    Method statement

    Doka framed formworkAlu-Framax Xlife

    9765

    -201

    -01

  • 7/27/2019 Doka Formwork

    2/802 999765002 - 06/2007

    User information Doka framed formwork Alu-Framax Xlife

    The Formwork Experts

    Introduction

    by Doka Industrie GmbH, A-3300 Amstetten

  • 7/27/2019 Doka Formwork

    3/803999765002 - 06/2007

    Contents Page

    User information Doka framed formwork Alu-Framax Xlife Introduction

    The Formwork Experts

    Introduction ..................................................................................................2

    General instructions for compliant utilisation............................................ 4

    Elementary safety warnings........................................................................5

    Product description ......................................................................................6

    Wall formwork ..............................................................................................7

    Forming walls with Alu-Framax Xlife .........................................................7

    Instructions for assembly and use .............................................................. 8

    Alu-Framax Xlife panel in detail................................................................10

    The logical system grid..............................................................................11

    Adaptability.................................................................................................12

    Inter-panel connections..............................................................................14

    Bracing the panels......................................................................................16

    Form-tie system..........................................................................................18

    Length adjustment using closures............................................................ 20

    90 degree corners.......................................................................................23Inter-panel connections for increased tensile loads................................ 26

    Acute & obtuse-angled corners.................................................................28

    Stop-end formwork ....................................................................................30

    Wall junctions, offsets and steps...............................................................32

    Vertical stacking of panels .........................................................................34

    Plumbing accessories.................................................................................38

    Pouring platforms with single brackets .................................................... 40

    Pouring platforms.......................................................................................44

    Resetting by crane......................................................................................46

    Transporting, stacking and storing ........................................................... 48

    Column formwork ......................................................................................51

    Design of column formwork......................................................................52Doka column formwork platform 150/90cm.............................................54

    Circular formwork ......................................................................................57

    Design of the circular formwork................................................................58

    Tying the circular forming plates .............................................................. 60

    Closing the full-circle formwork................................................................61

    Determining the max. panel width............................................................ 62

    Determining the best distribution of the panels ...................................... 63

    Erecting and plumbing / Pouring platform / Resetting............................64

    Foundation formwork ................................................................................ 65

    Design of the foundation formwork..........................................................66

    General remarks ......................................................................................... 68

    Cleaning and care of your equipment ...................................................... 68

    Doka service offerings................................................................................70

    Alu-Framax Xlife in conjunction with Framax Xlife.................................71

    Formwork planning with Tipos .................................................................72

    Component overview.................................................................................73

  • 7/27/2019 Doka Formwork

    4/804 999765002 - 06/2007

    User information Doka framed formwork Alu-Framax Xlife

    The Formwork Experts

    Introduction

    General instructionsfor compliant utilisation

    This User Information booklet (Method State-ment) is aimed at everyone who will be workingwith the Doka product or system it describes. Itcontains information on how to set up this sys-

    tem, and on correct, compliant utilisation of thesystem.This User Information booklet can also be usedas a generic method statement or incorporatedwith a site-specific method statement.

    Doka products are ONLY to be used in accord-ance with the Doka User Information bookletsor other technical documentation provided byDoka.

    The functional/technical instructions, safetywarnings and loading data must all be strictlyobserved and complied with. Failure to do socan cause accidents and severe (even life-

    threatening) damage to health, as well as verygreat material damage. If any deviation from these instructions is con-

    templated, or any application which goesbeyond those described here, then revisedstatic calculations must be produced for check-ing, as well as supplementary assemblyinstructions.

    The customer is to ensure that the User Infor-mation booklet (Method Statement) providedby Doka is available to all users, and that theyhave been made aware of it and have easyaccess to it at the usage location.

    Always observe all industrial safety regulationsand other safety rules applying to the applica-tion and utilisation of our products in the coun-try and/or region in which you are operating.

    Many of the illustrations in this booklet showthe situation during formwork assembly andare therefore not always complete from thesafety point of view.

    The equipment/system must be inspected bythe customer before use, to ensure that it is insuitable condition. Steps must be taken to ruleout the use of any components that are dam-aged, deformed, or weakened due to wear, cor-

    rosion or rot. Only original Doka components may be used as

    spare parts. Combining our formwork systems with those

    of other manufacturers could be dangerous,risking damage to both health and property. Ifyou intend to combine different systems,please contact Doka for advice first.

