DRAFT ENVIRONMENT IMPACT ASSESSMENT AND ENVIRONMENT MANAGEMENT...
-
Upload
doankhuong -
Category
Documents
-
view
216 -
download
1
Transcript of DRAFT ENVIRONMENT IMPACT ASSESSMENT AND ENVIRONMENT MANAGEMENT...
DRAFT
ENVIRONMENT IMPACT ASSESSMENT
AND ENVIRONMENT MANAGEMENT PLAN
FOR
M/S DURATECH CEMENTS INDIA LTD. Village- Khakh, PO- Tanda, Tehsil-
Dasuya, District- Hoshiarpur, Punjab
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
ii
CONTENTS
Section Particulars Page No.
PROJECT AT A GLANCE vi
EXECUTIVE SUMMARY 1-9
ENVIRONMENT IMPACT ASSESSMENT REPORT 10
CHAPTER 1.0 INTRODUCTION
1.1 PURPOSE OF THE REPORT 11
1.2 SCOPE 13
1.3 METHODOLOGY 13
1.4 PROFILE OF THE COMPANY AND PROMOTERS 14
CHAPTER 2.0 PROJECT DESCRIPTION
2.1 GENERAL 15
2.2 INSTALLED CAPACITY 15
2.3 RAW MATERIALS 15
2.4 MACHINERY 15
2.5 MANUFACTURING PROCESS 17
2.6 LAND 20
2.7 POWER 20
2.8 WATER SUPPLY 20
2.9 MANPOWER 21
2.10 WASTE HANDLING 21
CHAPTER 3.0 BASELINE ENVIRONMENTAL SETTING
3.1 THE STATE 22
3.2 HOSHIARPUR DISTRICT 23
3.3 PROJECT SITE 23
3.4 CLIMATE 30
3.5 TEMPERATURE 30
3.6 RAINFALL 32
3.7 HUMIDITY 33
3.8 CLOUDINESS 34
3.9 WINDS 34
3.10 HUMAN SETTLEMENTS 34
3.11 PLACES OF TOURIST INTEREST 34
3.12 SOIL 34
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
iii
3.13 DRAINAGE 34
3.14 LAND USE 35
3.15 FOREST 36
3.16 DEMOGRAPHY AND SOCIO-ECONOMIC SCENARIO 37
CHAPTER 4.0 ENVIRONEMNTAL BENCH MARK CONDITION IN THE STUDY AREA
4.1 GENERAL 38
4.2 POPULATION 38
4.3 WORKERS 38
4.4 PRESENT ENVIRONMENT 38
4.4.1 AMBIENT AIR QUALITY 39
4.4.2 AMBIENT AIR QUALITY STATUS 50
4.4.2.1 PM10 50
4.4.2.2 PM2.5 50
4.4.2.3 SO2 50
4.4.2.4 NOx 50
4.4.3 CONCLUSIONS 50
4.4.4 WATER QUALITY 51
4.4.5 GROUND WATER QUALITY 55
4.4.6 CONCLUSIONS 55
4.4.7 AMBIENT NOISE QUALITY 58
CHAPTER 5.0 ENVIRONMENTAL IMPACT ASSESSMENT & MITIGATION MEASURES
5.1 GENERAL 61
5.2 PROBABLE IMPACT ON ENVIRONMENT 61
5.3 DEVELOPMENT STAGE: - (SHORT TERM) 62
5.4 OPERATIONAL STAGE: - (LONG TERM) 63
5.5 CONCLUSION 66
CHAPTER - 6.0 ENVIROMENT MONITORING PLAN 67- 69
CHAPTER-7.0 CORPORATE SOCIAL RESPONSIBILITY 70- 72
CHAPTER 8.0 ENVIRONMENTAL MANAGEMENT PLAN
8.1 GENERAL 73
8.2 AIR ENVIRONMENT 73
8.3 WATER ENVIRONMENT 74
8.4 LAND ENVIRONMENT 74
8.5 SOLID WASTE 75
8.6 GREEN BELT 75
8.7 RAIN WATER HARVESTING 76
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
iv
8.7.1 GENERAL ARRANGEMENTS PROPOSED 77
8.7.2 RECHARGE POTENTIAL 77
CHAPTER-9.0 OCCUPATIONAL HEALTH AND SAFETY OF WORKERS
9.1 GENERAL 78
9.2 OCCUPATIONAL ENVIRONMENT 78
9.3 OCCUPATIONAL HAZARDS 78
9.3.1 HAZARDS COMPRISING AT THE INDUSTRY 79
9.4 MITIGATION MEASURES 79
9.4.1 SAFETY PRECAUTIONS & SUGGESTION 79
9.4.2 ROUTINE HEALTH CHECK-UP OF WORKERS 80
9.5 FIRE FIGHTING PLAN 81
9.5.1 INTRODUCTION 81
9.5.2 MANAGEMENT OF FIRE & OTHER HAZARDS 81
9.5.3 PREVENTION OF SPREAD OF FIRE 82
9.5.4 EXTINGUISHING SYSTEMS 82
9.5.5 FIRE PRONE AREAS OF THE INDUSTRY 82
9.5.6 PRECAUTIONS 82
10.0 RISK ASSESSMENT, ITS MITIGATION & DISASTER
MANAGEMENT PLAN
84-97
List of Tables
Table No. Name Page No.
2.1 DETAILS OF THE RAW MATERIAL REQUIRED 15
3.1 PLANT SITE AND LOCATION 24
3.2 MONTHLY AVERAGE TEMPERATURE 31
3.3 MONTHLY AVERAGE RAINFALL 32
3.4 MONTHLY AVERAGE RELATIVE HUMIDITY 33
3.5 LAND USE PATTERN 35
3.6 DEMOGRAPHIC DETAILS 37
4.1 AMBIENT AIR QUALITY STATIONS 39
4.2 AMBIENT AIR QUALITY RESULTS 41-46
4.3 AMBIENT AIR QUALITY ABSTRACT 47
4.4 FREQUENCY DISTRIBUTION 48-49
4.5 (a) GROUND WATER MONITORING STATIONS 51
4.5 (b) SURFACE WATER MONITORING STATIONS 51
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
v
4.6 (a) RESULTS OF WATER SAMPLES - GROUND WATER 54
4.6 (b) RESULTS OF WATER SAMPLES - Surface Water 56-57
4.7 NOISE LEVEL RESULTS 59
6.1 ENVIRONMENTAL MONITORING PLAN 67
6.2 EXPENDITURE ON ENVIRONMENTALMEASURES 69
7.1 DETAIL OF CSR AND ITS TIME BOUND IMPLEMENTATION 72
List of Figures
Figure No. Name Page No.
1.1 KEY-PLAN 12
2.1 PROCESS FLOW DIAGRAM & MATERIAL BALANCE 16
3.1 KEY PLAN 25
3.2 LOCATION PLAN 26
3.3 LOCATION ON GOOGLE IMAGE 27
3.4 LAYOUT PLAN 28
3.5 LOCATION ON TOPOSHEET MAP 29
4.1 LOCATION OF AMBIENT AIR MONITORING STATIONS 40
4.2 (a) LOCATION OF AMBIENT GROUND WATER MONITORING
STATIONS
52
4.2 (b) LOCATION OF AMBIENT SURFACE WATER MONITORING
STATIONS
53
4.3 LOCATION OF NOISE MONITORING STATIONS 60
List of Annexure
No. Name Page no. I. LAND PAPERS 98- 106
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
vi
Project at a Glance
1. Name of Project M/S Duratech Cements India Limited
2. Location Village-Khakh, PO- Tanda, Tehsil-Dasuya, District-
Hoshiarpur, Punjab
3. Product Ordinary Portland Cement (OPC)
4. Capacity (TPD) Production capacity
Total Production Capacity 0.5 Million Ton/Annum
5. Type of Project Cement Grinding Unit
6. Cost of the Project 49 Cr.
7. Total Land 6.8 Acres (27513m2)
Breakup of Land utilization
Total area of proposed plant 27513 sq m Plant building 5500 sqm Non plant building 2500 sqm Green area 10000 sqm Area under road/hard standing 5000 sqm Rain water harvesting 200 sqm. Storage shed 4000 sqm. Misc area 313 sqm
8. Power Requirement 4000 KW
9. Source of power From PSPCL
10. Source of Water Supply Own Tube well
11. Quantity of Water (KLD) 25 m3/day
12. Effluent Quantity 8 m3/day
13. Effluent treatment
Domestic = STP
Process = Nil
14. Alternate source of power DG Sets of 750 KVA
15. Air Pollution Control Bag Filters & cyclones
16. Solid Waste Solids from APCD
17. Hazardous waste Used oil from DG Set
18. Rain Water Harvesting 2640 m3/annum
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
1
EXECUTIVE SUMMARY
For
M/S DURATECH CEMENTS INDIA LTD.
Village-Khak, PO- Tanda, Tehsil-Dasuya,
District-Hoshiarpur, Punjab
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
2
EXECUTIVE SUMMARY
I. INTRODUCTION
M/S Duratech Cements India Limited, proposed a new cement grinding unit at
Village-Khakh, PO- Tanda Tehsil-Dasuya, District-Hoshiarpur, Punjab. They have
to get Environmental Clearance as per G.O.I Notification No. 1533 dated 14-09-
2006 for which necessary documents was submitted to the SEAC, Patiala, Punjab.
The case was first appraised on 121th meeting of State Expert Appraisal
Committee held on 26.06.2015, where they have issued the TOR for Final EIA.
One of the conditions in the TORs is to conduct public hearing & result should be
incorporated in the EIA Report. Accordingly, this Draft EIA Report of the project
has been prepared for submission to Punjab State Pollution Control Board for the
public hearing. The proposed capacity of the unit is 0.5 Million Ton/annum.
Raw Materials
The details of major raw materials are as under:
Raw Materials
Quantity Sources Transportation Mode
1. Clinker
3,10,000 T
Cement plants in Himachal Pradesh, Rajasthan and Pakistan
By road/ Rail
2. Gypsum
30,000 T
Mineral gypsum from Rajasthan and import from Pakistan
By road/ Rail
3. Fly Ash
1,60,000 T Thermal Power plants Lehra Mohabbat, Punjab.
By Road,/ Rail
Manufacturing Process
Ball Mill Technology:-
Required quantities of raw materials according to specifications are sent to the
Ball Mill through a feeder where they are grinded to a powder form. It is then
thoroughly blended by means of compressed air in an airtight vessel known as
silos and is completely homogenized. This final material is called cement. It is
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
3
weighed & packed in 50 Kg HDPE bags with Automatic packing machine and
sent for sale.
Power
The power demand for the proposed unit is about 4000 KW. It is proposed that
this demand will be met by sourcing the power from Punjab State
Power Corporation Limited from the nearby Sub-station.
Water
Major water consumption for the unit will be only for domestic and cooling.
For cooling water will be re-circulated and only makeup water of about 15
KLD is required for meeting the evaporation losses in the cooling circuit. In
addition about 10 KLD water will be needed for about 125 workers within the
factory area. There will be no discharge of waste water from the process. The
total requirement of water will be about 25 KLD. Source of water would be
from ground water through a tube-well within the Premises.
Manpower
The requirement of personnel for the proposed cement plant has been made
keeping in view of the following:
Technical concept of plant, including process control and instrumentation.
Smooth and efficient operation of the plant.
Effective co-ordination between the various departments within the plant.
Optimum organization will well defined and judicious job distribution
Optimum utilization of different grades of workmen and supervisory staff
and
Maximum capacity of the facilities.
In all about 125 workers will be needed in the unit. The unit will operate double
shift.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
4
II DESCRIPTION OF ENVIRONMENT
2.1 Present Environment
Various Environmental factors as existing in the study area which are liable
to be affected by the activities have been assessed both quantitatively and
qualitatively. Baseline environmental data generation of study area was carried
out during the period April to June, 2015.
2.2 Ambient Air Quality
The PM2.5, PM10, SO2, NO2 and other pollutant levels were monitored at 6
locations in the study area. The observed mean levels of criteria pollutants
are as follows: PM2.5 36.3 to 43.9 μg/m3, PM10 72.3 to 83.5 μg/m3, SO2 4.7 to
7.0 μg/m3 and NO2 13.8 to 21.40 μg/m3. The baseline air quality levels are
within the National Ambient Air Quality Standards prescribed for residential
and industrial area (Standards are 60, 100, 80 and 80 μg/m3 for PM2.5, PM10,
SO2 and NO2).
2.3 Water Quality:
2 surface water samples and 6 groundwater samples were collected from
the study area for chemical and biological analysis. The surface water
quality and groundwater quality of the study area are satisfactory. The
groundwater quality is fit for potable use. No metallic or bacterial
contamination was found in the water quality.
2.4 Noise Environment
Ambient noise levels were monitored at 6 locations in the study area. The
observed Leq levels for day range from 45 dB (A) to 52 dB (A) and night
time ranges from 32 to 38 dB (A). The baseline noise levels are well within
the National Standards.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
5
2.5 Soil Quality:
The soil of the district consists of Calcareous alluvial, peaty & saline peaty
soils. This soil contains a high content of carbonate of lime. Recent
alluvium, non-calcareous, non-saline soils are also found in the alluvial
plains of Hoshiarpur district. The soils are mostly coarse to medium
textured, acidic to neutral in reaction and yellowish white to light gray in
colour.
2.6 Ecology Quality:
The commonly reported fauna in the area are Partridges, Hare, Wild Boar,
Hog Deer, Barking Deer, Spotted Deer, Jungle Cat, Indian Mongoose, Indian
Jackal, Fruit Bat, Indian Porcupine and Nilgai, Plain Leaf Warbler, Brown
Chiffchaff, Rose Finch, Yellow Headed Wagtail, European Bee Eater,
Demoiselle Crane, Ruddy Shelduck, Pintail, White eyed Pochard, Mallard
and Gadwall.
