E.Berkay_EPRO Inc_ Company Profile

18
www.epro.com.tr Presentation

Transcript of E.Berkay_EPRO Inc_ Company Profile

Page 1: E.Berkay_EPRO Inc_ Company Profile

www.epro.com.tr

Pres

enta

tion

Page 2: E.Berkay_EPRO Inc_ Company Profile

EPRO Company Profile EPRO Company Profile

EPRO Power and Industrial Plants Inc. was founded in 1997 by five engineers and an economist, who as members of a management team, have successfully managed and completed major industrial and power plant construction projects both in Turkey and abroad between the years 1985-1997.

The main operational objective of EPRO Power and Industrial Plants Inc. to undertake and realize challenging construction andfabrication projects in the following fields; We are pleased to announce that as of 3 January 2011, EPRO Power and Industrial Plants Inc. has become a subsidiary Company of

TML Construction Co. Istanbul.

TML Construction Co. (www.tml.com.tr) as a leading international construction Co. (ranking 219 th in “ENR-The Top 225 International Contractors List-2010”) is currently active in Turkey, Libya and Azerbaijan and has recently extended its operations to the Gulf Region by recently established companies “TML Saudia” at Dammam – KSA and a branch in Abu Dhabi UAE.

Having reinforced and strengthened its financial and operational structures with this new alliance, EPRO is looking forward to new business opportunities in Turkey, Caspian Region, The Midde East, Europe and Africa.

Having optimized its physical and financial resources during the first thirteen years of its successful operations, EPRO Power and Industrial Plants Inc. is now dynamically structured to employ all major erection andfabrication disciplines including mechanical, piping, electrical, instrumentation, structural steel erection works and to perform detailed engineering and procurement of project materials.

Having successfully completed Power Plant Projects in Azerbaijan, Dubai and Albania EPRO has become the first Turkish Company ever to manufacture Heat Recovery Steam Generators (HRSG) abroad and now is aiming to enlarge its activities in the growing Power Generation Sectors of the Europe, Middle East, Caspian Region and Africa.

POWER PLANTS

Combined Cycle and Cogeneration PlantsGas Turbines Thermal Power Plants Hydraulic Power Plants Diesel Power Plants Desalination Plants

PIPELINES AND TERMINALS

Crude Oil and LNG Terminals Crude Oil and Natural Gas Pipelines Pumping Stations Compressor StationsWater Transmission Pipelines

FABRICATION OF POWER BOILERS ANDPRESSSURE VESSELS (ASME S & U) HRSG Modules FabricationBoiler PipingPressure Vessels

STEEL STRUCTURE FABRICATION ANDERECTION

Structural Steel for Industrial BuildingsPlatforms, Decks, Towers, etc. Storage Tanks,Stacks Secondary Steel Structures

INDUSTRIAL PLANTS

Iron and Steel PlantsCement PlantsGlass and Ceramic PlantsAutomotive Assembly PlantsElectronic Hardware PlantsFood, Beverage and Medicine PlantsCopper/Zinc Mills

ENVIRONMENT

Water Treatment PlantsFlue Gas Treatment PlantsSolid Waste Treatment Plants

POWER DISTRIBUTIONFACILITIES Transformer Substations

PROCESS PLANTS

Petroleum RefineriesPetrochemical Plants Fertilizer Plants

Page 3: E.Berkay_EPRO Inc_ Company Profile

EPRO Organization Chart EPRO Quality ManagementSystem Certificates

BOARD OF DIRECTORS

GENERAL MANAGER

AGENCIES

ASST. GENERAL MNG.Operations

Executive Assistant

Warehouse Machinery &Equipment Superintendent Commercial Manager

Accounting Manager

Person & Admin. Chief

Const. Superintendent Const. Superintendent

Site Managers Site Managers

Business Develop.Asst.

Plan. & Cost Cont.Asst.

HRSG ModuleSuperintendent

St. SteelSuperintendentTechnical Manager

ADVISORS

QUALITYMANAGEMENT

Legal AdvisorTechnical Advisor

QA/QC EngineersQA/QC Technicians

ASST. GENERAL MNG.Operations

ASST. GENERAL MNG.Planning & Logistic

ASST. GENERAL MNG.Fabrication

ASST. GENERAL MNG.Finance & Admin.

