Embedding employability and employer engagement into postgraduate teaching: a case study from...

31
Embedding employability and employer engagement into postgraduate teaching: a case study from ‘environmental management systems’ Simon Kemp 02 July 2008

Transcript of Embedding employability and employer engagement into postgraduate teaching: a case study from...

Page 1: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Embedding employability and employer engagement into postgraduate teaching:

a case study from ‘environmental management systems’

Simon Kemp 02 July 2008

Page 2: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

2

Content• Environmental Management Systems – description

of the module

• Wilding Butler – the case study company

• The pedagogical approach

• Student employability outcomes

• Case study company outcomes

• Employer engagement outcomes

Page 3: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

The module:

Environmental Management

Systems

Page 4: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

4

Environmental Management Systems• Postgraduate module available on the MSc

(optional) and MEnvSci (compulsory) programmes

• Running in various formats since 1997

• Previous version involved a fictional case-study company

• Academic year 2007-2008 used a local company to provide the module case study

Page 5: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

The case study company:Wilding Butler Construction

Ltd.

Page 6: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

6

Wilding Butler Construction Ltd.• Local small enterprise with large subcontractor base

• Small head office located in Colden Common, Hampshire opposite the regional Environment Agency headquarters

• Contacted through regional economic partnership body and the sustainable business partnership

• Looking to establish a competitive advantage through environmental management and to engage with the University

• Wide portfolio of construction projects in the South of England – commercial, education, residential

Page 7: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

7

Residential projects

Education projects

Page 8: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

The pedagogical approach

Page 9: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

9

Pedagogical approach• Mixed strategy with a focus on active student

participation

• Total of 30 students of mixed expertise and a range of nationalities – British, French, Greek, Chinese

• No students with previous experience or training in the subject area

• Emphasis on embedding employability and employer engagement throughout the module via the case-study

Page 10: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

10

Pedagogical approach• Embedding employability and employer engagement

was achieved through the following methods:

– Lectures

– Formation of five consultancy teams of six students

– Company head office & construction site visits

– Weekly email correspondence with the company (through a filter)

– Weekly progress and feedback sessions

– Team blogs and wiki sites

– ISO14001 certification audit

– EMS manual presentation to the board of directors

Page 11: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

11

WB Photos here

Page 12: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

12

Pedagogical approach• Embedding employability and employer engagement

was achieved through the following methods:

– Lectures

– Formation of five consultancy teams of six students

– Company head office & construction site visits

– Weekly email correspondence with the company (through a filter)

– Weekly progress and feedback sessions

– Team blogs and wiki sites

– ISO14001 certification audit

– EMS manual presentation to the board of directors

Page 13: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

13

Page title• First level

bullet points may need expanding into second level bullet points

– Second level bullet point

– Second level bullet point

– Second level bullet point

Page 14: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

14

Page 15: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

15

Pedagogical approach• Embedding employability and employer engagement

was achieved through the following methods:

– Lectures

– Formation of five consultancy teams of six students

– Company head office & construction site visits

– Weekly email correspondence with the company (through a filter)

– Weekly progress and feedback sessions

– Team blogs and wiki sites

– ISO14001 certification audit

– EMS manual presentation to the board of directors

Page 16: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Student employability

outcomes

Page 17: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

17

Student employability outcomes

Aims:

• Direct professional experience

• Practical application of theory

• Improved commercial understanding

• Practical experience of a growing area of employment

• Enhanced presentation skills

• Professional report writing skills

• Improved time management

• Enhanced CV for all students

Page 18: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

18

Student employability outcomesQuestionnaire and focus group to identify and assess

outcomes:

• Practical skills:

– “Producing something very comprehensive for a real-life company”

– “Allows us to develop clear understanding of EMS through hands-on experience”

– “Really helps you to know how to implement an EMS”

– “Working with a real company gave a sense of achievement”

– “Very practical and provided lots of guidance for students in their future careers in ISO14001”

– “Excellent method of learning what could be a very difficult to grasp subject”

Page 19: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

19

Student employability outcomes• Employability skills:

– “Relevant to business & work”

– “Relevant to real life. Excellent real case study”

– “Gave an insight into how the real world works – very useful reality check after 3 ½ years of environmental study”

– “Makes you manage your time”

– “Very practical experience, team work, organisation skills”

– “Real company therefore something valuable to talk about in job interviews. Feel I am employable as a result”

– “At last, learning about something useful in the workplace making us more employable – not enough of this”

Page 20: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

20

Student employability outcomes• Criticisms:

– “Lots of work, difficult organising team meetings”

– “Large groups, difficult to coordinate”

– “Too much work”

– “Heavy workload, although can’t suggest how to reduce it”

• Focus group 5 months after module completion:

– “Looking back the total workload wasn’t that much greater than other modules in total”

– “No exam meant the workload balanced out”

– “We definitely need more practical and employable modules”

Page 21: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Case study company

outcomes

Page 22: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

22

Case study company outcomes• EMS manual – meeting most of the requirements of

ISO14001

• Compliance with existing environmental legislation

• Ensured compliance with emerging environmental legislation - Site Waste Management Plans training, template and records system

• Regional publicity in newspapers and sector publications

• Competitive advantage

• Nominated at local business awards

Page 23: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

23

Page 24: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

24

Case study company outcomes• EMS manual – meeting most of the requirements of

ISO14001

• Compliance with existing environmental legislation

• Ensured compliance with emerging environmental legislation - Site Waste Management Plans training, template and records system

• Regional publicity in newspapers and sector publications

• Competitive advantage

• Nominated at local business awards

Page 25: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Employer engagement

outcomes

Page 26: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

26

Employer engagement outcomes• Curriculum relevance

• Further participation in EMS module

• Continuing professional work to inform teaching

• Ongoing relationship for future student research projects

• Participation in EU Framework bid

Page 27: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Conclusions

Page 28: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

28

Conclusions• Module enables graduates to develop a specific

employability profile and advanced level of expertise to pursue a career in EMS

• 10% of students have confirmed consultancy positions in this area prior to graduation

• Board presentations helped students prepare for interview presentations

Page 29: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

29

Conclusions• Production of the manual, certifications audits, and

board presentations have given the students confidence in their EMS expertise

• Employers have stated confidence in the EMS ability of the students after inspecting the EMS manual and testing practical understanding in interviews

• Case study organisation have an EMS almost to ISO14001 level for very little temporal and financial cost

• Module coordinator retains professional practice and relevance in teaching

Page 30: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

30

Next Year……

Page 31: Embedding employability and employer engagement into postgraduate teaching: a case study from environmental management systems Simon Kemp 02 July 2008.

Any Questions? Contact details

Simon KempSchool of Civil Engineering and the Environment

University of Southampton. SO17 1BJ

[email protected] 595868