Duct, Trench & Easement - Newpark
Transcript of Duct, Trench & Easement - Newpark
/ / / / / / / / / / / / / / / / / / / / / / / / / / /
/
//
//
//
//
//
/
//
//
//
//
//
/
/////
//
//
//
//
//
/
//
//
//
//
//
/
//
//
//
//
//
//
/
/
///////////////////////////////
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
36127
36126
36132
938661
938638
938637
938636
938631
938633
938632
938634
938635
938642
9386
43
938644
938645
938647
938646
9386
499386
48
9386
50
938651
938658
9386
57
9386
56
938655
938659
938660
938663
9386
62
9386
65
9386
64
938671
938691
938692
938694
938695
938725
9387
24
938727
938728
938729
2029
2028
2026
20272025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015
2405
2404
2403
2402
24012014201320122011201020092008200720062005200420032002
2001
20522030 2031 2032
2034 2035 2036 2037 20382406
2407
2408
2409
203920402041
2051
20502049 2048 2047
2045 2044 2043 2042
2410
2411
2412
2413
2067
20662065
20682069
20642063
2070207120722074207520762077207820792080
2082
2081
2084
2116
2115
2085 2086 2087 2088 2089 2090 2091 20922094 2095 2096 2097 2098 2099
2414
2415
2416
2417
210021012102210321042105
210621072108210921102111211221132114
2117
2146
2145
21442143 2142 2141 2140 2139 2138
21372136
2135 2134 21332132
2131
2421
2420
2419
241821302129
21282127212621252124
212321222121212021192118
2147
2169
2168
2148 2149 2150 2151 2152 21532154 2155
2156
21572158215921602161
2162
21632164
2166
2165
2167
2083
2053
2054 2055 2056 2057 2058 20592061 2062
2033
2046
2060
2073
2093
23522353 2354
2422
2351
2350
2423
2424
24252349
2356
2355
36014
S148894
1488
97
936900
9368
98
936899
148895
936901SU
ND
EW PAR
ADE
SUND
EW P
ARAD
E
PASSIONFLOWER STREET
SUN
DEW
PAR
ADE
SUN
DEW
PAR
ADE
GOODENIA STREET
TEATREE AVEN
UE
TWINE STREET
FREESIA STREET
ELDERBERRY STREET
MAYFLY AVENUE
MAYFLY AVENUE
PASSIONFLOWER STREET
BOLWARRA DRIVE
BOLWARRA DRIVE
SUN
DEW
PAR
ADE
McALISTER
PARAD
E
McALISTER
PARAD
E
McALISTER
PARAD
E
02
02
04
03
06
04
04
06
04
03
0303
02
06
02
0302
02
04
04
04
02
02
02
02
04
06
04
06
02
04
04
02
02
02
02
04
06
0202 02
02
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
06
S149787
149781
149780
S149779
S149
785
1497
84
1497
83
149788
1497
90
1497
91
S149786
149795
149796
1497
98S149
79914
9800
149793
S149794
149792
S149802
149812
S149803
149804
149805
S149
807
1498
08
1498
09
S149801
149811 149813
S149814
S149873
149872
149822
1498
18
S149
816
1498
17
149821
1498
19
149820
S149810
1498
24
1498
23
S149827
//
//
/////
04
2355
149779A
938630
17W
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
5960
61
127 128
129
131
132
133
134
135136
143
147148
149
150
151
152
153
154
155
156
157
158
159 160
161
233
355
203
359
355
5
201
31972
20
169
1
4
3
2
5
68
4
1
178
17
9
18
23
21
19
4
6
8
10
15
13
11
3
5
7
9
4
6
8
1
7
5
3
3
5
7
8
10
12
14
16
11881188
887738
802
2029
2028
2026
20272025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015
2405
2404
2403
2402
24012014201320122011201020092008200720062005200420032002
2001
20522030 2031 2032
2034 2035 2036 2037 20382406
2407
2408
2409
203920402041
2051
20502049 2048 2047
2045 2044 2043 2042
2410
2411
2412
2413
2067
20662065
20682069
20642063
2070207120722074207520762077207820792080
2082
2081
2084
2116
2115
2085 2086 2087 2088 2089 2090 2091 20922094 2095 2096 2097 2098 2099
2414
2415
2416
2417
210021012102210321042105
210621072108210921102111211221132114
2117
2146
2145
21442143 2142 2141 2140 2139 2138
21372136
2135 2134 21332132
2131
2421
2420
2419
241821302129
21282127212621252124
212321222121212021192118
2147
2169
2168
2148 2149 2150 2151 2152 21532154 2155
2156
21572158215921602161
2162
21632164
2166
2165
2167
2170
2191
2190
2189
2188 2187 2186 2185 2184 2183 2182 2181 2180
217921782177217621752174217321722171
21922193 2194 2195 2196 2197 2198 2199 2200 2201
220222032204220522062207220822092210
2211
2212
2213
22142215 2216 2217 2218 2219 2220
2221
2222
2223
22242225
222622272228222922302231
2233
2232
2235
2234
2258
2236 2237 2238 2239 2240 2241 22422243
2244
2245
2246
22472248
2249225022512252225322542255
2256
2257
2259
2283
