Courtyard 2 7500 Jefferson St. NE Albuquerque, NM 87109-4335 www.bhinc.com voice: 505.823.1000 facsimile: 505.798.7988 TO: Patrick Chavez, PE Storm Water Quality Engineer DATE: 9/28/2020 REPORT NUMBER: 189 PROJECT NUMBER: 20190447 PROJECT: AMAFCA Lower Bear Tributary Water Quality Improvements LOCATION: Wyoming Blvd. to Spain. North of Arroyo Del Oso Park OWNER: AMAFCA PRIME CONTRACTOR: SUB-CONTRACTORS: AUI Inc. None PROJECT MANAGER: OBSERVER: David Perko Robert Carr DATE: Monday 9/28/2020 WEATHER: High: 86°F, Low: 46°F, Clear. Wind Speed: 8mph, Gusts: 15 mph CONTRACTOR HOURS: 7:00am - 4:30pm FIELD OBSERVATIONS: 8:30am to 12:30pm VISITORS ON SITE: None Reported SUB-CONTRACTORS ON SITE: Mans construction EQUIPMENT ON SITE: AUI Inc. 1 Bobcat Mini Excavator 1 Concrete Pump Truck Hernadez 1 Golden G700 Blade 1 John Deere 644K Loader 1 Kenworth 2500 Gallon Water Truck 1 Kubota SVL 75-2 Skidster 1 Volvo 45D Compactor Smooth Drum Vibratory PERSONNEL ON SITE: Mans construction 1 Foreman 1 Operator 1 Laborer AUI Inc. 1 Superintendent 1 Foreman 2 Concrete Finisher 6 Laborer 2 Carpenter WORK DESCRIPTION: Car-1 AUI set forms for 6' wide valley gutter at Sta.26+73 LT, also set forms for 4' wide valley gutter at Sta.25+09 LT. Concrete will be placed tomorrow. Also continued with rubbing the wall on both sides of the channel. AUI's crew: 2 carpenters, 1 laborer, 3 finishers. Car-2 Man's Construction backfilled bottom of channel Sta.23+25 to Sta.23+45. Man's crew: 1 foreman, 1 operator, 4 laborers. AUI cut out spall area sections on grade wall structure at Sta.21+57. AUI crew: 3 laborers. Car-3 AUI cut out spall area sections on grade wall structures at Sta.18+96. AUI crew 3 laborers. Car-4 AUI cut out spall area sections on grade wall structures at Sta.16+36. AUI crew 3 laborers.

Transcript of DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp...

Page 1: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988 

TO: Patrick Chavez, PEStorm Water Quality Engineer

DATE: 9/28/2020

REPORT NUMBER: 189

PROJECT NUMBER: 20190447

PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements

LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park

OWNER: AMAFCA

PRIME CONTRACTOR:

SUB-CONTRACTORS:

AUI Inc.

None

PROJECT MANAGER:OBSERVER:

David PerkoRobert Carr

DATE: Monday 9/28/2020 WEATHER: High: 86°F, Low: 46°F, Clear. WindSpeed: 8mph, Gusts: 15 mph

CONTRACTOR HOURS:7:00am - 4:30pmFIELD OBSERVATIONS:8:30am to 12:30pm

VISITORS ON SITE:

None Reported

SUB-CONTRACTORS ON SITE:

Mans construction

EQUIPMENT ON SITE:AUI Inc.

1 Bobcat Mini Excavator1 Concrete Pump Truck Hernadez1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory

PERSONNEL ON SITE:Mans construction

1 Foreman1 Operator1 Laborer

AUI Inc.1 Superintendent1 Foreman2 Concrete Finisher6 Laborer2 Carpenter

WORK DESCRIPTION:

Car-1

AUI set forms for 6' wide valley gutter at Sta.26+73 LT, also set forms for 4' wide valley gutter at Sta.25+09 LT. Concrete willbe placed tomorrow.Also continued with rubbing the wall on both sides of the channel.AUI's crew: 2 carpenters, 1 laborer, 3 finishers.

Car-2

Man's Construction backfilled bottom of channel Sta.23+25 to Sta.23+45.Man's crew: 1 foreman, 1 operator, 4 laborers.AUI cut out spall area sections on grade wall structure at Sta.21+57.AUI crew: 3 laborers.

Car-3

AUI cut out spall area sections on grade wall structures at Sta.18+96.AUI crew 3 laborers.

