AN EXCITING EVOLUTION!EASTMAIN RESOURCES INC. ER:TSX
CORPORATE PRESENTATION | JANUARY 2017
FORWARD LOOKINGSTATEMENTS
EASTMAININVESTORPRESENTATION2
Certain information set forth in this presentation may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. Forward-looking statements consist of statements that are not purely historical, including statements regarding beliefs, plans, expectations or timing of future plans, and include, but not limited to, statements with respect to any potential director nominations, actions taken in respect of director nominations received by Eastmain, actual results of current and future exploration activities at the Company's properties, and the potential success of the Company’s future exploration and development strategies. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of Eastmain, including, but not limited to he results of matters to be considered at the upcoming annual and special meeting of shareholders of Eastmain, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, the availability of financing, timely completion of proposed studies and technical reports, and risks associated with the exploration, development and mining industry generally such as economic factors as they affect exploration, future commodity prices, changes in interest rates, safety and security, political, social or economic developments, environmental risks, insurance risks, capital expenditures, operating or technical difficulties in connection with development activities, personnel relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of Mineral Resources, contests over property title, and changes in project parameters as plans continue to be refined. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company assumes no obligation to update such information, except as may be required by law.
THE NEW EASTMAINADVANCING ASSETS WITH THE POTENTIAL FOR RESOURCE GROWTH
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com3
THE TRIANGLE OF SUCCESS
KEY PROJECTS
CLEARWATER PROJECT The Anchor Project: High-Grade Resource with Open-pit and Underground Potential
EASTMAIN MINE PROJECT A Past-Producer with Historic Resources and Growth Potential
ÉLÉONORE SOUTH JV Indicative Geochemical Signature
8 OTHER SIGNIFICANT LAND PACKAGES
Prospective Gold Potential
Strategically Staked Claims
TOP LAND POSITION IN THE JAMES BAY GOLD DISTRICT
Total Land Package: 137,665 hectares
Top Mining Jurisdiction
Access to Roads and Power
EASTMAIN January 19, 2016Shares outstanding 175,354,814
Options (W Avg Life - 6.83 yrs, $0.68) 10,213,605
Warrants (Expire 11/10/18 , $0.50) 6,899,999
Fully-Diluted 191,508,418
Market Capitalization (20-day VWAP) $91 million
Share Price (20-day VWAP) $0.52
52 Week High/Low $0.97 - $0.29
Daily Average Volume (30 day avg) 512,137
CASH POSITION
$12.4 MFT Funds: $9.7 M as of January 13, 2016
BUDGET TO Q1 2017:
$6.5 M
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com4
CAPITAL STRUCTURE TSX:ER
Beacon Securities - Mike BandrowskiCormark Securities - Tyron Breytenbach
GMP Securities - Ingrid RicoLaurentian Securities
Mackie Research Capital - Barry Allan/Ryan HanleyMacquarie Capital - Michael Gray
Paradigm Capital - Don Blyth
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com5
TOP SHAREHOLDERS
Polygon 17.1 million 9.7%
Goldcorp 10.5 million 6.0%
Integra Gold 8.9 million 5.1%
Van Eck 6.9 million 4.0%
RBC Asset Management 5.7 million 3.3%
Gabelli & Company 3.6 million 2.0%
Don Robinson 2.7 million 1.6%
Mackenzie Investments 2.6 million 1.5%
Caisse du Depot (Sodémex) 2.6 million 1.5%
US Global 2.3 million 1.3%
Industrial Alliance Inv Mgmt 1.9 million 1.1%
Commodity Discovery Fund 1.5 million 0.9%
Industrial Alliance Insurance 1.4 million 0.8%
Sentry 1.3 million 0.7%ANALYST COVERAGE
CAPITAL STRUCTURE SHAREHOLDERSTSX:ER
Insiders2%
Retail 50%
Institutional & Major
Shareholders37%
Goldcorp6%
Integra5%
OWNERSHIP
TOP INSIDERS
Claude Lemasson 1.0 million 0.6%
Blair Schultz 0.9 million 0.5%
Joe Fazzini 0.3 million 0.1%
Mike Hoffman 0.2 million 0.1%
Timo Jauristo 0.2 million 0.1%
Laurie Curtis 0.1 million 0.1%
EVOLUTION OF THE BOARD AND MANAGEMENT
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com6
Claude LemassonPresident & CEO and DirectorLaurence (Laurie) CurtisChairmanMichael HoffmanMine Engineer & ExecutiveBlair Schultz Capital markets experience
WELL-ESTABLISHED BOARD OF DIRECTORS
Timo JauristoGeologist, ex-Goldcorp Corp Dev Exec Stephen De Jong Integra President & CEOGeorge Salamis Integra Chairman
INTEGRA TECHNICAL ADVISORS
Previous experience with Management, the Éléonore Project (Goldcorp), & the James Bay region
Hervé Thiboutot, Geological EngineerIntegra Senior VP
Jacques Simoneau, P.Geo.Integra Exploration Manager
Claude Lemasson, P.Eng, MBA President & CEO • Highly-skilled mining professional • 30 yrs of mine dev’t & operational experience• Direct experience with Goldcorp’s Éléonore
project in northern QuébecJoe Fazzini, CPA, CFA, CA CFO & VP Corporate Development• 10+ yrs advising and auditing global gold and
base metal producers through PwC & Dundee Capital Markets.
