EASA - Enabling Final Approach Procedures Gerda Pardatscher FCL Officer, FS 3.2 31/01/2017 Bryan JOLLY, Hette HOEKEMA, VasileIos STEFANIOROS TE.GEN.00409-001

Transcript of EASA - Enabling Final Approach Procedures - Eurocontrol · 31/01/2017 EASA - Enabling Final...

EASA - Enabling Final Approach Procedures

Gerda Pardatscher FCL Officer, FS 3.2 31/01/2017 Bryan JOLLY, Hette HOEKEMA, VasileIos STEFANIOROS

TE.GEN.00409-001

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 2

What will you hear from me today?

EASA – an Agency of the EU Commission EASA - Enabling Final Approach Procedures System with 5 domains:

ATM/ANS Aerodromes Aircraft Pilots OPS

Conclusion

EASA – an Agency of the EU Commission

EASA Member States Core activities

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 3

European Union and EFTA countries

4

28 EU states

4 EFTA states

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

EASA MEMBERS

EASA - Core Activities (1/2)

Product Certification

Rulemaking

Standardisation

Organisation Approvals

Safety Assessment of Foreign Aircraft

5 31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

EASA - Core Activities (2/2)

Third Country Operators

Safety Analysis and Research

European Aviation Safety Programme

International Cooperation

Technical Training

6 31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

EASA - Enabling Final Approach Procedures

ATM/ANS

Aircraft

Aerodrome Pilots

OPS

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 7

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 8

EASA‘s system approach

Most of the PBN approaches will no longer require a ICAO, TCAA, CASA follow our proposal

EU Mandates - PBN in the High Density TMA

RNP 1 SIDs, STARs Plus Radius to Fix (RF)

RNP APCH to LNAV/VNAV and LPV minima

9

2024

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

From AIS to AIM

Ensures: The provision of quality aeronautical information and data in a timely manner, The accuracy and resolution appropriate for its intended use, that integrity levels are met and maintained throughout the management process.

Contains: Data quality requirements Rules for AIS providers, service providers, aerodrome operators and data origination

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 11

DAT Services

Requirements for DATA providers of navigation and other aeronautical databases:

Decrease of workload by DAT providers aircraft operators and NAAs

Continued recognition of FAA system Fully enable PBN Operations

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 12

13

Defining the process to determine safely designed, validated flight procedures and airspace structures Providing for

A change sponsor to follow change process IFP designs to be done by IFP design service provider Technical requirements

Airspace Design

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

ATCO

Regulation (EU) 2015/340 AMC/GM FAQs published on EASA web Technical Publication “Easy Access Rules” available

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 14

Ratings

Forms and templates

Initial Training

Aircraft

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 15

New CS-ACNS

One, aircraft centric Certification Specification that covers all NAV specs.

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 16

11 NAV Specs… One aeroplane…

Coming soon !

New CS-ACNS

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 17

RNAV

RNP

All applications include GNSS

CS-ACNS is therefore an RNP based CS. Credit is given for RNAV applications.

New CS-ACNS

New CS-ACNS: Who is the target audience?

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 18

Airbus?

Boeing?

Smaller and medium sized enterprises!

The CS is aimed at the audience that needs guidance most.

New CS-ACNS

New CS-ACNS:

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 19

The existing AMCs & TGLs contained many duplicate requirements, often already covered by ETSO / Industry Standards…

The new CS-ACNS recognises credit obtained through ETSOA

PBN made easier !

Aerodromes

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 20

Aerodromes

Requirement to safely operate and design an Aerodrome Includes

Non Precision/Precision Marking of the runway Lighting of the runway

21 31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

22

Aerodrome developments

Opinion 3/2016 Proposal to update the definitions of the runways in progress.

Update of Certification Specifications

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

Pilots

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 23

Pilots – new privileges for IR holders

Transition training

Privileges to be included as of 25 August 2018 Over 100 000 IR holders need transition training Three groups identified

Initial training

Privileges included as of 25 August 2018

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 24

Pilots

CAT airline

• Organisation

• Training and checking 6 months

• Extensive experience

CAT BA

• Organisation

• Training and checking 6 months

• Experience can be low

PPL

• Self dependent

• Checking every 12 months

• Experience can be low

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 25

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 26

Pilots - challenges

Transition training, recognition of “national” training

Different knowledge levels

ATOs, training manuals, LOs, aircraft

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 27

Pilots - challenges

Implementation plan

Transition period 2 years

Agency – TK exams

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 28

Pilots

Regulation 2016/539,

AMC and GM for syllabus and LOs

Transition till 25.8.2018 (ATOs 25.8.2020)

OPS

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 29

OPS Part-SPA

Part-SPA

GEN PBN

MNPS RVSM

LVO ETOPS

DG NVIS

HHO HEMS

30 31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

OPS Low Visual Operations

31

Requirements and condition under which low visual operations can be conducted CAT I/II/III

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

OPS PBN

32

Simplification of the PBN specifications, specific approvals requirements

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR

Safer operation !

Approach operations as a system

ATM/ANS

Aircraft

Aerodrome Pilots

OPS

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 33

Thank you very much for your attention!

Conventional versus PBN approaches

31/01/2017 EASA - Enabling Final Approach Procedures, FS 3.2/GPAR 35

•1 •2 •3