EMD-0851 E Auction for the sale of Battery Cell, Iron ... Vision India Pvt... · EMD-0851 E Auction...

10
EMD-0851 E Auction for the sale of Battery Cell, Iron Battery Stand, IPDMU, ACPDB, Coil, Power Plant available at Diff Location Owned by M/s. Tower Vision India Pvt Limited Through www.auctionbridge.net Starts at 15:00:00 AM & Closes at 16:00:00 PM ON 30 th Oct 2018 The Product details are as follows: S. No Product Name EMD in Rs 1 BATTERY CELL - 11600 KGS [PER KG BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 92,800.00 2 BATTERY IRON STAND - 960 KGS [PER KG BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 1,920.00 3 ACPDB - 3 NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 1,500.00 4 POWER PLANT - 6 NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 3,000.00 5 IPDMU - 10NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 5,000.00 6 BATTERY CELL - 1600 KGS [PER KG BASIS] @ RAIPUR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 12,800.00 7 BATTERY IRON STAND - 240 KGS [PER KG BASIS] @ RAIPUR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 480.00 8 BATTERY CELL - 5200 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 41,600.00 9 BATTERY IRON STAND - 540 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 1,080.00 10 ACPDB - 8 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 4,000.00 11 COIL ( COPPER TRANSFORMER WITH 25 KVA ) - 250 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 3,750.00 12 POWER PLANT - 7 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 3,500.00 13 IPDMU - 15 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 7,500.00 14 BATTERY CELL - 13600 KGS [PER KG BASIS] @ AMBALA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 1,08,800.00 15 BATTERY IRON STAND - 1500 KGS [PER KG BASIS] @ AMBALA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 3,000.00 16 BATTERY CELL - 4800 KGS [PER KG BASIS] @ RANCHI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 38,400.00 17 BATTERY IRON STAND - 420 KGS [PER KG BASIS] @ RANCHI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 840.00 18 BATTERY CELL - 3600 KGS [PER KG BASIS] @ KOCHIN (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 28,800.00 19 BATTERY IRON STAND - 300 KGS [PER KG BASIS] @ KOCHIN (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 600.00 20 BATTERY CELL - 16400 KGS [PER KG BASIS] @ BANGALORE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION) 1,31,200.00 {Quantities are Indicative with a Variance Level of +/- 20 %}

Transcript of EMD-0851 E Auction for the sale of Battery Cell, Iron ... Vision India Pvt... · EMD-0851 E Auction...

EMD-0851 E Auction for the sale of Battery Cell, Iron Battery Stand, IPDMU, ACPDB, Coil, Power Plant available at Diff

Location

Owned by M/s. Tower Vision India Pvt Limited Through www.auctionbridge.net Starts at 15:00:00 AM & Closes at 16:00:00 PM ON 30th Oct 2018

The Product details are as follows:

S. No Product Name EMD in Rs

1 BATTERY CELL - 11600 KGS [PER KG BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

92,800.00

2 BATTERY IRON STAND - 960 KGS [PER KG BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,920.00

3 ACPDB - 3 NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,500.00

4 POWER PLANT - 6 NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,000.00

5 IPDMU - 10NOS [PER NO BASIS] @ PATNA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

5,000.00

6 BATTERY CELL - 1600 KGS [PER KG BASIS] @ RAIPUR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

12,800.00

7 BATTERY IRON STAND - 240 KGS [PER KG BASIS] @ RAIPUR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

480.00

8 BATTERY CELL - 5200 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

41,600.00

9 BATTERY IRON STAND - 540 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,080.00

10 ACPDB - 8 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

4,000.00

11 COIL ( COPPER TRANSFORMER WITH 25 KVA ) - 250 KGS [PER KG BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,750.00

12 POWER PLANT - 7 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,500.00

13 IPDMU - 15 NOS [PER NO BASIS] @ AHMEDABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

7,500.00

14 BATTERY CELL - 13600 KGS [PER KG BASIS] @ AMBALA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,08,800.00

15 BATTERY IRON STAND - 1500 KGS [PER KG BASIS] @ AMBALA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,000.00

16 BATTERY CELL - 4800 KGS [PER KG BASIS] @ RANCHI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

38,400.00

17 BATTERY IRON STAND - 420 KGS [PER KG BASIS] @ RANCHI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

840.00

18 BATTERY CELL - 3600 KGS [PER KG BASIS] @ KOCHIN (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

28,800.00

19 BATTERY IRON STAND - 300 KGS [PER KG BASIS] @ KOCHIN (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

600.00

20 BATTERY CELL - 16400 KGS [PER KG BASIS] @ BANGALORE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,31,200.00

{Quantities are Indicative with a Variance Level of +/- 20 %}

The Product details are as follows:

S No Product Name EMD in Rs

21 BATTERY IRON STAND - 1620 KGS [PER KG BASIS] @ BANGALORE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,240.00

22 BATTERY CELL - 21600 KGS [PER KG BASIS] @ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,72,800.00

23 BATTERY IRON STAND - 2340 KGS [PER KG BASIS] @ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

4,680.00

24 ACPDB - 13 NOS [PER NO BASIS] @ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

6,500.00

25 COIL ( COPPER TRANSFORMER WITH 25 KVA ) - 250 KGS [PER KG BASIS]@ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,750.00

26 COIL ( COPPER TRANSFORMER WITH 40 KVA ) - 250 KGS [PER KG BASIS]@ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

3,750.00

27 POWER PLANT - 14 NOS [PER NO BASIS] @ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

7,000.00

28 AC - 5 NOS [PER NO BASIS] @ PUNE (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

2,500.00

29 BATTERY CELL - 9200 KGS [PER KG BASIS] @ BOPHAL (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

73,600.00

30 BATTERY IRON STAND - 1080 KGS [PER KG BASIS] @ BOPHAL (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

2,160.00

31 BATTERY CELL - 2000 KGS [PER KG BASIS] @ BHUBANEWAR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

16,000.00

32 BATTERY IRON STAND - 300 KGS [PER KG BASIS] @ BHUBANEWAR (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

600.00

33 BATTERY CELL - 5200 KGS [PER KG BASIS] @ HYDERABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

41,600.00

34 BATTERY IRON STAND - 540 KGS [PER KG BASIS] @ HYDERABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,080.00

35 BATTERY CELL - 9600 KGS [PER KG BASIS] @ CHENNAI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

76,800.00

36 BATTERY IRON STAND - 1140 KGS [PER KG BASIS] @ CHENNAI (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

2,280.00

37 BATTERY CELL - 3600 KGS [PER KG BASIS] @ GHAZIABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

28,800.00

38 BATTERY IRON STAND - 420 KGS [PER KG BASIS] @ GHAZIABAD (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

840.00

39 BATTERY CELL - 8400 KGS [PER KG BASIS] @ LUCKNOW (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

64,000.00

40 BATTERY IRON STAND - 780 KGS [PER KG BASIS] @ LUCKNOW (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

1,560.00

41 BATTERY CELL - 3200 KGS [PER KG BASIS] @ KOLKOTTA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

25,600.00

42 BATTERY IRON STAND - 480 KGS [PER KG BASIS] @ KOLKOTTA (MATERIALS LIFTING SHOULD BE COMPLETED WITHIN 10 WORKING DAYS FROM THE DATE OF CONFIRMATION)

960.00

{Quantities are Indicative with a Variance Level of +/- 20 %}

General Terms:

1. The bid registered will be exclusive of all applicable duties, taxes and other statutory levies. 2. GST & TCS will be as applicable at the time of sale. 3. The terms and conditions contained in this mailer may be changed without notice. You are requested to visit and register at our website, www.auctionbridge.net for latest information / changes in terms and conditions on start time/date and end time/date, changes in items offered for sale and other changes, extension of auction time, date etc. 4. Refer the offer document hosted with this auction for detailed Terms and Conditions of sale on the day of auction. 5. Auto Extension Feature: The auction will get closed on the scheduled closing time indicated in the site if there are no bids in the last 10 minutes. If there is a bid in last 10 minutes before the scheduled closing time the auction closing time will get extended by another 10 minutes from the bid time. The auction will get closed if there are no bids / bid attempts in the auto extension period (extended 10 minutes). If there is a bid the auction continues till we reach 10 minutes of No / Nil Activity. 6. People coming for inspection should wear the Safety shoes compulsorily

SPECIAL TERMS & CONDITIONS FOR THE E-AUCTION

1) Contract Validity: The validity of the contract is on immediate clearance mode. 2) SALEORDERS TO BEISSUED IN THE NAME OF BIDDERS ONLY AND NOMINATION IS NOT POSSIBLE. 3) Delivery should be one in the supervision of only one representative of the buyer. The representative should have

valid authorization letter 4) Price Validity: Price bided online is valid for a period of 20 days from the date of e-auction and upon confirmation, till

completion of delivery. 5) Price Terms : Bids placed / Rates offered are for the BASIC PRICE only. GST, IT-TCS shall be extra as applicable. 6) Payment Terms: 100% payment should be made within 3 working days from the date of confirmation from