2282
2281
2280
2279 2278 2277 2276 2275 2274 2273 2272
2271
2270
2269
2284
2300
2299
2298
2297
22962295 2294
22932292
2291
2360
229022882287
2289
22862285
2260 22612263 2264 2265 2266
2262
2267
2268
2083
2053
2054 2055 2056 2057 2058 20592061 2062
2033
2046
2060
2073
2093
23522353 2354
2422
2351
2350
2423
2424
24252349
23482426
24272347
23462428
2345
2344
2343
2342
2341
2340
2339
2338
2337
2336
2335
2334
2333
2332
2331
2429
2362
2301
2302 2303 2304 2305 2306 2307 2308
230923102311231223132314
2315
2316
2317
2318
23232322 2321 2320 2319
2324
2325
2326
2327
2328
2329
2330
2357
2358
2359
2361
2356
2355
2355
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
5960
61
62
63
64
65
66
67
68
69
70
71
7273
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
9293
94 95
96
97
9899
100
101
102
103
104
105
106
107
108
109 110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125126
127 128
129
130
131
132
133
134
135 136
137
143
144
145
146
147 148
149
150
151
152
153
154
155
156
157
158
159 160
161
162
163
164
165
166
167
168
169
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885DUCT, TRENCH & EASEMENT
505358 D1 5Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m
Michael Baranowski Michael Baranowski 20.03.2018.
This design complies with Endeavour Energy's relevant standards as current at thistime & as listed on the Endeavour Energy Accredited Service Provider's Internetsite. These standards include, but are not limited to:
· CP: Connection Policy,· EMS: Environmental Management Standard,· MCI: Mains Construction Instruction,· MDI: Mains Design Instruction,· PDI: Protection Design Instruction,· SDI: Substation Design Instruction,· SAD: Design Drawing Standard,· MMI: Mains Maintenance Instruction,· SMI: Substation Maintenance Instruction,· LDI: Public Lighting Electrical Design Element.·Additionally, where relevant, the design complies with AS/NZS7000 "Overhead LineDesign - Detailed Procedures" published by The Australian Standards.
Power Line Design Pty Ltd indemnifies Endeavour Energy for any loss or damageresulting from non-compliance of the design with the above standards.
Service Provider Number: 2486Name:
Signed:
Date:
DESIGN COMPLIANCE AND INDEMNITY
RICHMOND RD
ELARA BVD
Locality of Development
Continues Sheet 2- Top of Sheet 2
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Duct, Trench & EasementSite Plan
Scale 1:1000
WARNING A current services search of all
utilities must be carried out prior tothe commencement of works.
WARNINGExisting live electrical assets located
in this vicinity, appropriate safetyprecautions must be utilized.
WARNINGHigh Pressure Gas Assets in this
area. constructor to contact Jemenaon ph 1300 665 380 prior to the
commencement of works.
WARNINGTelstra assets in this area.
Constructor to contact Telstra onph 1800 653 935 prior to the
commencement of works.
VegetationVegetation to be cleared in
accordance with Endeavour Energy'sdocuments MMI0013 and EMS0004
"Vegetation Management".
PollutionRequirements of the environmentalprotection authority pollution control
legislation is to be strictly adhered to.
Final Ground LevelThe constructor is to confirm finished
ground level with the developer prior tothe commencement of construction.
Route LengthsAll route lengths are to be confirmed
on site by the constructor prior toordering materials.
Streetlight LV SupplyAll active conductors extending from
LV pillars to service streetlightcolumns to be fitted with a 16A in
line fuse.
Streetlight ColumnsAll streetlight columns are to be
installed 350mm from the propertyboundaries unless otherwise
indicated.
Proposed Ducts/ConduitsAll Proposed 125mm ducts / conduitsare to have a minimum 750mm cover.
(in accordance with MDI0028)
Service DuctsThe end of service ducts must not be
placed under proposed driveways.(Refer to Developers Representative
for details for details)
DBYD searches indicates the presence of serviceswithin the proposed work-site. The Level 1 ASP
/Constructor is to confirm the location of "all" servicesprior to the commencement of works.