    The customer must ensure that this product iserected and dismantled, reset and generallyused for its intended purpose under the direc-tion and supervision of suitably skilled persons

    with the authority to issue instructions. All persons working with the product described

    herein must be familiar with the contents of thismanual and with all the safety instructions itcontains.

    Persons who are incapable of reading andunderstanding this booklet, or who can do soonly with difficulty, must be instructed andtrained by the customer.

  • 7/27/2019 Doka Formwork

    5/80

    User information Doka framed formwork Alu-Framax Xlife Introduction

    5999765002 - 06/2007 The Formwork Experts

    Elementary safety warnings

    Symbols usedThe following symbols are used in this booklet:

    MiscellaneousWe reserve the right to make alterations in the inter-ests of technical progress.

    Unless otherwise stated, all dimensions are givenin cm.

    Doka products and systems must be set up insuch a way that all loads acting upon them aresafely transferred!

    The stability of all components and units mustbe ensured during all phases of the construc-tion work!

    Provide safe workplaces for those using theformwork (e.g. for when it is being erected/dis-mantled, modified or repositioned etc). It mustbe possible to get to and from these workplacesvia safe access routes!

    Do not exceed the permitted fresh-concretepressures. Excessively high pouring rates leadto formwork overload, cause greater deflectionand risk causing breakage.

    Do not strike the formwork until the concretehas reached sufficient strength and the personin charge has given the order for the formworkto be struck!

    When striking the formwork, never use thecrane to break concrete cohesion. Use suitabletools such as timber wedges, special pry-barsor system features such as Framax strippingcorners.

    When striking the formwork, do not endangerthe stability of any part of the structure, or ofany scaffolding, platforms or formwork that isstill in place!

    Observe all regulations applying to the hand-ling of formwork and scaffolding. In addition,the Doka slinging means must be used - this isa mandatory requirement.

    Remove any loose parts or fix them in place sothat they cannot be dislodged or fall free!

    All connections must be checked regularly toensure that they still fit properly and are func-tioning correctly.It is very important to check all screw-type con-nections and wedge-clamped joins wheneverthe construction operations require (particu-larly after exceptional events such as storms),and to tighten them if necessary.

    All components must be stored safely, follow-ing all the special Doka instructions given in therelevant sections of this User Information book-let!

    Further safety instructions, especially warn-ings, will be found in the individual sections ofthis document!

    The faulty utilisations shown in the varioussections of this booklet are only a selection ofexamples taken from our many years' experi-ence in the field.

    Important note

    Failure to observe this may lead to malfunction or

    damage.

    Caution / warning / danger

    Failure to observe this may lead to material damage,and to injury to health which may range up to thesevere or even life-threatening.

    Instruction

    This symbol indicates that actions need to be takenby the user.

    Sight-checkIndicates that you need to do a sight-check to makesure that necessary actions have been carried out.

    Tip

    Points out useful practical tips.

  • 7/27/2019 Doka Formwork

    6/80The Formwork Experts6 999765002 - 06/2007

    Introduction User information Doka framed formwork Alu-Framax Xlife

    Product description

    Areas of use

    Walls

    Columns

    Circular formwork

    Foundations

    Alu-Framax Xlife - the crane-independent variantof Framax Xlife

    Alu-Framax Xlife is a complete system with high-performance safety and working accessories. Thepanels are lightweight and handy, and so can bequickly erected by hand.

    The system uses only a very few different sizes ofpanel to obtain a consistent 15 cm increment-grid.The connecting devices and accessories are alsodesigned to fit in with this increment-grid.The innovative plastic coating of the Xlife sheetenables it to be re-used intensively, with superbconcrete results every time.

    Alu-Framax Xlife is ideal for use on: walls columns circular formwork foundations

    A range of practical accessories makes work onthe site a lot easier and does away with the needfor costly in-situ improvisations.Alu-Framax Xlife is 100% compatible with Doka'sframed formwork Framax Xlife. All the linkingparts, closures and accessories are interchangea-ble, of course.With Framax Xlife, you can form large areas withcrane-shifted gangs, and then continue formingmanually with Alu-Framax Xlife, without having towait for the crane.

    9731-359-01

    9731

    -326

    -01

    9731-323-01

    9731-349-01

  • 7/27/2019 Doka Formwork

    7/80

    User information Doka framed formwork Alu-Framax Xlife

    7999765002 - 06/2007 The Formwork Experts

    Wall formwork

    Forming walls with Alu-Framax XlifeWith the Doka framed formwork Alu-Framax Xlife,you can achieve perfect forming results even with-out a crane.

