    Successful Implementation ofGIS Techniques forRoute Alignment & Surveys ofPower Transmission Projectsof POWERGRID

    Power Grid Corporation Of India Ltd

  • 8/2/2019 ed Latest Modern Survey

    2/38

    To optimize cost of transmission line

    Line length, number of locations, deviations Minimum river crossings Minimum forest areas Accessibility, right of way considerations To assess route constraints and do constructionplanning

    To ensure statutory clearances

    Ground clearance Horizontal/Right of way clearance Clearances from power lines, railway lines, road

    crossings etc.

    Why Surveying Is Important?

  • 8/2/2019 ed Latest Modern Survey

    3/38

    UHV Transmission LinesUHV Transmission Lines- 765 kV , Requiring Large ROW- 765 kV , Requiring Large ROW

  • 8/2/2019 ed Latest Modern Survey

    4/38

    Long Distance TransmissionLong Distance Transmission

    Lines 500 kV HVDCLines 500 kV HVDC

  • 8/2/2019 ed Latest Modern Survey

    5/38

    Transmission LinesTransmission Lines

    thru Agricultural fieldsthru Agricultural fields

  • 8/2/2019 ed Latest Modern Survey

    6/38

    Transmission Lines in Hilly areasTransmission Lines in Hilly areas

  • 8/2/2019 ed Latest Modern Survey

    7/38

    Multiple Transmission LinesThrough Same Corridor

  • 8/2/2019 ed Latest Modern Survey

    8/38

    Transmission Line River CrossingsTransmission Line River Crossings

    http://192.168.1.18/PN/Gallery/view.asp?img=IMAGES/TOWERS/POWERGRID%20TOWERS/TALCHER-KOLAR/TMP28.JPG&folder=IMAGES/TOWERS/POWERGRID%20TOWERS/TALCHER-KOLAR&si=True&up=IMAGES/TOWERS/POWERGRID%20TOWERShttp://192.168.1.18/PN/Gallery/view.asp?img=IMAGES/TOWERS/POWERGRID%20TOWERS/GENERAL/POWERGRID3.jpg&folder=IMAGES/TOWERS/POWERGRID%20TOWERS/GENERAL&si=True&up=IMAGES/TOWERS/POWERGRID%20TOWERS
  • 8/2/2019 ed Latest Modern Survey

    9/38

    Project Conceptualization / Project FeasibilityStageFaster and accurate techniques required toevaluate various line routes

    Pre-Construction StageRoute alignment, Detailed Mapping of right ofway, ground profiling, finalisation of towerlocations with geo technical details

    Detailed contouring of undulated terrain forestimation of benching and revetment quantities

    Project Construction StageCheck Survey only

    Transmission Line Surveying

  • 8/2/2019 ed Latest Modern Survey

    10/38

    Large Quantity variations duringexecution stage avoided Constraints assessed in advance Engineering activities can be taken inadvance Construction work can be taken upimmediately after contract award Reduction in IDC due to reduction in

    project execution time

    offsetting costof survey using modern techniques Reduction of even 1-2 kms linelength would offset cost of surveyingusing modern techniques

    Advantages of Conducting Detailed Survey inAdvance

  • 8/2/2019 ed Latest Modern Survey

    11/38

    Detailed Survey Modern TechniquesDetailed Survey Modern Techniques

    Route Alignment using latest satellite imageriesRoute Alignment using latest satellite imageries

    (PAN + LISS III Merged products)(PAN + LISS III Merged products)superimposed on Survey of India Topographicalsuperimposed on Survey of India TopographicalMapsMaps

    Digital terrain modeling in hilly terrain usingDigital terrain modeling in hilly terrain using

    contouring datacontouring data Detailed Survey using GPS, Total stations orDetailed Survey using GPS, Total stations or

    alternatively ALTMalternatively ALTM Digitized contouring at undulated / hilly towerDigitized contouring at undulated / hilly tower

    locationslocations Identification of Route constraints,Identification of Route constraints, Identification of infrastructure detailsIdentification of infrastructure details