Ref: 12159985 Date: 10 Apr 2017
DIAL BEFORE YOU DIG
Padmount SubstationEasement Requirements
The easement shall be flat & level over theentire easement area, and above the 1:100
year flood level.Services such as drains, piping or wiring are
not permitted to pass through either thesubstation easement or the ground below it.(Refer to MCI 0006, Section7.3.2 for details)
MARSDEN
PARK
ZONE
SUBSTATION
XYRoad Crossing Duct ConfigurationX =Number of 50mm Ducts,Y= Number of 125mm Ducts.
LEGEND
Existing Underground Cable/s
Existing Conduits (Ducts)
Install Proposed Conduits (Ducts)
High Voltage Trenching/ / / / /
Low Voltage Trenching
Street Light Trenching
Lay 40mm P.V.C. Service Conduits
Proposed Pillar Excavation Location
Existing Pillar Location
Proposed Column Excavation location- 5.5m Enlarged Base Column & 3.0m Eden Outreach- Type 2 Ragbolt (Type 2 Footing)- Colour Powder Coated Black
Existing Column
Establish Proposed Padmount Substation
Customer Connection Point (CCP)
Install Proposed Street Light Lantern-17W StreetLED Luminaries
Existing Street Light Lantern
Existing Padmount Substation
Proposed Column Excavation location- 10m Enlarged Base Column & 4.5m Eden Outreach- Type 2 Ragbolt (Universal Footing)- Colour Powder Coated Black
Install Proposed Street Light Lantern-82W LED Gerard V5 Luminaries
17W82W
McA
LIST
ER P
DE
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
15A Restriction Zone - Swimming Pools:A restriction zone on the use of land in relation to pools measured 5.0m from thepadmount substation easement and earth grid is to be created in favour ofendeavour energy within proposed lots 2027, 2025, 2084, 2085, 2421, 2131,2189, 2188, 2224, 2225, 2271, 2272, 2301,2302.
15A Restriction Zone - Fire Ratings of Buildings:A restriction zone on the use of land in relation to fire ratings of buildingsmeasured 3.0m from the padmount substation plinth is to be created in favour ofEndeavour Energy within proposed lots 2027, 2025, 2084, 2085, 2421, 2131,2189, 2188, 2224, 2225, 2271, 2272, 2301,2302.
15. Padmount Substation Easement - (Common Earthing):A minimum 5.5m x 2.75m easement for padmount substations is to be createdover proposed lots 2027, 2084, 2421, 2189, 2224, 2271 and 2301 in favour ofEndeavour Energy. This easement is a minimum size and in addition to thesubstation easement the following restriction zone requirements should bedocumented on the linen plan & 88b instrument. (Refer to Endeavour EnergyStandard MDI0044, Annexure 1 for Standard Easement Terms).
14. Existing Assets:Have all the existing assets been field checked and are accurate at the time ofdesign? YES
13. Telecommunications:Telecommunications assets are NOT effected by the proposed works.
12. Pollution Controls:All the requirements of the Environmental Protection Authority pollutioncontrol legislation is to be strictly adhered to.
11. Environmental Management plan:EMP EMS0001 is part of this design (refer to EIA for details).
10. Operational Limitations: Unless approved otherwise, interruption to any customer's supply must beavoided. the following alternatives should be considered: · mobile generators and substations,· live line work,· design alternatives,· low voltage parallels,· work practices/standards.the cost is to be funded by the customer/developer.
9. Reimbursements: Reimbursements will be paid to the nominated party on the letter of intent afterthe works have been competed and the letter of acceptance has been issued.The reimbursed amount is shown in the "Funding Arrangements for Scope ofWork table" . Any disagreement with the amount should be resolved withendeavour energy prior to the commencement of works.
8. WARNING: Live Endeavour Energy cables & other services in this area.Please contact "Dial Before You Dig" on telephone: 1100 for searches two daysprior to excavation.
7. ATTENTION:The preparation of this design has been undertaken giving due consideration tothe location of existing services. The Constructor is however responsible for theverification of services and permanent survey marks prior to the commencementof construction. No responsibility nor liability will be accepted by the designer fordamage to existing services as a result of this design.
6. ATTENTION:All services searches must be checked before construction.
5. ATTENTION:Permanent survey marks may exist in this area, these are to be located by asurveyor prior to commencement of work.
4. Accredited Service Provider to notify Endeavour Energy asset data customerdepartment daily when cable works is in progress. (ph. 131 081).
