Duraplate 301 Onshore/Offshore Track Record

Transcript of Dura plate 301 projects

Duraplate 301Onshore/Offshore Track Record

2

Owner Site (Location) Type Project Scope Year

VIETSOVPETROVSP Port (Vietnam)

Oil rig repair Two Helideck Top side refurbishment 2011

GRYPHON ENERGYJurong Shipyard

(Singapore)Jack-up rig

refurbishmentRubicone 191 Rig

Hull, legs, drill cover repair (3,500 m2)

2011

VTPTank farm (Vietnam)

Storage tanks 11 tanks External and internal areas refurbishment 2011

PMPCPVC plant (Vietnam)

Pipeline refurbishment

Pipeline External areas refurbishment 2011

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P62

Hull conversion from VLCC tanker (578,000 m2)

2010 - 2011

PETROBRASKeppel Shipyard - Tuas (Singapore)

FPSO conversion P58Hull conversion from VLCC tanker

(578,000 m2)2010 - 2011

MARLIN OFFSHOREModuspec / Keppel

Fels (Singapore)Tender barge

repairW. D. Kent

Store compartment, hull top side and crane refurbishment

2010

STATOILKristiansand Terminal

(Norway)Storage tank

repairTank N.6 External areas refurbishment 2010

PETRONASMalaca terminal

(Malaysia)Crude and

gasoline tanks Tank farm External and internal areas refurbishment 2010

PMPCPVC plant (Vietnam)

Chemical reactors

3 Reactors External areas refurbishment 2010

TPC VINAPVC plant (Vietnam)

Chemical reactors

3 Reactors External areas refurbishment 2010

PVGAS SE (Vietnam)Pipeline

refurbishmentPipeline External areas refurbishment 2010

GALP ENERGIASines Refinery

(Portugal)Pipeline

refurbishment

POV14/15/46 /47/48/49/50 /51/53 lines

External areas refurbishment 2010

ZUARI Indian Oil Tanking Ltd

Goa (India)

Storage tanks repair

Tank farm Internal areas refurbishment 2009-2011

PETROLIMEX II (Vietnam)Storage tank refurbishment

B29, C6, C7, B14, B34

Internal areas refurbishment 2009-2010

DAI HUNG OIL & GASVietnam Service Corp. (Vietnam)

Single buoy refurbishment

Calm buoy External side 2009

PETROLIMEX (Vietnam)Storage tank refurbishment

Jet A1 tank Internal areas refurbishment 2009

Owner Site (Location) Type Project Scope Year

VINH LONG OIL & GAS JSC

(Vietnam)Storage tanks

repairB1001 & 1002 Internal areas refurbishment 2009

DAI HUNG OIL & GAS CO.

(Vietnam) Separators 5 Separators Internal areas refurbishment 2009

PETROLIMEX III (Vietnam)Storage tanks

repairTank D1-2-3-4-5 Internal areas refurbishment 2009

GALP ENERGIASines Refinery

(Portugal)Storage tank maintenance

OP-T260 tank Roof refurbishment 2009

NATOPol Nato (Portugal)

Storage tanks refurbishment

Tanks TK-3.2, TK-3.3, TK-3.4 and TK-3.5 at Zone 3

Internal tank bottom refurbishment 2009

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T507

Internal tank bottom refurbishment, roof refurbishment

2009

PETROBRASAtlântico Sul Shipyard

(Brazil) FPU new building

P-55 Hull (550,000 m2) 2008 -2011

PETROBRASBrasfels (Brazil)

FPU new building

P-56Hull, main deck, modules and equipment,

fabrication and final assembly (680,000 m2)2008 -2011

PETEC (Vietnam) Storage tank T11, T12, T09, T07 Internal tank bottom refurbishment 2008 -2011

TRANSOCEANSembawang Shipyard

(Singapore)Jack-up rig Harvey H. Ward Ballast and cargo tanks, service life extension 2008

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-2 tank Internal tank bottom refurbishment 2008

SBMBrasfels (Brazil)