Alison Dwoskin, CPIR Manager, Investor Relations• 10+ yrs in mining Investor Relations
MANAGEMENT TEAM Bill McGuinty, P.GeoVP Exploration• 30 yrs experience in Canada and Latin
America, from exploration to environmental and feasibility studies
Manuel Ng-Lai, P.EngProject Engineer• 10+ yrs in the technical services sectorCarl Corriveau, P.Geo, SEGExploration Manager• 15+ yrs industry experience, including
project management and evaluation, advancing projects from exploration through economic studies
JAMES BAY GOLD CAMP EMERGING GOLD DISTRICT
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com7
ProductionThe Canadian Shield has produced over 200 million
ounces of gold
Life Cycle James Bay is one of the youngest camps in the
Canadian shield
Exploration Potential for many more
discoveries as exploration advances
Development Rapidly improved
infrastructure to speed up pace of exploration
1. The production and reserve figure for James Bay Central Camp includes Eastmain’s resources as there are currently no reserves. 2. The Eastmain mine extracted 40,000 ounces in 1995. 3. Casa Berardi and Chibougamau are located in Southern James Bay Source: Company reports, government studies, and academic journals.
Central James Bay
Rice Lake
Casa Berardi
Detour
Hemlo
Chibougamau
Red Lake
Rouyn-Noranda
Val D’or
Kirkland Lake
Timmins
7
2
3
23
21
7
28
20
30
45
74
Production & Reserves (Millions of Ounces)
First Gold Pour (Year)
2014
2005
1988
1983
1981
1952
1930
1927
1923
1915
1909
District
SUPERIOR INFRASTRUCTURE IN A TOP JURISDICTION137,665 HECTARES IN NEWEST GOLD DISTRICT
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com8
Note: Clearwater is accessible via a commercial airport at Nemaska, located 80 kms south of the project. Route 167 Nord has been constructed from Temiscamie north to the RenardProject, providing permanent road access to the Eastmain Mine project.
Ruby Hill
Lac LessardEastmain Mine
Route 167 Nord All-season road
Clearwater
Lac Hudson
Reservoir
Lidge
Lac Elmer
Radisson
Éléonore South JV
JAMES BAY REGION 50KM
Eastmain
JamesBay
Mistissini
Temiscamie
Éléonore MineGoldcorp
Renard MineStornoway
Troilus MineCopper One
Wemindji
Waskaganish
Chisasibi
Nemaska
Radisson
Lac Clarkie
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com9
CLEARWATER PROJECTADVANCED EXPLORATION ON THE EAU CLAIRE DEPOSIT
EAU CLAIRE: MINERAL RESOURCE ESTIMATE 1
Total Measured & Indicated: 951,000 oz @ 4.09 g/t Au -7,225,000 tonnesTotal Inferred: 633,000 oz @ 3.88 g/t Au – 5,072,000tonnes
PROPERTY51,614 hectares30 person camp incl. full-kitchen, core-shack and cabinsHydro-power (20 kms away), road and nearby airportsJames Bay gold district greenstone belt, volcanics100% ownership
Note 1. Technical Report for the Eau Claire Deposit, Clearwater Project by SRK Consulting (June 2015) filed on SEDAR.