Page 4: E.Berkay_EPRO Inc_ Company Profile

COMPLETED PROJECTS by EPRO SUPSA ON-SHORE OIL TERMINALSupsa, GEORGIA

Owner : Georgian Pipeline CompanyConsultant : Kvaerner John BrownMain Contractor : TML – Borova Joint VentureSubcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : May 1998 Description of work : Underground and Aboveground Piping

Installation Works consisting of;

• 1800 meters of Storm Water, Oily Water and Foul Water Piping (DN 100 to DN 700).• 3000 meters of Fire Fighting Pipework (DN 150 to DN 300)• Both underground and aboveground including Hydrants and Monitors.• 200 tons of Piperack and Pipe Supports

EEE GAS TURBINE POWER PLANT 1x40 MWEskişehir OSB, TURKEY

Owner : Eskişehir Industrial Power Generation Auto Production Group Co.

Supplier of Main Equipment : European Gas Turbines – SA GEC ALSTHOMContractor : EPRO Power and Industrial Plants Inc.Date of Completion : April 1998 Description of work : Complete Mechanical, Electrical and

Instrumentation Installation Works of a Frame 6 type Gas Turbine Power Plant The first stage of the Combined Cycle Power Plant) including;

• 328 tons Mechanical and Electrical Equipment.• 10 tons Piping.• 3 tons Power & Control Cables.• Complete NDT Services.

Page 5: E.Berkay_EPRO Inc_ Company Profile

Owner : TEAS, Turkish Electricity Corp. Main Contractor : SİMKO – SIEMENS Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : August 1998, Selimiye S/S - November 1998, Levent S/SDescription of work : Complete Electrical, Mechanical and Instrumentation

Installation Works of 170 kV GIS (Gas Insulated Switchgear) Transformer Substations including;

• 17 no. 154 kV GIS Switchgear Feeders.• 65 no. 34.5 kv Metal Enclosed Switchgear Feeders.• 43 no. 11 kV Metal Clad Switchgear Feeders.• 75 no. Control & Protection Panels for HV and LV Systems.• 44 km. HV/MV/LV and Control Cables and Accessories.• AC & DC and Auxiliary Systems.

170 kv GIS TRANSFORMER SUBSTATIONS - İstanbul, TURKEYSELİMİYE TR. SUBSTATION, 154 / 34.5 / 11kV, 1x100 + 2x50 MVA LEVENT TR. SUBSTATION 154 / 34.5 kV, 4 x 50 MVA

TENGIZCHEVROIL KTL 2.3 EXPANSION PROJECTKAZAKHSTAN PIPE SPOOLS FABRICATIONİstanbul, TURKEY

Owner : Tengizchevroil Main Contractor : BETCHEL ENKA J.VFabrication Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : November 1998Description of work : Fabrication of Pipe Spools for the Interconnecting

Piping System of 4 no.’s of FM type Utility Boilers and Pipe Connections to Water Deminerilazition Plant including;

• 80 tons Pipe Spools (Pipe diameters.range from 2” to 14”).• Complete NDT Services.• Painting of Pipe Spools.

BIS ENERGY COMBINED CYCLE POWER PLANTBursa, TURKEY

Owner : Bis Energy Main Contractor : Babcock & Wilcox GAMA (BWG) Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : July 1999Description of work : Complete Mechanical, Electrical and Instrumentation

Installation Works of two HRSG’s, one for Frame 6, and one for LM 6000 type Gas Turbines and all External Piping Work including;

• Frame 6 HRSG contains about 660 tons of Pressure Part and 300 tons of NonPressure Part.

• LM 6000 contains about 440 tons of Pressure Part and 200 tons of NonPressure Part.

• External Piping total weight (Alloy, SS and CS) is about 260 tons.• Piperack and Pipe Support weight is about 240 tons.• Heaviest Single Piece in this project was a Heating Module (173 tons) which was

handled by one 440 t. and one 330 t. Hydraulic Mobile Cranes together.• Complete Electrical and Instrumentation Installations.