M/s. Tower Vision India Pvt Limited, FAILING WHICH THE EMD WILL BE FORFIETED. 7) Lifting of materials: Lifting of materials should be completed within 10 working days from the date of confirmation

FAILING WHICH THE EMD WILL BE FORFIETED WITHOUT ANY FURTHER INTIMATION. Extension of Duration of Payment / Delivery: NO TIME EXTENSION WILL BE ALLOWED FOR PAYMENT / DELIVERY APART FROM THE DELIVERY SCHEDULE MENTIONED IN THE SALE INTIMATION NOTE.

8) EMD Terms : EMD collected will be refunded against the value receivable by seller after receipt of 100% payment by the seller and upon completion of lifting of scrap. EMD Will not be adjusted with payment for lifting. EMD will not been pertained by RTGS. Only DD/Pay Order/ Bankers Cheque will be accepted. EMD will not carry any interest.

9) All the correspondence by bidder shall be through the AUCTIONEER only. 10) The bidder should not indulge in any unfair trade practices & if found the EMD will be forfeited / They will not be

allowed to participate in Tower Vision India Pvt Limited, future auctions. 11) The H1 bidder has to get authorization from the AUCTIONEER before going for taking delivery. Without authorization

letter the material will not be delivered. 12) Delivery will be allowed only between 10.00AM to 3:00PM on all working days. 13) H1 Bidder should keep up the schedule for payment and delivery. 14) Payment against Sale Intimation letter shall be made through RTGS or Demand Draft /PO (Delivery of materials will be

allowed subject to realization of Demand Draft /PO

15) The auctioneer should ensure that all existing and new bidder should produce their KYC form (know your customer form) along with copy of tin & pan certificate / proprietor photo / id proof with EMD DD to participate in online auction.

Failure to comply the above will disqualify his participation.

1.0 GENERAL TERMS & CONDITIONS 1.1 Subject to the reserve price, if any, fixed by the SELLER and subject to the term and conditions set out

here in, sale shall be made to the HIGHEST BIDDER on “AS IS WHERE IS BASIS ” and “NO COMPLAINT

BASIS.” The Seller does not undertake any responsibility to procure any permission / license etc. in

respect of the auction property offered for sale.

1.2 SELLER reserves the right to modify and amend the terms & conditions and announce the same at any

time before the entire auction concludes. Announcements during the auction in the auction room on

the website and changes made in the catalogue including start price, bid increment / decrement,

extension of time for lots where received bids / no bids are received, and any other additional

conditions OR correction in the catalogue and/ or additions or deletions of items being offered for sale

are being done with the consent and knowledge of the seller, and it is binding on the bidder. Bidders

are advised in their own interest not to leave the auction room till the entire auction is closed.

1.3 Participation and bidding in this Auction shall be treated as conclusive evidence of the fact that the

bidder has inspected the Auction Property and the documents pertaining to it and is satisfied in all

respects regarding quantity, quality, condition of the Auction property, taxes and duties, and other

extraneous factors and the Principle of Caveat Emptor (let the buyer beware) will apply. It shall also

imply that the bidder has carefully gone through hand understood the terms and conditions of Auction

including the amendments if any, prevailing at the time of Auction. Seller / the Auctioneer will not

entertain any complaints or objections once Bid is placed

1.4 Seller does not give warranty or guarantee of the quality, quantity, measurement, condition Chemical

composition of each individual items or lot that form the auction property and about its “End Use” or

fitness for a particular purpose.

1.5 The highest bidder does not get any right to demand acceptance of his offer. SELLER reserves the right

to accept / reject / cancel any bid, withdraw any portion of the Auction Property at any stage from

Auction even after acceptance of bid / issue of delivery or deror release order / deposit of full value by

successful bidder without assigning any reason thereof. In the event of such rejection / cancellation /

withdrawal, SELLER, shall refund the value of Auction Property, if paid for, to the successful bidder.

SELLER shall not be responsible for any damages / loss what so ever to the successful bidder on account

of such withdrawal.

1.6 EMD amount will not carry interest.

1.7 In the event of failure on the part of the successful bidder to fulfill his contractual obligations, seller /

Auctioneer reserve the right to debar such bidder from participating in any future auction conducted by

the Auctioneer on behalf of seller.

