Zach Owens, Program Manager2019 National Energy Codes Conference
May 30, 2019
Electric Vehicle Charging& Building Codes
![Page 2: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/2.jpg)
Colorado Electric Vehicle Plan Station Needs
• Medium Scenario: 204 stations (817 fast-charging ports)
• High Scenario: 632 stations (2,530 fast-charging ports)
![Page 3: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/3.jpg)
From the ICCT 2019 White Paper “QUANTIFYING THE ELECTRIC VEHICLE CHARGING INFRASTRUCTURE GAP ACROSS U.S. MARKETS
Future Needs in Denver in 2025: 1,133 workplace; 1,287 Public L2; 176 DCFC
![Page 4: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/4.jpg)
Charge Ahead Colorado
![Page 5: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/5.jpg)
Charge Ahead Colorado
Charge Ahead Colorado
RAQC CEO
Funding Source Federal Highway Administration - CMAQ and Volkswagen settlement
EV Fund and Volkswagen settlement
Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area
Eligible Equipment Level 2, DC fast-chargers, Electric Vehicles Level 2 and DC fast-chargers
Funding Level
80% up to:
Level 2 DC Fast-Chargers
EV Level 2 DC Fast-Chargers
$9,000 $30,000 $8,260 $9,000 $30,000
• Eligible applicants include local governments, school districts, State agencies, and non-profits.
• Apartment/condo complexes and private businesses are also eligible.
![Page 6: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/6.jpg)
Electrifying Our CorridorsLocations for fast-charging infrastructure
![Page 7: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/7.jpg)
EV Plan: Building Codes
Goal #4: Develop strategies and partnerships that prepare property owners for future investments in EV charging infrastructure and electrify challenging facility types.
Strategy 1: Increase the local adoption of building, parking, and zoning codes that accommodate and support EV charging.
CEO will integrate EV-readiness building code amendments for commercial and residential buildings into its energy code training and technical assistance for interested local jurisdictions.
![Page 8: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/8.jpg)
City of Denver Building Code Updates
Colorado Energy Office and Regional Air Quality Council have signed on as Co-Proposers for:
R404 – Requires residential buildings to include infrastructure necessary to add a minimum portion of EV charging to on-site parking.
C405 – Requires that buildings include infrastructure necessary to add a minimum portion of EV charging to on-site parking.
![Page 9: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/9.jpg)
Denver EV Code Proposals
Table R404.2.2.
![Page 10: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/10.jpg)
2021 IECC Commercial Code Proposal
Table R404.2.2.
![Page 11: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/11.jpg)
Questions?
![Page 12: Electric Vehicle Charging & Building Codes...Geographic Area 7 County Denver Metro Area Outside the 7 County Denver Metro Area Eligible Equipment Level 2, ... of building, parking,](https://reader035.fdocuments.us/reader035/viewer/2022062920/5f0289977e708231d404c1cc/html5/thumbnails/12.jpg)
Colorado Energy Office
@COenergyoffice
Zach OwensProgram Manager
Transportation Fuels and [email protected]