    The exceptionally high loadability and long lifespanof Alu-Framax Xlife make it highly economical forall wall-forming tasks.

    Alu-Framax is unusually versatile and flexible, soyou can quickly form any layout with it.

    The panels can be fixed together at any pointaround the frame, quickly and safely, using theFramax quick-acting clamp RU or the multi-functionclamp.

    Because the Alu-Framax Xlife panels are so robust,you only need 2 form-ties per 2.70 m of panelheight.

    Any fitting-gaps left between the Alu-Framax Xlifepanels are very easy to close. The system gives youa choice between several different options so thatyou can always get the best possible length adjust-ment in each case.

    Alu-Framax Xlife also takes corners, stop-end form-work and wall junctions happily in its stride. Heretoo, it gives you perfect, cost-saving solutions.

    Matching safety and working accessories makework with Alu-Framax even quicker and easier.

    Perm. concrete pressure: 60 kN/m2

    A Alu-Framax Xlife panel (Page 10)B Inter-panel connections (Page 14)

    C Form-tie system (Page 18)

    D Length adjustment (Page 20)

    E 90 degree corners (Page 23)

    F Acute and obtuse-angled corners (Page 28)

    G Stop-end formwork (Page 30)

    H Plumbing accessories (Page 38)

    I Pouring platforms (Page 40)

    9731-366-01

    A

    B

    C

    D

    E

    F

    G

    H

    I

  • 7/27/2019 Doka Formwork

    8/80The Formwork Experts8 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Instructions for assembly and use

    Alu-Framax as a hand-moved form-workThe sequence shown here is based on a straightwall. However, you should always start to formfrom the corner outwards.Ladders must be located so as to create viable "traf-fic routes" in the horizontal. (On a straight wall, forexample, one ladder on the first element andanother on the last).

    Transporting / handling the panels

    For offloading panels from a truck, or lifting themon-site a stack at a time, use the Framax transportgear (see "Transporting, stacking and storing").

    Erecting the formwork

    Spray the ply with release agent (see "Cleaning

    and care"). Fix the first panel to the ground with a panel strut(see the section headed "Plumbing accessories").This stabilises the panel so that it cannot fallover.

    Continue lining up panels in this way, clampthem together (see "Inter-panel connections")and attach panel struts.The gang-form is now stable and can be plumbedand aligned exactly.

    Erecting the opposing formwork:

    Once the reinforcement has been placed, the form-work can be closed.

    Spray the form-ply of the opposing formworkwith release agent.

    Stand up the first panel of the opposing form-work. Fit the form-ties (see "Form-tie system"). Now the

    opposing formwork is also secured against top-pling over.

    In the same way, carry on lining up panels,clamping them together and fitting form-ties.

    Mount the pouring platform (see "Pouring plat-forms with single brackets").

    Fix the attachable ladder to the pouring platformto prevent it tipping over.

    Attach end-of-platform sideguards and opposingguard-rails (see "Pouring platforms with singlebrackets").

    Caution!

    Never use a sledge hammer to plumb thepanels!This would damage the profiles of the pan-els.Use only proper plumbing tools (e.g. a

    special pry-bar) that cannot cause any

    damage!

    9731-362-01

    9731-363-01

    9731-364-01

    9731

    -365

    -01

  • 7/27/2019 Doka Formwork

    9/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    9999765002 - 06/2007 The Formwork Experts

    Pouring

    Pour the concrete.Make only moderate use of vibrators, carefully

    co-ordinating the times and locations of vibratoruse.

    Striking

    Remove the end-of-platform sideguards, pouringplatform and opposing guard-rails.

    Beginning with the opposite formwork, dismountthe panels one-by-one - take out the form-tiesand remove the connectors to the neighbouringpanel.

    Lift the panel away and clean concrete residue offthe ply (see "Cleaning and care").

    Alu-Framax as a crane-moved form-workLarge multi-panel elements can be pre-assembledface-down on a level screed floor. See "Verticalstacking of elements" for detailed instructions on

    how to attach the interpanel connectors.These multi-panel elements can be lifted usingcrane-hoisting gear and the Framax lifting hook. Fordetailed instructions see Section "Resetting bycrane" and the Operating Manual for the Framaxlifting hook..

    Do not exceed the maximum permissible

    rate of placing. See also "Concrete pressure on perpen-

    dicular formwork to DIN 18218" in theDoka Calculation Guide.