The flora in the area include Phulahi, Kikar, Drek, Shisham, Siris, Mulberry,
Ber, Amla, Amaltas, Chill, Dhaman, Gauhin, Phaguri, Harar, Kakkar, Jaman,
Kamila, Maulsari, Lasura, Neem, Garna, Mendar, Basuti, Kharkana, Kahi,
Khabal, Bagar, Bui, Boru, Nara and Bulrush . No endangered species of
plants and animals are found in the study area.
2.7 Sensitive Ecosystem:
Within 10 km distance of the project site, no plant or animal species were
found to be on the endangered list. No ecologically sensitive area like
biosphere reserve, tiger reserve, and elephant reserve, migratory corridors of
wild elephant, wetland, national park and wildlife sanctuary are present
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
6
within 10 km distance of the project site. Reserve and Protected Forests
surrounds the project site in all directions.
2.8 Hazardous Materials
No hazardous materials are used in the process nor do the finished goods fall in
this category. There is no impact on the environment on this score.
III ENVIRONMENT MANAGEMENT PLAN
Environment Management Plan (E.M.P) in a project is prepared to mitigate
the possible adverse effect of various activities on the existing
environmental factors, during construction as well as in operational stages,
to avoid their deterioration, if any. It is desirable that necessary steps are
taken right from the beginning of the project to be more effective. As a
social and moral obligation on the part of everybody it becomes our
bounden duty to leave our environment to the next generation in a state at
least what we inherited from our ancestors, if not in a better condition.
E.M.P. for this project has been prepared keeping in view the existing
conditions and likely changes which may occur due to the proposed project.
The implementation and monitoring of different control measures have also
been covered. These are discussed as under:-
Air Pollution
There are only two sources of likely pollution:
a) SPM Emission from the process.
b) D.G. Sets emission.
Exhaust gases from the process shall be passed through APCD and then
released to atmosphere. In the grinding unit the raw material along with
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
7
clinker shall be grinded in closed operation. However, bag filter shall be
provided to arrest any SPM coming out of the grinding unit.
Flue gas from the DG Sets will pass through a chimney and the final gas
will be within permissible limits. Water shall be sprinkled on roads to avoid
dust generation by vehicles. Thus air environment is not likely to be
affected significantly.
Water Pollution
There is no waste water from the process. All the domestic effluent will be
sent to STP for treatment inside the project premises.
Noise Pollution
Although some noise is created due to Ball Mill & Jaw Crusher but the
machines are in enclosed sheds & it is not allowed to go outside. No specific
measures for noise control have, therefore, been provided by the firm. The
DG Set will be noise free. Acoustics shall be provided in the DG set room to
minimize the noise, if any.
Industrial Waste
Dust collected in the bag filters will be re-used as raw material. No hazardous
waste is generated from the factory; as such no special arrangements are
required towards that end.
IV ENVIRONMENT MONITORING PLAN
Regular monitoring of all significant environmental parameters is essential
to check the compliance status vis-à-vis the environmental laws and
regulation. The frequency of the monitoring will be as follows:
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
8
The ambient Air quality shall be monitored at project site and downstream
locations once every quarter for RSPM, NOx & SO2 levels during the
Construction Phase and Operational Phase.
The Ambient Noise Levels shall also be monitored once every six months.
Environment Management Cell:
The Environment Management Cell shall be created to effectively monitor all
parameters. Thus the Environment Management Cell shall include:
Representative of Management (Head of Environment Cell)
Process Incharge from STP/APCD, Water Works
Incharge Maintenance Department
A representative of Environmental Consultants
V RAIN WATER HARVESTING
Recharge Potential
To compensate the withdrawal of underground water to some extent, Rain
Water harvesting has been done. The recharge is proposed to be done from
the roof top of the building only. The recharge potential thus available is as
below:-
Area of the catchment (Roof Top) A = 5500 m2 (Approx.)
Average annual rainfall R = 0.6 m.
Runoff coefficient C = 0.8
About 80% of rainfall that falls on the roof (Roofs with tiles) is available
for use.
Annual Roof Top Rain Water Harvesting Potential = A x R X C
= 2640 m3
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
9
VI. EXPENDITURE ON ENVIRONMENTAL MEASURES
Cost of environment protection measures
S.No Title Capital Cost Rs. Lacs
Recurring Cost Rs. Lacs (Annum)
1. Air Pollution Control (APCDs)
75.0 10.0
2. Landscaping and Green Belt Development
10.0 2.0
3. Environment Monitoring and Management
10.0 1.5
4. Sewage treatment Plant 10.0 1.0
Total 105.0 14.5
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
10
ENVIRONMENT IMPACT
ASSESSMENT REPORT
For
M/S DURATECH CEMENTS INDIA LTD.
Village-Khakh, PO- Tanda, Tehsil-Dasuya,
District-Hoshiarpur, Punjab
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
11
CHAPTER-1.0
1. 1 PURPOSE OF THE REPORT
Environmental movement in India in its present form has its genesis in the
United Nations Conference on Human Environment held at Stockholm, in
June 1972. Mrs. Indira Gandhi, the then Prime Minister of India made a
mark in the conference with her off quoted remark “Poverty is the worst
Polluter”. The conference marked a water-shed in India’s efforts in
Protection of the Environment, forests & Wildlife. Legislations were
enacted for protection of the bio-diversity of the country.
Earlier, the assessment of the Projects was done on technical feasibility
reports and Cost-Benefit-Ratio which mainly considered financial &
technical resources. But no consideration was given to the Environmental
protection in this evaluation and these flaws became apparent with
continuous deterioration of the Environment. Thus in order to have more
realistic evaluation, and keeping in view the deteriorating condition, another
dimension was added which is now called as “Environmental Impact
Assessment” (E.I.A.). This forms an integral part of the Project and is taken
into account while appraising the Project at different stages. Thus, in the
new comprehensive approach all considerations like, Technical, Financial &
Environmental are given due weightage.
M/S Duratech Cements India Limited, proposed a new cement grinding
unit at Village-Khakh, PO- Tanda, Tehsil-Dasuya, District- Hoshiarpur,
Punjab. The project has to obtain Environmental Clearance as per G.O.I
Notification No. 1533 dated 14-09-2006. The case was first appraised on
121th meeting of State Expert Appraisal Committee held on 26.06.2015,
where they have issued the TOR for Final EIA. One of the conditions in the
TORs is to conduct public hearing & result should be incorporated in the
EIA Report. Accordingly, this Draft EIA Report of the project has been
prepared for submission to Punjab State Pollution Control Board for the
public hearing.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
12
Project Site
FIGURE – 1.1
KEY – PLAN
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
13
1.2 SCOPE
This study contains various information on the Environmental factors viz-a-
viz contribution of pollution by the proposed unit. These factors include air,
water, noise, health and welfare facilities, land use and agricultural pattern
etc., and discuss the predicted impact of the proposed plant activities on
these factors. Broadly under the scope of E.I.A. report it is envisaged:-
To assess the present status of air, water, land, noise, biological &.
Socio economic components of environment.
To identify, quantify & evaluate positive or negative impacts of various
operations on different environmental components.
To evaluate proposed pollution control measures and to suggest
additional control strategies, if any, to mitigate the adverse effects.
To prepare Environmental Management Plan for utilization and adoption
of safety measures.
To delineate future Environmental quality monitoring programme.
1.3 METHODOLOGY
Various steps involved in Environmental Impact Assessment study of the
proposed project are divided into the following phases:
Identification of significant environmental parameters and to study the
existing status within the impact zone with respect to air, water, noise, soil
and socioeconomic components of the environment.
Study of various activities of the proposed project to identify the areas
leading to impact/change in environmental quality.
Identification/Prediction of impacts for identified activities and to study
levels of impact on various environmental components.
Evaluation of impacts after superimposing the predicted impact over the
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
14
baseline quality.
Formulation of Environmental Management Plan for implementation in the
proposed project.
1.4 PROFILE OF THE PROMOTORS & COMPANY
ABOUT THE COMPANY:
M/S "DURATECH CEMENT INDIA LIMITED" is under incorporation as
a Public Limited Company as a sister concern of Asian Concretes and
Cements Pvt. Ltd which is successfully running a 1.3 MTPA Cement
Grinding Unit in Nalagarh, Himachal Pradesh. Understanding the current
market scenario the main promoter Mr. Harish Aggarwal intends to setup a
new 0.5 MTPA (extendable upto 1.0 MTPA) cement Grinding/Blending unit
in Tanda, Distt-Hoshiarpur, Punjab. He is a graduate and having vast
experience of over 30 years in various industries and trades. He is associated
with ACC Limited for last about 28 years and has handled major civil works
and marketing of Cement. The directors of the firm as under:-
1) Sri Harish Aggarwal
2) Sri. Prem Prakash Aggarwal
3) Sri. Karan Aggarwal
Other working staff & technical persons will be recruited as per the requirement.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
15
CHAPTER-2.0 PROJECT DESCRIPTION
2.1 General
Proposed Cement Grinding Unit of M/s Duratech Cement India Ltd. will be
located at Village Khakh, PO- Tanda, Tehsil Dasuya, District-Hoshiarpur,
Punjab. Geo Co-ordinates of Project Site are Latitude 31038’34.56”N &
Longitude 75o38’49.84”E. It is also connected by road with Jalandhar (35 KM),
Tanda Urmur (3km). The total plot a is 27513 sqm and cost of project will be Rs
49 Crores.
2.2 Installed Capacity
Production Capacity
Total Production Capacity 0.5 MTPA (Million Ton Per Annum )
2.3 RAW MATERIALS
The major raw materials and their requirements are as under:
TABLE 2.1
DETAILS OF RAW MATERIALS
Raw
Materials Quantity Sources Transportation
Mode 1. Clinker
3,10,000 T
Cement plants in Himachal Pradesh, Rajasthan and Pakistan
By road/ Rail
2. Gypsum
30, 000 T
Mineral gypsum from Rajasthan and import from Pakistan
By road/ Rail
3. Fly Ash
1,60,000 T Thermal Power plants Lehra Mohabbat, Punjab.
By Road,/ Rail
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
16
FLY ASH/ SLAGFLY ASH/ SLAG
2.4 MACHINERY:
The details of major components are as under:-
List of machines:-
1. Belt Conveyor
2. Bucket Belt Elevator
3. Hopper with weighing scale
4. Ball mill
5. Separator
6. Cement storage silo
7. Packer
8. Loader
Fig- 2.1: PROCESS FLOW DIAGRAM
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
17
2.5 MANUFACTURING PROCESS
The clinker is ground in Horizontal Ball Mills with an amount of gypsum
(3-5%) to a fine powder in order to regulate the setting time of cement and
to gain the most important property of cement, which is compressive
strength. These mills have three compartments and carry charges of
assorted sizes of steel grinding media (balls) weighing about 100 tons for
the smaller chamber and 600 tons in the larger chamber. To produce
different types of cement (e.g. Ordinary Portland Cement, OPC), the
required additives are ground with clinker and gypsum to a very fine
powder and then used as desired. Used in varying proportions, these
additions, which are of natural or industrial origin, give the cement specific
properties such as reduced permeability, greater resistance to sulfates and
aggressive environments, improved workability, or higher-quality finishes.
These Ball Mills grind the feed to a fine powder. The cement is ground to a
fineness of not less than 3000 square cm. per gram as determined by
measurement of the specific surface. The Mill discharge is then fed to an
elevator, which takes the material to a separator, which separates fine
product and the coarse. The latter is sent to the mill inlet for regrinding and
the fine product is stored in concrete silos. The cement stored in silos is
then packed and delivered in different ways, e.g. bagged or bulk, as per the
customer‘s requirement.
Blended Cement (OPC + Mineral Admixtures)
The blended cements will be manufactured by adding pozzolanic or
Cementitious materials like fly ash or ground granulated blast furnace slag
(GGBFS) or condensed silica fumes (CSF) to portland cement clinker and
Gypsum. Alternatively, these pozzolanic and cementitious materials will be
introduced into Portland cement concrete during concrete making
operations.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
18
General Features of use of mineral admixtures:
• Their use saves energy
• Conserve natural resources
Technical Benefits
• They affect the progress of hydration, reduce the water demand and
improve workability.
• The concrete containing GGBFS, on vibration becomes ‘mobile’ and
compacts well. Silica fumes greatly reduces, or even eliminates bleeding
• The particles of Pozzolanic Fly Ash (PFA) are spherical and thus improve
the workability.
• Their inclusion has the physical effect of modifying the flocculation of
cement, with a resulting reduction in the water demand.
• The pore size in concrete is smaller. The fine particles ‘fit in’ between
cement particles, thereby reducing permeability.
Advantages of using Blended Cement: The engineering benefits likely to
be derived from the use of mineral admixtures (blended cements and
cement + mineral admixtures can be used inter changingly) in concretes
are:
• Improved resistance to Thermal Cracking because of lower heat of
hydration
• Enhancement of Ultimate Strength
• Reduction in Permeability due to Pore Refinement
• Better durability to Chemical Attacks such as Chloride, Sulphate Water,
and Soil and Alkali- Aggregate expansion.
Quality Control: Various Quality Control (QC) tests are conducted on the
Raw Material, Semi Finished Product and Finished product, before the
material is given approval for Final Dispatch to the market (Quality
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
19
Assurance). Routine checks and tests are carried out by Laboratory
Technicians to each phase of the production process so as to ensure that a
consistent high quality is maintained. It must be noted here that the
complete Cement Grinding process is controlled via various SQC
Parameters. Also the implementation of SAP at various stages of
procurement, manufacturing, storage and dispatch ensures uniform and
optimum quality of the
Final Product (QA: Quality Assurance).