UPCOMING CATALYSTSDrilling results (1Q 2017)Mineral resource update (2Q 2017)Preliminary Economic Assessment (2H 2017)
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com10
EAU CLAIRE MINERAL RESOURCEOPPORTUNITY TO IMPROVE QUALITATIVE AND QUANTITATIVE DATA
77% More drilling data in next mineral resource updateQ2 2017
13,000 metres - drilling from late 201563,300 metres - in progress - 2016 and early 2017
Note:5,000metres drilledin2014attheClovisLaketarget,ClearwaterProject
EAU CLAIRE DEPOSIT OVERVIEW: LOOKING WEST 450WestZoneOutcroponHilltopOPEN PIT POTENTIAL
Eau Claire Mineral Resource Drilling 99,000 m drilled 2011-20130 m drilled 2014-201599,000 m drilled since 2011
2016-1Q2017 PLANNED DRILLING PROGRAM PLAN VIEW
450 West Zone850 West Zone
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com11
EAU CLAIRE DEPOSIT AND DRILLING PROGRAMFOCUSING ON OPEN PIT AND SHALLOW UNDERGROUND POTENTIAL
2016 TO EARLY 2017 EXPLORATION BUDGET
$8.8 million
EAU CLAIRE PROGRAM: 55,700 m
2015 MINERAL AND RESOURCE ESTIMATE:951,000 gold ounces (M&I)From surface to 400 m deep
ü Open pit infill and step-out (blue) 11,200 m
ü Shallow underground infill (pink) 26,000 m
ü Delineation and conversion drilling:Inf. - > Meas. & Indic. (green and orange) 18,500 m
2015 Definition drilling intersected multiple high-grade gold intervals laterally and down-plunge of the current Measured & Indicated resource. The deposit is open laterally to the east and down plunge to the southeast and southwest. Based on SRK June 11, 2015 mineral resource, “Technical Report for the Eau Claire Gold Deposit, Clearwater Project, Quebec”.
LONGITUDINAL VIEW (Facing North)
CONCEPTUAL
300 m
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com12
CLEARWATER & LAC CLARKIE TARGETSTESTING MULTIPLE TARGETS ALONG DISTRICT SCALE GREENSTONE BELT
5,790,000N
5,800,000N
480,
000E
5,780,000N
480,
000E
460,
000E
470,
000E
460,
000E
470,
000E
5,790,000N
450,
000E
5,800,000N
450,
000E
5,780,000N
V3BMafic Volcanic Rock
SVolcanoclastic Sediment
S4Polymictic Conglomerate
V1Felsic Volcanic Rock
S9Iron Formation
Area Outline
VQ, VTL, VQTLQuartz +/- Tourmaline Vein,
QFPQuartz Feldspar Porphyry
M8Schist / Alteration Zone >50%
I3B, I4BDiabase, Pyroxenite
Hydrology (rivers and lakes)
Claim Block
Geology
I2Diorite
I1DTonalite
Other Symbols
2016 - 2017EXPLORATION PROGRAM
ü Targeting drill-ready open pit potential w/in 15 km of the Eau Claire Deposit
ü Potential for Eleonore-style and Eau Claire-style mineralization elsewhere on the property
ü Lac Clarkie Phases 1 & 2: geophysics to identify priority drilling targets
Clearwater Property Exploration Drilling (m)
Snake Lake (in progress) 4,700Clovis Lake 1,300Knight 500Natel 500Serendipity 300Beluga 300Total Clearwater Property Exploration 7,600
POSITIVE EAU CLAIRE DRILLING RESULTS DRILLING IS CONFIRMING AND EXTENDING MINERALIZATION
- ER16-606 - 43.1 g/t Au over 2.0 m, incl. 96.8 g/t Au over 1.0 m (Dec 1, 16)- ER16-584 - 79.7 g/t Au over 0.5 m (Dec 1, 16)
- 11.5 g/t Au over 13.5 m, incl. 21.3 g/t Au over 5 m- ER16-608 - 67.7 g/t Au over 2.4 m, incl. 85.1 g/t Au over 1.9 m (Jan 4, 17)
- Infill drilling confirms mineralization as anticipated- Step-out drilling extends mineralization 100 m east of deposit- Additional drilling to test upper boundary of Eau Claire eastward extension
Eau Claire Infill: 16,814 m Eau Claire Step-out: 702 m
Completed Drilling: 17,516 mTotal Planned: 55,700 m
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com13
M&I: 951,000 oz @ 4.1 g/t Au
