International Best Practices

for Public Private Partnership

Industrial Wastewater

ManagementBy

Dr. Avigit Dagupta

Team Leader

14 March, 2012

Page 4: Edama ً wastewater workshop (final)

Critical Need

Centralized Industrial Wastewater Treatment Plants (IWTP) with reuse of treated effluent are critical to:

Reduce pollution

Conserve water and other resources

Reduce operating cost of industries

Page 5: Edama ً wastewater workshop (final)

Challenges of centralized

IWTPs

Capital cost for construction

Operation & Maintenance costs

Who will own and operate the IWTP ?

Ensure that industries will use the IWTP

Technical design issues

Page 6: Edama ً wastewater workshop (final)

Successful Approaches

Phased construction of the IWTP design capacity using modular technologies – reduces initial capital cost

Combined domestic and industrial wastewater treatment plant

Private-Public Partnership

Page 7: Edama ً wastewater workshop (final)

Public Private Partnerships

Includes financing package with:

◦ Grant from government and/or donor (20-30%)

◦ Investment by industries using the IWTP (15-25%)

◦ Private investors (20-30%)

◦ Soft loans (40-50%)

Page 8: Edama ً wastewater workshop (final)

Advantages of PPP Sharing of cost by industry stakeholders

Cost sharing attractive to potential investors and

loan agencies

Stakeholder ownership in IWTP

◦ Incentive to use the IWTP by industry stakeholders

◦ Incentive to discharge only proper waste to the IWTP

◦ Better management = better compliance

◦ Cost savings for industries

◦ Sustainable financial and operational model

Page 9: Edama ً wastewater workshop (final)

Examples of Central IWTPsItem Description

Number of IWTPs

as of 2005

88

Capacity 0.5 - 25 MLD

Types of

Industries

Food, chemical, textiles, leather,

paper, steel, pharmaceutical,

petroleum, power, plastics, metal

finishing, etc.

Use of Treated

Effluent

- Discharge to rivers

- Reuse for agriculture

- Reuse for industry

Capital cost $0.5 M - $15 M

Financing Govt. + Industries + Loan

Year of

construction

Since 1994

Page 10: Edama ً wastewater workshop (final)

Example in Jordan

Current Condition

With PPP Approach

Distance to disposal facility

70 km <10 km

Cost of wastewater disposal

JD 18,000/y JD 9000/y

Investment in WWTP

JD 0 JD 5000

Return on Investment

JD 0 JD 500/y

Net Cost Savings

JD 0 JD 4500 Yr 1JD 9000 Yr 2

Page 11: Edama ً wastewater workshop (final)

Recommendations

Industry commitment to pollution prevention

Increase industry-government and donor dialogue

and cooperation

Improving industry water/energy cost savings and

pollution prevention

Forward looking, creative sustainable approaches

to financing IWTPs through the PPP model

Page 12: Edama ً wastewater workshop (final)

Thank you for your attention

Page 13: Edama ً wastewater workshop (final)

Questions and Answers

13

Follow us on twitter @EDAMA

Page 14: Edama ً wastewater workshop (final)
Page 15: Edama ً wastewater workshop (final)

Page 16: Edama ً wastewater workshop (final)

-

Page 17: Edama ً wastewater workshop (final)

-

-

-

-

Page 18: Edama ً wastewater workshop (final)

-

Page 19: Edama ً wastewater workshop (final)

-

Page 20: Edama ً wastewater workshop (final)

-

Page 21: Edama ً wastewater workshop (final)

-

Page 22: Edama ً wastewater workshop (final)
Page 23: Edama ً wastewater workshop (final)

-

.1

.2

-

.3

.4

.5

Page 24: Edama ً wastewater workshop (final)

-

Page 25: Edama ً wastewater workshop (final)

-

•-

-

-

-

Page 26: Edama ً wastewater workshop (final)

-

(–

Page 27: Edama ً wastewater workshop (final)

-

-

.1

.2

.3-

(–

Page 28: Edama ً wastewater workshop (final)
Page 29: Edama ً wastewater workshop (final)
Page 30: Edama ً wastewater workshop (final)
Page 31: Edama ً wastewater workshop (final)
Page 32: Edama ً wastewater workshop (final)
Page 33: Edama ً wastewater workshop (final)
Page 34: Edama ً wastewater workshop (final)
Page 35: Edama ً wastewater workshop (final)
Page 36: Edama ً wastewater workshop (final)
Page 37: Edama ً wastewater workshop (final)

Questions and Answers

37

Follow us @EDAMA

Page 38: Edama ً wastewater workshop (final)

Grey Water Reuse

A Residential Community Case Study

by

Ala QubainMustakbal Clean Tech

March 14, 2012

Page 39: Edama ً wastewater workshop (final)

A Tale of Two Extremes

Page 40: Edama ً wastewater workshop (final)

A Tale of Two Extremes

Page 41: Edama ً wastewater workshop (final)

Case Study

Residential Community

4 building complexes/communities not connected to municipal sewage

5 treatment plants

Residence

Waste

Water

Water Treatment Storage Tank

Agricultural

Collection truck

Discharge to Empty

Land

Page 42: Edama ً wastewater workshop (final)

Water Treated Per Day

Name Graywater Output m3/day

Eman 900

Al Mustanadeh 500

Abu Olanda 1 950

Abu Olanda 2 500

TOTAL 2850

Page 43: Edama ً wastewater workshop (final)

Water Quality

Page 44: Edama ً wastewater workshop (final)

Water Amount Perspective

220,000 Toilet Flush per Day

712,000 m2 of Ground Cover Plants

65,000 m2 of Forest Plants

400 tons of CO2 Avoided

Or Do Nothing!

Page 45: Edama ً wastewater workshop (final)

Agricultural Use: Off-Site

Alpha-Alpha Clover , Meadow

Cut 6 – 7 times pear year

4 m3 per 1000 m2 per day

700,000 m2 required for 2850 m3/day

Potential Income from Sales per year: 300,000 JD

Already being done in Jordan

Page 46: Edama ً wastewater workshop (final)

Agricultural Use: On-Site

Total Garden Areas: 4827 m2

Water Requirement: 800 m3 per day

Page 47: Edama ً wastewater workshop (final)

Agricultural Use: On-Site

Page 48: Edama ً wastewater workshop (final)

Industrial Use: Steel Plants

10 Steel Plants in Muwaggar and Sahab located within 10 km radius

Water Required for Cooling

Steel plants pay 1-2 JD per m3

Cost of transportation 1 JD per m3

Not feasible unless managed properly, large carbon footprint from transport 20 m3 per

truck load.

Page 49: Edama ً wastewater workshop (final)

Base Course & Street Construction

Water required for base coarse mixing and street construction

10% Volume from Water

30,000 m2 of Street Construction per day

New roads are being constructed in the area

Page 50: Edama ً wastewater workshop (final)

Bio Gas Production

Anaerobic Digestion Co-Substrate

Page 51: Edama ً wastewater workshop (final)

Recommendation

Jordan underperforming when using grey water

Identify plot of land for animal fodder growth or potentially biofuel plant.

Community support projects in agriculture

Legislation and building codes