TOMSKNEFT GAS COMPRESSOR STATION Leuginetskoye, Tomsk Area WesternSiberia, RUSSIAN FEDERATION

Owner : OAO TOMSKNEFT VNC Main Contractor : Bateman International B.V, GAMA Industrial Plants

Manufacturing & Erection Corp.Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : November 1998Description of work : Complete Electrical and Instrumentation Installation

Works of Main Compressor Station and Booster Compressor Station including;

• 6 no. Power Transformers and Diesel Generators.• 134 no. MV, LV Switchgears and MCC’s and HT panels.• 1315 no. Lighting Fixtures including Poles, Supports and Accessories.• 262 km. Power & Control and Instrument Cables including Terminations.• 22 km. Heat Tracing Cables and complete HT Systems.• 25 km. Cable Ladders, Trays and Conduits.• 3120 no. Field Instruments including Calibration and Loop Checks.• 8 km. Instrument Impulse Piping.• 30 no. Instrument Panels (DCS & ESD Systems).• UPS, Power Metering and Monitoring Systems, Complete Lightning Protection &

Grounding Systems.• Fire & Gas Detection Systems, Telephone

Page 6: E.Berkay_EPRO Inc_ Company Profile

NUH ÇİMENTO COMBINED CYCLE POWER PLANT Hereke, TURKEY

Owner : Nuh Çimento A.Ş.Main Contractor : NEM - NetherlandsHRSG Subcontractor : Babcock & Wilcox GAMA (BWG)Erection Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : October 1999 Description of work : Complete Mechanical, Electrical and Instrumentation

Works of one HRSG for LM 2500+ type Gas Turbine and all External Piping Work including;

• HRSG contains about 285 tons of Pressure Part and 253 tons of Non Pressure Part.• External Piping total weight (alloy, SS and CS) is about 27 tons.• Pipe Rack and Pipe Support weight is about 25 tons.• Heaviest Single Piece in this project was the Heating Module (140 tons) which washandled by one 440 t. and one 330 t. Hydraulic Mobile Cranes together.

• Complete Electrical and Instrumentation Installations.

ÇAYELİ COPPER WORKS INC. PASTEFILL PLANTRize, TURKEY

Owner : Çayeli Copper Works Inc. Main Contractor : EPRO Power and Industrial Plants Inc.Date of Completion : March 1999Description of work : Civil Construction and Mechanical, Electrical and

Instrumentation Erection Works of Paste fill Plant including;

• Complete Civil Works.• Supply, Fabrication and Erection of a Three Storied Steel Building.• Supply, Fabrication and Erection of an Elevated Steel Thickener Tank and anAgitated Storage tank.

• Mechanical Erection of all Plant Equipment.• Supply and Erection of Victaulic Grooved Piping and Utility Piping Systems.• Supply of Power & Control and Instrument Cables, complete Plant Instruments,Lighting Fixtures.

• Complete Electrical and Instrumentation Erection Works.• Modification Works to existing Thickeners and Tailings Disposal System.

TRAKYA ELEKTRİK A.Ş.478 MW COMBINED CYCLE POWER PLANTMarmara Ereğlisi, TURKEY

Owner : Trakya Elektrik A.Ş.Main Contractor : NOOTER ERIKSEN - U.S.A.Subcontractor : EPRO Power and Industrial Plants Inc.Date of Completion : June 1999

Description of work :• Repair and replacement of internals on two silencers• Supply of material, fabrication and erection of new Bundle

bypass plates inside Heat Recovery Steam Generators

Owner : Trakya Elektrik A.Ş.Main Contractor : ENRON Engineering and

Construction Co. - U.S.ASubcontractor : EPRO Power and Industrial

Plants Inc.Date of Completion : September 1999

Description of work : Various repair and new complementary works inside Steam and Gas Turbines Building, Heat Recovery Steam Generators and BOP. The works include ma-terial supply and fabrication.

Page 7: E.Berkay_EPRO Inc_ Company Profile

TRAKYA ELEKTRİK A.Ş. 478 MW COMBINED CYCLE POWER PLANT Marmara Ereğlisi, TURKEY

Owner : Trakya Elektrik A.Ş.Main Contractor : EPRO Power & Industrial Plants Inc.Date of Completion : January 2000Description of work : Underground and Aboveground fire water

piping installation.

