Duck last

15
By Project Process Selection

Transcript of Duck last

Page 1: Duck last

By

Project Process Selection

Page 2: Duck last

Manufacturing process sequence

Page 3: Duck last

2.1 What is your primary process? Why did you choose this process?

Primary process is Wire drawing because we want to create a structure for each part. Before increase the strength.

Page 4: Duck last

• What is your secondary process? Why did you choose this process?

Similar hand lay-up process. It is The resin applied by hand. Wire frame covered with a cloth before applying resin stents to increase the strength.

Page 5: Duck last

• What is your tertiary process? Why did you choose this process?

Circuit process because the speaker must be connected to a battery source.

The assembly process by gluing.

And painting for decorate.

Because it is the process to assemble a complete piece of work.

Page 6: Duck last

2.2 Product function

Page 7: Duck last

With your selected material, how is your material compatible with

product geometry and manufacturing processes?

The resin material is selected which this resin is a polymer that is used to increase the stiffness of the structure of Labour.By making a wire frame, then use a shawl. Next, use the resin coating the surface.

It is easy to make different shapes.

Page 8: Duck last

What is the normal applied load to the material? Can your material take such load?

Because our products without a key chain. It was a impact for some time. So these materials are strong enough. Because plastic resins properties have high strength. Impact resistance as well.When it can’t changes shape when it hardens and forms a shape.

Page 9: Duck last

What is the normal ambient conditions to your material?

• We do not produce material for a particular load.It usually only hanging bag.But what should be a circuit which is to be fully engaged with the material for durability.

Page 10: Duck last

With your selected manufacturing process, how is your process compatible with the product

geometry?

The selection process for a piece of the curve. The shape depends on the bending wire into different shapes.

Page 11: Duck last

- Show a calculation to obtain the total cost per part of your product

Page 12: Duck last

• Total manufacturing cost (TMC) = Material (M) + Tooling (T) + Processing (P)

• Material (M)

• cw = material cost per unit weight

• wp = weight of finished part

• ww= weight of wasted material, scrap

• a = ratio of wasted material weight / finished weight

• = ww / wp

• Then the material cost per part, cM is

Page 13: Duck last

cM = cw wp (1+ a)

Page 14: Duck last

a= Ww/Wp=0.01kg/0.25=0.04

cM = (100 bath/kg)x(0.25kg/part)x(1+0.04)

= 26 bath/part (head and body)

Steel wire head 2 bath

Body 10 bath

Legs 3 bath total =15

Page 15: Duck last

So Material (M) cost= 26+15= 41 bath

And Other devicesLoudspeaker 50 bathFlashlight 30 bath

Battery 20 bath

Total manufacturing cost (TMC) = 41+50+30+20 bath= 141 bath