BURNING OF COAL IN A THERMAL POWER STATION
• Heat of coal generates steam in the Boiler which is fed to the steam
Turbine coupled with the Generator for ‘ GENERATION OF
ELECTRIC POWER’.
• It leaves behind huge quantities of residue called as ASH.
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 4/23
• FURNACE BOTTOM ASH
• ECONOMISER COARSE ASH• FLY ASH
TO
CHIMNEY
BOILER
BUNKER
BOTTOM ASH COARSE ASHFLY ASH
ESP+APH
HOPPERS
ECO
HOPPERS
MILLING SYSTEM
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 5/23
POWER GENERATION IN A THERMAL POWER STATIONIS DIRECTLY AFFECTED BY:
• The coal supply
• Ash Evacuation from the Boiler / Hoppers
•The Milling plant performance / Availability
•Main plant & auxiliary equipments performance/Availability
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 6/23
CLASSIFICATION OF ASH HANDLING SYSTEM
A) Operation duty• Operating Continuously
• Operating Intermittently
B) Method of Handling
• Wet Disposal System• Dry Disposal System
C) Means of Handling
•Pipe Lines
• Belt Conveyors
• Trucks / Mobile Equipments
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 7/23
TO REDUCE LAND & WATER REQUIREMENT
TO MINIMISE UNDERGROUND WATER & SURROUNDINGWATERWAYS POLLUTION
TO FACILITATE UTILISATION OF ASH IN BULK QUANTITIES
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 8/23
The fly ash is evacuated from fly ash hoppers & transported to ash
Storage Silos in two steps
> From the ESP & APH Hoppers to Buffer Hoppers throu
‘ VACUUM SYSTEM’.
> From Buffer Hoppers to ash storage Silos thro ‘PRESSURE
SYSTEM’.
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 9/23
TACs 1,2,3
FA LINES 1,2 TO ASH SILOs
BUFFER HOPPERS 1A/2A
VACUUM PUMPS
1A/2A
APH HOPPERS
A1
A7
A8
A14
FLY ASH ESP HOPPERS
PASS-ATOTAL ESP HOPPERS/PASS =28 NOs.
•EACH PASS HAVING 4 VAC LINES
•EACH VAC LINE HAVING 7 HOPPERS
•APH HOPPERS ARE CONNECTED TO
PASS B AND C
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 10/23
BUFFER HOPPER
Pr.COLLECTORSEC. COLLECTOR
TAC LINE # 1
TAC LINE # 2
VAC P/P
FROM ESP HOPPERS
BAG FILTERS
BHVIV
DASV
PCVEV
PCPEV
SCVEV
SCPEV
PCUDG
PCLDG
SCUDG
SCLDG
AIR LOCK TANKS
ALTUG ALTUG
ALTLGALTLG
FROM TAC LINESFROM TAC LINES
3-WAY V/V 3- WAY V/V
TO ESP DUCT
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 11/23
REAL TIME SEQUENTIAL OPERATION
T
I
MTIME (SEC) PCVEV PCPEV SCVEV SCPEV UDG LDG
0-60 OPEN CLOSE CLOSE OPEN OPEN CLOSE
65-125 CLOSE OPEN OPEN CLOSE CLOSE OPEN
ASH COLLECTION
(ESP HOPPERS TO BUFFER HOPPER VIA PR/SEC COLLECTORS)
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 12/23
OPERATION MODE
1. AUTO
MHV SELECTION MHV OPENING AND MHV CLOSING- ALL
OPERATIONS ARE PERFORMED IN AUTO DEPENDING ON
LINE VAC
2. MANUAL
MHV SELECTION IS WITH THE OPERATOR’S CHOICE
MHV SELECTION OPENING & CLOSING
LINE VAC 115 MMWC – SELECTED MHV CLOSING &
NEXT MHV SELECTION
LINE VAC 250 MMWC – SELECTED MHV OPENING
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 13/23
BUFFER HOPPER
TAC LINE # 1
TAC LINE # 2
AIR LOCK TANKS
ALTUG ALTUG
ALTLGALTLG
FROM TAC LINESFROM TAC LINES
3-WAY V/V 3- WAY V/V
TO ESP DUCT S/V
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 14/23
REAL TIME SEQUENTIAL OPERATION
REMOVAL OF ASH
(BUFFER TANK TO TAC LINES VIA AIR LOCK TANK)
TIME (SEC) 3-WAY Pr EQ. V/V ALTUG ALTLG
0-45 OPEN OPEN CLOSE
50-95 CLOSE CLOSE OPEN
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 15/23
FLY ASH EVACUATION – PROCESS (Contd.)