Final Product: The final product i.e. OPC Grade Cement is extracted from
Silos and is conveyed to the Automatic Rotary Packers where it is packed
in standard 50 KG Cement Bags and thereafter the Ready for Dispatch
Cement Bags are symmetrically loaded onto dispatch trucks for further
transportation to the company warehouse / market.
Other Features:
The plant would incorporate the most modern control system using the
latest microprocessor based Dust Control System
Cooling water circuit is close circuited, whereby ensuring no generation of
waste water
The process, selected envisages re-cycling all the material collected in the
pollution control equipment whereby ensuring no generation of solid
waste.
The plant lay out is so arranged that the major production units are laid in a
straight line whereby minimizing / avoiding the various transfer points.
Capacity of the units is planned so as to minimize the number of
equipment.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
20
2.6 LAND
Total 6.8 Acres of land has been acquired at Village: Khakh, Khasra No.
2509, 2510, 2511, 2512, 2513, 2514, 2515, 2516, 2483, and 2484 for
establishment of proposed Cement Grinding unit. Land of the project site
is owned by Duratech Cements India Ltd.
2.7 POWER
The power demand for the proposed unit is about 4000 KW. It will be met
by sourcing the power from PSPCL from the nearby Sub-station. Details of
Energy balance is given below:
A. Total Load : 4000 KW
1. Power load : 3800 KW
2. Office lighting load : 150 KW
3. Street lighting load : 50 KW
B. Savings:-
1. Energy savers (@ 4% energy saving) : 152 KW
2. Use of CFL for inner lighting : 75 KW
(CFL of 20 W instead of 40 W tubes @ 50%)
3. Use of solar energy for street lighting : 50 KW
(100% replacement)
Total Saving : 277 KW
% saving : 6.9%
2.8 WATER SUPPLY
The water consumption for the unit will be for domestic and cooling etc.
For cooling water will be re-circulated and only makeup water of about 15
KLD is required for meeting the evaporation losses in the cooling circuit.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
21
In addition about 10 KLD water will be needed for about 125 workers
within the factory area. There will be no discharge of waste water from the
process. The total requirement of water will be about 25 KLD. Source of
water would be from ground water through a tube-well within the
Premises.
2.9 MANPOWER
The requirement of personnel for the proposed cement plant has been made
keeping in view of the following:
o Technical concept of plant, including process control and
instrumentation.
o Smooth and efficient operation of the plant.
o Effective co-ordination between the various departments within the
plant.
o Optimum organization will well defined and judicious job
distribution
o Optimum utilization of different grades of workmen and supervisory
staff and
o Maximum capacity of the facilities.
In all about 125 workers will be needed in the unit. The unit will operate
double shift.
2.10 WASTE HANDLING
There are no solid or liquid process wastes. Some waste from the toilets is
received which will be treated separately through STP and used within the
premises for plantation.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
22
CHAPTER-3.0 BASELINE ENVIRONMENTAL SETTINGS
3.1 PUNJAB STATE
Punjab is one of the progressive States in the Northern part of India. It
derives its name from five rivers which used to flow through the State
before partition of the Country in 1947 viz Satluj, Beas, Ravi, Chenab, and
Jehlam. After partition two of the rivers i.e. Chenab and Jehlam went to
Pakistan Punjab and the other three remained in Indian Punjab. It has one of
the oldest irrigation systems of the country known as Sirhind Canal with
recent addition of Bhakhra Canal System. The economy of the State is
dependent mainly on Agriculture. It, alongwith Haryana, contributes about
50% food grains to the common pool of the country. Punjab has over 2.04
lakh small and medium industries and about 600 large scale industries. It
leads in the manufacture of machine and hand tools; printing and paper
cutting machinery; auto parts and electrical switch gear. The State also
provides more than 75% of the country's requirement for bicycles, sewing
machines, hosiery and sports goods. At par with the highest quality
standards in the world, these products have carved a niche for themselves in
markets across the globe.
It has also made big strides towards industrialization. A number of
Industrial areas have been developed by the State. Ludhiana, Jalandhar,
Amritsar and Mohali are famous for Large and Medium scale industrial
units. Many small Industrial areas & Focal Points have also been developed
in different towns for small scale units.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
23
3.2 HOSHIARPUR DISTRICT:
Hoshiarpur district is located in the north-east part of the State. It falls in
the Jalandhar Revenue Division and is situated in the Doaba region of the
State. The district is sub-mountainous and stretches of river Beas in the
north-west. It lies Latitude 31o38’37.92” N & Longitude 75o38’48.55” E. It
shares common boundaries with Kangra and Una districts of Himachal
Pradesh in the north east, Jalandhar, Nawansahar and Kapurthala districts
(interspersed) in south-west and Gurdaspur district in the north-west. At
present, it has an area of 3386 Sq. Kms. and a population, as per 2011
Census is 15, 86,625 persons.
3.3 PROJECT SITE
Proposed Cement Grinding Unit of M/s Duratech Cement India Ltd. will be
located at Village- Khakh, PO- Tanda, Tehsil - Dasuya, Distt. Hoshiarpur,
Punjab. Geo Co-ordinates of Project Site are Latitude 31o38’37.92” N &
Longitude 75o38’48.55” E. Project site is about 3 kms from Tanda Urmur
& which is well connected by road and rail with rest of the country. NH-44
(Jalandhar-Pathankot road) is passing at a distance of 700-800m from
project site & is about 40 Km. from District Headquarter at Hoshiarpur.
Total area of the plot is 6.8 Acres.
Key Plan & Location of the project site with respect to other features is
shown is Fig. 3.1 & 3.2.
Location on Google Map, Layout plan and Location on Topo-Sheet of the
unit is given in Fig. 3.3, 3.4 and Fig. 3.5.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
24
Plant Site and Location Details TABLE 3.1
S.No Particulars Details
1 Location
a Village Khakh
b District Hoshiarpur
c State Punjab
d Latitude 31o38’37.92” North
e Longitude 75o38’48.55” East
2 Elevation 242 mts. (Approximately)
3 Land use at the project site Agricultural Land
4 Climatic Conditions
i) Temp. Min/ Max/ Average Min: 4 oC, Max: 45 oC
ii) Rainfall : Average 600 mm (Average)
iii) Relative Humidity, % Min: 23%, Max:80%
iv) Wind speed, km/hour (Avg.) 15 km (Approximately)
5 Nearest highway NH-44 (Jalandhar-Pathankot) (700-
800m)
6 Nearest railhead/Railway station Tanda Urmur (about 3 km)
7 Nearest airport Pathankot (about 60 Km)
8 Features within 10 kms
i) Defence installations within 10 Kms Nil
ii) Archaeological important places
within 10 Kms
Nil
iii) Wild life/ Elephant & Tiger reserve
sanctuaries within 10 Kms
Nil
iv) Reserved forest/Protected
forest/National Park within 10 km
radius
Nil
v) Industries Nil
vi) Rivers Black Bein river (5 Km)
vii) State boundary in 10-Km radius Nil
vii) Hill ranges Nil
9 Nearest Major City Hoshiarpur (40 Km)
10 Nearest Major Settlement Dasuya (18 Km)
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
25
Project Site
Figure 3.1
KEY PLAN
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
26
Figure 3.2
LOCATION PLAN
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
27
Figure 3.3
500 mt radius Google map
31o38’37.92”-N 75o38’48.55”-E
31o38’33.08”-N 75o38’50.23”-E
31o38’44.07”-N 75o38’49.07”-E
31o38’43.62”-N 75o38’51.43”-E
31o38’33.36”-N 75o38’47.01”-E
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
28
Figure 3.4 LAYOUT PLAN
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
29
Figure- 3.5
10 KM RADIUS ON TOPO SHEET
PROJECT SITE
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
30
3.4 CLIMATE:
The district has mild climate compared to other districts of the State. This is
due to the abundance of hilly terrain on the one hand and sizeable forest
covers thereon, on the other. Moreover, chain of check dams constructed
recently on the choes under “Kandi Watershed Development Project” has
appreciably enhanced water surface area in the district. This has made the
summer heights quite pleasant.
The pattern of seasons in the district is similar to other districts of the state,
except slight variations at the terminals and year may be divided into three
main seasons. The summer season sets in April and lasts up to end of June,
to be taken over by the rainy season when it becomes hot and sultry. The
rainy season sets in July beginning and lasts up to September end. The
winter season starts after the rains are over from October and lasts up to
March end. May and June are the hottest months when mercury may cross
45 degree C on some days. It is pleasantly hot. The months of December,
January and February are the months when winter is quite severe and
mercury may however around 50C and on some days it may touch 00C.
3.5 TEMPERATURE:
The district has mild climate compared to other districts of the State. December
and January are the coldest months whereas in May and June the heat is
quite intense. The wettest months of the seasons are July, August and
September. The temperature varies from about 4.3oC minimum to about
44.2oC maximum during the year. Monthly average temperatures of the
area are given in Table-3.2
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
31
TABLE - 3.2
MONTHLY AVERAGE TEMPERATURE
Month
Mean Temperature (oC)
Daily Minimum
Daily Maximum
Jan 4.3 18.6
Feb 5.5 17.6
Mar 10.6 25.0
Apr 14.1 32.0
May 21.1 38.6
Jun 24.2 44.2
Jul 26.2 36.0
Aug 25.7 35.3
Sep 22.1 31.6
Oct 17.6 30.7
Nov 8.6 25.8
Dec 5.1 18.9
Source: IMD Chandigarh
Period: (2014)
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
32
3.6 RAINFALL
The district receives precipitation in the form of rainfall, mainly during the
monsoon period from July to September. The minimum and maximum
rainfall in the district is 1200 to 1800 respectively. The average annual
rainfall in the district is about 600 mm. Monthly rainfall data for this zone
is given in Table-3.3
TABLE - 3.3
MONTHLY AVERAGE RAINFALL (in mm)
Year Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
2009 8.8 27.7 16.0 34.8 3.3 2.8 291.9 153.6 49.4 1.7 12.1 0.0
2010 5.8 8.1 0.4 0.0 16.4 34.3 263.7 195.3 107.0 34.8 0.6 26.9
2011 5.8 66.0 9.5 13.9 22.1 128.2 171.1 206.2 114.8 0.0 0.0 4.0
2012 84.4 3.6 4.7 20.3 0.5 9.7 130.8 67.3 107.7 0.5 0.2 12.8
2013 15.0 64.0 10.0 3.8 4.4 111.1 128.6 170.2 40.6 14.4 3.7 20.2
Source: IMD Chandigarh Period: (2009-2013)
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
33
3.7 HUMIDITY
In summer months of April, May and June, which is the driest part of the
year, the afternoon humidity comes down to around 19 % to 22 % while the
relative humidity during monsoon months goes upto 70 % to 82 %.
Monthly humidity is given in Table-3.4
TABLE - 3.4
MONTHLY AVERAGE RELATIVE HUMIDITY
Months Relative humidity (%)
830* 1730*
January 76 61
February 74 46
March 56 40
April 34 24
May 22 19
June 35 28
July 75 61
August 82 70
September 74 63
October 60 52
November 60 49
December 75 58
Source: IMD Chandigarh
*Hours IST
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
34
3.8 CLOUDINESS
During monsoon season skies are over cast with moderate to heavy clouds.
During rest of the year, the sky is mostly clear. It is lightly clouded
occasionally during winter season.
3.9 WINDS
The Wind direction in the area is mostly from South-West to North-East.
During January to May the winds are quite strong while July to October is
calm months.
3.10 HUMAN SETTLEMENTS
The unit is proposed in the village Khakh, PO- Tanda, Tehsil-Dasuya,
District- Hoshiarpur, Punjab and it’s an agricultural land. The nearest town
is Tanda Urmur which is about 3km from project site. Tehsil Dasuya is at a
distance of 18 Km. District Head Quarter i.e. Hoshiarpur is at a distance of
40 km.
3.11 PLACES OF TOURIST INTEREST
There are no major places of tourist interest near the plant.
3.12 SOIL
In general the soils are yellowish brown to dark brown in colour. These
range from calcareous sand to fine sandy loam to silt. Sand is mostly
cultivated well drained with estimated infiltration rate of 8-10 cm/hours.
3.13 DRAINAGE
The district is drained by two major rivers, Beas in the North and north
west and Satluj in the south. Besides, a number of small streams flow down
the Siwalik Hills which are debouching into plains spread in numerous
branches locally known as choes giving rise to fan shaped structure. During
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
35
the monsoon period, these choes carry quantity of water as flash flood
along with considerable sand and silt.
3.14 LAND USE
Land use pattern means how the land is being used for various purposes. It
highlights the environmental quality of a particular area. It is an important
indicator of environmental health, intensity of human activity and degree of
interaction between the two. Land use pattern is significantly influenced by the
nature of soil, water availability and climatic conditions of the area. Data on
land use pattern of Hoshiarpur District have been collected to present baseline
status of the study area which falls in this District and is given in Table 3.5.
TABLE-3.5
LAND USE PATTERN OF HOSHIARPUR DISTRICT (‘000ha)
Total Geographical Area 340
Cultivable area 201
Forest area 108
Land under non-agricultural use 28
Permanent pastures 1
Cultivable wasteland <0.5
Land under Misc. tree crops and groves <0.5
Barren and uncultivable land 1
Current fallows <0.5
(Source:http://agricoop.nic.in/Agriculture%20Contingency%20Plan/Punjab/PUNJAB%204-Hoshiarpur%2030.04.2011.pdf)
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
36
3.15 FOREST
Little forest cover could be found in the district of Hoshiarpur. No
endangered species have been sighted in the area. No Wildlife Sanctuary,
National Park, Biosphere Reserves, Wildlife Corridors, migratory routes of
birds, Protected Forest/ Reserved Forest exists within study area of 10 km
radius.