Single buoys refurbishment

Sbm Imodico SO 17480 1 e 2

Full areas, service life extension 2007-2008

QUEIROZ GALVÃOMaua Shipyard

(Brazil)FPU

refurbishmentOlinda Star Full areas, service life extension (85,000 m2) 2007-2008

PETROBRASOffshore (Brazil)

Flotel maintenance

Garoupa Full areas, refurbishment (44,000 m2) 2007-2008

TRANSOCEANJohor Port (Malaysia)

Jack-Up Rig refurbishment

Nordic Ballast tanks repair 2007-2008

TRANSOCEANSembawang Shipyard

(Singapore)Drill Ship

refurbishmentDiscoverer Seven

SeasBallast tanks repair 2007-2008

JURONG SHIPYARDJurong Shipyard

(Singapore)Skid truss

maintenanceYard structures

upgradeSteel structure service life extension 2007-2008

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings www.sherwin-williams.com/protective

2 3

DuRaplaTe 301 OnshORe/OffshORe TRack RecORD

3

Owner Site (Location) Type Project Scope Year

VIETSOVPETROVSP Port (Vietnam)

Oil rig repair Two Helideck Top side refurbishment 2011

GRYPHON ENERGYJurong Shipyard

(Singapore)Jack-up rig

refurbishmentRubicone 191 Rig

Hull, legs, drill cover repair (3,500 m2)

2011

VTPTank farm (Vietnam)

Storage tanks 11 tanks External and internal areas refurbishment 2011

PMPCPVC plant (Vietnam)

Pipeline refurbishment

Pipeline External areas refurbishment 2011

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P62

Hull conversion from VLCC tanker (578,000 m2)

2010 - 2011

PETROBRASKeppel Shipyard - Tuas (Singapore)

FPSO conversion P58Hull conversion from VLCC tanker

(578,000 m2)2010 - 2011

MARLIN OFFSHOREModuspec / Keppel

Fels (Singapore)Tender barge

repairW. D. Kent

Store compartment, hull top side and crane refurbishment

2010

STATOILKristiansand Terminal

(Norway)Storage tank

repairTank N.6 External areas refurbishment 2010

PETRONASMalaca terminal

(Malaysia)Crude and

gasoline tanks Tank farm External and internal areas refurbishment 2010

PMPCPVC plant (Vietnam)

Chemical reactors

3 Reactors External areas refurbishment 2010

TPC VINAPVC plant (Vietnam)

Chemical reactors

3 Reactors External areas refurbishment 2010

PVGAS SE (Vietnam)Pipeline

refurbishmentPipeline External areas refurbishment 2010

GALP ENERGIASines Refinery

(Portugal)Pipeline

refurbishment

POV14/15/46 /47/48/49/50 /51/53 lines

External areas refurbishment 2010

ZUARI Indian Oil Tanking Ltd

Goa (India)

Storage tanks repair

Tank farm Internal areas refurbishment 2009-2011

PETROLIMEX II (Vietnam)Storage tank refurbishment

B29, C6, C7, B14, B34

Internal areas refurbishment 2009-2010

DAI HUNG OIL & GASVietnam Service Corp. (Vietnam)

Single buoy refurbishment

Calm buoy External side 2009

PETROLIMEX (Vietnam)Storage tank refurbishment

Jet A1 tank Internal areas refurbishment 2009

Owner Site (Location) Type Project Scope Year

VINH LONG OIL & GAS JSC

(Vietnam)Storage tanks

repairB1001 & 1002 Internal areas refurbishment 2009

DAI HUNG OIL & GAS CO.