• Stainless steel piping• H.D.P.E. underground piping• NDT Services• Excavation, back filling and concrete works.

Owner : Trakya Elektrik A.Ş.Main Contractor : EPRO Power & Industrial Plants Inc.Date of Completion : February 2000 Description of work : Turnkey construction of one.. Warehouse & Weldingshop

building Engineering Design

• Fabrication, Painting and Erection of 22 tons steel Structures.• Supply and Erection of 600 m² roof and sidewall cladding.• Supply and Erection of Electrical Power & Lighting Systems and Fire Alarm System.

TÜPRAŞ CCR & ISOMERIZATION PLANT PROJECTAliağa, İZMİR, TURKEY

Owner : TÜPRAŞ, Turkish Petroleum Refineries Corp. İzmir RefineryConsultant : Foster Wheeler ItalianaMain Contractor : GAMA Industrial Plants Manufacturing and Erection Corp.Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : September 2000Description of work : CCR & Isomerization Plant project, Spool Fabrication and

Erection works of Underground and Aboveground Pipe Lines including;

• 645 tons On site Aboveground Piping Erection• 285 tons Off site Aboveground Piping Erection• 215 tons On site Underground Piping fabrication and Erection• 100 tons Pipe Support Fabrication and Erection

ÇAYELİ COPPER WORKS INC. MILL PLANT MODIFICATION WORKSRize, TURKEY

Owner : Çayeli Copper Works Inc.Consultant : Foster Wheeler BimaşMain Contractor : EPRO Power and Industrial Plants Inc.Date of Completion : August 2000Description of work : Civil Construction and Mechanical, Electrical and

Instrumentation Erection Works of Mill Plant modifications including;

• Civil Construction works of a New Lime Storage Building and a Compressor Building.• Civil Modification Works at the Mill Plant.• Supply, fabrication and erection of Steel Structures.• Installation of a New Filter Press at the Mill Plant.• Supply and Installation of pipes, fittings valves, vessels etc. at the Mill Plant.• Supply and Installation of Electrical and Instrumentation equipment and materials.

Page 8: E.Berkay_EPRO Inc_ Company Profile

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT “REROUTING WORKS OF MECHANICAL & ELECTRICALPORTION”Shuvelan, REPUBLIC OF AZERBAIJAN

Owner : Joint Stock Company AZERENERJİ Consultant : Burns and Roe Enterprises, Inc.Main Contractor : Mitsubishi Heavy Industries ,Ltd. Civil and M/E/I Erection : TML - BOROVAWorks Subcontractor : EPRO Power and Industrial Plants, Inc.Date of Completion : November 2000Description of work : Rerouting of existing Power Plant active facilities such

as pipe lines. (Fuel Gas, Fuel Oil, H2&CO2 Gas, Steam, Raw/Condensate/Make-up Water, Chemical & Hydrazinepipelines) and U/G cables which are run through, new Power Plant area including;

• 163 tons Piping Fabrication and Erection.• 22 tons Pipe Support Fabrication and Erection.• 1,700 m U/G Power Cables Installation.• 7,700 m² Painting including supply of Paint Material.• 1,425 m² Insulation of pipelines.

EEE COMBINED CYCLE POWER PLANTEskişehir OSB, TURKEY

Owner : Eskişehir Industrial Power Generation Autoproductor Group Co.

Supplier of Main Equipment : BABCOCK & WILCOX ESPANOLA S.AContractor : EPRO Power and Industrial Plants Inc.Date of Completion : April 2001 Description of work : Complete Mechanical and Instrumentation

Erection Works of a Heat Recovery Steam generator and associated equipment.

• 523 tons Mechanical Equipment.• 17 tons Piping including supports and valves.• Complete Instrument Installation works including supply of cables, cabletrays,• Conduits and junction boxes.• Complete Inspection and Test. (i.e. NDT, PWHT, HT, Blow-out)

TÜPRAŞ ISOMERIZATION PLANT PROJECTKörfez, KOCAELİ, TURKEY

Owner : TÜPRAŞ, Turkish Petroleum Refineries Corp. İzmit RefineryConsultant : Technicas ReunidasMain Contractor : Technicas Reunidas - ENTES A.Ş. ConsortiumSubcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : December 2001Description of work : Fabrication, Erection Testings and Cleaning Works of

Process and Utility Piping Both Above and Underground Inside Boundary Limits of Isomerization Project.