  • 8/2/2019 ed Latest Modern Survey

    12/38

    Detailed Survey Modern TechniquesDetailed Survey Modern Techniques

    Tower spotting & optimization of locationsTower spotting & optimization of locations

    using commercial software like PLS CADDusing commercial software like PLS CADD

    Estimation Of BOQEstimation Of BOQ

    Preparation Of Survey reportsPreparation Of Survey reports

    Soil InvestigationSoil Investigation

  • 8/2/2019 ed Latest Modern Survey

    13/38

    METHODOLOGY

    Acquisition of Remote

    Sensing Data

    Digitization of Base

    details from SOI

    sheets

    Preparation of Updated

    Digitized Maps

    Selection ofcorridors/alternatives Route Selection ReconnaissanceSurvey

    GPS/Total Station Survey

    Digitized Profiling

    Computer-aided tower

    spotting

    BOQ Estimation, Reportsetc.

    GeotechnicalInvestigations

  • 8/2/2019 ed Latest Modern Survey

    14/38

    Digitized ToposheetDigitized Toposheet

    Survey of India Topo Sheet Corresponding Digitized Map

    indicating relevant information

  • 8/2/2019 ed Latest Modern Survey

    15/38

    Digitized Satellite ImageDigitized Satellite Image

    Satellite Imagery

    (5.8/20 m resolution)

    Corresponding Digitized Image

    indicating relevant information

  • 8/2/2019 ed Latest Modern Survey

    16/38

    Selection of Alternative RoutesSelection of Alternative Routes

    Bee

    Line

    Existing Line

    Alternative

    3

    Alternative

    2

    Alternative1

  • 8/2/2019 ed Latest Modern Survey

    17/38

    Computerized Route Optimization by StudyComputerized Route Optimization by Study

    of Alternative Routesof Alternative Routes

    Bee

    Line

    Existing Line

    Alternative

    3

    Alternative

    2

    Alternative1

  • 8/2/2019 ed Latest Modern Survey

    18/38

    Digital Terrain ModelDigital Terrain Model

    Computerized Three Dimensional Image

    Bee Line Alternative-3Alternative-1

    Alternative-2

  • 8/2/2019 ed Latest Modern Survey

    19/38

    Advantages of ModernAdvantages of ModernSurvey Techniques overSurvey Techniques over

    Traditional survey MethodTraditional survey Method

  • 8/2/2019 ed Latest Modern Survey

    20/38

    Topographic Sheet Indicates only Nala

  • 8/2/2019 ed Latest Modern Survey

    21/38

    Satellite Image Indicates

    Large waterbody

  • 8/2/2019 ed Latest Modern Survey

    22/38

    Topographic Sheet Indicates only a part

    of Canal

  • 8/2/2019 ed Latest Modern Survey

    23/38

    Satellite Image IndicatesAnother Branch of Canal

  • 8/2/2019 ed Latest Modern Survey

    24/38

    Topographic Sheet

    Not many details

  • 8/2/2019 ed Latest Modern Survey

    25/38

    Satellite Image IndicatesRecent InfrastructureDevelopments, LandslideAreas

  • 8/2/2019 ed Latest Modern Survey

    26/38

    T i i Li S th h GIS

  • 8/2/2019 ed Latest Modern Survey

    27/38

    Transmission Line Survey through GIS

    Change of RiverCourse

  • 8/2/2019 ed Latest Modern Survey

    28/38

    Detailed Survey on Selected RouteDetailed Survey on Selected Route

    Detailed Survey is done on the selected route using

    Total Stations. Plotting of Surveyed Route on the Topographical Maps

    Tower Spotting and profiling is done using PLS-CADDSoftware.

  • 8/2/2019 ed Latest Modern Survey

    29/38

    PLS CADD SoftwarePLS CADD Software

    Power Line Systems Computer Aided Design and Drafting (PLS CADD) isa software developed by Power line systems Inc. USA.

    The software is used for Tower Spotting.

    The software automatically provide SAG Clearances.

    The software automatically calculates wind & WeightSpan.

