Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
450mm Transition Update
SEMICON JapanDecember 1, 2010
SEMICON Japan 2010
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
Opening Remarks
Scott KramerVice President of Manufacturing Technology
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
Briefing Agenda and Program Overview
Tom JeffersonISMI 450mm Program Manager
1 December 2010 4
Meeting Agenda
• 450mm Background, Landscape and ISMI 450mm Program Overview
• 450mm Transition Current Status– Silicon– Equipment– Factory Infrastructure
• Summary and Discussion
1 December 2010 5
Coordinating Industry Convergence towards 450mm
Equipmentreadiness
Interoperability Test Bed (ITB)
RequirementsGuidelines
Early design
Mechanical Wafer Bank
Single Crystal Wafer Bank
Carrier & loadport interoperability
EquipmentDemonstrations
Equipment Performance Metrics (EPMs)
Test plansEquipmentprototypes
Metrology & process equipment development
25 wafer FOUP
Early prototypes
Test Wafer Generation
2007
2008
2009
2010+
Technology intercept node defined
Global Equipment Guidelines
EHS Guidelines
1 December 2010 6
450mm: Global Activity
450mm wafer handling evaluations
ITG-J(Interoperability Test Group –
Japan)
2008
450mm Standards initiated -
most finished by 2010
2007
European Commission Funding for 450mm
development
2010
2006
2008
450mm cleanroom announcement
2010
Funding for ISMI 450mm Program Announced
1 December 2010 7
450mm Supplier Engagement
ISMI thanks all suppliers who have helped to realize 450mm progress to date.
0
5
10
15
20
25
30
Jul'09 Oct'09 Dec'09 Jul'10 Dec'10
# CompaniesEngaged with ISMI450mm Program
~3X increase in 16 months
* Engaged = providing equipment, materials, or services to ISMI 450mm Program
1 December 2010 8
ISMI’s 450mm mission statement• Enable a cost-effective 450mm transition through coordination
and development of infrastructure, guidance, and industry readiness
Supplier engagement
Test wafer operations
Vacuum platform development
450mm transition program
Equipment test methods and metrics
Factory integration readiness
Starting materials
2010 ISMI 450mm organization
ISMI 450mm Program Mission and Organization
1 December 2010 9
“Cost Effective Transition” – Examples
Integrating metrology modules onto existing EFEMs reduced handling costs 50%
ISMI’s Test Bed helps enable a 60% reduction in time to Standards v. 300mm
2007 2008 2009
FI Prelim Stds Avail
450mm
Approved FI Stds Published
1996 1997 1998 1999 2000 2001
300mm
1995
2010
Sintered and Hybrid wafers reduce early development costs450mm Wafer Bank Loans
0
100
200
300
400
500
600
Mar-08
Apr-08
May-08
Jun-0
8Ju
l-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-0
9Feb
-09Mar-
09Apr-
09May
-09Ju
n-09
Jul-0
9Aug
-09Sep
-09Oct-
09Nov-0
9Dec-0
9Ja
n-10
Feb-10
Mar-10
Apr-10
May-10
Jun-1
0Ju
l-10
Aug-10
Sep-10
Oct-10
Nov-10
Num
ber o
f Waf
ers
# of Wafers # Wafers Loaned
ISMI’s Wafer Bank has loaned >550 wafers –
at no cost to suppliers
1 December 2010 10
ISMI 450mm Operations Increasing
Expansion and transition of ISMI to CNSE/Albany in 2011– $20M from New York accelerates ISMI’s 450mm program
• Increased supply of 450mm silicon• Increased equipment to generate additional 450mm test wafers• Factory infrastructure to support increased operational scope
ISMI/CNSE Transition Announcement –
10/12 2010
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
Silicon Readiness Update
Mike GoldsteinStarting Materials Project Manager
1 December 2010 12
2010 - 450mm Silicon Wafers Achievements• The major silicon suppliers are manufacturing
developmental test wafers, improving the wafer quality
• Improved hybrid wafers have been developed.• Supplier benchmarking has been completed
using wafer geometry inspection tools (Kuroda and Kobelco), LLS (NanoPhotonics), metal contamination (Balasz Lab), and SIRD (Jena Wave)
• SEMI developmental silicon wafer spec M76 has been published
• Wafer shipping methodology is in development. MAC specification E159 approved
300mm single crystal
Unidirectional cast poly
Nikko concentric hybrid wafer
12
1 December 2010 13
450mm Wafers Quality
• Suppliers are continuously improving the wafer quality, for some parameters already achieving the specification requirements:– Polishing process have been improved. Scratches have been
eliminated. Good achievements on SORI, GBIR and SFQR.– Particle levels have been reduced dramatically. Suppliers are able
to manufacture wafers with LLS (
90nm*) of 0.3-0.4 per cm2 and are working to improve wafer shipping. (a 10x improvement in ~6month).