(Vietnam) Separators 5 Separators Internal areas refurbishment 2009

PETROLIMEX III (Vietnam)Storage tanks

repairTank D1-2-3-4-5 Internal areas refurbishment 2009

GALP ENERGIASines Refinery

(Portugal)Storage tank maintenance

OP-T260 tank Roof refurbishment 2009

NATOPol Nato (Portugal)

Storage tanks refurbishment

Tanks TK-3.2, TK-3.3, TK-3.4 and TK-3.5 at Zone 3

Internal tank bottom refurbishment 2009

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T507

Internal tank bottom refurbishment, roof refurbishment

2009

PETROBRASAtlântico Sul Shipyard

(Brazil) FPU new building

P-55 Hull (550,000 m2) 2008 -2011

PETROBRASBrasfels (Brazil)

FPU new building

P-56Hull, main deck, modules and equipment,

fabrication and final assembly (680,000 m2)2008 -2011

PETEC (Vietnam) Storage tank T11, T12, T09, T07 Internal tank bottom refurbishment 2008 -2011

TRANSOCEANSembawang Shipyard

(Singapore)Jack-up rig Harvey H. Ward Ballast and cargo tanks, service life extension 2008

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-2 tank Internal tank bottom refurbishment 2008

SBMBrasfels (Brazil)

Single buoys refurbishment

Sbm Imodico SO 17480 1 e 2

Full areas, service life extension 2007-2008

QUEIROZ GALVÃOMaua Shipyard

(Brazil)FPU

refurbishmentOlinda Star Full areas, service life extension (85,000 m2) 2007-2008

PETROBRASOffshore (Brazil)

Flotel maintenance

Garoupa Full areas, refurbishment (44,000 m2) 2007-2008

TRANSOCEANJohor Port (Malaysia)

Jack-Up Rig refurbishment

Nordic Ballast tanks repair 2007-2008

TRANSOCEANSembawang Shipyard

(Singapore)Drill Ship

refurbishmentDiscoverer Seven

SeasBallast tanks repair 2007-2008

JURONG SHIPYARDJurong Shipyard

(Singapore)Skid truss

maintenanceYard structures

upgradeSteel structure service life extension 2007-2008

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings www.sherwin-williams.com/protective

2 3

4

Owner Site (Location) Type Project Scope Year

PETROBRASBT Engineering

(Singapore)Gas rig Mexilhao Module and equipment 2007-2008

AKER FPJurong Shipyard

(Singapore)FPSO Aker Smart 1

Vessel full areas including modules and structures

2007-2008

VEDAN COMPANY (Vietnam)Pipeline

refurbishmentPipeline External surfaces refurbishment 2007

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T406 Internal tank bottom refurbishment 2007

US AIR FORCELajes airbase

(Açores, Portugal)Storage tanks 873 e 874 Internal tank bottom refurbishment 2007

BPOffshore

(US Gulf of Mexico)FPU

maintenanceThunder Horse Helideck and structures 2006

TESMASembawang Ship-yard (Singapore)

FPSO conversion Brotojoyo Ballast tanks, pump room and fore peak tank 2006

TRANSOCEANSembawang Ship-yard (Singapore)

Drill ship refurbishment

Discover 534Ballast tanks, cargo tanks, mud pits,

service life extension2006

GALP ENERGIASines Refinery

(Portugal)Storage tanks OP-T05 tank Internal tank bottom refurbishment 2006

REPSOLLeça Tank Farm

(Portugal)Storage tanks

TK-02, TK-03, TK-04

Internal tank bottom refurbishment 2006

GALP ENERGIALeça Refinery

(Portugal)Storage tanks

TK-6012 and TK-6015

External surfaces refurbishment 2006

PETROBRASEstaleiro Rio Grande

(Brazil)FPU top sides and integration

P-53Top sides (modules), assembly, integration

(200,000 m2)2005 - 2008

PETROBRASBrasfels (Brazil)

FPU new building

P-51Pontoon, columns, main deck, modules and

equipment construction, assembly, integration (410,000 m2)

2005 - 2007

PETROBRASMaua Jurong

(Brazil)FPSO top sides and integration

P-54Top sides (modules), assembly, integration

(100,000 m2)2005 - 2006

PETROBRASKeppel Shipyard - Tuas (Singapore)

FPU conversion P-53Hull conversion from VLCC tanker

(900,000 m2)2005 - 2006

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-54

Hull conversion from VLCC tanker (650,000 m2)