• Piping Materials; Carbon Steel, Alloy Steel and Stainless Steel• Pipe diameters ranging from ½” to 30”• Total pipe quantity 1,320 tons.• 144,720 dia-inch Welding Joints and 5,450 dia-inch threated joints• 361 no. of test packages.

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

Owner : Joint Stock Company AZERENERJİ Consultant : Burns and Roe Enterprises, Inc.EPC Main Contractor : Mitsui & Co. Ltd.Sub - Contractors : Mitsubishi Heavy Industries ,Ltd. and ABBCivil Works s/c : TML – BOROVAM/E/I Erection Works s/c : EPRO Power and Industrial Plants, Inc.Date of Start /Completion : M/E/I Works 01 August 2001 - 15 November 2002 Description of work : Complete Mechanical / Electrical / Control &

Instrumentation Erection Works of 400.MW Single-Shaft Combined Cycle Power Plant including Structural Steel works of GT Building / Pump House and Underground CW Pipeline.

Page 9: E.Berkay_EPRO Inc_ Company Profile

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

MITSUI & Co.Ltd. / MITSUBISHI HEAVY INDUSTRIES Ltd.Prequalification Certificates

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

BASIC TECHNICAL INFORMATION:

400MW, Single Unit, Combined-Cycle, Single-Shaft, Dual Fuel Plant

GT : One Mitsubishi M701 F Gas Turbine (made in Takasago, Japan)

ST : One Mitsubishi TC2F-35.4 Re-Heat Cycle Steam Turbine (made in Japan)

HRSG : One CMI Triple Pressure + Reheat, Natural Circulation (made in Belgium)

GEN : One ABB-ALSTOM 50WT21H-120, Hydrogen Cooled (made in Switzerland)

OTHERS : Water Treatment, Waste Water Treatment, Aux. Boiler, Storage Tanks, Water Intake Pumps, 110 kV GIS System

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

ERECTION SCOPE OF WORKS:

MAJOR EQUIPMENT

Turbine & Aux. : 710 tonSteam Turbine & Aux. : 960 tonMain Transformer : 270 tonGas Compressor : 110 tonWater Treatment Plant : 100 tonStart-Up Boiler : 175 tonOthers : 800 ton

Total : 3125 ton

PIPING

Cooling Water Pipes : 2500 tonPower House & Off-Sites : 1200 ton

Total : 3700 ton

STEEL STRUCTURE

Turbine - Gen. Building : 1200 tonOthers : 445 ton

Total : 1645 ton

STORAGE TANKS

CST10000 qm, FOT5000qm : 414 tonSW/FW, PW, LOT : 93 ton

Total : 506 ton

ELECTRICAL &INSTRUMENTATION

Power & Lighting Cables : 118 kmControl & Instrum. Cables : 213 kmSwitchgears, UPS, BatteriesControl Systems, Instruments

HRSG

Steel Structure : 480 tonModules : 1666 tonDrums & BDT : 136 tonCasing, Ducting & Stac : 211 tonPiping : 230 tonInsulation : 75 tonOthers : 50 ton

Total : 2848 ton

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

Page 10: E.Berkay_EPRO Inc_ Company Profile

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

SEVERNAYA 400 MW COMBINED CYCLE POWER PLANT Shuvelan, REPUBLIC OF AZERBAIJAN

Page 11: E.Berkay_EPRO Inc_ Company Profile

ANKARA OSB COMBINED CYCLE POWER PLANTAnkara, TURKEY

Owner : Ankara Chamber of Industry, Organized Industrial Zone Administration

EPC Contractor : ZORLU Enerji Electric Generation Auto producer Group Co. Inc.

Supplier of HRSG : AALBORG Engineering A/S - DenmarkContractor : EPRO Power and Industrial Plants Inc.Date of Completion : October 2002 Description of work : Complete Mechanical, Electrical and Instrumentation

Erection Works of a Heat Recovery Steam generator and associated equipment.