2.0 PARTICIPATION

2.1 The prospective bidders have to register with the Auctioneer by submitting the Membership

Registration form duly filled and signed along with self attested copies of their PAN Card, valid GST

registration certificate (if available), and address proof by way of electricity bill, or telephone bill, or

Bank account statement for the last six months. The Membership Registration form along with the

prescribed documents shall be submitted to the Auctioneer. The Prospective Bidders, who have

submitted the Membership Registration form along with the prescribed documents to the Auctioneer

once, need not submit the same again. The prospective bidders after completing the registration

process as above shall have to deposit Earnest Money Deposit (EMD) for each lot separately or for all

lots as prescribed. (Refer Details of Auction Property for Lot-wise EMD) by Demand Draft / Pay Order on

any Scheduled / Nationalized Bank /Scheduled Co-operative Banks (as prescribed by the Seller) Drawn

in favor of Auction Bridge Payable at Chennai

3.0 CONDITIONS APPLICABLE TO “ONLINE” AUCTION METHOD OF BIDDING

3.1 Validity: The Online auction bidders must keep their bids valid for a period of 15 days from the date of e-

auction, and upon confirmation till completion of delivery.

3.2 Bids: All bids placed are legally valid bids and are to be considered as bids from the bidder himself. Once

1the bid is placed, the Bidders cannot reduce or withdraw the bid for whatever reason. If done so, the

seller will forfeit the EMD. The highest and the latest bid on the Auction shall superse deal the previous

bids of the bidder. The bidder with the highest offer / bid does not get any right to demand acceptance

of his Bid.

4.0 Contract Validity - As mentioned in the special terms & conditions

5.0 Payment

5.1 Payment amount shall be made in the form of Demand Draft / Pay order issued by any Scheduled /

Nationalized Bank / Scheduled Co-operative Banks in favor of Tower Vision India Pvt Limited,

5.2 On receipt of sale confirmation, Successful Bidders shall deposit 100% value of the material for the

respective lots inclusive of the applicable taxes and duties if any, (calculated as per the bids placed and

approved by the seller) in the form of DD or through RTGS before commencement of lifting of scrap.

EMD collected will be refunded after completion of materials lifting.

5.3 In case of payment by DD, lifting will be allowed only after realization of DD Bids placed / Rates offered

are for the Basic Price only. GST, IT-TCS shall be extra as applicable.

DELIVERY - Appropriate Clauses mentioned below will apply according to the sale.

5.4 On receipt to full Sale Value along with applicable GST / TCS & other Charges by the Seller, the Seller will

issue Sale / Delivery / Release Order to the Buyer through the auctioneer there by enabling him to lift

the materials as per the sale order.

5.5 Lifting of materials will be allowed only between 10.00 AM to 3:00 PM on all working days. Successful

bidders should ensure that the material clearance is as per the sellers instructions. Neat and clean

maintenance of the stock yard from where the materials lifted is the responsibility of the successful

bidder. In the even to non- adherence to the above by the successful bidder, seller will reserve its rights

to impose penalties / forfeiture of EMD and other payments collected. Weight recorded at the sellers

premises hall prevail final.

5.6 Incase seller is unable to deliver the goods within the specified time due to unforeseen administrative

reasons, then the seller shall grant suitable extension of delivery period to the Buyer without any

penalties till the expiry of such extended period. In such eventuality, however, the Buyer shall not been

titled to claim any compensation for such delay.

5.7 If the goods sold or portion thereof remain un-cleared in the premises of the seller beyond the

stipulated period, the sales proceed soft he un-lifted assets shall be forfeited and the un-lifted portion

of the assets may be removed at the risk and cost of the buyer.

5.8 While taking delivery of the material, it will be at the discretion of the seller or its authorized

representative to direct the manner / order in which the materials or lots shall be removed. No

segregation of the items of any lot is allowed inside the sellers premises.

5.9 Breaking / cutting may be allowed to the extent necessary for facilitating loading into vehicles as per the

discretion of the seller. No gas cutting equipments or any equipment, which are likely to cause damage,

will be allowed in the premises. Only safe oxy-acetylene gas cutting equipment will be allowed with

permission of seller. The decision of the seller or his authorized representative shall be final in this

regard.

5.10 The buyer shall arrange for all tools and tackles, forklifts and hoists or cranes or labor at their own

expenses.

5.11 The buyer will make his own arrangement for lifting and transportation of materials from the sellers

premises. However, the seller will guide only in loading and weighing (if on weight basis) of material.