    Permitted concrete pressure: 60 kN/m2

    Concrete compaction by vibration mustcomply with DIN 4235 Part 2.

    Observe the stipulated striking times.

    Max. load- bearing capacity:

    1000 kg / Framax lifting hook(feasible formwork area with 2 lifting hooks =approx. 30 m )

    If "hybrid" gang-forms (containing both Alu-Framax Xlife + Framax Xlife panels) arelifted and reset by crane, they must be givenadditional stiffening reinforcement.Do not exceed the permitted design valuesof the Alu-Framax Xlife connector compo-nents! (see "Inter-panel connections")

    For more information on how to handle tallformwork, please refer to "Instructions forAssembly and Use" in the User Informationbooklet "Doka framed formwork FramaxXlife".

  • 7/27/2019 Doka Formwork

    10/80The Formwork Experts10 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Alu-Framax Xlife panel in detail

    High load-bearing capacity

    Clean concrete surfaces with theinnovative Xlife sheetThe Xlife sheet consists of a combination of a tradi-

    tional plywood core and a novel and innovativeplastic coating.This combination of materials ensures high num-bers of repeat uses, with superb concrete resultsevery time, and reduces the proneness to damage.

    High quality concrete finish Less touching-up needed Less cleaning work - the Xlife sheet can also be

    cleaned using a high-pressure spray cleaner No breaking away of plywood chips, and less

    water is absorbed through nail-holes Screwed-on from the rear, so no screw marks

    Accessories are easy to fasten, in theintegrated waling system

    Dimensionally stable powder-coated aluminium frame

    a ... 123 mm

    Dimensionally stable hollow profiles - 12 cmstructural depth

    Strong cross-profiles Powder coated, so easy to clean Edges are easy to clean - so panels always abut

    tightly All-round hardware slot for fastening the inter-

    panel connectors at any point required Edges of formwork sheet are protected by frame

    profile Cross boreholes in the 55 and 60 cm wide panels,

    for corners and stop-ends

    Form-tie sleeves

    a ... diameter 25 mmb ... 32 mmc ... 42 mm

    Tie-rods are very easy to insert through the large,conical form-tie sleeves

    Only 2 form-ties are needed for every 2.70 m ofpanel height

    60 kN/m2 concrete pressure acting on whole areato DIN 18218 where surface planeness tolerancesto DIN 18202 Table 3 Line 6 are complied with.

    A Alu-Framax Xlife panel

    B Framax wedge clamp

    C Framax universal waling

    9765

    -200

    -0

    1

    9765-203-01

    A

    B

    C

    A Frame profile

    B Bead for inter-panel connectors

    C Xlife-sheet

    D Silicone sealing strip

    Warning!

    It is forbidden to climb on the cross-pro-files. The cross-profiles are NOT a substi-tute for a ladder.

    9765-202-01

    A

    B

    C

    D

    a

    9727

    -279

    -01

    a

    b

    c

  • 7/27/2019 Doka Formwork

    11/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    11999765002 - 06/2007 The Formwork Experts

    The logical system grid

    Alu-Framax Xlife panelsLogical panel grid in 15 cm steps.The heights andwidths of the Alu-Framax Xlife panels togetherresult in a logical, advantageous "grid" whichmakes this formwork particularly flexible and eco-

    nomical. Easy planning and forming Height and width can be adjusted in 15 cm incre-

    ments Very few closures needed Clear joint pattern

    Only 2 form-ties in the height. On the 2.70 m highAlu-Framax Xlife panels, only 2 form-ties areneeded.

    Only 5 widths and

    2 heights of panelare all you need to form any layout.In Austria, a 55 cm wide panel is also available (forcorners without make-up, on 25 cm thick walls).

    Panel widths

    Panel heights

    Alu-Framax Xlife universal panels

    The special hole pattern makes these panels partic-ularly suitable for efficient forming of: corners wall junctions stop-ends columns

    9731-215-01

    90

    75

    60

    45

    30

    9765-204-01

    270

    57

    .5

    155

    .0

    57

    .5

    90

    32.5

    55

    .0

    9765-205-01

    270

    100.0

    17

    .5

    57

    .5

    17.5

    100.0

    17.5

    57.5

    75.0

    135

    35.0

    100.0

    17.5

    155

    .0

    57

    .5

    75

    75

    75

    32.5

    55.0

    90

    17.5

    55.0

    17.5

  • 7/27/2019 Doka Formwork

    12/80The Formwork Experts12 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Adaptability

    Possible combinationsThe perfect panel size-grid gives you innumerablecombinations, in both width and height. You canuse the panels either upright or horizontal, and the15 cm increment-grid gives you optimum adapta-

    bility of the formwork to the dimensions of thestructure, at all times.

