Eastmain Corporate Presentation Nov 2013

21
Eastmain Resources Inc. San Francisco Hard Assets Presentation November 2013 EASTMAIN Adding Value Through Discovery 52 52 o o 37 37 06 06 N N 72 72 o o 05 05 19 19 W W 75 75 o o 57 57 20 20 W W 52 52 o o 18 18 01 01 N N 75 75 o o 48 48 52 52 W W 52 52 o o 13 13 01 01 N N

Transcript of Eastmain Corporate Presentation Nov 2013

Page 1: Eastmain Corporate Presentation Nov 2013

Eastmain Resources Inc.

San Francisco Hard Assets Presentation

November 2013

EASTMAIN

Adding Value Through Discovery

5252oo 3737’’ 0606”” NN7272oo 0505’’ 1919”” WW 7575oo 5757’’ 2020”” WW5252oo 1818’’ 0101”” NN7575oo 4848’’ 5252”” WW 5252oo 1313’’ 0101”” NN

Page 2: Eastmain Corporate Presentation Nov 2013

EASTMAIN

2

Forward Looking Statements

Certain  information  set  forth  in  this  Presentation  may  contain  forward‐looking  statements  that  involve  substantial  known and unknown  risks and uncertainties.  These  forward‐looking  statements  are  subject  to  numerous risks and uncertainties, certain of which are beyond the control of Eastmain, including,  but  not  limited  to  the  impact  of  general  economic  conditions, industry  conditions,  dependence  upon  regulatory  approvals  and  the availability of financing. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should  not  be  placed  on  forward‐looking  statements.  Some  of  my commentary may  contain  forward‐looking  information,  therefore,  you  are cautioned that  the Corporation’s actual  results could differ materially  from my  conclusions,  forecasts or projections.  I  refer you  to  the  section entitled “Risk  Factors” in  our  Annual  Information  Form available  on www.SEDAR.com which  sets  out  certain material  factors  that  could  cause actual results to differ.

Page 3: Eastmain Corporate Presentation Nov 2013

EASTMAIN

3

Top 10 Reasons to Own Eastmain

1. Eau Claire – High‐Grade Gold deposit

2. Expanding Resources with Drilling

3. Safe Jurisdiction

4. Good Infrastructure

5. 100% Eastmain – ROYALTY FREE

6. Eastmain Mine – 2nd Deposit with a new road

7. Fully Funded for 2014

8. Proven Track Record – 16 Years Listed on TSX

9. Goldcorp – 10 for 10

10. M&A Candidate

Page 4: Eastmain Corporate Presentation Nov 2013

EASTMAIN

4

• Two High‐Grade Gold deposits:

− Eau Claire (1.8M ounces)

− Eastmain Mine (former producer)

• Eleonore South – Joint with Goldcorp

• Favourable Mining Jurisdiction

• Mine‐ready infrastructure (roads, power)

• New permanent road for Eastmain Mine

• Financial incentives (50% rebate)

• Goldcorp largest shareholder (9.9%)

• Fully funded for 2014

Overview of Eastmain Resources

5.71 MOptions

NilWarrants

C$7.9 MTreasury (2)

C$35 MMarket Cap

112.3 MShares Fully Diluted 

106.6 MShares Outstanding

C$0.19 – 0.90Share Price Range (1)

TSX:ERTrading Symbol

EASTMAIN

Summary Market Statistics

Focused on Gold Exploration in Mine‐Friendly James Bay, Québec

Company Overview

(1) As at close on October 31, 2013(2) As of July 31, 2013, Eastmain had cash and cash equivalents of $4.9M, plus marketable securities of $3.0M; prepaid accounts $0.4M; $2M Quebec rebate receivable (not included).