– Surface metals levels requirements have been achieved by some suppliers
– The crystal quality of 450mm wafers is in better shape than the 300mm wafers were at the same development stage.
* Note: (Test wafers requirement is for LLS size 45nm, however inspection tools for these particle size is still in development)
13
1 December 2010 17
Wafer Geometry Kuroda Precision Industries measurements
SORI 12.1um GBIR 0.686um
ERO -
Start -0.108m Cross PV 0.540um
1 December 2010 20
SIRD Evaluation Jena Wave measurements
• SIRD is a photoelastic measurement which creates a full wafer stress image and reveals local stress related defects.
• Frozen-in stress from crystal pulling and cooling
• Local stress from abrasive manufacturing and laser mark
• Crystal voids and BMD stress monopoles
• Defects created by handling and transportation
notch stress field edge defects
SIRIS45 - Scanning InfraRed Inspection System
20
1 December 2010 21
450mm vs. 300mm Stress Evaluation Jena Wave measurements
21
Early 300mm DSP wafer (1999)
She
ar s
tress
[P
a]
450mm Wafer (2009)
21
300mm State-of-the-art Wafer
Lorentzian Fit
1 December 2010 22
SEMI Specs
• Silicon wafers:– M76: Specification for developmental 450mm diameter polished single crystal
silicon wafers• Three different kind of wafers have been defined to assist manufacturers in choosing the most
cost effective wafers for a given application:– Particle monitors – Lithography monitors – Other monitors for general applications
• M74: Specifications for 450 mm diameter mechanical handling polished wafer
• Wafer carriers: – E158: Mechanical Specification for Fab Wafer Carrier Used to Transport and
Store 450mm Wafers (450 FOUP) and Kinematic Coupling– E159: Mechanical Specification for Multi Application Carrier (MAC) Used to
Transport and Ship 450mm Wafers
We would like to thank the SEMI standards members for their contribution
1 December 2010 23
Summary
• Silicon supply line is in good shape, with some suppliers able to achieve already test wafer quality, with the exception of LLS requirements
• ISMI starting materials working group ongoing activities include:– Support ISMI process test wafer generation activities– Benchmark silicon suppliers “state of the art”– Work with suppliers to improve wafer quality – Engage with wafer inspection OEMs– Work with SEMI silicon wafer committee to generate 450mm prime
wafer spec (M1 revision) – We plan to continue the loan program. In 2011 we will have a very
significant increase in the number of developmental test wafers available.
23
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
450mm Equipment Readiness
Tom AbellSupplier Engagement Project Manager
1 December 2010 25
ISMI Equipment Development and Demonstration Strategy
Better Wafers
Larger Equipment
Set
+
Basic Test Wafers
Advanced Test Wafers
-Higher quality
- Higher quantity
- More types
Equipment capable of meaningful
demonstration
Demonstration Test Methodology (DTM)
Equipment Development
Initial Wafers
Initial toolset
+
Equipment Performance Metrics
EHS Guidelines
Global Equipment Requirements
1 December 2010 26
ISMI Test Wafer Management
Test Wafer Operations
Equipment Suppliers
Starting Materials (silicon, etc.)