    Schematic representation

    Stepless height offset

    The fixing bead around the inside of the profilesenables the connectors to be fastened anywhere onthe frame. This allows adjacent panels to bestagge-

    redin height continuously, i.e. without being con-fined to any fixed grid. This means that the form-work can easily be accommodated to e.g. steps,slopes and uneven floors, at no extra cost in termsof time.

    Schematic representation

    Carry on forming with in-situ timber

    Alu-Framax formwork gives you easy connectionswhen you need to "fill-in" with in-situ timber form-work. Between them, the universal waling, thewedge clamp and the integrated bolt system makeit easy for you to join Alu-Framax panels to squaredtimbers and ply sheets.

    a ... 12.3 cm

    9731-298-01

    9731-299-01

    A Framax universal waling (with nail-holes for easy fasteningof squared timbers)

    B Framax wedge clamp

    C Framax moulded timber

    D Squared timber

    E Formwork sheet

    F Alu-Framax Xlife panel

    9731-300-01

    a

    AB

    C D EF

  • 7/27/2019 Doka Formwork

    13/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    13999765002 - 06/2007 The Formwork Experts

  • 7/27/2019 Doka Formwork

    14/80The Formwork Experts14 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Inter-panel connections

    Upright panels

    Sideways panels

    Simple inter-panel connections

    with Framax quick acting clamp RU

    The bead running around the inside of the outsideframe profile means that the clamp can be fastened

    at any point desired. This allows adjacent panels tobe staggered in height.

    More functions

    Vertical stacking with moulded timber

    The Framax quick acting clamp RU and Framaxmulti function clamp

    create fast, self-aligning and tension-proofjoints

    have no loose parts which might get lost are hard-wearing and dirt-resistant for site use should only be fixed using a formwork hammer

    (max. 800 g)

    Panel height Number ofclamps

    0.90 m 22.70 m 2

    Panel width Number ofclamps0.30 m 10.45 m 1

    0.60 m 20.75 m 20.90 m 2

    For details regarding extra inter-panel con-nections for outside corners and stop-endformwork (for increased tensile loads) see"Inter-panel connections for increased ten-sile loads".

    See "Vertical stacking of panels" for detailsof the positions of the Framax quick-actingclamps RU and Framax multi-functionclamps that are needed when verticallyextending.

    9731

    -350

    -01

    Framax quick acting clamp RU:

    perm. tensile force: 15.0 kNperm. shear force: 4.0 kNperm. moment: 0.25 kNm

    A Framax quick-acting clamp RU

    B Framax moulded timber 27mm (for 27mm formwork sheet)or Framax moulded timber 21mm (for 21mm formworksheet) or Framax moulded timber 18mm (for 18mm form-

    work sheet) orC Formwork sheet

    9731-236-01

    9731-237-01

    9727

    -289

    -01

    A

    B

    C

  • 7/27/2019 Doka Formwork

    15/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    15999765002 - 06/2007 The Formwork Experts

    Self-aligning inter-panel connec-tions and make up

    with Framax multi function clamp

    Particularly when panels are stacked in the vertical,

    the fact that the clamp bears directly on the profilesmeans that there is no need for any extra bracing ofthe panels with universal walings.

    More functions

    Inter-panel joints

    Joining the panels using the Framax multi functionclamp provides additional bracing of the gang-form(as the clamp bears directly onto the profile).

    Make up to 15 cm

    With its 15 cm clamping range, the Framax multi-function clamp exactly matches the panel size-grid.For more information, see "Length adjustmentusing closures".

    Squared-timber joints up to 20 cm

    Corner joints on foundations

    Framax multi function clamp:

    perm. tensile force: 15.0 kNperm. shear force: 6.0 kNperm. moment: 0.45 kNmValues apply only when mounted on profile.

    A Contact surface on the profile

    9731-238-01

    A

    9731-239-01

    9731-335-01

    9731-336-01

    9731-242-01

    9731-243-01

  • 7/27/2019 Doka Formwork

    16/80

  • 7/27/2019 Doka Formwork

    17/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    17999765002 - 06/2007 The Formwork Experts

    Notes

  • 7/27/2019 Doka Formwork

    18/80The Formwork Experts18 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Form-tie system

    Placing form-ties in the frame profile The Doka form-tie system 15.0

    As an alternative to the plastic tube with universalcone, there is also a distancer in the form of a com-

    plete form-tie sheathing tube.