3. Design certification shall lapse where:
(i) notice of intent has not been received within six (6) months of this certification,or
(ii) construction has been interrupted for more than six (6) months.
where design certification has lapsed the design must be resubmitted forcertification by the accredited designer.
2. Endeavour Energy Contact Phone: 131081.
1. This drawing is to be read in conjunction with the relevant Endeavour EnergyNetwork Standards and Connection Policy.
NOTES
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
- North
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
Shaded lots 2401-2429 are to besupplied under URS20371(Newpark Precinct 2 - Stage 2)
URS19233 2017/00535/001
2001-2355,Residue Lot2357-2361 &
DrainageReserve 2356
355 Winten Property Group Tana Sainsbury(J Wyndham Prince Pty Ltd) (02) 4720 - 3319
C.A.P. No. File No. Lot Numbers No. of Lots Developer Developers Representative Contact No.
This Drawing Supplies 355 Lots (Subdivision of Lot 3, DP 1225885)
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Total (exc Road Crossings) 5503 m
Existing Ducts Replaced 193 m
Roadcrossing Trenching 1338 m
Street Light Trenching 313 m
Low Voltage Trenching 2196 m
High Voltage Trenching 1463 m
Trench Length
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18
//
//
/
//
//
//
//
//
/
/ / / / / / / / / / / / / / / / / / / / / /
//
//
//
//
//
//
//
//
//////
/
/////////
/
//
//
//
//
//
//
//
//
//
/
//////////////////////
//
/
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
17W
36128
36129
36130BA
RE
EAR
TH
INSU
LATE
D E
ARTH
S141338
141335
S141334
938688
920019
920021
919989
141301
920020
920031938704
938708
938673
938672
938674
938675
938676
938677
938678
938679
938681
938680938682
938683
938684
938685
938687
938686
938689
938690
938693
938694
938695
938696
9386
98
938697
9386
99 9387
00 9387
01
9387
02
938703
938706
938707938705
938726
938732
938733
34945
215721582160
21632164
2166
2165
2170
2191
2190
2189
2188 2187 2186 2185 2184 2183 2182 2181 2180
217921782177217621752174217321722171
21922193 2194 2195 2196 2197 2198 2199 2200 2201
220222032204220522062207220822092210
2211
2212
2213
22142215 2216 2217 2218 2219 2220
2221
2222
2223
22242225
222622272228222922302231
2233
2232
2235
2234
2258
2236 2237 2238 2239 2240 2241 22422243
2244
2245
2246
22472248
2249225022512252225322542255
2256
2257
2259
2283
2282
2281
2280
2279 2278 2277 2276 2275 2274 2273 2272
2271
2270
2269
22842290
228822872289
22862285
2260 22612263 2264 2265 2266
2262
2267
2268
2351
2350
2423
2424
24252349
23482426
24272347
23462428
2345
2344
2343
2342
2341
2340
2339
2338
2337
2336
2335
2334
2333
2332
2331
2429
2362
2361
148895
S148896
936903
936901
936902
919990
S141338
34994
920021
TWINE STREET
TEATREE AVEN
UE
GECKO STREET
HERON AVENUE
TEATREE AVEN
UE
THORNBILL STREET
TEATREE AVEN
UE
MILNES PARADE
STARLING STREET
STARLING STREET
SUN
DEW
PAR
ADE
SUN
DEW
PAR
ADE
SUN
DEW
PAR
ADE
SUN
DEW
PAR
ADE
SUNDEW PARADE
McALISTER
PARAD
EM
cALISTER PAR
ADE
McALISTER
PARAD
E
RESIDUE LOT
RESIDUE LOT
04
02
06
0202 02
02
06
0403
0202 04
02
02
02
0204
02
02
0202
02
06 03
06
03
06
04
0302
02
02
02
04
0203
17W
17W
17W
17W
17W
17W
17W
17W
141336
149872
1498
24
1498
23
S149825
S149826
S149827
S149832
149833
1498
30 S149
828
1498
29
S149831
1498
36
149838
1498
35
S149
834
149839
149871
149870
149869