• 345 tons Mechanical Equipment• 25 tons Piping including supports and valves• Complete Electrical and Instrument Installation works including supply ofElectrical Heat Tracing System, Conduits and junction boxes

• Complete Inspection and Test (i.e. NDT, PWHT, HT, Blow-out)

AIOC Full Field Development Phase 1 Upgrade of SPSFabrication Yard ProjectREPUBLIC OF AZERBAIJAN

Owner : Azerbaijan International Operating CompanyMain Contractor : McDermott Caspian Contractors Inc. Civil Works : TML – BOROVAMechanical Works S/C : EPRO Power and Industrial Plants, IncDate of Completion : August 2002Description of work : Complete Mechanical Works within the scope of

Miscellaneous Civil Works Contract including;

• Design, supply, installation and commissioning of utility piping (water, fire water,compressed air, propane, oxygen and underground sewer) systems

• Installation and commissioning of water and fire water pumps• Chemical cleaning of gas piping systems in various parts of the SPS Fabrication Yard• Fabrication of embedded steel items for pile caps

ACG Full Field Development Phase 1 Fabrication andErection of Dummy Drill Floor,REPUBLIC OF AZERBAIJAN

Owner : Azerbaijan International Operating CompanyMain Contractor : McDermott Caspian Contractors Inc.Civil and Mech. Erection : TML – BOROVAWorks Subcontractor : EPRO Power and Industrial Plants, Inc.Date of Completion : April 2003Description of work : Fabrication and Erection of Dummy Drill Floor Steel

Structure including;

• Detail Design• Supply and Fabrication of I1800x990x60x35 Built-Up Beams• Supply and Fabrication of Dummy Drill Floor Beams and Deck Plates• Erection of above

KARADAGH GAS COMPRESSOR STATION PROJECTKaradagh, REPUBLIC OF AZERBAIJAN

Owner : Joint Stock Company AZERGAZMain Contractor : Toyo Engineering Corp. Civil and M/E/I Erection : TML - BOROVAWorks Subcontractor : EPRO Power and Industrial Plants, Inc.Date of Completion : August 2003Description of work : Complete Mechanical/Electrical/Control &

Instrumentation Erection Works of Gas Compressor Station also including;

• Supply of all structural steelwork for compressor building and pipe racks• Design, supply and fabrication of fire works storage tank• Supply and fabrication of vent stack

Page 12: E.Berkay_EPRO Inc_ Company Profile

YAROSLAVL REFINERY MODERNIZATION PROJECT (Yaroslavl, Russian Federation)STRUCTURAL STEEL FABRICATION - İstanbul, TURKEY

Owner : OAO Slavneft - YaroslavnefteorgsintezMain Contractor : TOYO Engineering Corporation (Japan)Fabrication Subcontractor : EPRO Power and Industrial Plants Inc.Date of Completion : April 2004 Description of work : Supply and Fabrication of 550 metric tons of

structural steel for the Yaroslavl Refinery Modernization Project. 72m height Reforming and Regeneration Structure including;

• Detail Design• Shop Drawings and Erection Drawings• Supply of raw material• Surface preparations and painting• Fabrication of columns, girders, sub beams, staircase, ladders, handrails,hoist rails and gratings

• Complete QC Service

BP EXPLORATION (SHAN DENIZ) LTD. / MCCIMECHANICAL WORKS FOR INTEGRATED LOGISTICS PROJECT(ILP) Phase 1A TANK FARM, Baku - AZERBAIJAN

Owner : Azerbaijan International Operating CompanyMain Contractor : BP, Mc DERMOTT Caspian Contractors Inc.Sub Contractor : TML (Civil works)Mechanical Works : EPRO Power and Industrial Plants Inc.Date of Completion : October 2004 Description of work : Complete Mechanical Works within the scope of;

external mechanical works, external fire and safety works.

• Design, supply, fabrication, installation and commissioning of piping(loading pipes to quayside andrundown lines, main water supply lines, connection with diverting existingmain, process unit piping,fire fighting pipes.

• Installation and commissioning of water and fire pumps, process unit,treatment plant

• Design, supply, fabrication and installation of support systems• NDT works.