Flora and fauna:
Flora: Hoshiarpur is quite rich in flora as well with numerous varieties
found in its forests. The main trees found in the district are Phulahi, Kikar,
Drek, Shisham, Siris, Mulberry and Ber. Thick groves are found in borders
of the choes due to good soil quality. There are other trees grown for their
properties and usage. These include Aisam for fodder, Amla for pickle
making, Amaltas for tanning, Bahera for medical uses. Ber for its fruits and
hard woods that give protection to nearby crops. Other trees found in
Hoshiarpur region are Chill, Dhaman, Gauhin, Phaguri, Harar, Kakkar,
Jaman, Kamila, Maulsari, Lasura and Neem.
The shrubs mainly found in this region are Garna, Mendar and Basuti.
These shrubs are commonly used as firewood, for hedging and as manure.
Bamboo and Bambusa Bambos are the principal grasses in this district.
They are available in three viz. bans, nal and magar. The other varieties of
grass found are Kharkana, Kahi, Khabal, Bagar, Bui, Boru, Nara and
Bulrush.
Fauna: The district has huge forests and one wildlife reserve at Takhni
Rehmapur. In the Jungles, Partridges, Hare, Wild Boar and Hog Deer are
found with occasional spotting of Samber, Barking Deer and Spotted Deer.
There are sightings of Jungle Cat, Indian Mongoose, Indian Jackal, Fruit
Bat, Indian Porcupine and Nilgai in the forests of district. Hoshiarpur has
numerous varieties of residents and migratory birds including Plain Leaf
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
37
Warbler, Brown Chiffchaff, Rose Finch, Yellow Headed Wagtail, European
Bee eater, Demoiselle Crane, Ruddy Shelduck, Pintail, White eyed
Pochard, Mallard and Gadwall
3.16 DEMOGRAPHY AND SOCIO-ECONOMIC
SCENARIO:
Demography is one of the important pointers of environmental health of an
area. It includes description of demography, occupational pattern, available
basic amenities like housing, medical care, services, transportation,
education, water supply, roads, transport, etc.
Amenities prevalent in the study area have been extracted from the Census
of 2001 and site visits and it has been found that:-
Almost every village situated within the study area having Education facility, Medical facility, Drinking water and Electricity.
About 90-95% houses are pucca.
Most of the villages are approachable with metalled road.
As per census 2011, the significant demographic and socio economic
statistics of the district are summarized and given in Table 3.6:
TABLE-3.6
DESCRIPTION DISTT. HOSHIARPUR PUNJAB
Censes 2011 2011
Male Population 809,057 14639465
Female Population 777,568 13103873
Total Population 1586625 27743338
Sex Ratio 961 895
Density of Population/Km2 469 551
Literacy Rate: Total (%) 84.59 75.84
Ref: Census of India 2011.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
38
CHAPTER-4.0
ENVIRONEMNTAL BENCH MARK CONDITION IN THE STUDY AREA
4.1 General
Proposed Cement Grinding Unit at Village Khakh, PO- Tanda, Tehsil-
Dasuya, District-Hoshiarpur, Punjab. The firm has already acquired 6.8
acre of land. In order to assess the impact of the unit on the Environment, it
is necessary to know the existing level of various parameters & then
superimpose the effect of the units to know the end results of the same.
4.2 Population
The study area falls in district Hoshiarpur. The total population of the
district is about 1586625 persons in an area of 3386 sq kms.
4.3 Workers
People are mostly engaged in agriculture related activities. However, other
occupations are also practiced, although to a lesser degree.
4.4 Present Environment
Various Environmental factors as existing in the study area which are liable
to be affected by the activities have been assessed both quantitatively and
qualitatively. Following are the factors which are sensitive to the plant
activities.
i) Ambient Air
ii) Water Quality
iii) Soil and Agriculture
iv) Land use pattern
v) Demography and Socio-economic pattern
vi) Transport & Communications
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
39
vii) Educational facility
Here we are describing the current status of ambient air, water and noise
quality.
4.4.1AMBIENT AIR QUALITY
An area of 10 km radius has been selected for study of various parameters.
The Status of Ambient Air Quality in the Study Area has been determined
by monitoring air quality at different Locations. The study area is a mix of
rural, industrial and agricultural area and the various sources of pollution
are dust arising from agricultural activities, vehicular traffic and industries.
Ambient air monitoring was carried out from April, 2015 to June, 2015. Sites
of the monitoring stations were kept keeping in view of the dominant wind
direction. Location of the monitoring stations for Ambient Air Quality is given
in Table 4.1 and shown in Fig. 4.1.The results are given in Table-4.2.
TABLE 4.1 AIR MONITORING STATIONS
S.No. Sample
code
Name of
village
Distance/
Direction
Coordinate
1. AA-1 Project site
--- Longitude: 75o38’37.92” E
Latitude: 31o 38’48.55” N
2. AA-2 Khokhar 2.5 Km/S Longitude: 75o38’57.07” E
Latitude: 31o37’15.74” N
3. AA-3 Jhanwan 4.5 Km/NE Longitude: 75o40’59.94” E
Latitude: 31o39’58.04” N
4 AA-4 Manpur 4.5 Km/
NW
Longitude: 75o36’43.57” E
Latitude: 31o 39’ 43.53” N
5 AA-5 Mirpur 7 Km/ SW Longitude: 75o34’33.27” E
Latitude: 31o37’32.81” N
6 AA-6 Tala 8.5 Km/
NW
Longitude: 75o35’26.20”E
Latitude: 31o42’16.74” N
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
40
Figure 4.1
Ambient Air Monitoring Stations
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
41
TABLE-4.2
AMBIENT AIR QUALITY MONITORING RESULTS (Average value)
(Source: Chandigarh Pollution Testing Laboratory)
Project Site
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 06-04-2015 7.2 18.3 ND 0.58 41.1 82.3 ND ND 32 ND
2. 13-04-2015 6.9 18.6 ND 0.59 40.3 80.8 ND ND 31 ND
3. 20-04-2015 7.6 18.8 ND 0.58 38.5 83.5 ND ND 33 ND
4. 27-04-2015 6.8 19.3 ND 0.60 41.7 80.9 ND ND 32 ND
5. 04-05-2015 6.2 18.1 ND 0.59 42.6 81.6 ND ND 33 ND
6. 11-05-2015 7.1 18.5 ND 0.61 41.4 83.5 ND ND 31 ND
7. 18-05-2015 7.5 19.7 ND 0.60 41.8 80.8 ND ND 33 ND
8. 25-05-2015 8.1 20.2 ND 0.62 43.4 78.4 ND ND 32 ND
9. 01-06-2015 7.8 19.4 ND 0.64 39.5 81.8 ND ND 30 ND
10. 08-06-2015 7.2 19.6 ND 0.63 41.7 82.0 ND ND 32 ND
11. 15-06-2015 6.8 20.0 ND 0.61 43.9 81.9 ND ND 33 ND
12. 22-06-2015 6.5 19.8 ND 0.64 42.1 79.1 ND ND 33 ND
Minimum
Maximum
6.2
8.1
18.1
20.2
----- 0.58
0.64
38.5
43.9 78.4
83.5
---- ---- 30
33 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
42
Khokhar
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 06-04-2015 6.5 17.6 ND 0.57 41.8 81.5 ND ND 31 ND
2. 13-04-2015 7.1 18.1 ND 0.58 42.6 79.6 ND ND 30 ND
3. 20-04-2015 7.9 18.6 ND 0.60 41.3 82.4 ND ND 32 ND
4. 27-04-2015 6.4 19.1 ND 0.59 40.5 79.9 ND ND 31 ND
5. 04-05-2015 7.2 19.1 ND 0.61 41.6 80.1 ND ND 33 ND
6. 11-05-2015 6.9 18.6 ND 0.60 41.9 83.0 ND ND 31 ND
7. 18-05-2015 7.6 19.9 ND 0.58 42.7 82.8 ND ND 32 ND
8. 25-05-2015 8.2 21.4 ND 0.61 43.3 83.3 ND ND 31 ND
9. 01-06-2015 7.6 19.9 ND 0.62 41.6 80.8 ND ND 33 ND
10. 08-06-2015 7.5 19.8 ND 0.62 40.1 78.5 ND ND 31 ND
11. 15-06-2015 7.8 21.0 ND 0.64 39.8 79.4 ND ND 31 ND
12. 22-06-2015 6.9 19.9 ND 0.64 38.2 80.8 ND ND 33 ND
Minimum
Maximum
6.4
8.2
17.6
21.4
----- 0.57
0.64
38.2
43.3 78.5
83.3
---- ---- 30
33 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
43
Jhanwan
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 06-04-2015 6.5 16.5 ND 0.56 39.5 77.1 ND ND 28 ND
2. 13-04-2015 7.0 15.8 ND 0.55 38.9 76.8 ND ND 29 ND
3. 20-04-2015 6.1 16.3 ND 0.54 40.8 78.5 ND ND 27 ND
4. 27-04-2015 5.7 16.8 ND 0.55 41.1 79.1 ND ND 28 ND
5. 04-05-2015 7.0 16.4 ND 0.54 39.4 78.9 ND ND 28 ND
6. 11-05-2015 7.1 16.7 ND 0.56 39.1 77.1 ND ND 30 ND
7. 18-05-2015 6.9 17.0 ND 0.56 40.2 76.5 ND ND 28 ND
8. 25-05-2015 7.0 16.8 ND 0.57 39.4 78.0 ND ND 28 ND
9. 01-06-2015 6.2 16.1 ND 0.59 39.7 77.8 ND ND 29 ND
10. 08-06-2015 5.5 17.5 ND 0.58 39.1 78.2 ND ND 30 ND
11. 15-06-2015 5.1 17.1 ND 0.58 40.1 80.1 ND ND 28 ND
12. 22-06-2015 5.2 15.9 ND 0.57 39.5 77.6 ND ND 30 ND
Minimum
Maximum
5.1
7.1
15.8
17.5
----- 0.54
0.59
38.9
41.1 76.5
80.1
---- ---- 27
30 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
44
Manpur
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 09-04-2015 6.2 15.7 ND 0.54 37.1 76.6 ND ND 27 ND
2. 16-04-2015 5.4 16.2 ND 0.55 39.4 77.1 ND ND 27 ND
3. 23-04-2015 7.1 15.9 ND 0.54 40.2 76.3 ND ND 28 ND
4. 30-04-2015 5.2 16.3 ND 0.54 38.8 77.5 ND ND 29 ND
5. 07-05-2015 5.6 15.5 ND 0.56 37.9 76.7 ND ND 29 ND
6. 14-05-2015 5.8 16.1 ND 0.55 38.5 79.2 ND ND 27 ND
7. 21-05-2015 6.0 15.2 ND 0.55 37.5 76.8 ND ND 29 ND
8. 28-05-2015 6.2 15.9 ND 0.54 38.8 76.9 ND ND 28 ND
9. 05-06-2015 5.7 15.9 ND 0.56 40.4 79.1 ND ND 29 ND
10. 12-06-2015 6.2 17.2 ND 0.57 39.1 80.0 ND ND 27 ND
11. 19-06-2015 5.9 16.7 ND 0.56 38.9 77.3 ND ND 29 ND
12. 26-06-2015 5.1 15.9 ND 0.56 37.2 78.8 ND ND 28 ND
Minimum
Maximum
5.1
7.1
15.2
17.2
----- 0.54
0.57
37.1
40.4 76.3
80.0
---- ---- 27
29 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
45
Mirpur
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 09-04-2015 5.9 15.4 ND 0.54 36.3 76.1 ND ND 28 ND
2. 16-04-2015 6.2 15.7 ND 0.54 38.6 74.3 ND ND 29 ND
3. 23-04-2015 5.4 14.8 ND 0.56 37.6 75.4 ND ND 27 ND
4. 30-04-2015 5.8 16.1 ND 0.55 38.1 76.6 ND ND 27 ND
5. 07-05-2015 5.3 15.4 ND 0.55 37.7 77.1 ND ND 29 ND
6. 14-05-2015 5.6 16.3 ND 0.54 39.1 76.3 ND ND 29 ND
7. 21-05-2015 4.8 15.0 ND 0.56 38.3 76.6 ND ND 28 ND
8. 28-05-2015 5.1 16.2 ND 0.55 38.7 80.0 ND ND 27 ND
9. 05-06-2015 5.6 15.4 ND 0.58 39.5 76.2 ND ND 27 ND
10. 12-06-2015 5.7 15.6 ND 0.56 40.1 79.7 ND ND 28 ND
11. 19-06-2015 5.8 15.1 ND 0.57 38.7 77.5 ND ND 28 ND
12. 26-06-2015 6.1 14.8 ND 0.58 37.9 76.8 ND ND 28 ND
Minimum
Maximum
4.8
6.2
14.8
16.3
----- 0.54
0.58
36.3
40.1 74.3
80.0
---- ---- 27
29 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
46
Tala
S
No. DATE OF
MONITORING SO2
(µg/m3)
NOX
(µg/m3)
Pb
(µg/m3)
CO
(mg/m3)
PM2.5
(µg/m3)
PM10
(µg/m3)
NICKEL
ng/m3
ARSENIC
ng/m3
O3
ug/m3
NH3
ug/m3
1. 09-04-2015 4.9 15.0 ND 0.52 36.5 72.3 ND ND 27 ND
2. 16-04-2015 5.2 14.5 ND 0.53 37.1 74.0 ND ND 28 ND
3. 23-04-2015 4.2 15.1 ND 0.54 36.8 75.8 ND ND 29 ND
4. 30-04-2015 4.7 14.8 ND 0.53 36.7 74.4 ND ND 27 ND
5. 07-05-2015 5.3 14.3 ND 0.53 36.3 74.7 ND ND 27 ND
6. 14-05-2015 4.9 14.2 ND 0.52 36.9 75.6 ND ND 27 ND
7. 21-05-2015 4.6 14.0 ND 0.54 38.1 75.4 ND ND 28 ND
8. 28-05-2015 4.9 14.1 ND 0.53 36.8 74.8 ND ND 28 ND
9. 05-06-2015 5.0 13.8 ND 0.52 37.3 73.0 ND ND 29 ND
10. 12-06-2015 4.9 14.6 ND 0.54 36.5 75.5 ND ND 27 ND
11. 19-06-2015 4.7 14.2 ND 0.53 36.7 74.7 ND ND 27 ND
12. 26-06-2015 4.8 14.5 ND 0.54 37.7 75.8 ND ND 28 ND
Minimum
Maximum
4.2
5.3
13.8
15.1
----- 0.52
0.54
36.3
38.1 72.3
75.8
---- ---- 27
29 ----
Permissible Limits 80 80 1 4 60 100 20 6 100 400
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
47
TABLE-4.3
AMBIENT AIR QUALITY ABSTRACT
Station Code
Name of the Station
Range Average
PM10
µg/m3
PM2.5
µg/m3
SO2
µg/m3
NOx µg/m3
CO mg/m3
O3
µg/m3 AA1 Project Site Range
Average
78.4-83.5
80.95
38.5-43.9
41.2
6.2-8.1
7.15
18.1-20.2
19.15
0.58-0.64
0.61
30-33
31.5
AA2 Khokhar Range
Average
78.5-83.3
80.9
38.2-43.3
40.75
6.4-8.2
7.3
17.6-21.4
19.5
0.57-0.64
0.60
30-33
31.5
AA3 Jhanwan Range
Average
76.5-80.1
78.3
38.9-41.1
40
5.1-7.1
6.1
15.8-17.5
16.65
0.54-0.59
0.56
27-30
28.5
AA4 Manpur Range
Average
76.3-80.0
78.1
37.1-40.4
38.7
5.1-7.1
6.1
15.2-17.2
16.2
0.54-0.57
0.55
27-29
28
AA5 Mirpur Range
Average
74.3-80.0
77.15
36.3-40.1
38.2
4.8-6.2
5.5
14.8-16.3
15.55
0.54-0.58
0.56
27-29
28
AA6 Tala Range
Average
72.3-75.8
74.05
36.3-38.1
37.2
4.2-5.3
4.75
13.8-15.1
14.45
0.52-0.54
0.53
27-29
28
*Pb, As, Ni, PAH is Not Detectable in the study area.
