Elconn Ppt By Manoj

23
Page 1 Name of presentation by Mr X ELCONN ENERGY SYSTEMS (INDIA) PVT. LTD INTELLIGENT ENERGY MANAGEMENT

Transcript of Elconn Ppt By Manoj

Page 1: Elconn Ppt By Manoj

Page 1

Name of presentationby Mr X

ELCONN ENERGY SYSTEMS (INDIA) PVT. LTD

INTELLIGENT ENERGY MANAGEMENT

Page 2: Elconn Ppt By Manoj

Page 2

First Page

"Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

Why Elconn Energy?

• Reduces energy consumption by up to 25%• Reduces harmonics by up to 90%• Improves power factor by up to 20%• Improves the life expectancy of your

equipment• Comes with guaranteed savings

• Is fully designed and manufactured in India

Page 3: Elconn Ppt By Manoj

Page 3

System comprise the following indices

• Reduction in consumed current ranges from 13.18% to 29.68%.

• KVA release ranges from 14.48% to 32.06% • Voltage rise ranges from0.28% to 2.65% • Increase in PF ranges from 6.09% to 27.18%. • Reduction in KW/KWH ( as seen by the consumer) ranges

from 8.84% to 19.57%.

• Reduction in KW/KWH ( as seen by the Utility) ranges from 10.54% to 23.55%.

• Reduction in distribution losses ranges from 1.75% to 8.25%.

• Reduction in voltage unbalance ranges from 3.23% to 75%.

• Reduction in negative current unbalance ranges from 5.76% to 79%

• Reduction in current THD ranges from 23.01% to 52.15%

• Reduction in voltage THD ranges from 15.86% to 45.98%

Page 4: Elconn Ppt By Manoj

Page 4

How the Savings Happen?

• Controlled your losses.• Reduced 3rd level harmonics.• Voltage & current optimization• Phase unbalancing• Reduced neutral current• Improving in power factor.• Reducing your copper losses and iron losses

Page 5: Elconn Ppt By Manoj

Page 5

PHASE UNBALANCE

Page 6: Elconn Ppt By Manoj

Page 6

SURGE

Page 7: Elconn Ppt By Manoj

Page 7

Losses in transmitions

Page 8: Elconn Ppt By Manoj

Page 8

Second Page

"Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

Zig-Zag Configuration

• The two windings for each phase (outer and inner windings) are wound on the same core but in opposite directions.

• The windings are connected in a zig-zag fashion. For instance, the primary winding of R phase may be connected to the secondary of Y, the primary of Y phase would be connected to the secondary of B.

Page 9: Elconn Ppt By Manoj

Page 9

Second Page

"Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

Zig-Zag Configuration

• Zig-zag transformers are used to filter harmonic currents. Since the transformer has opposing windings, the harmonic currents get cancelled out.

Page 10: Elconn Ppt By Manoj

Page 10

Second Page

"Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum."

Page 11: Elconn Ppt By Manoj

Page 11

Voltage Optimization

• The Elconn Energy’s Eluma Intelligent Energy Management system will automatically adjust the incoming voltage to suit your requirements.

Page 12: Elconn Ppt By Manoj

Page 12

Real Time Monitoring

• The Eltrak Energy Monitoring system provides real time monitoring with trend analysis at no extra charge. Therefore, our clients do not only save energy through the installation of the Eluma Intelligent Energy Management system but can continue to monitor in real time their supply and achieve additional savings through monitoring and targeting (M&T).

Page 13: Elconn Ppt By Manoj

Page 13

• In addition, the system stores the following information (every 1 minute):

• KVA per phase• kWh per phase• KVar per phase• Total Kwh (this will match your main

meter reading if Installed at the main incoming supply)

• Total kVA

• Current per phase• Voltage per phase

Real Time Monitoring

Page 14: Elconn Ppt By Manoj

Page 14

Real Time Monitoring

• Power Factor per phase• Harmonics (both Voltage and Current)

3rd, 5th, 7th, 9th, 11th,13th and 15th• The Eltrak system can be viewed on-

line and/or through an internal network and has its own IP address.

Page 15: Elconn Ppt By Manoj

Page 15

Why Energy Monitoring?

• The Eltrak Energy Monitoring system certainly provides an excellent platform for your company to clearly identify your electricity usage at any time and take action to further reduce this

Page 16: Elconn Ppt By Manoj

Page 16

Connectivity

Page 17: Elconn Ppt By Manoj

Page 17

CASE STUDY

Page 18: Elconn Ppt By Manoj

Page 18

CASE STUDY

BEFORE (WITHAUT ENERGY METER) JAN 2010 AFTER (WITH ENERGY METER)BILL IS-712,869.00 UNITS- 118693MARCH 2010 BILL IS- 628,283.00UNITS- 106725Actual saving in percentage 18.60%On installation of Elconn energy saver

Page 19: Elconn Ppt By Manoj

Page 19

CASE STUDY

Page 20: Elconn Ppt By Manoj

Page 20

CASE STUDY

Page 21: Elconn Ppt By Manoj

Page 21

CASE STUDY

Page 22: Elconn Ppt By Manoj

Page 22

OUR CLIENTS

Page 23: Elconn Ppt By Manoj

Page 23

THANKS……….

MANOJ A MAURYA