El Cuervo Norte Mitigation Boundary - San Diego · EL CUERVO DEL SUR HMMP CITY OF SAN DIEGO CREATED...
Transcript of El Cuervo Norte Mitigation Boundary - San Diego · EL CUERVO DEL SUR HMMP CITY OF SAN DIEGO CREATED...
kj
kjkjkj
kj
kj
"/
"/
"/
"/
"/
"/
"/
"/
"G
"G
"G
"G
"G
"/
"/
"G"G
!!̂
kj
kj
"/
"/
kj
kj
"G
"G
"G
"G
"G
"G"G
"/
"/
"/
"/
"/
"/
"/
"/ "/"/"/
"/
SORRENTO VALLEY BL
LUSK BL
VISTA SORRENTO PY
ROSELLE ST
SORRENTO VALLEY RD
Los Peñasquitos Creek
El Cuervodel Sur
El Cuervo NorteMitigation Boundary
%&s(
!"̂$
!"̂$
El Cuervo WetlandRevegetation
Mitigation Project
Path
:G:\g
is\pr
ojec
ts\1
577\
2767
9051
\map
_doc
s\mxd
\PQ
_Can
yon_
Miti
gatio
n\El
_Cue
rvo_
del_
Sur\E
lCue
rvoD
elSu
r_Se
nsSp
ecie
s.mxd
,col
in_m
attis
on,6
/13/
2013
,9:5
0:00
AM
SENSITIVE SPECIESEL CUERVO DEL SUR HMMP
CITY OF SAN DIEGO
CREATED BY: CM
PM: BE PROJ. NO: 27679954.08300
FIG. NO:6SCALE: 1" = 750' (1:9,000)
375 0 375 750 Feet
OSCALE CORRECT WHEN PRINTED AT 11X17
DATE: 6/13/2013
SOURCES: Site Boundary (URS, 2013).Species (CNDDB, CDFW, 2012). Survey Observations (URS, 2013).SD Public Utilities Mitigation, MHPA (SanGIS, 2011). Mitigation Sites (City of SD, 2012). Land Ownership (Sandag, 2010). Roads, Rivers, Coastal Zone (SanGIS, 2011). Aerial Imagery (SanGIS, 2012).
2013 Survey Observations
"/ Least Bell's vireo
Sensitive Species
"G Light-footed Clapper Rail
kj Coastal California Gnatcatcher
"/ Least Bell's Vireo
El Cuervo del Sur Site Boundary
Coastal Zone Overlay
Multiple Habitat Planning Area (MHPA)
El Cuervo Mitigation Site
City of San Diego Public Utilities Mitigation Sites
River
Public Land Ownership
City
Other Local
State
Copyright:© 2009 ESRI
30
35
40
45
50
55
60
65
70
75
80
70 170 270 370 470 570 670 770 870
ELEV
ATION (F
T)
STATION (FT)
FIGURE 7. LOS PENASQUITOS CREEKEL CUERVO DEL SUR
CONCEPTUAL GRADING CROSS‐SECTION
Existing 2‐Ft Contour Field Survey Existing Ground Surveyed Water Surface Elevation Winter High Water Mark (March 2013) Storm Event Water Surface Elevation
Stopped Field Survey. Due to dense vegetation.
Approximate Boring (B02) Location
Mitigation Area
Note(s): Plot contains significant vertical exaggeration in scale.Cross‐Section plotted from left to right looking in the downstream (westerly) direction.Water surfaces shown are preliminary only. Calculations were based on the Manning's Equation and preliminary survey data .
25 Yr WSE10 Yr WSE 5 Yr WSE
2 Yr WSE
Proposed Baseline Grading (Herbaceous Wetland Surface)
Not Impacted
Eucalyptus
Palm Trees
Existing Shrubsto Remain
Phase II
Path
:G:\g
is\pr
ojec
ts\1
577\
2767
9051
\map
_doc
s\mxd
\PQ
_Can
yon_
Miti
gatio
n\El
_Cue
rvo_
del_
Sur\E
lCue
rvoD
elSu
r _C
once
ptua
lDes
ign_
phas
e2.m
xd,p
aul_
mor
eno,
8/2/
2013
,3:0
1:03
PM
SOURCES: Site Boundary, Buffer, Vegetation, Soil Disposal Area (URS, 2013). Soil (SSURGO, USDA, 2007). Aerial Imagery (SanGIS, 2012).
CONCEPTUAL MITIGATION DESIGNEL CUERVO DEL SUR HMMP
CITY OF SAN DIEGO
CREATED BY: LR
PM: BE PROJ. NO: 27679954.08300
45 0 45 90 Feet
ODATE: 8/2/2013
El Cuervo del Sur Site Boundary (Phase I)
El Cuervo del Sur Site Boundary (Phase II)
Planting Zones
Herbaceous Wetland
Riparian Scrub
Riparian Transitional
Proposed Soil Disposal Area
SCALE: 1" = 90' (1:1,080)SCALE CORRECT WHEN PRINTED AT 11X17
FIG. NO:8
Phase I
Planting Zones Phase I Phase IIHerbaceous Wetland 1.00 0.41
Riparian Scrub 0.94 0.55Riparian Transitional 0.36 0.46
Total 2.30 acres 1.42 acres
Not Impacted
Eucalyptus
Palm Trees
Existing Shrubsto Remain
48
49
47.2
47.2
Phase II
47
47
47
44
47.5
43
47.4
47.1
47
46.5
47.2
47.4
43.2
47.2
43.2
47
47.2
43.2
46.6
47.2
44
47.2
47.1
47.5
47.2
47
43
47.5
43.1
47.5
43.2
4443
44
47
48
Path
:G
:\gis
\pro
ject
s\1577\2
7679051\m
ap_docs
\mxd\P
Q_C
anyo
n_M
itig
ati
on\E
l_C
uer
vo_del
_Sur\
ElC
uer
voD
elSur_
Concep
tualD
esig
n_2phase
_gra
din
g_pla
n.m
xd,dia
na_sm
ith,6/1
4/2
013,12:2
5:4
2P
M
SOURCES: Site Boundary, Buffer, Vegetation, Soil Disposal Area (URS, 2013). Soil (SSURGO, USDA, 2007). Aerial Imagery (SanGIS, 2012). Vertical Datum: NAVD 88.
CONCEPTUAL GRADING PLAN
EL CUERVO DEL SUR HMMP
CITY OF SAN DIEGO
CREATED BY: LR
PM: BE PROJ. NO: 27679954.08300
45 0 45 90 Feet
ODATE: 6/14/2013
El Cuervo del Sur Site Boundary (Phase I)
El Cuervo del Sur Site Boundary (Phase II)
Proposed Contours
Proposed Contours - 1ft
Finished Grade Spot Elevation
Existing Contours
Existing Contours - 10ft
Existing Contours - 1ft
Planting Zones
Herbaceous Wetland
Riparian Scrub
Riparian Transitional
Proposed Soil Disposal Area
SCALE: 1" = 90' (1:1,080)SCALE CORRECT WHEN PRINTED AT 11X17
FIG. NO:10
Phase I
Planting Zones Phase I Phase II
Herbaceous Wetland 1 0.41
Riparian Scrub 0.94 0.55
Riparian Transitional 0.31 0.51
Total 2.25 acres 1.47 acres