SNAKE LAKE DRILLING RESULTS DRILLING IDENTIFIES TWO-STYLES OF GOLD MINERALIZATION NEAR EAU CLAIRE
- ER16-592 - 12.2 g/t Au over 1.5 m (Oct 24, 16)- ER16-596 - 6.38 g/t Au over 1.0 m (Dec 1, 16)- ER16-615 - 8.16 g/t Au over 0.6 m (Dec 1, 16)- ER16-604 - 11.3 g/t Au over 1.15 m (Jan 4, 17)
- 700 m long x 200 m wide shallow mineralized corridor - Two types of mineralization: A sulphide-rich zone and quartz-tourmaline gold mineralization- Quartz-tourmaline mineralization similar to the Eau Claire deposit, w/in 2km
Completed Drilling: 3,608 mTotal Planned: 4,700 m
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com14
5,790,000N
5,800,000N
480,
000E
5,780,000N
480,
000E
460,
000E
470,
000E
460,
000E
470,
000E
5,790,000N
450,
000E
5,800,000N
450,
000E
5,780,000N
V3BMafic Volcanic Rock
SVolcanoclastic Sediment
S4Polymictic Conglomerate
V1Felsic Volcanic Rock
S9Iron Formation
Area Outline
VQ, VTL, VQTLQuartz +/- Tourmaline Vein,
QFPQuartz Feldspar Porphyry
M8Schist / Alteration Zone >50%
I3B, I4BDiabase, Pyroxenite
Hydrology (rivers and lakes)
Claim Block
Geology
I2Diorite
I1DTonalite
Other Symbols
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com15
EASTMAIN MINE PROJECTHISTORIC PRODUCTION, HISTORIC RESOURCE, INFRASTRUCTURE IN PLACE
Note 1. The Eastmain Mine (past-producing) Historical Resources is not NI 43-101 compliant. A Qualified Person has not done sufficient work to classify them as mineral resources. The issuer is not treating these historical resources as current mineral resources and these resources should not be relied on.
HISTORIC MINING & RESOURCE Mined: 40,000 ozs at 10.58 g/t Au (1995)Resource1: 255,750 oz of 10 g/t Au in 878,000 tonnes$40M invested by previous owners on exploration & development
PROPERTY8,014 hectaresPermanent all-weather road, onsite airstrip, generator-power60 person-camp incl. full-kitchen, core shack and cabinsJames Bay gold district greenstone belt (volcanics)100% ownership
UPCOMING CATALYSTSExploration program results (1Q 2017)Full assessment of Eastmain past production, historic resources and targets (under review)Planning 2017 program
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com16
EASTMAIN MINE PROJECTGREAT LOCATION & INFRASTRUCTURE
Otish Park
EastmainMineCamplookingNWalongminetrendtosurfacetargets
Route167Road,partofPlanNord Eastmain Mine
All-season road built in 2014 by Quebec gov’t and Stornoway
StornowayRenard MIne
2016 - EARLY 2017 EXPLORATION BUDGET
$1.5 millionEXPLORATION UPSIDENew targets identified, including Julien and Suzanna – follow up underwayKnown mineralization around the historic resource Minimal past follow-up on drilling
EXISTING RESOURCE AND INFRASTRUCTURE
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com17
EASTMAIN MINE PROJECTREVITALIZATION AND EXPLORATION OPPORTUNITY
3 strong targets identified w/in 3 km of the mine: Hillhouse, Suzanna, JulienFollow-up IP survey and line cuttingAdditional drilling planned in March – larger program after spring break up• Trenching
– Trenching on 4 targets warrants further drilling, new mineralized structures identified (161212 press release):– Channel J3-6: 45.1 g/t Au, 26.5 g/t Ag and 0.61% Cu over 2.0 m, including 85.5 g/t Au, 48.0 g/t Ag and 1.09% Cu over 1.0– Channel J3-5: 4.81 g/t Au, 10.3 g/t Ag and 0.44% Cu over 6.5 m, including 13.5 g/t Au, 28.0 g/t Ag and 1.17% Cu over 2.0– Channel J4-3: 5.04 g/t Au, 8.34 g/t Ag, 0.59% Cu over 2.5 m, including 10.7 g/t Au,13.9 g/t Ag, 1.26% Cu over 0.5 m