Buyer will not been titled to claim any further facility or assistance in these regard. The material sold on

weight basis will be weighed on sellers Weigh Bridge in the presence of sellers representative. The

weight recorded in the weighbridge will be final and binding on both parties. No complaints as regard

the shortage in the weight will be entertained later. Further the vehicle meant for loading the

scrap should have a valid pollution under control certificate and should be free of any leakage

of diesel or oils. The buyer has to pay for the weight arrangements also.

5.12 Should the successful bidder wish to take delivery of the surplus material through its employee, he must

authorize the latter by a letter of authority or continuing authority, which shall be presented to the

seller. The seller may in his entered is creation decline to action any such authority and it shall be for the

purchaser to satisfy the seller that the authority is genuine. Delivery to such authorized person will

constitute valid delivery and no claims hall lie against the seller on any account thereafter.

5.13 Once the goods / materials are taken out of the factory gate, purchaser will be solely responsible for all

sorts of claims like shortage, missing parts, damage, incident, accident, loss of material etc.

5.14 Resale will not be recognized. The purchaser shall not been titled to resell any lot or part of a lot while

goods are still lying with in the premises of the seller and no delivery would be affected by the seller to

any person other than the Purchaser whose names are mentioned in the sale order /Delivery order.

5.15 Purchaser and his men are subject to the security rule of seller in force while in the sellers premises. The

purchasers, their work men agents or representatives shall not commit any nuisance, theft or indulge in

any anti social activities in the sellers premises and the purchaser shall be liable for the good conduct,

safety & discipline of his workmen. Incase of any such activity, delivery will be suspended and strict

action as per law will be taken including forfeiture of EMD.

5.16 While taking delivery of the material, the Purchasers shall be responsible for any damage that maybe

done to premises / fitting soft he SELLER in the course of removing the lot or lots purchased by them.

The SELLER may at its option arrange to make good such damages and the purchasers hall pay for the

same on demand. If such payment is not made on demand, the SELLER may forfeit the EMD / Security

Deposit or may stop delivery of the material till payment is made.

5.17 SELLER will not at any time be responsible for any injuries caused due to accident with in its premises

either to the buyer or his representative / labor etc., and the buyer will make proper arrangements for

any claim arising out of the employment under any status. It is the responsibility of the buyer to provide

necessary safety appliances (like hand gloves / safety shoes etc.,) to the laborers, who are engaged for

loading the materials.

5.18 If any accident or damage to the property / life etc. arises by reason of any act of negligence / omission

/ default or non-compliance with any of the Terms & Conditions or statutory regulations or rules and

regulations applicable with in the Sellers premises, on the part of the Buyer / his representative or

employees, resulting in death or injury to any persons or damages to the property of the SELLER or any

third party, then in such an event the Buyer will have to pay compensation to such person including the

employees of the SELLER for such accident or injury / death or damage caused to their employees or to

any of the Sellers employees or to others or to the Sellers property. The Buyer shall in such event, keep

the SELLER fully indemnified from any demand, claims or proceedings thereof.

Disputes/Arbitration

5.19 An authorized official or any other person appointed by the seller shall decide any dispute arising between the successful bidder and seller. The decision of the Arbitrator shall be final and binding on both the parties.

5.20 Disputes between seller & bidder if any shall be within the jurisdiction of Chennai courts only.

Action Responsibility

Follow up with Bidders for taking pos session of the assets / scrap awarded through auction

Auctioneer

Availability of inspected assets / scrap which was let out for auction

Tower Vision India Pvt Limited

Forfeiture of EMD Auctioneer and Client

5.21 However, the Auctioneer shall coordinate with both the Seller and Bidders to resolve the dispute amicably, if any, by discussion & negotiation to the best of its ability.

Contact Details: Contact Person

Mr. D Jackson Jayaraj

7338826565

Mr. G P Mohan Raj

7338826562

Mr. S Kingslin

7338826564

Auction Bridge #185, Labour Colony, Guindy Industrial Estate, Guindy, Chennai-32

Schedule of Programmed

Inspection of Materials Till 29th Oct 2018 (Except Holidays)

Time: 10.00 A.M. To 2.00 P.M. with prior appointment Auction Link https://auctionbridge.net

EMD Details EMD DD As Mentioned in Item Details for Auction to be taken in

favor of Tower Vision India Pvt Limited Payable at Gurgaon Registration Fee - Mandatory (Not applicable for existing Members registered with Auction Bridge)

Rs. 4720/- As non-refundable annual charges, to Be paid in favor of Auction Bridge payable at Chennai

Last Date to receive EMD 30.10.18 - Before 01.00 P.M.

