transcript of EMMA 2 Public Launch 20 th April 2006 Malpensa
Integrated Project of theSixth Framework Programme,
Priority 1.4: Aeronautics and Space,
sponsored by EC, DG TRENContract FP6-503192
Internet: http://www.dlr.de/emma
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA 2 Public Launch20th April 2006
Malpensa
A. Nuzzo, ENAV S.p.A.
G. d’Auria, SELEX Sistemi Integrati
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 2
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
SMR
Malpensa before EMMA
Surveillance:Apron •SMR Based Surveillance
•Apron Area Excluded
Apron
Apron
APP Radars
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 3
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa before EMMA
Surveillance:Apron
Surveillance:Labelling
•Arriving Flights: Automatic Labelling
•Departing flights: No Automatic LabellingSMR
APP Radars
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 4
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
SMRAPP Radars
Malpensa before EMMA
Surveillance:Apron
Surveillance:Labelling
Surveillance:Vehicles
•Localization in maneuvering area only•No identification
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 5
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
SMRAPP Radars
Malpensa before EMMA
Surveillance:Apron
Surveillance:Labelling
Surveillance:Vehicles
Control
•Basic Surface Conflict Alert
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 6
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa: The EMMA Solution
Surveillance:Apron
Surveillance:Labelling
Surveillance:Vehicles
Control
Multilateration
TWR/ACC Integration/Multilateration
Advanced Vehicle Management System
Enhanced Surface Conflict Alert
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 7
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa: The EMMA Solution
Surveillance:Vehicles
Surveillance:Apron
Multilateration
Surface Conflict AlertControl
ADAM - ADvanced Airport Multilateration System
Surveillance:Labelling
•Selective Interrogation replies DF4/5/20/21 RX1
RX2
Target
RX1
RX2
Target
RX1
RX2
TargetRX3
RX1
RX2
TargetRX3
MLAT is based on the TDOA principle, the Time Difference of Arrival between the “arrivals” of one transponder’s signal received at several receivers
•Based on Spontaneous Squitters (DF11/17/18)
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 8
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa: The EMMA Solution
Surveillance:Vehicles
Surveillance:Apron
Multilateration
TWR/ACC Integration
Advanced Vehicle Management System
Surface Conflict AlertControl
ADAM - ADvanced Airport Multilateration System
•Configuration
•10 RX
•2 TX 1030 interrogators
•2 1090 TX Synchronisers
Surveillance:Labelling
•ADS-B ES Data Extraction:
•Surface Position
•Airborne Position
•Airborne Velocity
•Aircraft Identification
•Operational Status
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 9
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Surveillance:Labelling
Surveillance:Vehicles
Surveillance:Apron
Multilateration
TWR/ACC Integration
Advanced Vehicle Management System
Surface Conflict AlertControl
Malpensa: The EMMA Solution
Sector 1Sector 2
Sector 3
Sector 4
Sector 6
Sector 7
Sector 5
ACC
Apron Services
TWR Ground
TWR Air
TWR Ground
Airport
Area of Overlap
Sector 1Sector 2
Sector 3
Sector 4
Sector 6
Sector 7
Sector 5
Apron Services
TWR Ground
TWR Air
TWR Ground
ACC/TWRIntegration
Airport: Sector of ACC
•Shared Flight Plan ACC •Power on Flight Plan
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 10
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa: The EMMA Solution
Surveillance:Vehicles
Control
Surveillance:Apron
•Aircraft Mode 3A/C Code and Call Sign received through MLAT infrastructure
•Correlation of Mode 3A/C Code with Call Sign
37443744
AZA0203
•Flight Plans with Call Signs received trough TWR/ACC integration
3744Mode A codeCallsign
Surveillance:Labelling
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 11
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Malpensa: The EMMA Solution
Surveillance:Vehicles
Control
Surveillance:Apron
Call Sign taken directly from MULTILAT if:
• Flight Plan not available• No Correlation between Transponder Code and Flight Plan
37443744
AZA0203Surveillance:Labelling
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 12
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Surveillance:Labelling
Surveillance:Vehicles
Surveillance:Apron
Multilateration
TWR/ACC Integration
Advanced Vehicle Management System
Surface Conflict AlertControl
Malpensa: The EMMA Solution
AVMS - Advanced Vehicle Management System
•Movement area: MULTILAT