OTCBB: EANRF

Page 5: Eastmain Corporate Presentation Nov 2013

‐ 20.0 40.0 60.0 80.0

10

9

8

7

6

5

4

3

2

1

GOLD DEPOSITS

> 3 - 5 M OZ

> 10 M OZ

> 0.3 - 3 M OZ< 0.3 M OZ

> 5 - 10 M OZ

500 km

Gold Mining Camps in the Canadian Shield

James Bay, Québec – An emerging Mining Camp

CANADA • Over 200 million ounces Gold produced from Canadian Shield 

• James Bay, Québec, ranks amongst the top 10 gold camps 

• First Gold production in James Bay starting in 2014

JAMES BAY, QUE

James Bay, Quebec

Geraldton

Timmins

Rainy River

DetourNorandaRed LakeHemlo

Val d’OrKirkland Lake

Past Production + Current Gold Resources (millions oz)

CANADIAN SHIELD

Hemlo

Detour

Val d’Or

RR

KL

GL

CWEM

EL

Abbreviations: CW – Clearwater; EL – Eleonore; EM – Eastmain Mine; GL – Geraldton; KL – Kirkland Lake; RR – Rainy River

EASTMAIN

Gold Mining Camps in the Canadian Shield Overview

Top 10 Canadian Gold Camps

Gold Mining Camps in the Canadian Shield

Page 6: Eastmain Corporate Presentation Nov 2013

EASTMAIN

6

JAMES BAY REGION

Clearwater Project(Eau Claire Deposit)

Eastmain Mine

Eléonore Project(Roberto Deposit)

(Goldcorp)

50 kms

James Bay, Québec – Project Location Map

Excellent infrastructure – Roads, power, airports, fuel …James Bay – New Mining District QUEBEC

Map AreaDY

RK

LE

LG LH

ES

RH

RH

RD

EastmainProject

ClearwaterEastmain MineDY – DynaES – Eléonore SouthLE – Lac ElmerLG – LidgeLac LessardLH – Lac HudsonRD – RadissonRK – Road KingRS – ReservoirRH – Ruby Hill

RSEastmain

JamesBay

Nemaska

Radisson/LG2

Plan Nord Road Under Construction

StornawayRenard Deposit

Temiscamie

Page 7: Eastmain Corporate Presentation Nov 2013

EASTMAIN

7

Clearwater Project - Eau Claire Gold Deposit

• High‐Grade Open Pit & Underground Gold Deposit

• Road accessible with power nearby

• High‐grade trenching & drilling results in 2013 will 

add to the Gold resource

• 30,000 metre drill program in progress

• Resource Update ‐ Q4 2013

• PEA ‐ H1 2014

• Objectives – Long‐Life, Low‐Cost, Highly Profitable 

Gold Deposit

Eau Claire is Higher Grade than 75% of all Gold Deposits WorldwideOverview

Page 8: Eastmain Corporate Presentation Nov 2013

EASTMAIN

8

Channel R15

39.2 g/t Au over 8.5 m

Up to 215 g/t Au

Channel R13

18.7 g/t Au over 8.0 m

Up to 144.5 g/t Au

Channel JQ36

51.5 g/t Au over 5.1 m

Up to 406.5 g/t Au

Channel JQ507.7 g/t Au over 9.9 mUp to 32.7 g/t Au

Trenching HighlightsQuartz‐Tourmaline Vein system with Au (Te‐Bi‐Ag)

Eau Claire – a precious metal deposit rich in gold and tellurides

Creating Shareholder Value through Discovery

BA

Photo A – Quartz‐Tourmaline piano‐key breccia  (P Vein from the 450 West Zone). Photo B – 2013 expansion of the 450 West Zone. 

Expanding 450 West Zone

P Vein

Page 9: Eastmain Corporate Presentation Nov 2013

EASTMAIN

9

5790000 mN

Clearwater Project 

Clearwater: Eastmain’s Flagship Project (Contains Eau Claire Gold Deposit)

Eau ClaireGold Deposit

Large Property >200 km2

Road AccessibleClose to PowerHigh GRADE

VA

SL

SP

Hydro QuebecAccess Road

4450

00 m

E

4500

00 m

E

4650

00 m

E

4400

00 m

E

4550

00 m

E

4600

00 m

E

5780000 mN

5785000 mN

5 km

KN

Regional Target Areas: SD – Serendipity; SP – Spider; SL – Snake Lake; VA – Vanna; KN – Knight; NL – Natel 

EastmainReservoir

1.to 2.5 g/t Au30 to 500 g/t Au 10 to 30 g/t Au 5 to 10 g/t Au 2.5 to 5 g/t AuRockAssays

•Mining Camp‐scale gold‐bearing corridor – 5kms long

• >1000 rock samples ranging from >1 to 500 g/t Au

SD

NL

SL

Page 10: Eastmain Corporate Presentation Nov 2013

EASTMAIN

10

Eau Claire Gold Deposit 

Felsic Volcaniclastic rock

Mafic Volcanic rock Felsic Porphyry/Tonalite

Surface Projection of Gold Mineralization, Potential Open Pit Areas & 2013 Drilling

450 West Pit

850 West Pit

250 mGold Mineralization

CW15

BM

Note – Gold Mineralization surface projection represents the 0.5 g/t Au grade shell created in Leapfrog based on drilling up to 2011. Drill hole azimuth N 355E dipping 45 to 60 degrees north.