S149868
149867
S149866
S149840
149845
149852
S149
841
1498
42
149844
S149837
149843
1498
47
S149
846
149851
149849
149848
S149
854
S149
853
149857
S149856
149850
10.5m
7.5m
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
9293
9495
96
97
9899
100
101
102
103
104
105
106
107
108
109 110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125126
127 128
129
130
131
132
133
134
137
143
146
147148
149
150
151
162
163
164
165
233
355
203
359
355
5
201
31972
20
169
1
4
3
2
5
68
4
1
178
17
9
18
23
21
19
4
6
8
10
15
13
11
3
5
7
9
4
6
8
1
7
5
3
3
5
7
8
10
12
14
16
11881188
887738
802
2029
2028
2026
20272025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015
2405
2404
2403
2402
24012014201320122011201020092008200720062005200420032002
2001
20522030 2031 2032
2034 2035 2036 2037 20382406
2407
2408
2409
203920402041
2051
20502049 2048 2047
2045 2044 2043 2042
2410
2411
2412
2413
2067
20662065
20682069
20642063
2070207120722074207520762077207820792080
2082
2081
2084
2116
2115
2085 2086 2087 2088 2089 2090 2091 20922094 2095 2096 2097 2098 2099
2414
2415
2416
2417
210021012102210321042105
210621072108210921102111211221132114
2117
2146
2145
21442143 2142 2141 2140 2139 2138
21372136
2135 2134 21332132
2131
2421
2420
2419
241821302129
21282127212621252124
212321222121212021192118
2147
2169
2168
2148 2149 2150 2151 2152 21532154 2155
2156
21572158215921602161
2162
21632164
2166
2165
2167
2170
2191
2190
2189
2188 2187 2186 2185 2184 2183 2182 2181 2180
217921782177217621752174217321722171
21922193 2194 2195 2196 2197 2198 2199 2200 2201
220222032204220522062207220822092210
2211
2212
2213
22142215 2216 2217 2218 2219 2220
2221
2222
2223
22242225
222622272228222922302231
2233
2232
2235
2234
2258
2236 2237 2238 2239 2240 2241 22422243
2244
2245
2246
22472248
2249225022512252225322542255
2256
2257
2259
2283
2282
2281
2280
2279 2278 2277 2276 2275 2274 2273 2272
2271
2270
2269
2284
2300
2299
2298
2297
22962295 2294
22932292
2291
2360
229022882287
2289
22862285
2260 22612263 2264 2265 2266
2262
2267
2268
2083
2053
2054 2055 2056 2057 2058 20592061 2062
2033
2046
2060
2073
2093
23522353 2354
2422
2351
2350
2423
2424
24252349
23482426
24272347
23462428
2345
2344
2343
2342
2341
2340
2339
2338
2337
2336
2335
2334
2333
2332
2331
2429
2362
2301
2302 2303 2304 2305 2306 2307 2308
230923102311231223132314
2315
2316
2317
2318
23232322 2321 2320 2319
2324
2325
2326
2327
2328
2329
2330
2357
2358
2359
2361
2356
2355
2355
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
5960
61
62
63
64
65
66
67
68
69
70
71
7273
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
9293
94 95
96
97
9899
100
101
102
103
104
105
106
107
108
109 110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125126
127 128
129
130
131
132
133
134
135 136
137
143
144
145
146
147 148
149
150
151
152
153
154
155
156
157
158
159 160
161
162
163
164
165
166
167
168
169
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885DUCT, TRENCH & EASEMENT
505358 D2 5Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m
Continues Sheet 3- Top of Sheet 3
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Duct, Trench & EasementSite Plan
Scale 1:1000
Continues Sheet 1- Bottom of Sheet 1
RICHMOND RD
ELARA BVD
Locality of Development
MARSDEN
PARK
ZONE
SUBSTATION
XYRoad Crossing Duct ConfigurationX =Number of 50mm Ducts,Y= Number of 125mm Ducts.