• Drilling - 7,450 m completed – Encouraging results, new Julien Target confirmed, results on next slide (170119 press release)
JULIEN TARGET: DRILLING CONFIRMS NEW ZONEENCOURAGING GOLD/SILVER/COPPER INTERCEPTS
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com19
2.75 KM NW FROM THE EASTMAIN MINE, 0.3 KM NE FROM THE MINE TREND
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com19
ÉLÉONORE SOUTH JV PROPERTY INDICATIVE GEOCHEMISTRY – CONTIGUOUS TO ELEONORE MINE
Property size: 147 sq km
JOINT VENTURE PARTNERS:• Eastmain (36.7%)• Goldcorp (36.7%)• Azimut (26.6% - Manager: 2016 – 1H2017)GOLDCORP’S ELEONORE MINE:• Sedimentary-hosted gold deposit• >8 M MI&I ounces• 2016 gold production forecast: 250k -280k oz
($950/oz AISC)
MONI PROSPECT: • 3-4 km long x 0.5 km wide corridor• All 10 drill holes from Phase 1 intercepted
mineralization• Located within the Prospect Corridor:
Extends from JT Prospect east to Cheechoo discovery, over Moni Prospect (July 2016)
FD PROSPECT• New FD Prospect down trend from Goldcorp’s
Eleonore gold mine, 4.5 km north of JT Prospect(July 2016)
2016-1H2017 Drilling Program$2 million - JV Budget$0.74 million (Eastmain portion)
Goldcorp’s Eleonore PropertyEleonore South JV Property
FD Prospect
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com22
ÉLÉONORE SOUTH JV POSITIVE CHANNEL SAMPLING RESULTS ON MONI PROSPECT
Composite Results from channel samplingon outcrops:• 19.22 g/t Au over 3.8 m (Channel 1)• 7.85 g/t Au over 3.4 m (Channel 2)• 49.18 g/t over 4.0 m (Channel 3)• 50.37 g/t Au over 3.5 m (Channel 4)
Reportedgoldvaluesareuncut
76°W
76°W
52°3
7'3
0"N
52°3
7'3
0"N
435,000
435,000
440,000
440,000
5,8
25
,000
5,8
25
,000
5,8
30
,000
5,8
30
,000
5,8
35
,000
5,8
35
,000
0 500 1,000 1,500
meters
1:50,000
UTM zone 18 projection - NAD83
ELEONORE SOUTH PROPERTYSoil geochemistry - Arsenic (As)
Date: 2016-05-11
100%99%96% - 98%91% - 95%86% - 90%81% - 85%71% - 80%61% - 70%51% - 60%1% - 50%
71.82 - 929.3550.27 - 71.8129.23 - 50.2719.25 - 29.2314.84 - 19.2512.14 - 14.848.85 - 12.146.76 - 8.855.19 - 6.76
0 - 5.19
As (ppm) | Percentiles
76°W
76°W
52°3
7'3
0"N
52°3
7'3
0"N
435,000
435,000
440,000
440,000
5,8
25
,000
5,8
25
,000
5,8
30
,000
5,8
30
,000
5,8
35
,000
5,8
35
,000
0 500 1,000 1,500
meters
1:50,000
UTM zone 18 projection - NAD83
ELEONORE SOUTH PROPERTYSoil geochemistry - Gold (Au)
Date: 2016-05-11
100%99%96% - 98%91% - 95%86% - 90%81% - 85%71% - 80%61% - 70%51% - 60%1% - 50%
0.079 - 0.930.05 - 0.0790.026 - 0.05
0.016 - 0.0260.012 - 0.0160.009 - 0.0120.007 - 0.0090.006 - 0.0070.005 - 0.006
0 - 0.005
Au (ppm) | Percentiles
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com21
ÉLÉONORE SOUTH JV DRILLINGRESULTS SUPPORT STRONG GEOCHEMICAL SIGNATURE
2016 – early 2017 Drilling Program:COMPLETE: PENDING:Surface prospecting Phase 2 – 2,500 m follow-up drillingPhase 1 Drilling - 2,500 m drilling (12 holes) (1H 2017)
PROSPECTIVE CORRIDOR3 - 4 km long0.5 km wide
PHASE 1 RESULTS:ALL 10 DRILL HOLES
IN THE PROSPECTIVE CORRIDOR ARE MINERALIZED
EASTMAININVESTORPRESENTATIONER:TSXwww.Eastmain.com22
THE WAY FORWARDAGGRESSIVE EXPLORATION FOR AGGRESSIVE GROWTH
3Q16 4Q16 1Q17 2Q17 3Q17
Complete comprehensive drill campaign (63,000m)
Updated mineral resource estimate
Perform other technical optimization work
Optimize and complete PEA and study work
CLE
AR
WA
TER
PR
OJE
CT
EAST
MA
IN
MIN
E PR
OJE
CT
ÉLÉO
NO
RE
SOU
TH J
V
Trenching
Drilling (7,500m)
Drilling (5,000m)
Sampling
PRIORITIES (Calendar Year)
2017 Program
2017 Program
2017 Program
4Q17
TODAY
23