•Dual Data Link architecture:
VehicleType 1
WLAN MLAT
Movement area
VehicleType 2
WLAN
Apron
Apron
•Apron Area: WLAN
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 13
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Surveillance:Labelling
Surveillance:Vehicles
Surveillance:Apron
Multilateration
TWR/ACC Integration
Advanced Vehicle Management System
Surface Conflict AlertControl
Malpensa: The EMMA Solution
E-SCA – Enhanced Surface Conflict Alert•Full configuration flexibility
•Selective enabling for conflict class•Selective enabling for area•Selective management of warnings and alarms
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 14
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
Surveillance:Labelling
Surveillance:Vehicles
Surveillance:Apron
Multilateration
TWR/ACC Integration
Advanced Vehicle Management System
Surface Conflict AlertControl
Malpensa: The EMMA Solution
•Two sessions held at NLR – Amsterdam for tuning the system
E-SCA – Enhanced Surface Conflict Alert
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 15
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
MXP Validation TrialsMXP Validation TrialsReal Time SimulationsReal Time Simulations
A-SMGCS onA-SMGCS on
A-SMGCS offA-SMGCS off
Res
po
nse
tim
eR
esp
on
se t
ime
00
11
22
33
44
55
66
77SAFETYSAFETY
Reaction Time for alert Reaction Time for alert situations occurrences is situations occurrences is reduced when A-SMGCS reduced when A-SMGCS
Level II functionality is in Level II functionality is in useuse
To demonstrate or validate that the To demonstrate or validate that the AdvancedAdvanced system (including the system (including the E-SCA tool) is preferred over the E-SCA tool) is preferred over the BaselineBaseline system by verifying ad-hoc system by verifying ad-hoc
HypothesisHypothesis
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 16
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
MXP Validation TrialsMXP Validation TrialsReal Time SimulationsReal Time Simulations
A-SMGCS onA-SMGCS on
A-SMGCS offA-SMGCS off
Res
po
nse
tim
eR
esp
on
se t
ime
00
11
22
33
44
55
66
77SAFETYSAFETY
6464
6666
6868
7070
7272
7474
7676
7878
11 22visibility visibility
SU
sco
reS
U s
core
System Usability (HMI)System Usability (HMI)
The Controllers accepted A-SMGCS Level II The Controllers accepted A-SMGCS Level II related tools and procedurerelated tools and procedure
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 17
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
MXP Validation TrialsMXP Validation TrialsReal Time SimulationsReal Time Simulations
A-SMGCS onA-SMGCS on
A-SMGCS offA-SMGCS off
Res
po
nse
tim
eR
esp
on
se t
ime
00
11
22
33
44
55
66
77SAFETYSAFETY
visibilityvisibility00
101020203030404050506060707080809090
100100
11 22
Rat
ing
Rat
ing
Workload (NASA TLX)Workload (NASA TLX)
6464
6666
6868
7070
7272
7474
7676
7878
11 22visibility visibility
SU
sco
reS
U s
core
System Usability (HMI)System Usability (HMI)
Controllers workload shall Controllers workload shall decrease when A-SMGCS decrease when A-SMGCS Level II functionality is in Level II functionality is in
useuse
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 18
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
MXP Validation TrialsMXP Validation TrialsReal Time SimulationsReal Time Simulations
A-SMGCS onA-SMGCS on
A-SMGCS offA-SMGCS off
Res
po
nse
tim
eR
esp
on
se t
ime
00
11
22
33
44
55
66
77SAFETYSAFETY
visibilityvisibility00
101020203030404050506060707080809090
100100
11 22
Rat
ing
Rat
ing
Workload (NASA TLX)Workload (NASA TLX)
6464
6666
6868
7070
7272
7474
7676
7878
11 22visibility visibility
SU
sco
reS
U s
core
System Usability (HMI)System Usability (HMI)
11
22
33
44
55
66
11 22visibilityvisibility
Rat
ing
(1
- 5)
Rat
ing
(1
- 5)
Situation AwarenessSituation Awareness
Situation Awareness of Situation Awareness of controllerscontrollers
is increased when A-SMGCS Level is increased when A-SMGCS Level II functionality is in useII functionality is in use
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 19
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
INDICATORSINDICATORS EXAMPLES OF QUESTIONNAIRE ITEMSEXAMPLES OF QUESTIONNAIRE ITEMS MXP Mean ValuesMXP Mean Values
SafetySafety When I will use A-SMGCS it will help me to operate safer.When I will use A-SMGCS it will help me to operate safer. Answers from 1 (disagreement) through 6 (agreement)Answers from 1 (disagreement) through 6 (agreement)
4.74.7
CapacityCapacity
How do you assess impact of A-SMGCS on the RWY Departure ThroughputHow do you assess impact of A-SMGCS on the RWY Departure Throughput??