2005 - 2006

PETROBRASMac Laren Shipyard

(Brazil)FSO PRA-1

I-beams and panels from module, module assembly

2005

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings

4

Owner Site (Location) Type Project Scope Year

QUEIROZ GALVÃOOffshore (Brazil)

FPU refurbishment

Alaska Star Hull, legs, underdeck 2005

PETROBRASGDK

(Brazil)FPSO

maintenanceP-34

General maintenance, skids from chemical modules and piping

2005

PETROBRASKeppel Fels (Singapore)

FPU new building

P-51 Nodes for pontoon (60,000 m2) 2005

GALP ENERGIALeça Refinery

(Portugal)Storage tanks

TK-6013 and TK-6014

External surfaces refurbishment 2005

GALP ENERGIALeça Refinery

(Portugal)Storage tank TK-6105 D Internal tank bottom refurbishment 2005

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T305 Roof refurbishment 2005

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T011 Tank reinforcement rings repair 2005

BENCOMAçores Terminal

(Portugal)Storage tanks 4 tanks External surfaces refurbishment 2005

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-3

External bottom draft fiberglass reinforcement lining

2005

GALP ENERGIALeça Refinery

(Portugal)Storage tank TK-5103 C Exterior hydroblasting and painting 2005

PETROBRASKeppel Fels (Singapore)

FPU new building

P-52 Complete hull below main deck (350,000 m2) 2004 - 2006

PETROBRASMaua Jurong

(Brazil)FSO

refurbishmentP-III External hull, full area 2004

PEMEX Bender ShipyardFPU

refurbishmentChemul External hull, full area (80,000 m2) 2004

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T03 tank Exterior tankside repair 2004

PETROBRASMaua Jurong

(Brazil)FPSO integration P-50

Top sides assembly and final integration (180,000 m2)

2003 - 2005

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-50

Hull conversion from VLCC tanker (650,000 m2)

2003 - 2004

PETROBRASUltratec (Brazil)

FPSO refurbishment

P-47 Cargo tanks maintenance (46,000 m2) 2003

www.sherwin-williams.com/protective

5

DuRaplaTe 301 OnshORe/OffshORe TRack RecORD

5

Owner Site (Location) Type Project Scope Year

PETROBRASBT Engineering

(Singapore)Gas rig Mexilhao Module and equipment 2007-2008

AKER FPJurong Shipyard

(Singapore)FPSO Aker Smart 1

Vessel full areas including modules and structures

2007-2008

VEDAN COMPANY (Vietnam)Pipeline

refurbishmentPipeline External surfaces refurbishment 2007

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T406 Internal tank bottom refurbishment 2007

US AIR FORCELajes airbase

(Açores, Portugal)Storage tanks 873 e 874 Internal tank bottom refurbishment 2007

BPOffshore

(US Gulf of Mexico)FPU

maintenanceThunder Horse Helideck and structures 2006

TESMASembawang Ship-yard (Singapore)

FPSO conversion Brotojoyo Ballast tanks, pump room and fore peak tank 2006

TRANSOCEANSembawang Ship-yard (Singapore)

Drill ship refurbishment

Discover 534Ballast tanks, cargo tanks, mud pits,

service life extension2006

GALP ENERGIASines Refinery

(Portugal)Storage tanks OP-T05 tank Internal tank bottom refurbishment 2006

REPSOLLeça Tank Farm

(Portugal)Storage tanks

TK-02, TK-03, TK-04

Internal tank bottom refurbishment 2006

GALP ENERGIALeça Refinery

(Portugal)Storage tanks

TK-6012 and TK-6015

External surfaces refurbishment 2006

PETROBRASEstaleiro Rio Grande

(Brazil)FPU top sides and integration

P-53Top sides (modules), assembly, integration

(200,000 m2)2005 - 2008

PETROBRASBrasfels (Brazil)

FPU new building

P-51Pontoon, columns, main deck, modules and

equipment construction, assembly, integration (410,000 m2)

