Electricity Generation III GEOS 24705/ ENST 24705
Copyright E. Moyer 2011
![Page 2: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/2.jpg)
Industrial generation design specs
• Generator should be large for heat dissipa3on
• Current carried in stator to avoid any sliding mechanical connec3ons that carry big current
• Magnet in stator is electromagnet for bigger B-‐field
• Voltage higher than 110 V to minimize resis3ve hea3ng
• Many loops to increase voltage and power output
![Page 3: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/3.jpg)
Generators are virtually unchanged in 100 yrs
Stator, 3-phase generator, Brakpan, South Africa, 1897. Photo: Siemens
Stator, 3-phase generator, Wellluck Co., China, 12.5 MW, 2010
![Page 4: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/4.jpg)
Rotor carries electromagnet
Small Hydro Generator rotor - Rotor Assembly Area - Alstom Hydro
Manufacturing site in Galindo (Spain) copyright © 2010 M. Monteaux for Alstom
Old mill rotor (source unknown)
![Page 5: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/5.jpg)
Turbo-generator power grew very quickly
(though seems to be leveling off)
From Vaclav Smil, “Energy at the Crossroads”
* Requires growth not just in generators but in turbines that power them
* exponential growth in several stages
* topping-out of steam P and T ca. 1960
![Page 6: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/6.jpg)
First major hydropower station, Niagara Falls, 1895
Adams power station, 10 5MW AC generators. Photo: Tesla Society
![Page 7: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/7.jpg)
Hoover Dam hydropower station, upgraded 1961
17 generators, average 120 MW. Photo: source unknown
![Page 8: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/8.jpg)
First commercial generating stations
1) Used reciprocating engines rotating at around 2000 rpm (33 Hz)
2) Turn generators via belt drives
3) AC frequency didn’t matter much – each grid was separate, and electricity was used mostly for lighting anyways (where frequency doesn’t matter)
Westinghouse commercial AC generating station, 1888
![Page 9: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/9.jpg)
Edison vs. Tesla: “war of the currents”
DC
Edison’s company: General Electric, founded 1890, now ranked (Forbes, 2009) the largest company in the world. Precursor: Edison Illuminating Co., 1880
Technical achievement: First steam-powered electricity & electric utility, 1882, first U.S. transmission standard, multiple power plants (1.5 mi. transmission) (for lighting only)
PR stunt: invented (AC) electric chair, attempted execution, 1890
AC
Tesla’s company: Westinghouse Electric Company, founded 1886, now (after purchase of CBS) knows as CBS Corp. (sold power generation to Siemens, itself provider of first electric street lighting in 1881). Hired first woman electrical engineer in 1890s.
Technical achievement: long-distance transmission of hydropower at Niagara Falls to factories in Buffalo New York, 1895 (25Hz)
PR stunt: lit Chicago World’s Fair, 1893
![Page 10: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/10.jpg)
Electric lighting common only a decade after invention
W.L. Sontag, 1895, "The Bowery at Night"
Individual private grid systems operation on their own standards, DC or AC from 25-133 Hz
![Page 11: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/11.jpg)
Edison vs. Tesla at 1893 Chicago World’s Fair
Tesla’s system already had most characteristics of the modern electricity system in 1893..
World’s Fair + choice at Niagara 2 years later committed us to AC
Comparatively little evolution after choice was made – standardization of frequencies.
![Page 12: Electricity Generation III GEOS 24705/ ENST 24705geosci.uchicago.edu/~moyer/GEOS24705/2011/Notes/... · Edison vs. Tesla: “war of the currents” DC Edison’s company: General](https://reader035.fdocuments.us/reader035/viewer/2022070911/5fa870c6a948af4eae540ba2/html5/thumbnails/12.jpg)
Tesla’s AC is “three-phase”
3-phase generation animation
(http://www.koehler.me.uk/animation/e_and_m_3phase_gen.htm)