LEGENDExisting Underground Cable/s
Existing Conduits (Ducts)
Install Proposed Conduits (Ducts)
High Voltage Trenching/ / / / /
Low Voltage Trenching
Street Light Trenching
Lay 40mm P.V.C. Service Conduits
Proposed Pillar Excavation Location
Existing Pillar Location
Proposed Column Excavation location- 5.5m Enlarged Base Column & 3.0m Eden Outreach- Type 2 Ragbolt (Type 2 Footing)- Colour Powder Coated Black
Existing Column
Establish Proposed Padmount Substation
Customer Connection Point (CCP)
Install Proposed Street Light Lantern-17W StreetLED Luminaries
Existing Street Light Lantern
Existing Padmount Substation
Proposed Column Excavation location- 10m Enlarged Base Column & 4.5m Eden Outreach- Type 2 Ragbolt (Universal Footing)- Colour Powder Coated Black
Install Proposed Street Light Lantern-82W LED Gerard V5 Luminaries
17W82W
McA
LIST
ER P
DE
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
- Central
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
BShaded lots 2401-2429 are tobe supplied under URS20371
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18
/
/
//////////////////////
//
//
//
//
//
/
/
/
/ / / /
17W
17W
17W
17W
17W
17W
17W
82W
82W
17W
82W
82W
82W
82W
17W
OLEA ST
36131
ELARA BVD
ELARA BVD
938708
938681
938680938682
938683
938709
9387
10 9387
11 9387
12
938713
9387
21
938715
938716
938718
938717
9387
23
15m
802
2280
2284
2300
2299
2298
2297
22962295 2294
22932292
2291
2360
229022882287
2289
22862285
2301
2302 2303 2304 2305 2306 2307 2308
230923102311231223132314
2315
2316
2317
2318
23232322 2321 2320 2319
2324
2325
2326
2327
2328
2329
2330
2357
2358
2359
RESIDUE LOT
RESIDUE LOT
RESIDUELOT
RESIDUE LOT
MILNES PARADE
SUN
DEW
PARAD
E
HOOKINS AVENUE
ELARA BVD
ELARA BVD
SUN
DEW
PARAD
E
PRATIA CRESCENT
04
0203
04
06
02
04
06
04
03
02
17W
17W
82W
17W
15m
938720
82W
938722
9387
19
S149
854
S149
853
149857
S149856
149855
S149860
149861
S149859
149858
149864
149863
S149
862
149865
32.0m
//
//
//
//
/ / / / /
/ / / / / / ///
/ / /938714
2627
62
63
64
65
66
67
68
69
70
71
7273
74
75
76
77
78
79
80
81
144
145
166
167
168
169
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885DUCT, TRENCH & EASEMENT
505358 D3 5Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
N
SCALE 1:100010m0m 20m 30m 40m 50m 60m 70m 80m 90m 100m
XYRoad Crossing Duct ConfigurationX =Number of 50mm Ducts,Y= Number of 125mm Ducts.
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Duct, Trench & EasementSite Plan
Scale 1:1000
LEGENDExisting Underground Cable/s
Existing Conduits (Ducts)
Install Proposed Conduits (Ducts)
High Voltage Trenching/ / / / /
Low Voltage Trenching
Street Light Trenching
Lay 40mm P.V.C. Service Conduits
Proposed Pillar Excavation Location
Existing Pillar Location
Proposed Column Excavation location- 5.5m Enlarged Base Column & 3.0m Eden Outreach- Type 2 Ragbolt (Type 2 Footing)- Colour Powder Coated Black
Existing Column
Establish Proposed Padmount Substation
Customer Connection Point (CCP)
Install Proposed Street Light Lantern-17W StreetLED Luminaries
Existing Street Light Lantern
Existing Padmount Substation
Continues Sheet 2- Bottom of Sheet 2
Proposed Column Excavation location- 10m Enlarged Base Column & 4.5m Eden Outreach- Type 2 Ragbolt (Universal Footing)- Colour Powder Coated Black
Install Proposed Street Light Lantern-82W LED Gerard V5 Luminaries
17W82W
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
- South
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Replace Existing HV & LV Conduits (Ducts)/ / / / /
Existing Conduits & Cables to be RaisedRefer to Electrical Reticulation Drawing No. 505359D
Note on Sheet 3 of 22 for details .
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18
HV
LV
3.0m
5.0m
"B""C"
"A" *
FREESIA STREET
LOT 2027
LOT 2025
PRO
PER
TY B
OU
ND
ARY
0.91
5m
1.41
5m
0.7m0.7m
PMS
PLIN
TH(3
.17
x 1.
35m
)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
EASE
MEN
T FO
R A
CC
ESS
0.9m
HV
LV
3.0m
5.0m
"B" "C""A"
*
PASSIONFLOWER STREET
LOT 2085
LOT 2084
PRO
PER
TY B
OU
ND
ARY
0.91
5m
1.41
5m
0.7m 0.7m
PMS PLIN
TH(3.17 x 1.35m
)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
EASE
MEN
T FO
R A
CC
ESS
0.9m
HV
LV
3.0m
5.0m
"B""C"
"A" *
GOODENIA STREET
LOT 2131 LOT 2421
PRO
PERTY BO
UN
DAR
Y
0.91
5m
1.41
5m
0.7m0.7m
PMS
PLIN
TH(3
.17
x 1.