Supplier Engagement
ISMI Silicon Bank
Test Wafer Planning and Equipment Readiness
Supplier Processing and Measurement
Bare silicon
In-house Processing and Measurement
1 December 2010 27
Cost-Sharing Overview
• ISMI recognizes that the historical financial risk model for wafer-size transition funding is no longer relevant
• Risk-sharing with tool suppliers is expected to realize the 450mm transition– Cost-sharing is the planned mechanism to lower the financial risk; may not be
necessary for tool development
• ISMI is prepared to engage in discussions and negotiations concerning resources for funding of development and plan scope
– Realistic costs for building tools are needed to help determine which projects will be supported and assess levels of support
• Cost-sharing program is structured to allow suppliers maximum flexibility for consideration
– Cost-effective transition is the program goal– It is expected that suppliers will have different approaches for different business
plan objectives– There are several decisions to consider in the context of tool development plans
and ISMI involvement– ISMI requires certain information to evaluate supplier plans
1 December 2010 28
Example Cost- Sharing Scenarios
Alpha/prototype At ISMI
Beta tool
Alpha/prototype At supplier
[ Test Wafer Tool ]
[ Provides Test Wafer support remotely ]
At Supplier [ Remote Test Wafer Tool ]
Demo toolAt ISMI
Demo and Advanced Test Wafers at ISMI
At supplier Demo at supplier and remote Advanced Test Wafers
At ISMI [ Test Wafer Tool ]
Alpha/prototype At supplier [ Provides Test Wafer support remotely ]
Demo toolAt ISMI Demo and Advanced
Test Wafers at ISMI
At supplier Demo at supplier and Remote Advanced Test Wafers
1 December 2010 29
ISMI’s 450mm Cleanroom Operations
Lot Sorter
Wet Cleans
Particle Inspection / Wafer Edge Inspection
Ellipsometer
FOUP Washer (Dec. Install)
1 December 2010 30
450mm PECVD Oxide Depositions and Ellipsometry Measurements
-200
-100
0
100
200
Y
-200 -100 0 100 200
X
Contour Plot for Wafer 1
Wafer 1
<= 4800
<= 4900
<= 5000
<= 5100
<= 5200
> 5200
• Very good uniformity for 1st depositions by Oxford Instruments Plasma Technology
• Ellipsometry measurements provided by SOPRALAB
• Etch testing planned on blanket films
1 December 2010 31
Building Test Wafer Infrastructure
• Q4’09: Initial 3 step process flows executed
• Q4’10: 8 step flows are presently in fabrication– Looped flows have been designed to accelerate tool development
(Processing, measurement, processing, reclaim, etc.)
∞ Loop
Oxidation Thk/Unif Wet etch Thk/UnifParticles Wet Clean∞
Particles Wet Clean Particles Metals Measurement*
* Full wafer VPD
Example Test Wafer Flows
Particles PECVD Oxide
Thk/Unif
Particles
Plasma Etch
Thk/UnifWet Clean Particles
1 December 2010 32
Equipment Performance Metrics - Update
• Equipment Performance Metrics (EPMs) were published in 2009 as guidance for determination of requirements for ISMI equipment demonstrations
• 2010 Updates to EPMs– EHS expectations and Factory Integration metrics added to EPM– LPCVD temperature revised.
