E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart
NI-Days 2000, CERN Geneve, 26 October 2000
The Control Architecture for the LHC Dipole Series Measurements
CERN-LHC-IAS
Contents
Introduction to the magnet test activities The magnet test applications The defined control architecture for SM18 Project status and Summary
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
The LHC dipole magnet test programme
• 4 years to test all dipoles
•~1200 dipole magnets to be tested
• ~1 week test time per dipole
• 12 magnet test benches
• 4 years to test all dipoles
•~1200 dipole magnets to be tested
• ~1 week test time per dipole
• 12 magnet test benches
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
SM18 test area
• a total of 6 clusters will be installed
• the first cluster shown here
• 2 dipole magnets per cluster with shared power supplies
• a total of 6 clusters will be installed
• the first cluster shown here
• 2 dipole magnets per cluster with shared power supplies
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
LHC dipole test systems using LabVIEW™
Power Test DAQ and analysis
Magnetic Measurement
Magnetic mole
Optical telescope
Calibration bench
LHC dipoles
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Magnetic Measurement System
Magnet under test
shaftAxialmotorAngularmotorAngularencoderForce &TorsionSHAFT CONTROLPowerSupplycoilsRS-232C
Sun Workstation
DVM
RS-232Cto GPIB
MXI busVME integrators
Analogue signals
Trigger
Energy LossMeasurement
GPIB
Database
TCP/IP
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Power test DAQ and analysis
Database
TCP/IP
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Magnet under test
VME A/D converterswebaccess
Sun Workstation
PowerSupplyshaftcoils Shaft unit
Quenchantennaesignals
Quench detector signals Strain gaugesmeasurement
MXI bus RS-232
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Operator console for magnet tests in Central Control Room in SM18
Magnetic Measurementsor Power Control
Low FrequencyDAQ display
High FrequencyDAQ display
EthernetEthernet
UPMUPMVME integratorsVME integrators
Power SupplyPower Supply
VME Data AcquisitionVME Data Acquisition
DVMsDVMsLossLoss M. M.
Operator ConsoleOperator Console
Power TestPower TestMagnetic MeasurementMagnetic Measurement
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Cooling dow
n
Magnetic m
eas.
Th
e Ap
plication
Layer
Th
e Test M
aster Layer
MM
P
Loss
LF
-DA
Q
HF
-DA
Q
Cluster
View
Application
View
TR
U
Mole
Telescope
Pow
er-supply
Motor
Sub-system
View
Th
e Resou
rce Man
ager Layer
SM18
Clusters
View
Inventory tableH
istory tableD
evice info
Warm
ing up
Pow
er Test
Installed onlyP
S
Statu
sS
equ
ence
MM
1P
ower2
Test3
NI-D
ays 2000, CE
RN
Geneve, 26 O
ctober 2000C
ER
N-L
HC
-IAS
Power supply sharing
PS 60 A
PS 600 A
PS 13 kA
application 1
application 2
application 3
server & acces crtl
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Who drives which?
application layer
Client-server and access management to power supplies with LabVIEW VI server
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Command file system for TeMa application control
User/TeMa level
Application level
edit cmd filecheck sts file
looking for cmd
execution
write sts
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
TeMa operation using the Internet Toolkit
send status
LF application
HF application
send
stat
us
Magnetic Measurement application
get sts
send cmd
TeMa
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
UDPsocket
UDPsocket
send status
FTP send cmd and read sts
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
ReMa communication
TeMa layer
ReMa layer
TeMa TeMa TeMa TeMa TeMa TeMa
power station
databaseReMainfo consumption
inventory
history
power agreement and info through UDP
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
T
he A
pp
lication L
ayer
Th
e Test M
aster Layer
MM
P
Loss
LF
-DA
Q
HF
-DA
Q
Cluster
View
Application
View
TR
U
Mole
Telescope
Pow
er-supply
Motor
Sub-system
View
Th
e Resou
rce Man
ager Layer
SM18
Clusters
View
Inventory tableH
istory tableD
evice info
PS
Statu
sS
equ
ence
MM
1P
ower2
Test3
NI-D
ays 2000, CE
RN
Geneve, 26 O
ctober 2000C
ER
N-L
HC
-IAS
Project S
tatus
ready
un
der
develop
men
t
Summary
NI-Days 2000, CERN Geneve, 26 October 2000 CERN-LHC-IAS
Choice of LabVIEW for the three layers: Equipment interface in the application layer (VME,
MXI, GPIB, RS232, …) Internet tools for the communication between
applications in the Test Master and Resource Manager layers (FTP, UDP, HTTP, …)
Homogeneity in all control levels Fast development of user friendly applications