35m
)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
159
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885DUCT, TRENCH & EASEMENT
505358 D4 5Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36132
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
DUCT END LOCATION DETAIL
GROUND LEVEL
300m
m
DEVELOPER TO ATTACHPVC MARKER TAPE
TO DUCT END
TYPICAL ROAD CROSSING CONFIGURATION
Dimensions are in Millimetres
900m
m
℄-6
00m
m
900mm
900mm
Kerb Line
Property Line
Boundary
RoadcrossingDucts
900mm
600m
m
900m
m
Cable Trench
℄-600mmBoundary
Property Line
Road
Roadcrossing
Ducts
PMS
Roa
d
Prop
erty
Bou
ndar
y
HVØ81
HVØ81
SpareØ125
SpareØ125LV
Ø55LV
Ø55
C SLG
TØ100
725
880
1050
1100
350℄
600 450
690 820 960
75
50
25Minimum depth for HV
electrical services (750)
Minimum depth for gas &LV electrical services (600)
Minimum depth forTelco services (450)
Final Ground Level
TYPICAL TRENCH CROSS SECTION(Refer to Technical Bulletin -0105c for further details)
All dimensions in millimetres
5050
G
C
SL
Consumers Conduit (Ø40mm)
Streetlight Conduit (Ø50mm)
Gas Pipe (Ø50mm)
Telecommunications Duct
TØ100
Col
umn
Cen
trelin
e
100
150
1340 1640
300
MinimumSeparation (Telco's)
MinimumSeparation (Gas)
MinimumSeparation (HV)
MinimumSeparation (LV)
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36126
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36127
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
Temperary Easement Requiredfor Lot 2421 till Stage 2 design is
completed under URS20371.
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18
HV
LV
3.0m
5.0m
"B""C"
"A" *
GECKO STREET
LOT 2189LOT 2188
PRO
PERTY BO
UN
DAR
Y
0.915m
1.415m
0.7m
0.7m
PMS
PLIN
TH
(3.1
7 x
1.35
m)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
EASEMEN
T FOR
ACC
ESS
0.9m
122
HV
LV
3.0m
5.0m
"B""C"
"A" *
THORNBILL STREET
LOT 2225
LOT 2224
PRO
PERTY BO
UN
DAR
Y
0.915m
1.415m
0.7m
0.7m
PMS
PLIN
TH
(3.1
7 x
1.35
m)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
HV
LV
3.0m
5.0m
"B""C"
"A" *
MILNES PARADE
LOT 2272
LOT 2271
PRO
PERTY BO
UN
DAR
Y
0.915m
1.415m
0.7m
0.7m
PMS
PLIN
TH
(3.1
7 x
1.35
m)
PROPERTY BOUNDARY
PMS
EASE
MEN
T
(5.
5x 2
.75m
)
HV
LV
3.0m
5.0m
"B"
"C"
"A"*
HOOKINS AVENUE
LOT 2302
LOT 2301
EASEMEN
T FOR
ACC
ESS
0.915m
1.415m
0.7m
0.7m
PMS PLIN
TH
(3.17 x 1.35m)
PROPERTY BOUNDARY
PMS EASEM
ENT (5.5x 2.75m
)
PRO
PERTY BO
UN
DAR
Y
1.5m
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885DUCT, TRENCH & EASEMENT
505358 D5 5Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
Signature: Date:
Works Completed:
Signature: Date:
Inspected By:
I:
Contact No:
of:
Hereby certify that assets marked as-built on this drawing have been recorded in accordance with Endeavour Energy's Standard SAD 004.
Signature: Date:
WORKS COMPLETED / FIELD BOOK
ASSET RECORDING
Constructed By:
This Certification is issued subject to Endeavour Energy'sStandard Certification Terms.
Amendment:
Date Approved:
Examiner's Signature:
Print Name:
CERTIFIED BY ENDEAVOUR ENERGY
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36129
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36130
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36128
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
A. Padmount substation easement 2.75m x 5.5m, centred aroundthe substation plinth except for 0.25m offset toward the HV end.