EACH UNIT HAS 4 BUFFER HOPPERS & TWO ASH TRANSPORT LINES.
ASH IS TRANSFERRED FROM VAC SYSTEM TO PRESSURESYSTEMWITH THE HELP OF PLCCONTROLLED UPPER GATE, LOWER.GATE & PRESSURE EQUALISING VALVES
EACH BUFFER HOPPER IS PROVIDED WITH PULSE JET CLEANEDBAG FILTERS TO SEPARATE ASH FROM CONVEYING AIR.
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 16/23
FLY ASH EVACUATION - PROCESS
FA HOPPERS ARE DIVIDED INTO GROUPS.
FA IS REMOVED FROM GROUPS IE ONE HOPPER FROM EACH GROUPSIMULTANEOUSLY IE ONE HOPPER FROM EACH GROUP AT A TIME.THRO’ PLC SYSTEM
VARYING LINE VACUUM IS USED TO CONTROL THE SYSTEM OPERATION
WHEN HOPPERS BECOME EMPTY VAC. FALLS AND THEN MHV CLOSES,
ANOTHER HOPPER IS SUBSEQUENTLY SELECTED.
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 17/23
A NO. OF PROTECTION / INTERLOCKS ARE PROVIDED FOR SYSTEM OPERATION.
3 SILOS FOR 2 UNITS OF 500 MW
SEG V/Vs LOCATED ON EACH SILO IN EACH FLY ASH TRANSPORT LINE ARE
USED TO CONTROL SILO SELECTION.
THE SYSTEM HAS PROVISION FOR STORAGE OF SEGREGATED ASH FROM ESP
HOPPER INDESIRED SILO FOR PURPOSE OF MEETING DIFFERENT REQMTS
FOR ASH SALE/UTILISATION.
SILO IS ALSO PROVIDED WITH BAG FILTERS, VENT FANS, HYDROMIX DUST
CONDITIONERSROTARY FEEDERS, AERATION BLOWERS ETC.
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 18/23
ASH STORAGE SILO
TAC LINES TAC LINES
HMDC
ROTARY FEEDERS
TO CLOSED TRUCKSTO OPEN TRUCKS
( CAPPACITY- 500 MT)
VENT FAN
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 19/23
FROM FAHP
FROM FAHP
FROM VAC P/P
FROM ESP HOPPERS
VIVs WHWV
ASH SLURY P/PS
WETTING HEAD
COLLECTOR TANK
WSV
WSV
WHWV
VBVB
ASH SLURY PIT
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 20/23
BOTTOM ASH / COARSE ASH EVACUATION
BOTTOM ASH EVACUATION SYSTEM:
BOTTOM ASH - WATER IMPOUNDED BA HOPPER- BOTTOM ASH GATE-- CLINKER GRINDER —
- HYDROEJECTOR- ASH SLURY LINES-- ASH SLURY PIT
> EACH BAH HAS TWO SECTION.
> EACH BAH HAS TWO OUTLETS.
> EACH OUTLET IS HAVING ONE BA GATE,ONE CLINKER GRINDER & ONE HYDROEJECTOR
> EACH UNIT IS HAVING TWO ASH SLURY LINES, BOTH OPERATING SIMULTANEOUSLY.
.> TOTAL 02 ASH SLURY PIT FOR TWO UNITS.
> BAH OVERFLOW- OVERFLOW TANK- OVERFLOW P/PS- SETTLING TANKS
> ECO HOPPER FLU. APPT ECO SLURY TANK ECO SLURY P/PS ASH SLURY PIT
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 21/23
ISOLATING GATE
ESPHOPPER
HP / LP
WATER
FLUSHING APPARATUS
SLURRY TO
ASH SLURRY PIT
ASH SLURRY PIT
GATE
GATE
ASH SLURRY LINES
TO ASH POND
STAGE # 1 ASH DISPOSAL SYSTEM
• EACH ESP HAVING 56 NOS OF HOPPERS
• THERE ARE 3 NOS OF ASH SLURRY PUMP HOUSES
• ONE PUMP HOUSE IS COMMON FOR TWO UNITS
• EACH PUMP HOUSE HAVING 3 SERIES OF ASH SLURRY PUMPS
• EACH PUMP HOUSE IS HAVING 3 NOS OF ASH DISPOSAL LINES
• ANY P/P CAN BE SELECTED FOR ANY ASH SLURRY LINE
LOW LIFT P/P
HIGH LIFT P/P
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 22/23
7/31/2019 Dry Ash Handling-presentation
http://slidepdf.com/reader/full/dry-ash-handling-presentation 23/23