    The software prepares the Plan & Profile View of theT/L line.

    Report Generation.

    The overall organization of the PLS CADD software is shown in the

    following slide.

  • 8/2/2019 ed Latest Modern Survey

    30/38

    PLS CADD SoftwarePLS CADD Software

    3-D Model of-D Model ofLine in Corridorine in Corridor

    3-D Terrain3-D Terrain

    Survey DataSurvey Data

    Feature CodesFeature Codes

    Design CriteriaDesign Criteria

    LoadsLoads

    ClearancesClearances

    StructuresStructuresGeometryGeometry

    StrengthStrength

    CablesCables

    All PropertiesAll Properties

    ReportsReports

    Material ListMaterial List

    SpecificationSpecification

    Etc.Etc.

    DrawingsDrawings

    Plan & ProfilePlan & Profile

    Exported toExported to

    CAD systemCAD system

    ArchivingArchiving

    LineLine

    ManagementManagement

    FutureFuture

    ModificationsModifications

    Corridor TerrainCorridor Terrain

    Ground + ObstaclesGround + Obstacles

    InstallationInstallation

    SpottingSpotting

    AutomaticAutomatic

    ManualManual

    StringingStringing

    SaggingSagging

    Etc.Etc.

    CalculationsCalculations

    Sag TensionSag Tension

    ClearancesClearances

    Struct-StrengthStruct-Strength

    SwingsSwings

    Etc.Etc.

    Librariesibraries

    Inputnput Processingrocessing Outpututput

  • 8/2/2019 ed Latest Modern Survey

    31/38

    Plan & Profile DrawingPlan & Profile Drawing

  • 8/2/2019 ed Latest Modern Survey

    32/38

    Key AdvantagesKey Advantages

    PLS Cadd software used forPLS Cadd software used forpreparing Plan & Profile Drawingpreparing Plan & Profile Drawingand Report Generationand Report Generation

    Eliminates manual error in ReportEliminates manual error in Reportgeneration.generation.

    Empowers Managers to move /Empowers Managers to move /

    modify structures and see the effectmodify structures and see the effecton the Line.on the Line.Reports / Calculations of modifiedReports / Calculations of modified

    structures can be viewed instantly.structures can be viewed instantly.

  • 8/2/2019 ed Latest Modern Survey

    33/38

    Airborne Laser Terrain Mapping(ALTM)

    First reflection

    (first pulse)

    Last reflection

    (last pulse)

    The laser locator installed onboard

    records both returns from the

    vegetation cover and objects onthe ground (that is the first pulse)

    and from the terrain under the

    vegetation (that is the last pulse).

    This system together with data

    processing software are used to

    create digital terrain model notaffected by the vegetation.

  • 8/2/2019 ed Latest Modern Survey

    34/38

    New Line ConstructionNew Line Construction

    Knowing exact geometry along the route with as many details desirable as it makesdesign process much more productive. With laser survey much more efficient andfast to collect the information along the route for new power line design andconstruction.

  • 8/2/2019 ed Latest Modern Survey

    35/38

    Evaluation Of ClearancesEvaluation Of Clearances

  • 8/2/2019 ed Latest Modern Survey

    36/38

    Thermal Uprate StudiesThermal Uprate Studies

    Thermal uprate study will become much less complicated process with laser

    survey data. Three-dimensional information about actual power line geometry and

    condition brings all relevant details along the route of the power line.

    DETAILED SURVEY USING MODERN TECHNIQUES

  • 8/2/2019 ed Latest Modern Survey

    37/38

    TEESTA-V (Route Alignment using satellite imagery) SRINAGAR-LEH (Route Alignment using satelliteimagery)

    PARBATI-II, KOLDAM KAHALGAON

    BARH KUDAMKULAM NEYVELI RANCHI-SIPAT RAPP-5&6

    MAITHON WR STRENGTHENING PARBATI-III URI-II etc. etc.

    DETAILED SURVEY USING MODERN TECHNIQUESFOR PROJECTS

    COMPLETED / UNDER IMPLEMENTATION