Owner : AkenerjiMain Contractor : General Electric Energy Products EuropeHRSG Contractor : NEM BV, The NetherlandsSubcontractor : EPRO Power and Industrial Plants Inc.Contract Date : 22.01.2004Date of Completion : December 2004 Description of work : Complete Mechanical and Instrument Erection Works of

2 Heat Recovery Steam Generators and associated equipment

• 32 Tons piping including supports and valves• Instrument Installation• Supply and installation of Insulation• NDT, PWHT services

AKENERJİ KEMALPAŞA COMBINED CYCLE POWER PLANTKemalpaşa - İzmir, TURKEY

TÜPRAŞ DESULPHURIZATION PROJECTKörfez, KOCAELİ

Owner : TÜPRAŞ, Turkish Petroleum Refineries Corp. İzmit RefineryConsultant : Technicas ReunidasMain Contractor : Technicas Reunidas - Alarko-Akfen Joint Venture ConsorsiumSubcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : December 2005 (1st Phase) – June 2006 (2nd Phase)Description of work : Fabrication, Erection Testings and Cleaning Works of

Process and Utility. Piping Both Above and Underground Inside and Outside Boundary Limits of Desulphurization Project.

• Piping Materials; Carbon Steel, Alloy Steel and Stainless Steel• Pipe diameters ranging from 1/4” to 72”• Total pipe quantity 2,100 tons.• Total support quantity 200 tons.• Welding quantity :Shop 103,500 dia inch (38,400 joint)• Field : 62,150 dia inch (20,330 joint)

Page 13: E.Berkay_EPRO Inc_ Company Profile

SUMGAIT 500 MW COMBINED CYCLE POWER PLANTMANUFACTURING & ERECTION OF 2 HRSGREPUBLIC of AZERBAIJAN

Owner : AZERENERJI JSC.Main Contractor : SIEMENS AG. Power GenerationSubcontractor : CMI Energy HRS – EPRO Power & Industrial Plants Inc.

ConsortiumDate of Contract : August 2005Date of Completion : May 2007Description of work : Engineering, Supply, Manufacturing, Erection and

Commissioning of .2 Heat Recovery Steam Generators

CCPP22 430 MW COMBINED CYCLE POWER PLANTMANUFACTURING & ERECTION OF 2 HRSGDubai / U.A.E

Owner : DUBAL Aluminium Company.Main Contractor : ALSTOM Power Controllers - CMI Energy HRSSubcontractor : EPRO Power & Industrial Plants Inc.

INCO International Fz. CoDate of Contract : April 2006Date of Completion : June 2007Description of work : Engineering, Supply, Manufacturing, Erection and

Commissioning of 2 Heat Recovery Steam Generators

KUC PROJECTJ2 NORTHERN UTILITIESKINGDOM OF SAUDI ARABIA

Owner : SAUDI ARAMCOEPC Main Contractor : SNAMPROGETTI S.p.A - SAUDIAMechanical Works Contractor : TEKFEN İNŞAAT VE TESİSAT A.Ş.

Saudi Arabian BranchPiping Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : March 2009 Description of work : Erection of Utility Piping Systems and

Internal pipingof 4 nos. of HRSG units

• Installation, testing and commissioning of utility piping systems 41,200 Wdi• Installation and testing of Internal piping of 4 HRSG Units under ASME S Code,

3,000 Wdi

2 x 338 MW MARITZA EAST1 POWER PLANTGalabova, BULGARIA

Owner : AES CorporationEPC : ALSTOM PowerMain Contractor : TGO Ltd.Subcontractor : EPRO Power and Industrial Plants Inc. Date of Completion : August 2009 Description of work : Fabrication, Erection Testings and Cleaning Works

of Piping Both Above and Underground Inside and Outside Turbine Building

• Piping Materials; Carbon Steel, Alloy Steel and Stainless Steel• Pipe diameters ranging from 1/4” to 72”• Total pipe quantity 2,100 tons.• Total support quantity 200 tons.• Welding quantity Shop: 103,500 dia-inch (38,400 joint), Field: 50,000 dia-inch

Page 14: E.Berkay_EPRO Inc_ Company Profile

VLORE 1 x 100 MW COMBINED CYCLE POWER PLANTVlore, ALBANIA

Owner : KESH Albanian Power CorporationMain Contractor : MAIRE TECNIMONT S.p.ASubcontractor : SOEPRO J.V. (EPRO Power and Industrial Plants Inc.