Car-4

AUI cut out spall area sections on grade wall structures at Sta.16+36.AUI crew 3 laborers.

Page 2: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

 

Page 3: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

IMAGES:

4' wide valley gutter Sta.25+09.

6' wide valley gutter Sta.26+73.

Page 4: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Car-2 spall repair for grade structure wall Sta.21+57.

Car-3 spall repair for grade structure wall Sta.18+96.

Page 5: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

COPIES [email protected]@[email protected]

REVIEWED9/29/2020

FIELD REPORT SIGNED9/29/2020

Page 6: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988 

TO: Patrick Chavez, PEStorm Water Quality Engineer

DATE: 9/29/2020

REPORT NUMBER: 190

PROJECT NUMBER: 20190447

PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements

LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park

OWNER: AMAFCA

PRIME CONTRACTOR:

SUB-CONTRACTORS:

AUI Inc.

None

PROJECT MANAGER:OBSERVER:

David PerkoRobert Carr

DATE: Tuesday 9/29/2020 WEATHER: High: 71°F, Low: 41°F, Clear. WindSpeed: 8mph, Gusts: 14 mph

CONTRACTOR HOURS:7:00am - 4:30pmFIELD OBSERVATIONS:8:30am to 12:30pm

VISITORS ON SITE:

None Reported

SUB-CONTRACTORS ON SITE:

Mans construction

EQUIPMENT ON SITE:AUI Inc.

1 Bobcat Mini Excavator1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory

PERSONNEL ON SITE:Mans construction

1 Foreman1 Operator4 Laborer

AUI Inc.1 Superintendent1 Foreman2 Concrete Finisher6 Laborer2 Iron Worker

WORK DESCRIPTION:

Car-1

AUI placed concrete for 6' wide valley gutter at Sta.26+73 LT and 4' wide valley gutter at Sta.25+09 LT.BHI testing lab sampled concrete for valley gutters, concrete met job specifications.AUI crew: 2 concrete finishers, 1 laborer.AUI installing reinforcement for 6' curb to bottom of channel LT & RT.AUI crew: 1 foreman, 2 iron workers, 4 laborers.Man's Construction rubbing walls on north side of channel.Man's crew: 2 laborers.

CAR-3

Man's Construction remove previously placed erosion gravel on RT side of channel. Man's crew: 1 foreman, 2 operators.

 

Page 7: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

IMAGES:

Car-1 reinforcement for 6" curb.

6' wide valley gutter Sta.26+73.

Page 8: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Car-2 grade structure wall repair Sta.21+57.

Car-3 grade structure wall repair Sta.18+96.

Page 9: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Car 4 grade structure wall repair Sta.16+36.

COPIES [email protected]@[email protected]

REVIEWED9/30/2020

FIELD REPORT SIGNED9/29/2020

Page 10: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988 

TO: Patrick Chavez, PEStorm Water Quality Engineer

DATE: 9/30/2020

REPORT NUMBER: 191

PROJECT NUMBER: 20190447

PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements

LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park

OWNER: AMAFCA

PRIME CONTRACTOR:

SUB-CONTRACTORS:

AUI Inc.

None

PROJECT MANAGER:OBSERVER:

David PerkoRobert Carr

DATE: Wednesday 9/30/2020 WEATHER: High: 76°F, Low: 44°F, Clear. WindSpeed: 5mph, Gusts: 6 mph

CONTRACTOR HOURS:7:00am - 4:30pmFIELD OBSERVATIONS:8:30am to 12:30pm

VISITORS ON SITE:

None Reported

SUB-CONTRACTORS ON SITE:

Mans construction

EQUIPMENT ON SITE:AUI Inc.

1 Bobcat Mini Excavator1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory

PERSONNEL ON SITE:Mans construction

1 Foreman2 Operator3 Laborer

AUI Inc.1 Superintendent1 Foreman2 Concrete Finisher4 Laborer2 Iron Worker

WORK DESCRIPTION:

Car-1

AUI installing reinforcement and angle iron for concrete curb, Sta.24+52 to Sta.26+50.AUI crew: 2 foreman, 2 ironworkers, 2 carpenters, 4 laborers.Man's Construction continues rubbing walls.Man's crew: 3 laborers.

Car-3,4

Man's Construction continues clearing out around grade wall structures and working on slopes.Man's crew: 2 operators, 1 foreman.

Page 11: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

IMAGES:

Car-1 Installing reinforcement and angle iron for concrete curb.