On-Line Auction Event Date 30.10.18 BETWEEN 15.00 A.M to 16.00 PM All un bid lot will reopen from 16.00 to 16.30 PM

Contact Details for Inspection

Patna Barun kant kislay - SCM Tower Vision India Pvt. Ltd. Sudama Bhavan ,2nd Floor, Boaring Road Crossing , Patna 800001, Bihar L : +91 612 2277028 , M : +91 7541814045

Raipur C/o L L Logistics. Godown No. D, Ring Road 3, Near Bridge, Village- Giroud, Industrial Area, SILTARA, Raipur-493111. Warehouse Phone - 0771-6550554

Ahmedabad Mr Dharmendra Tower Vision India Pvt LTd, 15, Jyoti Warehouse, Near Aslali Octroi Naka Aslali, Ahmdebad, Gujrat, Phone - 8140299987

Ranchi Mr.Bashishtha - 8825331223

Tower Vision India Pvt. Ltd. C/O. Agility Logistics, 11 Satrughan Singh, Jp Nagar, Opp :- Pani Tanki, Bariatu, Ranchi, Jharkhand-834009,

Kochi Sabu - Supply Chain Management Building No: 32/1663 B2, Bcg Estate, Nh-Bypass Road, Palarivattom Po, Cochin-682025 Ph: 04844034980 , Mob:+91 9746470785 Ll-0484-4034821 , Emai: [email protected]

Bangalore

Madhu Rayavarapu - Manager -Scm Tower Vision India Pvt Ltd , #18/3,Varma Chambers,1st Floor. Wood Street,Ashok Nagar, Bangalore - 560025 ,Karnataka , Mob- 9560102952, Email - [email protected]

Pune Ramdas Kada - Scm-Mh Circle Diesl 3pl Division , Shri Mohan Govind Pisal S/O Govind Pisal,Gat No-458, Village Gram Panchayat Wagholi Katkewadi,Tal.Haveli Dist. Pune 412 207. Mh India.T +91 9225020808 / +91 9767891521

Bhopal Shubham Warehouse, Khasra No 8/1, Gram Rapadia, Ward No 85,Tehsil Huzur, Dist. Bhopal- 462047, Mobile 09200200996

Bhubneswar

Bikash C/O.Agility Logistics Pvt. Ltd, Plot No. 668, Rasulgarh, Bhubaneswar, Odisha-751010 Pranab Das – 9337675308, Cell : +91 99373 78642 / [email protected]

Jaipur Manish Kumar Srivastava - Scm Jaipur, Rajasthan Contact - 9610444824 / 01414066401 [email protected]

Hyderabad Aravinder - Scm Tvs Logisitcs Pvt Ltd ( Diesl), Sy.No : 16-18,Village :Gundlapochampally, Nutankal Road, Mandal & Dist : Medichal District , Secundrabad, Telangana 500014 Phone - 9000500947 [email protected]

Chennai

Karthik V Senior Executive - Scm Tower Vision India Pvt Ltd, Ramaniyam''the Lords"Block 1 No:1 & 2np,Jawaharlal Nerhu Road, Ekkaduthangal,Chennai - 600 032 Cell No : 9840-957-731

Lucknow Rajiv Kumar Srivastava Assistant Manager - Logistics Tower Vision India Pvt Ltd ,3rd Floor,Taj Plaza, 27/6/1 ,Ram Mohan Rai Marg ,Lucknow. 0522-3021871 , Extn-875 ,Mob- 09559993746 [email protected]

Kolkatta Tower Vision India Pvt Ltd C/O-Agility Global Integrated Logistics Sankrail Industrial Park, Mouza - Bhagabatipur PO - Kandua PS - Sankrail, Dulagarh Howrah - 711302. Mob - 9560603901

Declaration

We submit our bids subject to the terms and conditions stipulated in the e-auction which we have carefully read and agreed.

S No DD No Bank Name Branch Dated EMD Amount

Company/Firm Name*:__________________________________________________________ Proprietor/Director/Representative Name *:________________________________________ Address*: ____________________________________________________________________

____________________________________________________________________ PAN*: _______________________ GSTIN*:_______________________ (* Personal PAN No In case of Individual / Proprietary Concern or Company’s / Firm’s PAN No.)

Telephone/Fax No:/Mobile No.________________ E Mail: ______________________________

Signature of bidder:______________________________