    The stoppers for plugging the distancers are alsoincluded.

    Note:

    Doka also offer economical solutions for makingwatertight form-tie points.

    In general:

    Fix a form-tie in every form-tie sleeve that is notcovered over by a super-plate.

    Always tie in the bigger (wider) of the two panels.

    For exceptions, see the sections headed "Lengthadjustment using closures" and "Vertical stackingof panels".

    Only use approved tie-rodsNever weld or heat tie-rods

    Seal off unneeded form-tie sleeves with Uni-versal plugs R20/25.

    Spanner for tie-rod 15.0/20.0

    For turning and holding the tie-rods.

    9731

    -351

    -01

    9731-249-01

    A Tie-rod 15.0mm

    B Super-plate 15.0

    C Plastic tube 22mm

    D Universal cone 22mm

    The "Plastic tubes 22mm" left behind in theconcrete are sealed off with Plugs 22mm.

    A Tie-rod 15.0mm

    B Super-plate 15.0

    C Distancer (Ready for use for certain thicknesses of wall)

    Tie-rod 15.0mm:

    Permitted load with safety factor of 1.6: 120 kNPermitted load to DIN 18216: 90 kN

    9727-299-01

    A

    B

    C D

    9727-301-01

    A

    B

    C

  • 7/27/2019 Doka Formwork

    19/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    19999765002 - 06/2007 The Formwork Experts

    Inclined and height-mismatchedpositioningThanks to their large, conical form-tie sleeves, thepanels can be inclined on one or both sides, and/orheight-mismatched. The super-plate readily copeswith all these situations.

    Note:

    Secure all inclined panels against uplift.Inclined and mismatched positioning are not possi-ble with panels that have been placed on their

    sides.

    Detached home, Ramsau

    9727-294-01

    Conical on 1 sideConical on both

    sidesHeight mismatch

    max. 4 max. 2 x 4.5 max. 1.0 cm per 10cm wall thickness

    9731-247-01 9731-248-01 9731-246-01

  • 7/27/2019 Doka Formwork

    20/80The Formwork Experts20 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Length adjustment using closures

    Closures: 0 - 15 cm

    with fitting timber and Framax multi function

    clamp

    By combining the fitting-timber widths of 2, 3, 5,

    and 10 cm in various ways, the closures can bemade in 1 cm increments.

    Tie through frame profile

    Ties through fitting timber

    Universal waling:

    Perm. moment: 5.2 kNm

    A Framax multi-function clamp

    B Fitting timber

    C Framax universal waling

    D Framax wedge clamp

    E Alu-Framax Xlife panel (max. width 60cm)

    F Alu-Framax Xlife panel

    9731

    -352

    -01

    9731-251-01

    C

    EBF

    A

    D

    A Framax multi-function clamp

    B Fitting timber

    C Framax universal waling (for closures of up to 5 cm in width,no universal walings are needed)

    D Alu-Framax Xlife panel

    9731

    -353

    -01

    9731-252-01C

    A

    BD

  • 7/27/2019 Doka Formwork

    21/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    21999765002 - 06/2007 The Formwork Experts

    Closures: 0-20 cm

    with Framax fitting timber and Framax adjust-

    able clamp

    Closures: 4-20 cm

    with closure plate R20

    Closures: 0-80 cm

    with Framax moulded timber, formwork sheet

    Framax adjustable clamp:

    Perm. tensile force: 10.0 kN

    A Framax adjustable clamp

    Fit the Framax adjustable clamp in the sameposition as the Framax multi-functionalclamp.

    A Framax Closure plate R 20

    B Framax Multi function clamp or Framax Adjustable clamp

    C Framax Universal waling

    D Framax Wedge clamp

    E Alu-Framax Xlife panel

    Unneeded tie-holes in the closure plate canbe sealed with Plugs for closure plate R25.

    9731-254-01

    A

    9731-337-01

    9731-255-01 C

    D

    AE

    B

    A Framax moulded timber

    B Framax quick-acting clamp RU

    C Squared timber

    D Formwork sheet

    E Framax universal waling

    F Framax wedge clamp

    G Alu-Framax Xlife panel

    Closure rangeFramax universal waling 0.90m 0 to 30 cmFramax universal waling 1.50m 0 to 80 cm

    Tying the panels:

    Closure widths 30 cm: fix 2 form-ties in each ofthe 3 universal walings (per 2.7 m formworkheight).

