Transcript of DPR_09-10-2013

  • 7/27/2019 DPR_09-10-2013

    1/5

  • 7/27/2019 DPR_09-10-2013

    2/5

    PERMIT BREAKDOWNWork shop /Barge

    2 2 Hot Work

    Materialhandling

    2 2 ColdWork

    Radiography 0

    Routine 2 1 Hot Work 1 ColdWork

    Painting 2 2 Hot WorkScaffolding 6 6 Cold

    WorkE&I 0Construction 1 1 Hot WorkCommissioning 0

    HSE Activities1 No Incident /accident for the last 24 hours: None2 HIP/ Tool Box talks:

    Welding: Hazards related to welding and painting in same area.

    Fabrication: Possible fire and explosion.

    Rigging: Unsecured materials that lead to falling object.

    Scaffolding:Tripping Hazard

    Painting: Sign boards and barricade while doing blasting

    3 Daily PTW Audit on worksite - None4 HSE Planned Activities

    None

    5 HSE walkthroughs are conducted on regular basis.Provision of safe Access, ensure provision of portable fireextinguishers at requisite locations, noise protection.

    6 HSE Observation:

    none

    Page

    2

  • 7/27/2019 DPR_09-10-2013

    3/5

    Structural Activities1 Completed Fit up and welding of deck plate on going.2 Installation of gratings for middle deck/ helideck completed.

    3Preparation and installation of hand rails for various elevationscompleted.

    4 Sand Blasting & painting as required on various elevation in progress.

    56789101112

    13

    14

    Other Activities1 Continue to apply paint as required for different elevation.2 Continue to transfer rigging and scaffolding materials from PC 80 to

    barge deck3 Continue to dismantle scaffold as required for various elevation.4 Continue general housekeeping5

    Page

    3

  • 7/27/2019 DPR_09-10-2013

    4/5

    LocationPC75

    Deck installation Status

    Remarks

    Fitup(20%)

    Welding(50%)incl.grinding/cleaning

    NDT(10%)

    Handrail/Floorplates(10%)

    Blasting/Painting(10%)

    %Complete

    Lower deckSouth

    20 50 10 10 9 99% REFERNOTE

    MiddleDeck South

    20 50 10 10 8 98%

    Helideck South

    20 50 10 8 7 97%

    Emergencylandingplatform

    20 50 10 10 5 95%

    Diagonal

    braces2 number

    20 50 10 10 8 98%

    All activities include necessary inspection/ testing and reporting

    Planned activities (24 hrs look ahead)1 Continue scaffolding works as required.

    2 Continue to receive project materials and supply.3 Commence transfer of materials from PC 80 to barge deck.4 Complete works on emergency platform incl. ladders5 Complete installation of gratings and various levels.6 Complete installation of loose items on top deck extension.

    7 Continue to apply paint as required and necessary inspection andtesting.

    8 Final walk around.

    Page

    4

  • 7/27/2019 DPR_09-10-2013

    5/5

    Areas of concern

    1 Zadco approved Structural installation procedure outstanding.(REQUIRED AS PER CONTRACT, APPENDIX- B- SCOPE OFSERVICES, Page 5 of 46, third para.)

    Down timeNo. Of hrs Period Reason

    1Note:

    PMC Site TeamName Position

    1 Sajit Pootuvalappil Construction Supdt.2 Michael Raj Welding Eng./Inspector

    3

    ZadcoName Position

    1 Juror Sabariaga Sr. Operator

    Personnel movement planName

    1 None

    2

    Page

    5