Downtown Campus Overview University of Texas at San Antonio January 25, 2017

Transcript of Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... ·...

Page 1: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Downtown Campus Overview

University of Texas at San Antonio

January 25, 2017

Page 2: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Conference Center Durango Building – Level One

Southwest Conference Room

Conference Director Suite

East Conference Suites(names TBD)

Front Conference Room(name TBD)

Location Renovation Schedule

Southwest Conference Room Jul-Sep 2016

Conference Director Suite Aug-Dec 2016

East Conference Suites Apr-Aug 2017

Front Conference Room Apr-Aug 2017

West Conference Suite

Former Art Gallery

Kitchen

Storage

Check-in Registration

West Conference Suite

Page 3: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Campus ServicesFrio Street Building – Level One

Buena Vista Bookstore moved to Frio Street Building Nov 2016

“One-stop”Various Student Services

Food

Court

Recent Bookstore Relocation

Starbuck’s

Bookstore

Page 4: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Business and Counseling Service to the CommunityDurango Building – Levels Two and Three

Durango Building –Level 2

Durango Building –Level 3

3.202

3.314 3.316A2.306 2.308

2.112

3.302

Department of Counseling, COEHD Institute for Economic Development (IED)

Assignment Location Renovation Schedule

Relocate IED Offices from Washington Place DB 2.306, 2.308, 2.112, 3.310, 3.312, 3.314, 3.316A

Demo Feb-Mar 2017Build Apr-Jul 2017

Relocate IED Training Room from Washington Place DB 3.202 Demo Feb-Mar 2017Build Apr-Jul 2017

Department of Counseling, COEHD DB 3.302 Jun-Aug 2017

3.310/12

Page 5: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Temporary IED Training Room

Campus ServicesFrio Street Building – Level Two

Student Disability Services

Exercise Class Location

Location Activity

FS 2.402 Training room temporarily assigned to IED

FS 2.404 Student Activities

FS 2.422 Student Disability Services

FS 2.448 Campus Recreation Exercise Classes

Changes In-Progress

Additional planning for this space utilization will be continued in Fall 2017-Summer 2018

Page 6: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

P-20 ConsolidationBuena Vista Building – Level One

1.308

1.320

1.342

Location Space Assigned Renovation Schedule

BV 1.308 Sep 2016 Oct-Dec 2016

BV 1.342 Oct 2016 Jan-Mar 2017

BV 1.320 Dec 2016 Mar-Apr 2017

Changes In-Progress

Page 7: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Student Counseling Services

4.556 Suite

Elevators

Lounge

Area

Frio Street Building – Level Four

New Location Space Assigned

FS 4.556, 4.556A, 4.556B

Sep 2016

Student Counseling Services

Page 8: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

University CommunicationsBuena Vista – Level Three

Assignment New Location

Renovation Schedule

Move University Communications Production Studio from Durango 1.204, 1.204A, 1.201A1, 1.204B

BV 3.312, 3.314, 3.316

Jan-Feb 2017 –design reviewApr-Jul 2017 –renovation

3.3163.314

12

Page 9: Downtown Campus Overview - UTSA Facilitiesfacilities.utsa.edu/wp-content/uploads/2017/03/... · Department of Counseling, COEHD Institute for Economic Development (IED) Assignment

Jul ‘16

Aug ‘16

Sep‘16

Oct ‘16

Nov‘16

Dec ‘16

Jan ‘17

Feb ‘17

Mar ‘17

Apr ‘17

May‘17

Jun ‘17

Jul ‘17

Aug ‘17

Conference Center –Southwest Room Renovation

P-20 – Space Assigned

Conference Center – Director’s Suite Renovation

P-20 – Space Assigned

Campus Bookstore Relocation

P-20 – Space Assigned

IED – Demolition

IED – Construction

Conference Center – East Room Renovation

University Communications Renovation

Conference Center – Front Room Renovation