The monitoring of Ambient Air has been undertaken from April, 2015 to
June, 2015 as per CPCB guidelines.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
48
TABLE-4.4
FREQUENCY DISTRIBUTION OF PM10, PM2.5, SO2 AND NOx IN
STUDY AREA
PM10 Range (µg/m3) Frequency Cumulative
Frequency % Cumulative
Frequency
72.30-73.42 2 2 2.78 73.42-74.54 3 5 6.90 74.54-75.66 7 12 16.67 75.66-76.78 11 23 31.94 76.78-77.90 13 36 50.00 77.90-79.02 7 43 59.72 79.02-80.14 12 55 76.38 80.14-81.26 5 60 83.33 81.26-82.38 6 66 91.66 82.38-83.50 6 72 100
72
P98 = 81.5
PM2.5
Range (µg/m3) Frequency Cumulative Frequency
% Cumulative Frequency
36.30-37.06 9 9 12.50 37.06-37.82 8 17 23.60 37.82-38.58 8 25 34.72 38.58-39.34 11 36 50.00 39.34-40.10 12 48 66.67 40.10-40.86 6 54 75.00 40.86-41.62 6 60 83.33 41.62-42.38 6 66 91.67 42.38-43.14 3 69 95.83 43.14-43.90 3 72 100
72
P98 = 43.53
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
49
SO2
Range (µg/m3) Frequency Cumulative
Frequency % Cumulative
Frequency
4.20 – 4.60 2 2 4.2 4.60 – 5.00 9 11 15.2 5.00 – 5.40 10 21 25 5.40 – 5.80 10 31 36.11 5.80– 6.20 11 42 52.77 6.20 – 6.60 4 46 52.77 6.60– 7.00 9 55 55.55 7.00 – 7.40 7 62 75 7.40 – 7.80 7 69 91.66 7.80 – 8.20 3 72 100
72
P98 = 7.88
NOx
Range (µg/m3) Frequency Cumulative Frequency
% Cumulative Frequency
13.80 – 14.56 8 8 11.11 14.56 – 15.32 9 17 23.61 15.32 – 16.08 13 30 41.67 16.08 – 16.84 14 44 61.11 16.84 – 17.60 5 49 68.05 17.60– 18.36 3 52 72.22 18.36 – 19.12 7 59 81.94 19.12 – 19.88 6 65 90.27 19.88 – 20.64 5 70 97.22
20.64-21.40 2 72 100 72
P98 = 20.7
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
50
4.4.2 Ambient Air Quality Status 4.4.2.1 Respirable Suspended Particulate Matter (PM10)
As is evident from the data, PM10 concentration observed in the study area
during April- June, 2015 is minimum of 72.3µg/m3 at Tala and maximum of
83.3 µg/m3 at Project Site. P98 remained as 81.5 µg/m3 during this period.
4.4.2.2 Respirable Suspended Particulate Matter (PM2.5) Table 4.3 gives the PM2.5 levels concentration at different monitoring
stations. It was minimum of 38.1 µg/m3 at village Tala and maximum of
43.9 µg/m3 at Project Site. P98 remained as 43.53 µg/m3 during this period.
4.4.2.3 Sulphur Dioxide (SO2)
The SO2 levels at various monitoring stations ranged from 4.2 to 8.1 µg/m3.
It would be seen that the SO2 levels are quite low in the area. The 98th
percentile value for SO2 has been determined as 7.88 µg/m3. The situation
in the study area as far as SO2 concentration is concerned is comfortable.
4.4.2.4 Oxides of Nitrogen (NOx)
P98 remained as 20.7 µg/m3 during this period.
4.4.3 CONCLUSIONS
The Ambient Air Quality Monitoring in the study area shows that:
i) P-98 of PM10 and PM2.5 respectively are well within the NAAQ standards of
100 and 60µg/m3 respectively.
ii) The levels of SO2 are much below the desired limits of 80µg/m3 P 98 is 7.88
µg/m3.
iii) The levels of NOx are also below the desired limits of 80µg/m3 P 98 is 20.7
µg/m3.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
51
4.4.4 WATER QUALITY
Water quality of ground as well as surface resources in the study area has
been studied for assessing the water environment and to evaluate the
anticipated impact of the project. The monitoring locations have been
identified considering drainage pattern, population and croplands and likely
areas that represent base line conditions. Location of the monitoring stations
for Ground and Surface Water is given in Table 4.5 (a), (b) and shown in Fig.
4.2 (a), (b).The results are given in Table-4.6 (a), (b).
TABLE-4.5 (a)
DETAILS OF GROUND WATER MONITORING STATIONS
S.No. Name Source
1. Project Site Tube-well
2. Khokhar Tube-well 3. Jhanwan Tube-well
4. Manpur Tube-well
5. Mirpur Tube-well
6. Tala Tube-well
TABLE-4.5 (b)
DETAILS OF SURFACE WATER MONITORING STATIONS
S.No.
Name
Source
1. Kali Bein (near Rasulpur)
River Water
2. Kali Bein (near Mirpur) River Water
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
52
Figure 4.2 (a) Ground Water Monitoring Stations
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
53
Figure 4.2 (b)
Surface Water Monitoring Stations
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
54
TABLE-4.6 (a)
RESULTS OF WATER SAMPLES (mg/l except pH)
Ground Water
Characteristic
GW-1 (Project Site)
GW-2 (Khokhar)
GW-3 (Jhanwan)
GW-4 (Manpur)
GW-5 (Mirpur)
GW-6 (Tala)
Colour, Hazen unit <5 <5 <5 <5 <5 <5
Turbidity, NTU <1 <1 <1 <1 <1 <1
pH 7.25 7.35 7.14 7.41 7.37 7.20
Total Hardness (as CaCO3) 170 140 130 190 100 110
TDS 228 210 225 263 175 178
Total Alkalinity (as CaCO3) 168 156 146 200 125 132
Iron (as Fe) 0.18 0.09 0.13 0.21 0.13 0.09
Chloride (as CI) 22 10 12 14 4.98 12
Nitrate (as NO3) 10 15 12 10 8.9 10
Calcium (as Ca) 44 36 32 48 24 20
Fluoride (as F) 0.87 1.1 1.4 0.98 1.1 0.56
Magnesium 14.4 12 12 16.8 9.6 14.4
Sulphate (as SO4) 28 30 32 39 28 26
Arsenic ND ND ND ND ND ND
Copper (as Cu) ND ND ND ND ND ND
Lead (as Pb) ND ND ND ND ND ND
Cyanide (as CN) ND ND ND ND ND ND
Zinc (as Zn) ND ND ND ND ND ND
Aluminum (as Al) ND ND ND ND ND ND
Chromium (as Cr) ND ND ND ND ND ND
Ecoli/100 ml Absent Absent Absent Absent Absent Absent
Coliforms/100 ml Absent Absent Absent Absent Absent Absent
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
55
4.4.5 Ground Water Quality:
It has been seen from the results that:
1. pH varies from 7.2-7.34 which is the acceptable limits for potable water.
2. Calcium varies from 20 to 48 mg/l. The highest value was observed at
Village Manpur.
3. Magnesium varies from 9.6 to 16.8 mg/l. The highest value was observed at
village Manpur.
4. Chloride concentration which is also one of the important parameters varies
from 4.98 to 22 mg/l. It was found maximum at Project site and minimum
at Mirpur.
5. Heavy metals like Chromium, Lead, and Zinc were much below the
permissible limit in all the samples.
6. Iron varies from 0.09 to 0.21 mg/l.
7. Sulphates vary from 26 to 39 mg/l.
4.4.6 CONCLUSION
All the above parameters at the various locations in the study area are
within permissible and tolerable limits for drinking. The underground water
in the area is thus potable.
In the study area since the samples have been collected from different sites
at isolated places, the level of concentration and different elements vary
quite considerably which may be due to small aquifers. However, the levels
of the various components are within acceptable / permissible norms for
drinking water.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
56
TABLE-4.6 (b)
RESULTS OF WATER SAMPLES (mg/l except pH) Surface Water
Characteristic SW-1 Kali Bein (near Rasulpur)
Upstream Downstream
Colour, Hazen unit < 5.00 < 5.00
pH 7.7 7.6
Turbidity, on NTU 8 9
Total Hardness (as CaCO3) 108 110
TDS 240 241
Alkalinity 114 113
Sulphate (as SO4) 32 33
Calcium (as Ca) 30.4 31
Magnesium (as Mg) 7.68 7.4
Total Phosphate (as P) 0.421 0.424
Nitrate 0.812 0.815
TKN 1.384 1.388
Iron (as Fe) 0.08 0.08
Free Ammonia 0.034 0.035
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
57
Characteristic SW-2 Kali Bein (near Mirpur)
Upstream Downstream
Colour, Hazen unit < 5.00 < 5.00
pH 7.5 7.4
Turbidity, on NTU 7 8
Total Hardness (as CaCO3) 108 110
TDS 216 220
Alkalinity 114 112
Sulphate (as SO4) 32 33
Calcium (as Ca) 24 22
Magnesium (as Mg) 9.6 9.5
Total Phosphate (as P) 0.422 0.425
Nitrate 0.813 0.815
TKN 1.385 1.386
Iron (as Fe) 0.08 0.09
Free Ammonia 0.034 0.038
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
58
4.4.7 Ambient Noise Quality
The acoustical environment varies dynamically in magnitude and character
throughout most communities. The noise level variation can be temporal,
spectral and spatial. The residential noise level is that level below which the
ambient noise does not seem to drop down during the given interval of time
and is generally characterized by unidentified sources. Ambient noise level
is characterized by significant variations above a base or a residential noise
level. The maximum impact of noise is felt in urban areas which are mostly
due to the commercial activities and vehicular movement during peak hours
of the day.
From environment point of view, higher noise levels may affect health of
human beings and disturbance to animals if they are close to the noise
generating sources.
Measurement of noise levels in the study area at several locations has been
carried out to determine the existing noise levels to subsequently
superimpose increment in noise levels due to the setting up of proposed
unit.
Noise levels recorded at each station are computed for Equivalent noise
levels. Equivalent noise level is a single number descriptor for describing
time varying noise levels. Location of noise monitoring station is given in
Fig. 4.3.
Details of noise monitoring stations and equivalent noise levels are shown
in Table 4.7. Noise levels in the study area vary from 45 dB (A) to 52 dB
(A) at day time. The highest levels were observed at Project Site.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
59
TABLE-4.7
NOISE LEVEL RESULTS
S.No. SITE NOISE LEVEL, dB (A)
Day(06:00am-10:00pm) Night(10:00pm-06:00am)
1. Project Site
52 38
2. Khokhar 51 38
3. Jhanwan 48 37
4. Manpur 47 35
5. Mirpur 47 34
6. Tala 45 32
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
60
Figure 4.3
Noise Monitoring Station
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
61
CHAPTER-5.0 ENVIRONMENTAL IMPACT ASSESSMENT &
MITIGATION MEASURES
5.1 GENERAL
Impact of the project on various Environmental factors as existing in the
project area which possibly could be affected both adversely and
beneficially by the activities have been assessed & identified as under.