2005 - 2007

PETROBRASMaua Jurong

(Brazil)FPSO top sides and integration

P-54Top sides (modules), assembly, integration

(100,000 m2)2005 - 2006

PETROBRASKeppel Shipyard - Tuas (Singapore)

FPU conversion P-53Hull conversion from VLCC tanker

(900,000 m2)2005 - 2006

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-54

Hull conversion from VLCC tanker (650,000 m2)

2005 - 2006

PETROBRASMac Laren Shipyard

(Brazil)FSO PRA-1

I-beams and panels from module, module assembly

2005

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings

4

Owner Site (Location) Type Project Scope Year

QUEIROZ GALVÃOOffshore (Brazil)

FPU refurbishment

Alaska Star Hull, legs, underdeck 2005

PETROBRASGDK

(Brazil)FPSO

maintenanceP-34

General maintenance, skids from chemical modules and piping

2005

PETROBRASKeppel Fels (Singapore)

FPU new building

P-51 Nodes for pontoon (60,000 m2) 2005

GALP ENERGIALeça Refinery

(Portugal)Storage tanks

TK-6013 and TK-6014

External surfaces refurbishment 2005

GALP ENERGIALeça Refinery

(Portugal)Storage tank TK-6105 D Internal tank bottom refurbishment 2005

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T305 Roof refurbishment 2005

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T011 Tank reinforcement rings repair 2005

BENCOMAçores Terminal

(Portugal)Storage tanks 4 tanks External surfaces refurbishment 2005

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-3

External bottom draft fiberglass reinforcement lining

2005

GALP ENERGIALeça Refinery

(Portugal)Storage tank TK-5103 C Exterior hydroblasting and painting 2005

PETROBRASKeppel Fels (Singapore)

FPU new building

P-52 Complete hull below main deck (350,000 m2) 2004 - 2006

PETROBRASMaua Jurong

(Brazil)FSO

refurbishmentP-III External hull, full area 2004

PEMEX Bender ShipyardFPU

refurbishmentChemul External hull, full area (80,000 m2) 2004

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T03 tank Exterior tankside repair 2004

PETROBRASMaua Jurong

(Brazil)FPSO integration P-50

Top sides assembly and final integration (180,000 m2)

2003 - 2005

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-50

Hull conversion from VLCC tanker (650,000 m2)

2003 - 2004

PETROBRASUltratec (Brazil)

FPSO refurbishment

P-47 Cargo tanks maintenance (46,000 m2) 2003

www.sherwin-williams.com/protective

5

6

Owner Site (Location) Type Project Scope Year

PETROBRASDinamic Shipyard

(USA)FPSO top sides

fabricationP-50

Modules PO2A&B and PO3A&B, equipment and piping (70,000 m2)

2003

PETROBRASOffshore (Brazil)

FPSO maintenance

P-40 Main deck (primer coat only) 2003

PETROBRASBrasfels (Brazil)

FPSO conversion P-48Hull conversion, top sides integration

(550,000 m2)2003

PETROBRASMaua Jurong

(Brazil)FPSO top sides and integration

P-43 Modules fabrication and integration 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T10 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T511 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T513 tank Internal tank bottom refurbishment 2003

EXXONTrafaria Terminal

(Portugal)Storage tank Tank 27 Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T301 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T400 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T12 tank Internal tank bottom refurbishment 2003

TRANSOCEANSembawang Ship-yard (Singapore)

Jack-up rig Harvey H. Ward Drill water tanks refurbishment 2002

PETROBRASBrasfels (Brazil)

FSU refurbishment

P-17 General maintenance and conversion 2002

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-43

Cargo oil tanks, diesel oil tanks and double bottoms refurbishment (120,000 m2)

2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T12 tank Roof treatment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T508 tank Internal tank bottom refurbishment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T263 tank Internal tank bottom refurbishment 2002

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings

6

Owner Site (Location) Type Project Scope Year

TANQUISADOSetúbal terminal

(Portugal)Storage tanks

TS1 and TS3 tanks

Bottom outer ring repair 2002

GALP ENERGIASines Refinery

(Portugal)Storage tanks

OP-T423, OP-T308 and OP-T250

Roof refurbishment 2002

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-2 Bottom outer ring repair 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OPT-13 Internal tank bottom refurbishment 2002