SOECO Engineering and Construction) Date of Completion : September 2009

Description of work Complete Mechanical Erection, Piping, Insulation and Painting Works of 100 MW Single-Shaft Combined Cycle Power Plant.

• Gas Turbine, Steam Turbine, Generator and auxiliaries (Supplied by Ansaldo-Italy)• HRSG (Supplied by Nooter Ericsen - Italy)• Condenser (Supplied by Ofmeco - Italy)• Piping and Supports (Fabrication, Erection, PWHT, NDT, Painting, Insulation, Testing)• BOP Equipments and Systems i.e. Water Treatment Plant, Sea Water Pumps,Fuel Oil Storage, etc.

• 4300 m. API 5L Fuel Oil Piping for Offshore connection between CBMS and Site(Welding and NDE testing)

FABRICATION - STORAGE TANKS

VENT STACK

FUEL OIL STORAGE TANK CLEAN & DIRTY OIL STORAGE TANK

SERVICE WATER / FIRE WATER STORAGE TANK CONDANSATE WATER STORAGE TANK

FABRICATION - STELL STRUCTURES

PLANT STRUCTURE

WAREHOUSE / HANGERS

PIPERACKS

DUMMY DRILL FLOOR STRUCTURE

BUILDINGS

FABRICATION - HRSG(Pressure Parts - Modules)

Page 15: E.Berkay_EPRO Inc_ Company Profile

FABRICATION - HRSG(Pressure Parts - Modules)

FABRICATION - HRSG(Pressure Parts - Modules)

FABRICATION - HRSG(Pipe Spools and Stacks)

FABRICATION - HRSG(Non Pressure Parts - Steel Structures and Casings)

Page 16: E.Berkay_EPRO Inc_ Company Profile

ADDRESSES & CONTACTS GENERAL COMPANY INFORMATION

EPRO A.Ş. - İstanbul, TURKEY

Adress : Fatih Sultan Mehmet Cad. No: 33 Kavacık 34810

Telephone : +90 (216) 413 33 39

Fax : +90 (216) 413 13 22

Contact Persons : Mr. Erdal Berkay Chairman of the Board [email protected]

: Mr. Niyazi [email protected]

[email protected]

[email protected]

Vice - Chairman of the Board

Mr. Mehmet Eşigök Director of the Board

Mr. Ali Rıza Kale

Director of the Board

Mr. Bülent Ababay

Director of the Board [email protected]

Quality Certificates : ISO 9001:2000 CERTIFICATE ASME “S” and “U” Stamps (To be renewed for a new Fabrication Location)

Company Name : EPRO ENERJİ ve ENDÜSTRİ TESİSLERİ İNŞAAT SAN. TİC. A.Ş.

Type of Company : Corporation registered in Turkey

Date of Establishment : October 1997

Interested Work Areas : Europe, Eastern Europe, Caspian Region, Middle East, North Africa

Countries Worked : Albania, Azerbaijan, Bulgaria, Georgia, K. Saudi Arabia, Russian Federation, Turkey, UAE (Dubai),

Quality Systems : ISO 9001 : 2000 , ASME “S & U”

Page 17: E.Berkay_EPRO Inc_ Company Profile

www.epro.com.tr

Page 18: E.Berkay_EPRO Inc_ Company Profile

Hatay-Erzin 900 MW CCGT Project / Erection Works of 2 HRSG Units - Erzin, TURKEY

Owner : EGEMER Electric Production A.Ş. EPC Contractor : GAMA GÜÇ SİSTEMLERİ A.Ş. Subcontractor : EPRO Power and Industrial Plants Inc.& BETA Eng. JV Date of Completion : December 2013 Description of work : Complete Mechanical, Electrical and Instrumentation Works of two (2) HRSGs for GE 209 TB MS type Gas Turbine (Horizontal Draft, Triple Pressure + Reheat, Manufactured by DOOSAN) including all External Piping Works.

3