• ISMI will continue to update and revise EPMs in 2011 based on supplier and device maker inputs– Currently 6 updates and 4 new applications are in process. – Additional updates planned for 2011
1 December 2010 33
Demonstration Test Methods/Metrics 2010 Status and 2011 Plan
Demonstration
PerformanceMetrics
Standards &Guidelines
Test & AssessmentMethods
Demonstration Test InfrastructureTesting of select DTM Elements
DTM Training 2H 2011
2011+
1H 2011
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
ISMI 450mm Factory Infrastructure
Eddy BassFactory Integration Project Manager
1 December 2010 35
Interoperability Test Bed (ITB) Objectives – Established 2008
• Engage with suppliers for feedback and joint development for faster learning cycles
• Lead/facilitate rapid development of factory integration elements through demonstration and testing of equipment
• Feedback technical data and information into the semi standards and guideline development process
• Assess conformance of equipment to SEMI Standards and ISMI guidelines
• Measure equipment performance against targets
• Assess interoperability of factory integration elements
1 December 2010 36
ITB Progress – Mission Accomplished
2010SEMICON
Japan
Final revisions of carriers and
loadports developed for
testing and standards confirmed
in a cleanroom
Testing: • Standard
compliance and interoperability testing of final/functional prototype components
Q4 2010Standards Demonstrations and
Cleanroom OperationsPhase
Q1 2011Support Any Final FI Component Testing
Wrapping up: • Return
prototype equipment and publish final reports
• Particle Testing of ITB elements remains important
ISMI will continue to monitor Factory Integration progress
1 December 2010 37
ITB Accomplishments: 2008->2010• ITB has tested and provided results to member companies and SEMI Task
Forces for:– 18 versions of wafer carriers and shipping boxes– 11 versions of load ports– 5 wafer handling robotic systems– 4 versions of PGVs (Person Guided Vehicles)– 2 AMHS stockers and OHT (Overhead Hoist
Transport) systems– Wafer wands, vibration and displacement sensors
• Provided five FI guideline clarifications• Enabled the development of FOUP, Loadport, MAC, and Stocker interface
standards
1 December 2010 38
Cumulative Total Robot & LP Cycles11/05/2010
0
1000
2000
3000
4000
5000
6000
7000
May
-08
Jul-0
8
Sep-
08
Nov
-08
Jan-
09
Mar
-09
May
-09
Jul-0
9
Sep-
09
Nov
-09
Jan-
10
Mar
-10
May
-10
Jul-1
0
Sep-
10
(x10
00)
Month
Cum
ulat
ive
Rob
ot M
oves
0
200
400
600
800
1000
1200
(x10
00)
Cum
ulat
ive
Load
Por
t Cyc
lesRobot Moves
Load Port Cycles
ITB Robots and Load Port Cycle History
>5.0 M Robotic handling moves to date. >1 M Load Port cycles with FOUPs and MACs.
Focus Shifted to Load Ports
& MAC10 to 12 mm Pitch Change
MAC cycling
1 December 2010 39
New Strategy - Reusable Silicon Shipping Crate (RSSC)• Purpose: Force shipping companies to treat wafer
shipments as freight and improve carrier protectionToo small and light to use standard pallet jack
Shipping crates better fit freight handling equipment
Secondary package fits securely inside surrounded by cushions
1 December 2010 40
450mm AMHS
• Evaluation of 2 stockers and 1 OHT completed• 300mm AMHS model scales to 450mm with no significant problems• 450mm Carrier standards maturity is enabling suppliers’ progress• PGVs are demonstrated as ready for safe manual handling of 450mm
carriers
450mm Overhead Hoist Transport 450mm PGV
1 December 2010 41
1st 450mm Vacuum Platform
Successfully Integrated EFEM and Loadports with Platform
450mm Vacuum Platform Available Now
1 December 2010 42
Key ISMI 450mm EQ Software Guidelines (First Published @ SEMICON JAPAN 2009)
-#18 Equipment shall be capable of providing (near) real-time data of high quality and integrity to enable external monitoring of equipment status such as process conditions, health, and reliability.
-Equipment software shall support cost effective programmable or configurable interfaces for easy integration with factory systems
-Equipment software shall support standardized inter/intra tool data communication approach
-#17 There shall be a Single Point of Control for factory system command and control of equipment with standard messages and state models. All other data and file communication shall be handled via standardized supplemental communications port(s).
