Downtown Duluth and the UDC
• Tie uses to the Downtown Plan• Eliminate multiple zonings • Allow office use on the ground floor
throughout the CBD• Keep the historic homes protected – Historic
Residential District (HRD)• Eliminate CPD-C and CPD-R Boards
![Page 2: Downtown Duluth and the UDC](https://reader036.fdocuments.us/reader036/viewer/2022062517/56812ed0550346895d9470d9/html5/thumbnails/2.jpg)
Current Zoning
CBDM-2 CPD-C
R-100
M-1
M-1 CPD-C
M-1CPD-R
![Page 3: Downtown Duluth and the UDC](https://reader036.fdocuments.us/reader036/viewer/2022062517/56812ed0550346895d9470d9/html5/thumbnails/3.jpg)
UDC Zoning
CBD
HRD(Historic Residential
District)
![Page 4: Downtown Duluth and the UDC](https://reader036.fdocuments.us/reader036/viewer/2022062517/56812ed0550346895d9470d9/html5/thumbnails/4.jpg)
UDC Zoning Uses Tied to Downtown Plan
![Page 5: Downtown Duluth and the UDC](https://reader036.fdocuments.us/reader036/viewer/2022062517/56812ed0550346895d9470d9/html5/thumbnails/5.jpg)
Proposed UDC Design Standards
• Design standards– Updated CBD standards
• - Based on Downtown Overlay District • (DOD) standards- Modify where inconsistent with Downtown
Plan
– Planning Department review replaces CPD-C and CPD-R Review Boards