COPIES [email protected]@[email protected]

REVIEWED10/2/2020

FIELD REPORT SIGNED9/30/2020

Page 12: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988 

TO: Patrick Chavez, PEStorm Water Quality Engineer

DATE: 10/1/2020

REPORT NUMBER: 192

PROJECT NUMBER: 20190447

PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements

LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park

OWNER: AMAFCA

PRIME CONTRACTOR:

SUB-CONTRACTORS:

AUI Inc.

None

PROJECT MANAGER:OBSERVER:

David PerkoRobert Carr

DATE: Thursday 10/1/2020 WEATHER: High: 86 °F, Low: 50°F, Clear. WindSpeed: 4mph, Gusts: 9 mph

CONTRACTOR HOURS:7:00am - 4:30pmFIELD OBSERVATIONS:8:30am to 12:30pm

VISITORS ON SITE:

None Reported

SUB-CONTRACTORS ON SITE:

Mans construction

EQUIPMENT ON SITE:AUI Inc.

1 Bobcat Mini Excavator1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory

PERSONNEL ON SITE:Mans construction

1 Foreman2 Operator3 Laborer

AUI Inc.1 Superintendent1 Foreman2 Concrete Finisher4 Laborer2 Iron Worker

WORK DESCRIPTION:

Car-1

AUI completed installing reinforcement and angle iron for 6" curb.AUI's crew: 1 foreman, 2 iron workers, 4 laborers, 3 carpenters.Man's construction completed rubbing the walls of the channel.Man's crew: 2 laborers.

Car-3

Man's Construction grading the bottom of channel and slopes, the mats should arrive on the job next week.Man's crew: 1 foreman, 2 operators, 1 laborer.

Page 13: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

IMAGES:

Car-1 North side of 6" curb with reinforcement and angle iron.

Car-1 showing angle iron bolts tied to reinforcement.

Page 14: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Car-3 grading of channel bottom and slopes.

COPIES [email protected]@[email protected]

REVIEWED10/2/2020

FIELD REPORT SIGNED10/2/2020

Page 15: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

Courtyard 27500 Jefferson St. NEAlbuquerque, NM87109-4335www.bhinc.comvoice: 505.823.1000facsimile: 505.798.7988 

TO: Patrick Chavez, PEStorm Water Quality Engineer

DATE: 10/2/2020

REPORT NUMBER: 193

PROJECT NUMBER: 20190447

PROJECT: AMAFCA Lower Bear Tributary Water QualityImprovements

LOCATION: Wyoming Blvd. to Spain. North of Arroyo DelOso Park

OWNER: AMAFCA

PRIME CONTRACTOR:

SUB-CONTRACTORS:

AUI Inc.

None

PROJECT MANAGER:OBSERVER:

David PerkoRobert Carr

DATE: Friday 10/2/2020 WEATHER: High: 80°F, Low: 49°F, Clear. WindSpeed: 9mph, Gusts: 11 mph

CONTRACTOR HOURS:7:00am - 4:30pmFIELD OBSERVATIONS:8:30am to 12:30pm

VISITORS ON SITE:

None Reported

SUB-CONTRACTORS ON SITE:

Mans construction

EQUIPMENT ON SITE:AUI Inc.

1 Bobcat Mini Excavator1 Golden G700 Blade1 John Deere 644K Loader1 Kenworth 2500 Gallon Water Truck1 Kubota SVL 75-2 Skidster1 Volvo 45D Compactor Smooth DrumVibratory

PERSONNEL ON SITE:Mans construction

0 Foreman0 Operator0 Laborer

AUI Inc.1 Superintendent1 Foreman4 Concrete Finisher4 Laborer

WORK DESCRIPTION:

Car-1

AUI placed 15 cubic yards of concrete for 6" curb.Testing lab on site to test two trucks, which met job site requirements.AUI's crew: 1 foreman, 4 finishers, 4 laborer's.Man's Construction not on site.

Page 16: DUG -HIIHUVRQ6W 1( $OEXTXHUTXH 10 ZZZ EKLQF FRP · 2 days ago · &23,(672 mrhd#dxllqf frp pduvkdooy#dxllqf qhw sfkdyh]#dpdifd ruj 5(9,(:(' ),(/'5(32576,*1('

IMAGES:

Car-1 reinforcement and angle iron installed, All debris was washed away from 6" curb area.

COPIES [email protected]@[email protected]

REVIEWED10/5/2020

FIELD REPORT SIGNED10/2/2020