B. Restriction on the use of land in relation to the fire rating ofbuildings measured 3.0m from substation plinth.
C. Restriction on the use of land in relation to the swimming poolsmeasured 5.0m from substation easement.
* Substation Plinth 1.35m x 3.17m at top of concrete.(all offsets to plinth shown from top of concrete)
Easement & Restriction Zones DimensionsPMS No. 36131
Based on Common Earthed Substation(Refer to project notes 15A, 15B and 15C for details)
N
DUCT END LOCATION DETAIL
GROUND LEVEL
300m
m
DEVELOPER TO ATTACHPVC MARKER TAPE
TO DUCT END
TYPICAL ROAD CROSSING CONFIGURATION
Dimensions are in Millimetres
900m
m
℄-6
00m
m
900mm
900mm
Kerb Line
Property Line
Boundary
RoadcrossingDucts
900mm
600m
m
900m
m
Cable Trench
℄-600mmBoundary
Property Line
Road
Roadcrossing
Ducts
PMS
Roa
d
Prop
erty
Bou
ndar
y
HVØ81
HVØ81
SpareØ125
SpareØ125LV
Ø55LV
Ø55
C SLG
TØ100
725
880
1050
1100
350℄
600 450
690 820 960
75
50
25Minimum depth for HV
electrical services (750)
Minimum depth for gas &LV electrical services (600)
Minimum depth forTelco services (450)
Final Ground Level
TYPICAL TRENCH CROSS SECTION(Refer to Technical Bulletin -0105c for further details)
All dimensions in millimetres
5050
G
C
SL
Consumers Conduit (Ø40mm)
Streetlight Conduit (Ø50mm)
Gas Pipe (Ø50mm)
Telecommunications Duct
TØ100
Col
umn
Cen
trelin
e
100
150
1340 1640
300
MinimumSeparation (Telco's)
MinimumSeparation (Gas)
MinimumSeparation (HV)
MinimumSeparation (LV)
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18
Substations
Underground
Overhead
General
5 6
Local Government Area
7 8
CheckedHV OP Diagram
UBD/Penguin Ref No.
HV Switching
AM Project. No.
CAP / SAMP No.Work Orders
GIS Map No.Drawn
Date
Design
9 10
DO NOTSCALE
11
Sheet No of Sheets
12
A1
H
G
F
E
D
C
87 109 1211
H
AAM
END
MEN
TS
Orig
inal
Issu
e
G
F
E
D
C
B
A
652 431
2 431
B
A
C THIS DRAWING AND THE
COPYRIGHTTHEREIN IS THEPROPERTY OF
ENDEAVOUR ENERGY ANDMAY NOT BE COPIED,REPRODUCED,DISTRIBUTED, LOANED ORUSED WITHOUT THEWRITTEN CONSENT OFENDEAVOUR ENERGY
TEM
PLAT
E VE
RSI
ON
No.
DIMENSIONSIN
METRES
ORIGINALSCALE
Reference Drawings RICHMOND ROADMARSDEN PARK
URS19233RESIDENTIAL SUBDIVISION
LOT 3 DP 1225885WAE, DUCT, TRENCH & EASEMENT
505358 D1 1Michael.j.B
Z MOORE
20.03.2018
1:1000
URS19233
2017/00535/001
C11 126
U82674
MARSDEN PARK
BLACKTOWN CITY
URS17427 500805A RETIC
URS17428 500803A RETIC
URS18956 504827A RETIC
URS17974 502648A RETIC
60747
4.3
Michael.j.B
POWER LINE DESIGN PTY LTDPO BOX 338 Mittagong NSW 2575
Ph (02) 4872 1920 Fax (02) 4872 1240Accredited Designer Number 2486 / ABN: 33107 591 846
THE PREPARATION OF THIS DESIGN HAS BEENUNDERTAKEN GIVING DUE CONSIDERATION TO THE
EXISTING SERVICES. THE PROJECT CONSTRUCTOR ISWHOLLY RESPONSIBLE FOR VERIFYING THE EXACT
LOCATION OF EXISTING SERVICES AND PERMANENTSURVEY MARKS PRIOR TO COMMENCING
CONSTRUCTION. NO RESPONSIBILITY OR LIABILITYWILL BE ACCEPTED BY THE DESIGNER OF THIS
PROJECT FOR DAMAGE TO EXISTING SERVICES AS ARESULT OF THIS DESIGN.
NUL0572 500653A RETIC
URS16140 408751A RETIC
URS14178 388896C RETIC
URS18495 503195A RETIC
URS19233 505359D RETICB23
.10.
2017
CH
ANG
E TO
STA
GIN
GPL
AN 1
& 2
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
C20
.12.
2017
REM
OVE
STA
GE
2 FR
OM
DES
IGN
DR
AWN
: Z M
OO
RE
CH
K'D
: M J
B
D20
.03.
2018
Exis
ting
duct
s on
Ela
ra B
vdre
plac
ed a
t cor
rect
dep
thD
raw
n: J
.AC
hk'd
: M.J
.B
Hereby certify that the ducts shown on this drawing have beeninstalled inaccordance with this drawing & Endeavour EnergyStandards MDI0028 & MCI0006. The duct depths and locations ateach end have been correctly marked on this drawing as perEndeavour Energy standard SAD0004.
Land Surveyor registered under Surveying & Spatial Information ACT 2002A.
I:
DUCT DECLARATION
of
Contact Number:
Commenced on:
& completed on:
Signature:
The installation of the ducts was
Malcolm HarveyDaracon
02 4974 9200
9/11/1715/1/18