    9731-338-01

    9731-256-01

    EF

    ACG

    B

    D

  • 7/27/2019 Doka Formwork

    22/80The Formwork Experts22 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Facilitating stripping with the strip-ping timberThe diagonally cut stripping timber makes quickwork of striking inside-formwork in narrow cross-sections such as lift-shafts or stair-wells.

    a ... 10 cm

    The Framax stripping timber is available in lengths

    of 2.85 m. The stripping timbers thus project 15 cmbeyond the ends of the panels, and so are easier toremove.

    A Inside - stripping timber

    B Outside - fitting timber

    9731-273-01

    A

    B

    9731-274-01

    a

    9731-275-01

  • 7/27/2019 Doka Formwork

    23/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    23999765002 - 06/2007 The Formwork Experts

    90 degree corners

    The corner solutions are based on the strong, tor-sion-proof Alu-Framax inside corner.

    a ... 30 cm

    There are 2 ways of forming right-angled outsi-decorners: with Framax outside corner with Alu-Framax Xlife universal panel

    with Framax outside cornerThe Framax outside corner is an easy way of form-ing corners in narrow trench situations or wherelarge wall thicknesses are called for.

    a ... 30 cmb ... 35 cm

    Number of quick-acting clamps RU needed:

    For details regarding extra inter-panel con-nections on outside corners (for increasedtensile loads), see the section headed "Inter-panel connections for increased tensileloads".

    9

    731

    -354

    -01

    9731-265-01

    a

    a

    A Framax outside corner

    B Alu-Framax Xlife inside cornerC Framax quick-acting clamp RU

    D Framax multi-function clamp

    E Framax universal waling

    F Framax wedge clamp

    G Fitting timber

    H Alu-Framax Xlife panel

    When there is a closure on both sides of theinside corner, bracing can be achieved eco-nomically with the universal corner waling.

    Height of outside corner N of clamps0.90m 42.70m 8

    9731-368-01

    9731

    -266

    -01

    A

    D

    E

    F

    C

    G

    B

    H

    a

    b

  • 7/27/2019 Doka Formwork

    24/80The Formwork Experts24 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    with Alu-Framax Xlife universalpanelWhen this panel is used, a wall-thickness grid with5 cm increments is available.

    Note:

    The Alu-Framax Xlife universal panel can only be

    used in conjunction with panels that contain crossboreholes (Alu-Framax Xlife 55 and 60 cm panelsplus a second universal panel).

    a ... 30 cmb ... 25 cm

    Required numbers of universal fixing bolts + super-plates 15.0:

    Attainable wall thicknesses in 5 cm grid:

    Framax steel closure plate 5cmUsed mainly in corner zones, the Framax steel clo-sure plate 5cm stands out for its high strength andlong lifespan.

    a ... 25 cm

    A Alu-Framax Xlife universal panel

    B Alu-Framax Xlife inside corner

    C Framax universal fixing bolt + Superplatte 15,0

    D Framax quick-acting clamp RU

    E Panel with cross boreholes (Alu-Framax Xlife panel 0,55 /0,60 or Alu-Framax Xlife universal panel

    universal panels 0.75x0.90m 2 of eachuniversal panels 0.75x2.70m 4 of each

    9731-355-01

    9731

    -267

    -01

    D

    CE B

    A

    a

    b

    A Framax steel closure plate 5cm

    B Framax multi-function clamp

    C Alu-Framax Xlife inside corner

    D Alu-Framax Xlife universal panel

    E Panel with cross boreholes (Alu-Framax Xlife panel 0.55 or0.60m or Alu-Framax Xlife universal panel)

    When the steel closure plates are used, nouniversal walings are needed.