2 cases: Vis. Cond. 1 and Vis. Cond. 2 - Answers: positive, negative, no impact.2 cases: Vis. Cond. 1 and Vis. Cond. 2 - Answers: positive, negative, no impact.
If positive, how do you estimate the benefits compared with the existing baseline?If positive, how do you estimate the benefits compared with the existing baseline?
2 cases: Vis. Cond. 1 and Vis. Cond. 2 Answers: 0-5%, 5-10%, 10-15%, 15-20%, more2 cases: Vis. Cond. 1 and Vis. Cond. 2 Answers: 0-5%, 5-10%, 10-15%, 15-20%, more
Vis. 1Vis. 1
No Impact: No Impact: 96.9%96.9%
Vis. 2Vis. 2
Positive: Positive: 62.5%62.5%
0-5%: 0-5%: 90%90%
EfficiencyEfficiency
How do you assess impact of A-SMGCS on the Taxi-in DelayHow do you assess impact of A-SMGCS on the Taxi-in Delay??
2 cases: Vis. Cond. 1 and Vis. Cond. 2 - Answers: positive, negative, no impact.2 cases: Vis. Cond. 1 and Vis. Cond. 2 - Answers: positive, negative, no impact.
If positive, how do you estimate the benefits compared with the existing baseline?If positive, how do you estimate the benefits compared with the existing baseline?
2 cases: Vis. Cond. 1 and Vis. Cond. 2 Answers: 0-5%, 5-10%, 10-15%, 15-20%, more2 cases: Vis. Cond. 1 and Vis. Cond. 2 Answers: 0-5%, 5-10%, 10-15%, 15-20%, more
Vis. 1Vis. 1
No Impact: No Impact: 87.5%87.5%
Vis. 2Vis. 2
Positive: Positive: 71.9%71.9%
0-5%: 91,30-5%: 91,3%%
AcceptanceAcceptance
- I think A-SMGCS is easy to use- I think A-SMGCS is easy to use- Some relevant information is frequently missing in the A-SMGCS displaySome relevant information is frequently missing in the A-SMGCS display- With the A-SMGCS it is easier to detect runway incursionsWith the A-SMGCS it is easier to detect runway incursions- With the A-SMGCS it is easier to detect aircraft on the ApronWith the A-SMGCS it is easier to detect aircraft on the Apron
Answers from 1 (disagreement) through 6 (agreement)Answers from 1 (disagreement) through 6 (agreement)
4.14.1
2.72.7
4.64.6
4.34.3
UsabilityUsability
- I found the various functions in this system were well integratedI found the various functions in this system were well integrated- I think I would need the support of a technical person to be able to use this systemI think I would need the support of a technical person to be able to use this system
Answers from 1 (disagreement) through 5 (agreement)Answers from 1 (disagreement) through 5 (agreement)
4.24.2
1.21.2
5 typologies of debriefing questionnaires submitted to the ATCo after every session5 typologies of debriefing questionnaires submitted to the ATCo after every session
MXP Validation TrialsMXP Validation TrialsShadow ModeShadow Mode
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 20
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 21
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
Meteo Data
Flight Data
Surveillance DataAircraft Category
Surveillance Data
Light Status
Segment StatusAirport Category
Airport Category
Runway Status
Flight PlanAircraft Category
Surveillance
Replanning
Divergencewarning
Runway Planning
Taxi Planner
ConformanceCheck
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 22
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
TWR Air
ACCMXP
Sector 1 Sector 2
Sector 3
Sector 4
Sector 6
Sector 7
Sector 5
•Electronic Flight Strips replacing paper strips
•Electronic Flight Strips supporting a more general Data Sharing:•extending Data Sharing from Boundary towards the Apron Services:
•TWR•GND•Apron Management•Airport Operator•Aircraft Operators
Area of Data Sharing
Extended Area of Data Sharing
ACC/TWRIntegrationApron Services
TWR Ground
TWR Ground
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 23
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
•ADS B using Extended Squitter technology and MLAT infrastructure
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 24
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 25
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
Cleared for start up
Cleared for start up
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 26
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
EMMA Evolution
ADS B In
EFS
Route Planner
ADS B Out
CPDLCClearances & Guidance
Cleared for start up
Cleared for start up
WILCO
WILCO
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 27
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
The Way Ahead
Test Aircraft
Real Time Simulations
Traffic of Opportunity
Test Van
Mal
pens
a, 2
0th A
pril
2006
EMMA 2 Public Launch 28
EUROPEAN AIRPORT MOVEMENT MANAGEMENT BY A-SMGCS, Part 2
For More information:
Antonio Nuzzo: [email protected], +39 06 8166733
Giuliano d‘Auria: [email protected], +39 06 4150 4448