TANQUISADOSetúbal terminal

(Portugal)Storage tanks

TS1, TS2, TS3 and TS4

Roof and piping refurbishment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T01 Internal tank bottom refurbishment 2001

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T220 Internal tank bottom refurbishment 2001

www.sherwin-williams.com/protective

7

DuRaplaTe 301 OnshORe/OffshORe TRack RecORD

7

Owner Site (Location) Type Project Scope Year

PETROBRASDinamic Shipyard

(USA)FPSO top sides

fabricationP-50

Modules PO2A&B and PO3A&B, equipment and piping (70,000 m2)

2003

PETROBRASOffshore (Brazil)

FPSO maintenance

P-40 Main deck (primer coat only) 2003

PETROBRASBrasfels (Brazil)

FPSO conversion P-48Hull conversion, top sides integration

(550,000 m2)2003

PETROBRASMaua Jurong

(Brazil)FPSO top sides and integration

P-43 Modules fabrication and integration 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T10 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T511 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T513 tank Internal tank bottom refurbishment 2003

EXXONTrafaria Terminal

(Portugal)Storage tank Tank 27 Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T301 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T400 tank Internal tank bottom refurbishment 2003

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T12 tank Internal tank bottom refurbishment 2003

TRANSOCEANSembawang Ship-yard (Singapore)

Jack-up rig Harvey H. Ward Drill water tanks refurbishment 2002

PETROBRASBrasfels (Brazil)

FSU refurbishment

P-17 General maintenance and conversion 2002

PETROBRASJurong Shipyard

(Singapore)FPSO conversion P-43

Cargo oil tanks, diesel oil tanks and double bottoms refurbishment (120,000 m2)

2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T12 tank Roof treatment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T508 tank Internal tank bottom refurbishment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T263 tank Internal tank bottom refurbishment 2002

ES301 Oil & Gas Projects

©2012 The Sherwin-Williams Company Protective & Marine Coatings

6

Owner Site (Location) Type Project Scope Year

TANQUISADOSetúbal terminal

(Portugal)Storage tanks

TS1 and TS3 tanks

Bottom outer ring repair 2002

GALP ENERGIASines Refinery

(Portugal)Storage tanks

OP-T423, OP-T308 and OP-T250

Roof refurbishment 2002

TANQUISADOSetúbal terminal

(Portugal)Storage tank TR-2 Bottom outer ring repair 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OPT-13 Internal tank bottom refurbishment 2002

TANQUISADOSetúbal terminal

(Portugal)Storage tanks

TS1, TS2, TS3 and TS4

Roof and piping refurbishment 2002

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T01 Internal tank bottom refurbishment 2001

GALP ENERGIASines Refinery

(Portugal)Storage tank OP-T220 Internal tank bottom refurbishment 2001

www.sherwin-williams.com/protective

7

Duraplate 301Onshore/Offshore Track Record

To learn more, visit us atsherwin-williams.com/protectiveEMEA

©2013 The Sherwin-Williams Company Protective & Marine Coatings 2/13 EMEA0021/V01

sherwin-Williams protective & Marine coatings

Whether providing passive fire protection from the world class

FIRETEX® range, or high performance anti-corrosive coatings

solutions, Sherwin-Williams is committed to developing

and delivering innovative protective and marine coatings,

unparalleled service and expert specification support to

its customers.

The Sherwin-Williams Company was founded in 1866 in

Cleveland, Ohio by Henry Sherwin and Edward Williams.

Today, the company is a global leader in the development,

manufacture and sale of coatings and industrial related

products with approximately 33,000 employees and business

in 116 countries. With annual sales of more than $9 billion,

Sherwin-Williams is one of the largest coatings companies in

the world. In 2011, Sherwin-Williams acquired Leighs Paints

based in Bolton, UK which now trades under the name

Sherwin-Williams Protective & Marine Coatings.