(i) Ambient Air
(ii) Water Quality
(iii) Noise
(iv) Land use pattern
(v) Demography and socio-economic pattern.
Mitigation measures to minimize the adverse effects to acceptable /
permissible limits have also been discussed.
5.2 PROBABLE IMPACT ON ENVIRONMENT
Broadly the impacts may be classified in two categories as under:-
i) Short term - during construction/development stage
ii) Long term - during operational stage.
Both these categories have been considered while predicting and evaluating
the impacts as given herein after:-
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
62
5.3 DEVELOPMENT STAGE: - (SHORT TERM)
This is a construction phase of the project and the impacts are temporary
due to construction related activities which are as under:-
i) Air Environment
There is no manufacturing machinery working during this phase as such no
point source air pollution is expected. The only source will be the dust
generation due to excavation, construction and plying of vehicles. Some
emission may be expected from burning of bitumen during lying of roads
and from vehicles plying in the area for transportation of material etc. Since
the area of the plant is very small there will not be any significant effect on
the overall air environment of the area.
ii) Water Environment
Requirement of water during construction will be about 10m3/day and there
will be no discharge as the same will be used completely. However, during
monsoon some malba etc may get washed due to run off from the site.
There is a natural nalha near the land which takes the entire run off from the
area.
Labour during construction is not very large. Hardly about 40 persons may
be working on an average that may be using water for drinking and bathing
etc. A septic tank shall be provided for the labour with toilet facilities
during working hours.
In view of this there is no likely hood of any significant impact on the
general environment of water in the area.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
63
iii) Noise Environment
Some noise may be expected from the working of the machinery for
construction purpose and movement of vehicles. Steps will be taken to
reduce its effect by resorting to staggering of various operations. Even
otherwise since there will not be any large scale machinery; the activity is
not likely to have any significant effect on the overall noise environment.
iv) Land Environment
The land at site is fairly level as such no leveling is required. In view of this
no deterioration of the existing conditions will occur. Natural drainage will
not be disturbed. Solid waste from construction activities will be used
within the premises under roads & refilling. The area being very small there
will not be any significant impact on land.
v) Demography & Socio Economic Pattern
The project does not involve any displacement of population or
rehabilitation of any kind within study area. Rather it will provide
employment to local people in the shape of additional man power required
for the units, & will boost the economy of the area. It will have some
positive impact, although not to a large extent.
5.4 OPERATIONAL STAGE: - (LONG TERM)
After completion, when the unit starts production, the operational impacts
on the various parameters are considered as under:-
i) Ambient Air Environment Impact on ambient air quality at site and in the immediate neighborhood could be attributed to the following sources of emissions.
SPM/ Dust Emission from grinding process
D.G. Sets emission.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
64
Exhaust gases from the grinding section shall be passed through APCD and
then released to atmosphere. In the grinding unit the raw material along
with clinker shall be grinded in closed operation. However, bag filter shall
be provided to arrest any SPM coming out of the grinding unit. Flue gas
from the DG Sets will pass through a chimney and the final gas will be
within permissible limits. Thus air environment is not likely to be affected
significantly.
Existing PM10 level in the study area varies from 72.3 to 83.3 µg/m3 & P98
is 81.5 µg/m3. DG sets have been provided chimneys of adequate height as
per CPCB Norms. There are no process emissions as all the manufacturing
processes are closed circuits. However, APCD like Bag filters will be
provided to arrest particulate matter.
ii) Water Environment
The domestic use of water will be about 10m3/day and it will be treated through
S.T.P. It will be used for plantation within the premises. Treated effluent will not
be thrown in any water body. Thus water environment is not likely to be affected.
Further, ground water will be balanced through recharge by rain water harvesting
from the roof top through recharge wells. Thus pressure on underground water
will be reduced.
iii) Land Environment:
About 6.8 acre land has been acquired for the unit. The land is uncultivated
as such there will be no adverse effect on the land environment with the
coming up of the unit.
iv) Noise Environment:
There will be some noise producing machinery or equipment. The D.G. Set
will be placed in acoustically sound proof room causing least disturbance in
the area. There is no likely hood of change in noise environment
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
65
v) Socio Economic
Social aspects can be defined as the consequences to people of any
proposed action that changes the way they live, work, relate to one another,
organize themselves and function as individuals and members of society.
This includes social-psychological changes, for example to people’s values,
attitudes and perceptions of themselves and their community and
environment.
Sometimes impact on people can be by far the most important
consideration. Adverse social impacts can reduce the intended benefits of a
proposal, and can threaten its viability if they are severe enough.
Broadly social and economic aspects could be as under:-
1 Individual Life Style – These are ways people behave & relate to
family, friends & cohorts on day to day basis.
2 Community aspects- These are infrastructure, services, voluntary
organizations, activity networks and cohesion.
3 Health aspects- These include mental, physical and social wellbeing of
the persons in general
4 Rehabilitation and Resettlement- These include displacement of
families beyond defined thresholds. There are no rehabilitation and
resettlement of people.
It is a new cement grinding unit. It does not directly or indirectly interfere in
the life of the people in the study area especially with respect to the aspects
mentioned above. There will not be any adverse impact on them due to this
project. The project will provide direct & indirect employment to local
people in the field of running plants and maintenance of machinery, APCD &
security etc. Thus it will have positive effect on the employment potential
in the area.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
66
5.5 CONCLUSION
It can be seen from the assessment of impacts that the proposed construction
and operation of unit will not have any significant impact on the surrounding
environment. Proper arrangements for collection and treatment of effluents
and supply of water are unlikely to affect water environment adversely.
Proper pollution control measures proposed for grinding unit and disposal of
hazardous waste would ensure that air, water, solid waste and noise
environment do not have any adverse impact. It is concluded that with the
adoption of appropriate mitigation and enhancement measures, there will be
improvement in the development of commercial activities, generation of
direct and indirect employment opportunities and the overall quality of life in
the surrounding area.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
67
CHAPTER - 6.0
ENVIROMENTAL MONITORING PLAN
No project can succeed unless it is monitored at regular intervals & results
analyzed. Keeping this requirement in view an elaborate Monitoring
programme has been developed for this project. Regular monitoring of all
significant environmental parameters will be carried out to check the
compliance status vis-à-vis the environmental laws and regulations. The
objectives of the monitoring will be as follows:
To verify the results of the Impact Assessment Study with respect to the
proposed projects.
To study the trend of concentrated values of the parameters, which have
been identified as critical and then planning the mitigating measures.
To check and assess the efficacy of pollution control equipment.
To ensure that any additional parameters, other than those identified in the
impact, do not turn critical after the commissioning of proposed project.
A comprehensive Environmental Monitoring Program that has been
prepared for the purpose of implementation in the proposed Industrial unit
is given below:
Table 6.1: Environmental Monitoring Plan
S.No Item Parameters to be checked Frequency
1 Ambient Air RSPM, NOX Silica & SO2 Every six months
2 Vehicles PUC Every Quarter
3 Noise Level dB (A) Once in a year
4 Ground water As per IS 10500 Once in a year
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
68
All the above observations will be compiled and documented to serve the
following purposes.
Identification of any environmental problems that are occurring in the
area.
Initiating or providing solution to those problems through designated
channels and verification of the implementation status.
Controlling activities inside the project, until the environmental problem
has been corrected.
Suitably responding to emergency situations.
To implement the EMP, a structured Environment Management Cell
(EMC) interwoven with the existing management system will be created.
EMC will undertake regular monitoring of the environment and conduct
yearly audit of the environmental performance during the construction of
the project. It will also check that the stipulated measures are being
satisfactorily implemented and operated. It shall also co-ordinate with local
authorities to see that all environmental measures are well coordinated.
Environment Management Cell:
The Environment Management Cell shall include:
Representative of Management (Head of Environment Cell)
Process Incharge
Incharge Maintenance Department
A representative of Environmental Consultants
The cell shall be constituted immediately at the start of the project so that
appropriate actions to protect the Environment are taken from the very
beginning. All actions taken by the cell shall be documented.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
69
Table 6.2
EXPENDITURE ON ENVIRONMENTALMEASURES
Cost of various Environment protection measures is indication as under
S. No Title Capital Cost Rs. Lacs
Recurring Cost Rs. Lacs (Annum)
1. Air Pollution Control (APCDs)
75.0 10.0
2. Landscaping and Green Belt Development
10.0 2.0
3. Environment Monitoring and Management
10.0 1.5
4. Sewage treatment Plant 10.0 1.0
Total 105.0 14.5
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
70
CHAPTER-7.0 CORPORATE SOCIAL RESPONSIBILITY
Corporate social responsibility is the commitment of businesses to
contribute to sustainable economic development by working with the
employees, their families, local community & society at large to improve
their lives in ways that are good for business as well as overall
development. It is a voluntary activity of a company that supports social
interests & environmental issues. It is a principle through which the
business houses contribute to the welfare of the society & not only
maximize their profits. CSR, in fact, is about business giving back to the
society.
As late as 1990s even when pollution control related legislations were in
place, Indian Corporate Sector used to consider any actions related to
pollution control as discharge of their social responsibility. Only when
Supreme Court of India pronounced “Polluter Pays Principle” & some of
the courts came down heavily on Polluters for their inaction to control
pollution at several locations, the Corporate Sector felt that it was their
legal responsibility to abide by laws of the land. Industries have now
realized that it pays to be proactive on the environmental management front
including corporate social responsibility. This obligation is seen to extend
beyond the statutory obligation to comply with legislation & sees
organizations voluntarily taking further steps to improve the quality of life
of employees, their families & society at large. Social includes economic &
environmental responsibilities also. Some of the large enterprises have
created some kind of institutional frame work, educational & health care
programs in the form of schools, colleges, training centers, public
healthcare & hospitals etc. Some business houses provide financial aid to
some other agencies for specific programs or as donations to them who take
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
71
up works relating to the social uplift of the society in general & for the
weaker section in particular.
Some of the CSR related activities are summarized as follows:-
(i) Sustainable livelihood creation – Promoting micro entrepreneurship
through skill development, market linkages & women’s economic
empowerment.
(ii) Education – Setting up schools, colleges, curriculum development, teacher
training & community involvement.
(iii) Health care – Healthcare awareness camps & setting up hospitals &
dispensaries in areas where these are deficient.
(iv) Community initiative – Need based services, project/programs for
disadvantage youth, illiterate adults, socially & economically deprived
sections of the society & women self help groups.
(v) Rural development – Water management, housing, sheds, waste land,
agriculture & animal husbandry, genetic improvement & model village
development with all basic amenities.
(vi) Infrastructure developments – Roads, drinking water & sanitation etc.
In addition sewage management & solid waste management especially in
urban areas where local self-govt. have resource crunch could also be taken
up under CSR which could bring a complete revolution in the country.
For CSR a corpus of about 0.5% of the project cost i.e. Rs. 49 Cr. shall be
created and following activities shall be taken up from its interest during
the entire life of the project.
(0.5% of 49 Cr ≈ 25 lacs)
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
72
Table 7.1 DETAIL OF CSR AND ITS TIME BOUND IMPLEMENTATION
Name of the
Village Welfare action Plan Estimated
Cost (Rs Lacs)
Khakh Environmental education cum awareness campaign through audio/video in the village and School of the village once a year.
1.0
Health check up camps including vision, audiometry, spirometry, respiratory disorders and free medicines whenever required once a year.
3.0
Purified drinking water and separate toilets in the schools and their upkeep. Free medical treatment to very poor patients as recommended by Hospital
3.0
Total
7.0
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
73
CHAPTER-8.0
ENVIRONMENTAL MANAGEMENT PLAN
8.1 GENERAL
Environment Management Plan (E.M.P) in a project is prepared to mitigate
the possible adverse effect of various activities on the existing
environmental factors, during construction as well as in operational stages,
to avoid their deterioration, if any. It is desirable that necessary steps are
taken right from the beginning of the project to be more effective. As a
social and moral obligation on the part of everybody it becomes our
bounden duty to leave our environment to the next generation in a state at
least what we inherited from our ancestors, if not in a better condition.
E.M.P. for this project has been prepared keeping in view the existing
conditions and likely changes which may occur due to the proposed project.
The implementation and monitoring of different control measures have also
been covered. These are discussed as under:-
8.2 EMP FOR AIR ENVIRONMENT:
During construction stage water will be sprinkled on the soil to avoid dust
generation. The debris and unused construction malbas shall be removed
immediately for recycling, if any, or for land fill.
Bag filters shall be provided to arrest SPM to keep it within permissible
limits. All vehicles for service activities at the project site shall be checked
for vehicular emission. The agencies will be asked to keep them within
prescribed limits. They will also be asked to maintain them properly.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
74
After the project comes under operation, a chimney of suitable height shall
be provided for the D.G.Set to control the G.L.C. of S.P.M., SO2, & NOx
levels.
Extensive tree plantation shall be resorted to for further improving the air
environment in general and minimize noise levels.
8.3 EMP FOR WATER ENVIRONMENT:
Drinking water shall be drawn from a tube-well installed in the factory area
and distributed through an Over Head Service Reservoir. This will all be a
closed system. During construction septic tank shall be provided for the
labour with toilet facilities for daily use. Waste water from the toilets shall
be taken to S.T.P. through underground delivery system and treated upto
tertiary level. Treated water will be completely used within the premises for
tree plantation, landscaping, parks and recycling for flushing etc. to reduce
withdrawal. It will not be thrown outside either on land or in any water
body.
Roof top Rain Water shall be harvested and used for ground water recharge
to minimize effect of withdrawal of water from the underground.
8.4 EMP FOR LAND ENVIRONMENT:
To avoid erosion of the top soil the development is planned in the shortest
possible time and land-clearing activity shall be kept to the absolute
minimum by working at the specific sites one by one where construction is
to take place so as to increase detention and infiltration.
