Elx305 Ref Exam Solutions

download Elx305 Ref Exam Solutions

of 7

Transcript of Elx305 Ref Exam Solutions

  • 7/28/2019 Elx305 Ref Exam Solutions

    1/7

  • 7/28/2019 Elx305 Ref Exam Solutions

    2/7

  • 7/28/2019 Elx305 Ref Exam Solutions

    3/7

    Should the pressure supply fail then the valve will reset. However the pressure

    stored in the volume will only bleed slowly away at a rate determined by thevariable port setting. Therefore pressure will be supplied via the valve/shuttle

    to cause a retract of the cylinder!

    [4 marks]

  • 7/28/2019 Elx305 Ref Exam Solutions

    4/7

    Q3 a(i) Factors considered when selecting the a PLC

    1) Speed of operationThe speed of the PLC is important because it has to befast enough to respond to the process which is being controlled. This is

    especially important when controlling DC and AC drive controls and rapidly

    varying control signals.

    2) Number and type of inputs and outputs requiredWhether the I/O is analogue

    or digital, plus the quantity and additional capacity for expansion.

    3) Type of construction - Whether a block type PLC would be suitable orcard/slot system is needed.

    4) Cost

    5) Is Networking requiredWhether the PLCs can be or are required to be

    networked

    [6 marks]

    Q3a (ii) Factors considered when selecting a PLC network

    Key design issues are normally speed of operation, distance between nodes, number

    of nodes required, criticality of application

    Most likely to be a Bus or Ring configuration

    1) Data consideration - What data is going to be shared and communicated

    b t PLC d t SCADA t

  • 7/28/2019 Elx305 Ref Exam Solutions

    5/7

    3c)

    i) Star : Large number of wires required : Expensive and confusing[2 marks]

    Ring : As star (lesser cost) but also potential ground loop problems

    [2 marks]

    ii) Use a Tree structure by connecting bus structures to each other via

    repeaters to boost signal strength

    [3 marks]

    Q4

    a)

    [8 k ]

    I:0/0

    O:2/0

    T4:0 DN

    I:0/1

    1 scan cycle

    O:2/150 seconds

  • 7/28/2019 Elx305 Ref Exam Solutions

    6/7

    c) CBAX .

    CBACBACBACXY ...... [5 marks]

    Q5.

    a)

    I1Card

    24V DCInput

    0

    1

    2

    34

    5

    6

    7

    COM

    24V DC

    Output

    Cd

    0

    1

    2

    34

    5

    6

    7

    COM

    24V+

    DC

    -

    StartStop

    Sensor 1

    Process

    O2 Card

    +24V

    -DC

    Enable

    Conv.Heater

    R 1

    R 2

    3Phase

    415 volt

    R2To Gas

    Heater

    R1 To MCC

    PLC

  • 7/28/2019 Elx305 Ref Exam Solutions

    7/7

    [13 marks]