-Equipment software shall provide cost effective communication supplemental ports, if the port(s) isn’t standardized
-Equipment software shall consider security management features to protect key recipe and equipment configuration
-#8 Equipment shall be designed to minimize unscheduled downtime through fundamental improvements and information-based predictive performance.
-Equipment software design shall support to minimize unscheduled downtime .Cost effective applications are required to manage equipment health and performance
-# 19 Equipment shall be capable of material carrier slot integrity or redirecting material to any carrier/slot available to the equipment.
-High throughput equipment shall support dynamic wafer redirecting capability and support to release idle empty FOUP to AMHS systems
MESMESFactoryFactorySystemsSystemsNo new updates at this time
Key Message
Intelligent 300mm Scale-Up with no new software standards = Minimizing Costs and Risks
1 December 2010 43
ITB Remaining Activities in 2010 / early 2011
• MAC testing– Actively shipping wafers all over the world in MACs
• All damaged wafers to date were caused by rough or improper handling by shippers
• Adjustments in 3rd level (tertiary) packaging has been implemented to force shippers to handle wafer shipments as freight
– MAC interoperability testing on load ports, AMHS OHT and Stockers complete - no open issues
• AMHS testing– Complete initial testing of AMHS systems; including OHT and
Stockers – no roadblocks to scale up discovered– AMHS suppliers continue on track to deliver systems/components
by 2012
1 December 2010 4444
Summary
450mm ITB• > 1M load port cycles completed in the ITB with prototype carriers
– > 73k load port cycles with MACs• ITB key focus is demonstration of MAC compliance, performance and interoperability
– Completed initial evaluations with Stockers and Overhead Hoist Transport in September 2010• Shipping test show chronic problems with handling of wafer carriers and secondary packaging by
freight companies– Reusable Silicon Shipping Crate (RSSC) proposal to be tested in November with initial results available in
December• Sun-setting ITB after completion of MAC, MAC load port (i.e., new standard load ports), and
interoperability with FOUPs and MACs testing at end of 2010
Platform• 450mm vacuum platforms are available now• Successful integration of 450mm EFEM and Platform has been demonstrated• ISMI will continue to evaluate the feasibility of platform:chamber standardization
Software guideline• There are no updates on 450mm Software guideline at this time
Accelerating Manufacturing Productivity
Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International SEMATECH Manufacturing Initiative, ISMI, Advanced Materials Research Center and AMRC are servicemarks of SEMATECH, Inc. All other servicemarks and trademarks are the property of their respective owners.
Summary and Key Messages
1 December 2010 46
Summary - 450mm readiness – October 2010• Test wafer development has started for multiple process and
metrology equipment• Supplier interest in development of equipment for test wafer generation
and/or demonstration is increasing - in all geographies• Silicon suppliers are positioned to provide additional quantities of
450mm wafers - with improved quality– ISMI’s wafer loan program has provided >550 wafers for industry
development
• SEMI Standards are completed for 450mm FOUPS and loadports, and 450mm Mechanical and Developmental grade wafers
• Initial evaluations of AMHS prototype pilot lines are completed• 450mm equipment platforms are available now
1 December 2010 47
450mm Key Messages – October 2010
• ISMI continues to drive the activities required to enable the needs of its members towards the realization of a cost- effective 450mm transition
• ISMI expects to realize multiple new capabilities and increased wafer inventory in 2011
• Challenges remain to realize a comprehensive 450mm infrastructure at advanced technology nodes
• Wanted - constructive discussion with entities interested in contributing towards ISMI’s 450mm transition goals
1 December 2010 48
For Further Information …
http://ismi.sematech.org/meetings/archives/450mm/
-or-
Tom Jefferson, ISMI 450mm Program [email protected]
THANK YOU !!!
.