The activities that result in soil being laid bare shall be scheduled in such a
way that some type of vegetative cover appropriate to the site shall be
established prior to onset of monsoons. Natural waterways/drainage pattern
shall be maintained by providing culverts where needed.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
75
The requirements of sand and aggregates for the construction works will be
supplied by venders. The land use is thus so planned that there is minimum
adverse impact.
8.5 EMP FOR SOLID WASTE
The solid waste generated from the construction activities shall be
effectively recycled within the project. Recyclable shall be sold to vendors.
The other solid wastes shall be dumped in a dumping pit of R.C.C.
construction and disposed off in the designated land fill places.
8.6 GREEN BELT:
The main objective of the green belt is to provide a barrier between the
source of pollution and the surrounding areas. The green belt helps to
capture the fugitive emission and to attenuate the noise generated, apart
from improving the aesthetics. Development of green belt and other forms
of greenery shall also prevent soil erosion and washing away of topsoil
besides helping in stabilizing the functional ecosystem and further, to make
the climate more conducive and to restore water balance. It is also
presumed that the selected plants will be grown as per normal horticultural
(or forestry) practice and authorities responsible for plantation will also
make sure that adequate provision for watering and protection of the
saplings exists at site.
The landscaping and green belt will be designed and trees will be planted in
open areas, around factory boundary along footpaths and dividers.
Standard practice will be followed for planting of saplings in pits of
substantial dimensions, 1m x 1m x 1m for big trees and almost half of these
dimensions for smaller trees and shrubs. The pits shall then be filled with
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
76
earth, sand, silt and manure in predetermined proportions. Saplings planted
in the pits will be watered liberally. The growing plants will be cared for
the first five years under favorable conditions of climate and drainage. Care
will be taken for nutrient supplement (healthy growth), plant protection,
absence of water stress (to maintain openness of stomata apertures and
epidermal structures) and exposure to normal atmospheric conditions (free
air flow). The guidelines as laid out in National Building Code of India
shall be followed in the overall development of Green Belt.
8.7 RAIN WATER HARVESTING
Rain Water Harvesting is collecting and using precipitation from a
catchments surface. The rainwater collected can be stored for direct use or
can be recharged into the groundwater. Rain Water Harvesting is thus
becoming essential as it helps to meet our demand for the water either
directly as rain water is stored and put to different uses or indirectly via
replenishing the ground water.
Thus, there are two main techniques of Rain Water Harvesting (RWH)
depending on the end use.
- Storage of rain water on surface for direct use
- Recharge to ground water
For RWH, the rainwater that falls on a catchment’s is carried through
pipelines or drains for storage or recharge. The catchment’s can be a paved
area like a roof, terrace or courtyard of a building, or an unpaved area like a
lawn or open ground.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
77
8.7.1 GENERAL ARRANGEMENTS PROPOSED
In the present case since the land available is limited and large tanks cannot
be constructed it is proposed to recharge the ground water through deep
bores.
8.7.2 RECHARGE POTENTIAL
The recharge is proposed to be done from the roof top of the building
(Admin, Lab, Work Shop, Staff room, Store) only. The recharge potential
thus available is as below:-
Area of the catchment (Roof Top) A =5500 m2 (Approx.)
Average annual rainfall R = 0.6 m.
Runoff coefficient C = 0.8
About 80% of rainfall that falls on the roof (Roofs with tiles) is available
for use.
Annual Roof Top Rain Water Harvesting Potential = A x R X C = 2640 m3
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
78
CHAPTER-9.0
OCCUPATIONAL HEALTH AND SAFETY OF WORKERS
9.1 GENERAL
Occupational Health basically relates to protecting the Industrial Workers
from the ill effects of various parameters at the work place or in other
words, “Occupational Environment”. It is synonymous with `Preventive
Medicine’ as both aim at prevention of diseases & physical discomfort. This
in the long run increases their efficiency and ultimately results in better
production. Thus, both the workers and the industrialists are gainers.
9.2 OCCUPATIONAL ENVIRONMENT
Occupational Environment includes external conditions and influences
which prevail at the place of work and which have a bearing on the health of
workers. These are of three types i.e.
(a) Man and physical, chemical & biological agents.
(b) Man and Machine
(c) Man & Man.
9.3 OCCUPATIONAL HAZARDS
Keeping in view the above environmental factors, the workers may be
exposed to following types of hazards depending upon his occupation.
(a) Physical hazards, i.e. heat, light, noise, vibration.
(b) Chemical hazards which affect the health of workers in three ways: i)
local action, ii) inhalation, iii) ingestion
(c) Mechanical hazards, e.g. moving parts of machinery etc.
(d) Biological hazards, it mainly occurs in units dealing with animals and
animal products.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
79
9.3.1 Hazards Comprising at the Industry:
Identified hazards:
Noise induced hearing loss
Exposure to excessive dust resulting in respiratory diseases (Silicosis,
Bronchitis, etc)
Excessive heat leading to stress and fatigue
Burns and shocks due to electricity
Illumination
Permissible level of exposure:
S. No. Description of Hazard Permissible Exposure Level (Factories Act)
1. Dust Exposure (Amorphous as Total dust)
10 mg/m3 TWA (8 hr)
2. Noise Hazard 90 dBA – 8 hrs 92 dBA – 6 hrs 95 dBA – 4 hrs 100 dBA – 2 hrs
9.4 MITIGATION MEASURES:
The main aim of occupational health is the promotion & maintenance of the
highest degree of physical, mental and social well being of workers in all
occupations. Thus, different measures are required to control ill-effects of
the various activities in the industries.
9.4.1 Safety Precautions & Suggestion:-
To protect the health of the workers in the Industry, following measures
shall be taken:-
i) Proper housing shall be provided to workers in large Units for
comfortable & stress free living.
ii) Personal Protection Equipment (PPE) shall be provided to workers,
such as Earplugs, Gloves, Eye Goggles, and Helmets & Gum Boots etc.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
80
iii) Clean & cool drinking water shall be available to workers near work
places especially near hot spots.
iv) Proper ventilation shall be provided in work place, especially where
heat is generated.
v ) Employees working near hot areas shall be rotated to minimize
exposure time.
vi) Acoustics shall be provided in rooms where noise creating machines
work.
vii) All moving & protruding parts of machinery shall be guarded, so that
worker does not come in contact with them.
viii) Proper lighting shall be provided in the work place. Glares will be
avoided.
ix) Exhaust fans & canopy hoods shall be provided in the areas where dust
& other gases are expected from the operations.
x) First Aid Box shall be kept at prominent place to be used in emergent
cases.
xi) All firefighting equipment shall be frequently checked to see that they
are effective always.
xii) Frequent health check-up of the workers shall be done on regular basis
and the results documented. Timely medical treatment shall be provided to
affected person, if any.
9.4.2 Routine health check-up of workers:
Routine health check-up of workers are done. Eye examination and
Audiometry of truck drivers and crane operators are done every year. Other
workers working near dust prone areas are also subjected to PME. Health
Records are statistically analyzed and maintained. The medical examination
covers the following tests.
General Physical Examination
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
81
X-Ray Chest and ECG
Sputum Examination
Differential WBC Count
Routine Blood and Urine Examination
Lung Function Test
Eye Examination
Audiometric Test
The medical histories of all the employees will be maintained in a standard
format.
Frequency of Periodical Examination:
For employees <30 Years, once in five years
Between 31-50 Years, once in four years
Between 41-50 Years, once in two years
Above >50 years once a year
9.5 FIRE FIGHTING PLAN
9.5.1 Introduction:
The project area lies in agricultural land. There are no Reserve forests or
other sensitive sites within 10 km of the area of the unit. Residential area is
quite far from the unit.
9.5.2 Management of fire & other hazards
Industrial fires and explosions cause considerable damage to lives and
property besides impending productivity. This damage may extend to
neighboring areas. The fundamental approach governing fire safety
attempts shall be adopted to ensure that fires do not at all start in the first
place and should they occur, to restrain their spread by quick detection and
extinguishment.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
82
9.5.3 Prevention of spread of fire:
Despite many precautions taken, fires do break out. Hence every factory
should have established measures to detect a fire and to attack it
immediately. Automatic fire detection has many advantages such as speed
and reliability and is recommended for warehouses, control
rooms/computer rooms and unoccupied areas with high fire hazard.
Depending on the nature of the occupancy and the hazard, a variety of
detection systems are available. They are activated by one of the effects of
fire such as temperature rise, smoke flame or heat and can be coupled to an
alarm system which would provide visual/audible alarms at designated
manned locations. They can also be designed to automatically actuate fire-
extinguishing systems. The selection/installation of the detection system
shall conform to the applicable National Standards.
9.5.4 Extinguishing Systems:
Equipment for firefighting shall be chosen with care and suited to the task.
Fires are classified depending on the materials involved and appropriate
extinguishing agents are also recommended. Different kinds of fire fighting
media are available: Water, Dry Chemical Powders, Carbon Dioxide, Foam
etc.
9.5.5 Fire prone areas of the industry:
i)High tension cable wiring: reason: due to short circuit.
ii)Other places; reason: due to any manual reason.
9.5.6 Precautions:
Following measures will be in place for M/s Duratech Cements India Ltd:
i) First Aid
First Aid shall be readily available and at the nearest place in case of any
emergency. First aid charts showing actions to be taken in a practice shall
be displayed prominently. Following equipment shall be provided.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
83
First Aid Boxes
Stretchers/Wheel/Chairs
Fire Blankets
Emergency Showers & Eye wash facilities
Emergency lighting
Arrangement shall be made with some local Doctor or Clinic for immediate
assistance in case of Emergency.
Exposure to fumes or vapours
Remove the affected person to fresh air. If needed try artificial respiration
& consult Doctor immediately.
Eye Contact
Flush with water and get medical advice.
Skin Contact
Remove contaminated clothing and wash off immediately with water.
Burns
Cool down the affected area with cold water until pain subsides. Apply
some antiseptic and obtain medical advice.
ii) Portable fire extinguishers and hydrant systems
Portable fire extinguishers and hydrant systems are provided at strategic
locations throughout the plant.
iii) Fire detection and alarm system
These will be provided to detect fire/smoke in vulnerable areas of the plant
through smoke / heat detectors.
iv) Signs such as “NO SMOKING” must be prominently displayed within the
premises, especially in parts where flammable materials are handled.
v) Regular inspection and servicing of the extinguishers must be undertaken
by a reputable service provider and records of such inspections maintained.
vi) Electrical fittings near all potential sources of ignition shall be flame proof.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
84
CHAPTER-10.0
RISK ASSESMENT, ITS MITIGATION & DISASTER
MANAGEMENT PLAN
10.1 GENERAL
All projects, whether industrial or otherwise, do have some pitfalls. The
gravity of such happenings depends on manufacturing process, quality of
the materials used, man power utilized and general working environment.
While small Industrial projects employ comparatively less number of
employees some big projects deal with large number of persons. In both
cases adequate measures have to be taken to reduce possible accidents and
save human life. Keeping these factors in mind Risk Assessment and
Disaster Management Plan for this project has been prepared.
10.2 RISK ASSESSMENT
Risk can be defined as possibility of harm, which can occur during the life
time of a project and its anticipated severity. In absolute terms, 100% risk
free projects cannot be achieved. Thus, the safety of a Plant is considered
in terms of acceptability of the risk created. “Safety at any cost” is ideal
and desirable but sometimes the cost involved in such a situation is
prohibitive. Thus a crucial decision has to be taken on “safety-at-what-
cost”. The need for safety provisions are felt only when the mishaps occur.
It is rare that all the problems are anticipated and an answer is sought
before a disaster occurs. The risk evaluation is, therefore, done within the
prescribed limits fixed for a Unit to be safe enough. But when the risks in a
process are greater than the acceptable limiting risk the project is termed as
a `dangerous’ and appropriate measures have to be adopted to bring the risk
within limits for the safety of the project.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
85
Normally almost all Plants handle some materials and processes which are
hazardous/ toxic in the Industry. All precautions have therefore, to be taken
to handle such materials as per HWM Rules. The processes and layout of
the machinery have to be regulated as per the norms fixed to minimize the
risks involved.
Broadly, following types of possible risk/ hazards are encountered in the
Industrial Units and their safeguards are suggested as under:-
(i) Physical Hazards like heat, humidity, light & noise etc.
(ii) Electrical Hazards like unsafe equipments, unsafe work practices, unsafe
environment.
(iii ) Mechanical Hazards like machinery having moving parts and unguarded.
(iv) Lightening like strokes during rainy season causing damage to buildings.
(v) Fire Emanating from different sources and due to different causes.
These are discussed as under:-
(i) Physical Hazards:
(a) Heat: Heat is the most common hazards in the Industries especially
where furnaces and boilers are used. Its continuous exposure causes heat,
exhortation, heat strokes and heat cramps. Thus, for safety of the workers,
reasonable temperature which is normally acceptable in working area
should be maintained which is about 70° F to 80° F and could be achieved
by proper ventilation.
(b) Light: Inadequate light or extreme glares are also big hazards in an
Industry as they cause eye strain and headache etc. Thus, proper lighting
with adequate distribution and steadiness has to be maintained to reduce the
risk factor.
(c) Noise: Noise is a big stress factor and annoyance to the workers. It can
lead to accidents, if the worker is not relieved of the stress by having
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
86
different measures to reduce noise in the area like mufflers, acoustics in the
room and providing ear-plugs and muffs to the employees.