Potential Open Pit Area

N

2013 Drill Hole2013 Drill Hole with Visible Gold2013 Proposed Drill Hole

5,785,750 mN

5,785,000 mN

5,785,500 mN

444,

000

mE

5,785,000 mN

5,785,250 mN

5,785,500 mN

5,785,750 mN

445,

250

mE

445,

500

mE

445,

750

mE

444,

250

mE

476

493

505501

494

502

Gold Deposit

490

Eau Claire Highlights• 1800 m long to 900 m depth• 50% of the resources occur

from surface to 300 m depth• 37 of 59 drill holes contain

Visible Gold in 2013

Page 11: Eastmain Corporate Presentation Nov 2013

EASTMAIN

11

Eau Claire Gold Deposit – Longsection Looking North

3D View of Gold‐bearing drill intersections Longitudinal view of Eau Claire Gold Deposit – 450 & 850 Zones – Continued expansion

• Drilling over the past 24 months has DOUBLED the size of the gold deposit within 300 m of surface• ER12‐412 – 17.7 g/t Au/6.5 m; ER12‐456 – 10.98 g/t Au /11.0 m 

2011/2012 gold intercept

Pre 2011 gold intercept

450West Zone850 West Zone

0 m RL

OPEN

OPEN

‐300 m EL

1 kmER12‐456

ER12‐412

Page 12: Eastmain Corporate Presentation Nov 2013

EASTMAIN

12

Eau Claire Gold Deposit – Looking West

FootwallVolcaniclastics &

Porphyry

F2 Fold Axis

HangingwallPorphyry

WesternPorphyry

Page 13: Eastmain Corporate Presentation Nov 2013

EASTMAIN

13

WesternPorphyry

HangingwallPorphyry

High‐gradeGold Zone

FootwallVolcaniclastics &

Porphyry

Eau Claire Gold Deposit – Location of the High Grade

Page 14: Eastmain Corporate Presentation Nov 2013

EASTMAIN

14

Eau Claire Gold Resource (Polygonal Model)

Resource Summary

(1) Resource estimate includes drilling up to the end of 2011 and was completed by P&E Mining Consultants.(2) Underground grade based on a 2.5 g/t cut‐off grade; Open pit grade using a 0.5 g/t cut‐off grade.(3) Block Model Resource estimate in progress

Measured & Indicated Open Pit Grade at 4.67 g/t Au

449,0005.122,728Measured

1,148,0005.486,513Total Inferred

780,0004.914,938Total Measured & Indicated

935,0007.204,035Inferred

145,0006.37706Measured & Indicated

Eau Claire – Underground (2)

213,0002.682,478Inferred

635,0004.674,228Measured & Indicated

Eau Claire ‐ Open Pit (1)

(oz, uncapped)(g/t)(000’s)

In Situ GoldAu GradeTonnes

Next Update – Q4 2013

Page 15: Eastmain Corporate Presentation Nov 2013

EASTMAIN

15

Legend

Expl/Mining ProjectOtish ParkSection A: 0-82 kmSection B: 82-143 kmSection C: 143-195 kmSection D: 195-245 km

Route 167 North Extension and Eastmain Mine Access

Quebec’s Plan Nord Infrastructure program – permanent road access• Quebec government’s Plan Nord program 

provides new infrastructure to James Bay region; MTQ are building Sections A & B of Route 167 North Extension

• Stornoway constructing Sections C & D (financial assistance by Quebec)

• Eastmain Mine now linked to Route 167 

Photos courtesy of Stornoway Diamond Corporation;  MTQ – Quebec Ministry of Transport

Km 0

Km 195

Km 245

Km 143

Km 82

Sections C & DStornoway97 km of Mine Road(50 km/hr)