(ii) Electrical Hazards :
Most electrical accidents occur from one of the following factors:
a) Unsafe equipment
b) Unsafe environment
c) Unsafe work practices
Electrical accidents could, therefore be prevented through use of:
Proper Insulation
Guarding
Earthing
Electrical protective devices
Safe work practices
Insulators
Insulators such as glass, mica, rubber, or plastic used to coat metals and
other conductors help stop or reduce the flow of electrical current. This
helps prevent shock, fires, and short circuits. Before connecting electrical
equipment to a power source, it's a good idea to check the insulation for any
exposed wires for possible defects. Insulation covering flexible cords such
as extension cords is particularly vulnerable to damage. No live wires shall
be allowed to hang at any place, where persons can normally go.
Guarding
Guarding involves locating or enclosing electrical equipment to make sure
that people don’t accidently come into contact with its live parts. This
should be done for equipments with exposed parts operating at 50 volts or
more especially where it is accessible to authorized people, qualified to
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
87
work with it. The recommended locations are room, vault or similar
enclosure, a balcony, a gallery or elevated platform. Sturdy permanent
screens also can serve as effective guards. Conspicuous signs shall be
displayed at the entrances to electrical rooms and similar guarded locations
to alert people to the electrical hazards and to forbid entry of unauthorized
persons. These signs may contain the word “Danger”, “Warning” or
“Caution” and beneath that appropriate concise wording that alerts people
to the hazard or gives an instruction such as, “ Danger / High Voltage /
Keep Out” should be given.
Earthing
Earthing a tool or an electrical system means intentionally creating a low
resistance path that connects to the earth. This prevents the buildup of
voltages that could cause an electrical accident. Earthing helps to protect
the operator as it provides an alternative path for the current to pass through
from the tool or machine to the ground and does not affect the operator.
Safe Work Practices :
Electrical accidents are largely preventable by adopting safe work practices
such as:
Checking Insulation of the equipment before installation
Properly earthing the equipment
De-energizing electrical equipments before inspection or repair
Keeping electrical tools properly maintained.
Using appropriate protective equipment such as:
a) Rubber insulating gloves
b) Hoods
c) Sleeves
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
88
d) Matting
e) Line Hose
f) Protective Helmets
g) Protective Eye Glasses
(iii) Mechanical Hazards:
Mechanical Hazards like protruding and moving parts of machinery are big
Hazards/ risk factors in almost all Units. Proper fencing should be provided
in such areas and sufficient space for proper movement should be avoided
to avoid any accident.
(iv) Lightening
Tall buildings are prone to lightening strikes especially during rainy
seasons which can not only damage the building but can result in fatal
accidents for workers. It is, therefore, necessary that in order to avoid
lightening strikes, causing any damage, lightening arresters should be
provided with proper earthing as per the electricity rules in all the buildings
individually.
(v) Fire
In spite of all precautions taken, fires do break out in factories where
furnace, electrical heaters and other equipments are used extensively. To
meet such exigencies, adequate fire extinguishers shall be provided at
suitable places with suitable hydrants. Underground tanks shall be provided
and kept always full with water so that during emergency the same could be
utilized. These tanks should be accessible by road for the fire tenders.
Supervisory staff should be fully aware and given adequate training for
meeting such exigencies. First aid shall be available nearby for affected
persons.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
89
10.3 DISASTER MANAGEMENT PLAN
Despite of all efforts made accidents do occur which need immediate
attention. The risks involved in this project have been identified and their
mitigation measures have been delineated in earlier paras. But when serious
accidents occur & negligence could result in loss of life the whole thing
has to be handled in a systematic well planned manner Accordingly
following plan of disaster management has been evolved:-
10.3.1 Major Activities
Broadly Disaster Management Plan covers the following activities:
Pre - Emergency Preparedness
Emergency actions
Post Emergency activities
These activities are aimed at facing any emergency so that at the required
time there is no chaos and everything is handled in a very effective manner.
a. Pre-emergency Preparedness:
The activities falling in this category are carried out in a normal situation
without any reference to any particular accident / hazard. They are of a
precautionary nature. These normally include:
i) Internal safety
ii) Non-destructive testing
iii) Fire fighting system testing
iv) Mock drills
v) Training
vi) Productive equipment
vii) Communication
viii) Emergency lights
ix) Emergency control Room
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
90
x) Assembly points
xi) Liaison with state authorities
xii) Hospital activities
xiii) Outside shelters
b. Emergency Time Activity:
During emergency the staff at various levels is expected to work in
coordinated manner with pre-assigned duties to meet the emergency
situation and bring normalcy with the help of the resources available within
and outside the premises. Availability and correct use of different means of
communication and control is very important during emergency time.
Duties of the various persons shall be defined properly.
c. Post Emergency Procedures:
After the emergency is over investigations are required to be made to
establish the reasons for emergency and preventative measures needed for
future happenings. These activities include:
i) Collection of records
ii) Conducting enquiries
iii) Making insurance claims, if any,
iv) Preparation of enquiry report and suggestion
v) Implementation of enquiry report and recommendations.
vi) Rehabilitation of affected persons.
10.3.2 Emergency Plan
This includes following actions:-
i) Site Layout:
Site plan of the Plant will be kept at a conveniently approachable place.
The plan will show the storage site of the various materials alongwith the
details of the surrounding areas. This gives a layout of the Buildings and
other facilities like roads, open and work areas etc.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
91
i) Emergency Control Centre:
The Control Centre will be established within the premises which will be
marked on the site plan. It will be the focal point from where all operations
to handle the emergency will be directed and coordinated. It will have
internal and external telephone communications along with list of essential
telephone numbers and list of key persons and their addresses.
ii) Assembly Point:
Assembly area will be earmarked for the people to get together in case of
emergency which will be away from material storage. A list of all the
employees/ residents will be available at this site so that their roll call could
be taken and missing person, if any, could be located.
iii) Emergency Alarm System:
An audible emergency alarm system will be installed in the premises. It
will be operated from at least 4 different points spread over the entire area
and clearly marked as “Emergency Area Switch”. The system will be tested
regularly. The alarm will signify to the persons & staff that the emergency
has occurred and emergency services should be put in operation. The
Public Address System will also be activated and specific instructions for
eventualities will be passed on to the staff working in the colony.
iv) Service & Control:
a) Emergency Services
This includes Fire fighting, First Aid and rescue teams. Alternative source
of power supply for operating fire pumps and communication with local
bodies and fire brigade etc shall be given.
b) Control Centre:
The control centre could be either in Security room or Fire Station and shall
have:
i) Adequate No. of Internal and external telephones.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
92
ii) Layout Plan of the colony buildings showing:
a) Sources of safety equipment.
b) Fire hydrant system and alternate supply source
c) Stock of other fire fighting materials
d) Assembly points & first aid centers.
e) Surrounding habitation within ½ km distance.
iii) Additional work plans which may illustrate during emergency
a) areas affected / endangered
b) deployment of emergency vehicles and personnel
c) Areas where particular problems arise e.g. fractured pipe-line.
d) Areas evacuated.
It would be useful if these plans be covered with plastic/glass sheets on
which felt ink markings can be deciphered.
iv) Normal roll of employees.
v) List of key persons and their addresses with telephone numbers.
vi) Note pads, pencils, etc to record messages received and instructions to
be passed on through runners.
vii) A tape recorder on which the incident and actions, being taken and
progress could be recorded.
viii) Roll call – Roll Call board listing the names of all persons department
wise and shift wise should be placed in the allocated places called assembly
points. All personnel including visitors and contractors except those who
are detailed to fight emergency to man such services, shall proceed to such
allocated points as soon as an evacuation is ordered over PAS or orally by
the section in charge and roll call taken. Section incharge should see that
these boards are always kept up-to-date. The assembly point incharge shall
report to control room immediately any absentee/unaccounted for persons.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
93
He will also keep the group until advised to move or return to work by the
site controller or any other person pre-nominated by him.
10.3.3 Key Personnel and their Duties
Following persons will be designated for emergency situation.
1. Site Controller
2. Incident Controller
3. Personnel / Administrative Managers
4. Communication Officers
5. Telephone operator
6. Engineer Incharge and Electrician
7. Fire pump attendants
8. First Aid
Their duties are given as under: -
1. Site Controller:
General Manager or his nominated deputy will retain overall responsibility
for the premises and its personnel. As soon as he is informed of the
emergency, he shall proceed to the control room and meet the
communication officer. His duties shall be:
i) Assess the magnitude of the situation and decide if people need to be
evacuated from their assembly points.
ii) Exercise direct operational control over areas other than those affected.
iii) Maintain a continuous review of possible development and assess, in
consultation with incident Controller and other key personnel, as to whether
evacuation of persons is required.
iv) Liaise with senior officials of Police, Fire Brigade, Medical provide
advice on possible effects on areas outside the factory premises.
v) Control rehabilitation of affected areas on discontinuation of
emergency.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
94
vi) Issue authorized statements to news media, and ensures that evidence is
preserved for enquiries to be conducted by statutory authorities.
2. Incident Controller:
Manager or Officer of similar rank nominated will act as Incident
Controller. On hearing of an emergency he will rush to the incident point
and take overall charge and report to site controller. On arrival he will
assess the scale of emergency and decide if major emergency exists or is
likely and inform the communication officer accordingly. His duties will
be:
i) Direct all operations within the affected area with the priorities for
safety of personnel minimize damage, property and environment and
minimize loss of materials.
ii) Pending arrival of Site Controller, assume the duties of his post and in
particular:
a) Direct the evacuation of the persons from areas likely to be adversely
affected by the emergency and
b) Ensure that all key personnel and outside help is called in.
iii) Provide advice and information to the Fire and Security officer and the
local Fire Service as and when they arrive.
iv) Ensure that all non-essential workers / staff of the areas affected are
evacuated to the appropriate assembly points and the areas are searched for
casualties.
v) In the event of failure of electric supply and thereby PAS and Internal
telephones, set up communication point and establish contact with
Emergency Control Centre.
vi) Report on all significant developments to the communication officer.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
95
vii) Have regard to the need of preservation of evidence so as to facilitate
any enquiry into the causes and circumstances which caused or escalated
the emergency.
3. Personnel / Administrative Manager:
He will also work as Liaison Officer and will be stationed at the main
entrance (Gate House) during the emergency. He will under the direction of
the site controller, handle police, press and other enquiries, receive reports
from roll-call leaders from assembly points and pass on the absentee
information to the incident controller. His responsibilities shall include.
i) To ensure that casualties receive adequate attention / to arrange
additional help, if required, and inform relatives.
ii) To control traffic movements into the premises and ensuring that the
alternate transport is available when need arises.
iii) When emergency is prolonged, arrange for the relief of personnel and
organize refreshments / catering facility.
4. Communication Officer:
He will, on hearing the alarm, proceed to Control Centre and maintain
communication with the Incident Controller. He will:-
i) Advise the Site Controller of the situation, recommending (if necessary)
evacuation of persons from assembly points.
ii) Recruit suitable staff to act as runners between the Incident Controller
and himself if the telephone and other system of communication fail due to
whatsoever reasons.
iv) Maintain prior agreed inventory in the control centre.
v) Maintain a log of the incident on tape.
vi) In case of prolonged emergency involving risk to outside areas by
wind-blown materials – contact local meteorological office to receive early
notification of changes in weather conditions.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
96
5. Telephone Operator: -
On hearing the emergency alarm, he will immediately contact site
controller and on his advice call the local Fire Brigade or mutual aid
scheme members. In case the PAS, Internal / external telephone system
becomes inoperative he shall inform the Communication Officer through a
messenger / runner. In case fire is detected and the alarm is not in
operation, he shall receive information about location from the person who
detected the fire and thereafter immediately consult the Incident Controller
and make announcement on PAS or telephone telling the residents about
location of the incident and to evacuate to their assembly points. He will
continue to operate the switch board advising the callers that staffs are not
available and pass all calls connected with the incident to the
Communication Officer.
6. Engineer In-charge and Electrician: -
They will report to the scene of the incident and close down the services as
requested by the Incident Controller.
7. Fire – pump Attendants: -
Two persons identified will work as fire-pump attendants. On hearing the
fire alarm, they will immediately proceed to pump house to ensure that
pumps are operating and stand by to maintain them. At the end of
emergency they will be relieved of their duty by the Fire and Security
officers.
8. First Aid Teams: -
The Manager shall keep the roll call lists for the Fire and First-aid team on
duty. Roll call leaders shall check their rolls as members of the services and
report for emergency duty. Names of any unaccounted for absentees will be
informed to the Fire and Security Officer. Members of the First – aid teams
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
97
will report to the Incident Controller on hearing of the alarm and follow his
directions.
9. Factory Fire Brigade Personnel: -
The duty Fire – Brigade personnel under the command of the Fire and
Security Officer shall be responsible for fire fighting and rescue. On
hearing the alarm, they shall proceed to the place of incident, if known,
otherwise to the Fire station. The men at Fire station shall find out the
location of the emergency, the equipment and proceed to the site of
occurrence. At the site, all the squad members will respond to the direction
given by the Incident Controller.
10.4 TRAINING
The promoters shall ensure that everyone employed on the premises is
made aware of the risks involved and has been given adequate training on
the action to be taken in case of any emergency and that provision has been
made for other people also, for example, visitors and contractors who may
also be on the premises. Such training shall ensure that those people who
are not involved in dealing with the emergency, leave the vicinity of the
Incident and go to a place of safety. So that those people needed to carry
out the emergency plans shall be capable of carrying out their specified
tasks. They shall be thoroughly trained, given the correct personal
protective & other equipment and be adequately supervised.
Further, it shall be ensured that the plan is thoroughly tested and rehearsed.
It will also be reviewed and revised on a regular basis.
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
98
ANNEXURES
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
99
ANNEXURE – I
LAND PAPERS
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
100
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
101
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
102
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
103
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
104
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
105
__________________________________________________________________________
M/S DURATECH CEMENTS INDIA LTD. DASUYA, HOSHIARPUR, PUNJAB.
106