Western Troy

Renard

Eastmain

Strateco

25 km

Temiscamie

Sections A & BMTQ143 km of RegionalHighway (70 km/hr)

Route 167

D

A

B

C

Page 16: Eastmain Corporate Presentation Nov 2013

EASTMAIN

16

• 100% Ownership – 125 km2

• New Route 167 Northpermanent road access

• Eastmain Mine Au‐Ag‐Cu‐rich deposit

• Historical M&I resource 255,750 ounces gold (1M tonnes at 9.95 g/t Au)(1)

• Mine Trend >10 km long 

• 53.3 g/t Au across 13.2 m

• 100‐person camp, airstrip, fuel farm, ramp & underground development

• Prospecting & geochemical surveys completed in 2013

Eastmain Mine – Project Overview

A High‐Grade Gold Deposit with Significant Exploration Potential

(1) The Eastmain Mine Historical Resources are not NI43‐101 compliant. A Qualified Person has not done sufficient work to classify them as current mineral resources. The issuer is not treating these historical resources as current mineral resources and these resources should not be relied upon.

Project Geology  Project Overview

Eastmain Mine Property

Ruby Hill East

Eastmain Mine

2.5 kms

Access RoadRoute 167 North

Mine Trend

MineCamp

>1 to 5 g/t Au

Rock Assay Data

>30 g/t Au >10 to 30 g/t Au >5 to 10 g/t Au

Priority Target

Airstrip

N

Page 17: Eastmain Corporate Presentation Nov 2013

EASTMAIN

17

• Existing mine site infrastructure includes:

‐ Ramp & U/G access to the A & B Zones ~100,000 tonnes mined in 1994‐95

‐ Airstrip, fuel farm, 100‐person mine camp, tailings pond, mining lease

• Winter road access soon to become permanent all weather road with Québec’s “Plan Nord”

Eastmain Mine – Existing Infrastructure at Mine Site

$40 M Invested by Previous Owners on Exploration & Development

Mine Site Infrastructure

Eastmain Mine buildings and UG ramp (foreground)Aerial view of Mine buildings & tailings pond (foreground)

Page 18: Eastmain Corporate Presentation Nov 2013

EASTMAIN

18

Eastmain Mine – 3D Underground View (Looking South)

3D Longitudinal View – A & B Zones with mine development workings

Gold mineralization

High‐grade Gold deposit – significant resource expansion potential

1500 m E

1000 m E

2000 m E B Zone

F ZoneTarget

Surface

‐ 500 m EL

Underground Development

Ramp

500 m

A Zone

TargetTarget

Page 19: Eastmain Corporate Presentation Nov 2013

EASTMAIN

19

Research Coverage

Analyst research coverage provided by three Brokerage firms

$1.10Brian Szeto

416 342-9918Stonecap Securities

$1.70Eric Lemieux819 472-8037

Laurentian Bank Securities

$1.00Michael Gray604 639-6372

Macquarie Equities Research

25,000 m drilling Block Model Resource Update Q4 2013PEA – H1 2014 High grade, safe jurisdiction, near development

Investment Catalysts

Target PriceAnalystBrokerage

Speculative Buy Recommendations ranging from $1.00 to $1.70

Page 20: Eastmain Corporate Presentation Nov 2013

EASTMAIN

20

Reasons to own Eastmain

• Two High Grade Gold Deposits

• Clearwater 1 of 7 gold projects in NA 

• Resource expansion through trenching & 

drilling

• Royalty Free 

• Mine essential Infrastructure in place

• Top Mining Jurisdiction

• Provincial financial incentives (50%)

• Goldcorp – long term shareholder

• Evidence for long‐life, low cost, highly 

profitable gold deposit at Eau Claire

Clearwater One of the Highest‐Grade Undeveloped Gold Projects in Canada

1 cm

2,540 g/t Au (74.17 oz/ton); incl. 24.6 g/t Au over 55.6m

S‐Vein (Hole 98 – 65 m depth)

Visible Gold

Page 21: Eastmain Corporate Presentation Nov 2013

EASTMAIN

21

Adding Value Through Discovery

Tel: 519‐940‐4870Fax: 519‐940‐[email protected]

36 Toronto Street Suite 1000Toronto, OntarioCanada, M5C 2C5

EASTMAINEASTMAIN

Contact Information

TSX:ER OTCBB:EANRF