    9731-270-01

    X5

    10

    15

    20

    25

    30

    X =

    9731-268-01

    A

    CE

    B

    D

    a

    a

  • 7/27/2019 Doka Formwork

    25/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    25999765002 - 06/2007 The Formwork Experts

    Example: T-junction

    a ... 25 cmb ... 30 cm

    Edges

    with Framax frontal triangular ledge

    The frontal triangular ledge can be pushed over theend face of the panel (no nails needed). For formingoutside corners, it is used with the universal panel(integrated slot grid for universal fixing bolts).Edges can also, of course, be formed using the tri-

    angular ledge.

    a ... 20 mm

    with the Framax triangular ledge

    Where outside corners are formed using theFramax outside corner, the quick acting clampsused for the interconnection mean that the Framaxtriangular ledge has to be used.

    a ... 20 mm

    A Alu-Framax Xlife inside cornerB Framax quick-acting clamp RU

    C Fitting timber

    D Framax multi-function clamp

    E Framax universal waling

    F Alu-Framax Xlife panel

    9731-339-01

    9731-269-01

    DA

    C

    EB

    F

    a

    b b

    A Alu-Framax Xlife universal panel

    B Alu-Framax Xlife panel (0.55 / 0.60m) or Alu-Framax Xlifeuniversal panel

    C Framax universal fixing bolt

    D Super platte 15.0

    E Framax frontal triangular ledge or Framax triangular ledge

    A Framax outside corner

    B Framax quick-acting clamp RU

    C Alu-Framax Xlife panel

    D Framax triangular ledge

    E Wire nail 22x40

    9731-271-01

    B

    C

    D

    EA a

    9731-272-01

    E

    A

    C

    B

    D

    a

  • 7/27/2019 Doka Formwork

    26/80The Formwork Experts26 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Inter-panel connections for increased tensile loadsAs a rule, only 2 clamps are needed per 2.70 mformwork height as a tension link between the pan-els.However, where increased tensile loads areencountered, especially in outside-corner and stop-end configurations, extra clamps are needed.

    Near stop-ends

    a ... 40 cm up to 60 cmb ... up to 1.95 mX1 ... for every 2.70 m of formwork height: 2 clamps + 1 extraclamp

    Near outside corners

    a ... up to 40 cmb ... up to 1.95 mX1 ... for every 2.70 m of formwork height: 2 clamps + 1 extraclamp

    a ... up to 60 cm

    b ... up to1.35 mc ... from 1.35 m up to 2.70 mX1 ... for every 2.70 m of formwork height: 2 clamps+ 2 extraclampsX2 ... for every 2.70 m of formwork height: 2 clamps + 1 extraclamp

    Wall thicknesses from 40 up to 60 cm:

    For each inter-panel join up to 1.95 m away fromend of wall: 1 extra clamp

    Wall thickness up to 40 cm:

    For each inter-panel join up to 1.95 m away fromoutside corner 1 extra clamp

    9731-258-01

    a

    b

    X1

    b

    X1

    9731-257-01

    a

    a

    bX

    1

    b

    X1

    Wall thicknesses up to 60 cm:

    For each inter-panel join up to 1.35 m away fromoutside corner 2 extra clamps

    For each inter-panel join between 1.35 m and 2.70m away from outside corner: 1 extra clamp

    9731-259-01

    a

    c

    X2

    a

    cX2

    b

    X1

    b X1

  • 7/27/2019 Doka Formwork

    27/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    27999765002 - 06/2007 The Formwork Experts

    Notes

  • 7/27/2019 Doka Formwork

    28/80The Formwork Experts28 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Acute & obtuse-angled corners

    Acute and obtuse angles are solved using thehinged inside and outside corners.

    Number of clamps needed in the hinged outsidecorner:

    Annaberg District Hospital, Buchholz

    70 (60) - 135 angles, with hinged

    corners I + A

    a ... 30 cm

    Where universal fixing bolts are used (only on 55and 60 cm wide panels) instead of the quick-actingclamp RU in the inside corner, an angle of60 isalso possible.

    Hinged inside corner I Hinged outside corner A

    a ... 0.8 cmb ... 29.2 cm

    a ... 0.8 cmb ... 5.5 cm

    When preparing the corners, remember the fol-lowing points:

    From angles of 120 and upwards, universal wal-ings must be used on the inside corner in everywaling-profile level.

    On outside corners, universal walings shouldgenerally be positioned in every waling-profile

    level.Where there are closures, provide extra Universalwalings as shown in the section headed "Lengthadjustment using closures".

    For details regarding extra inter-panel connec-tions on outside corners (for increased tensileloads), see the section headed "Inter-panel con-nections for increased tensile loads".

    Height of panel Number of clamps

    0.90 m 42.70 m 8

    9731

    -356

    -01

    9727-323-01

    a

    b

    ba

    9727-322-01

    a

    b

    b a

    A Framax hinged outside corner A

    B Framax hinged inside corner I

    C Alu-Framax Xlife panel 0.60m

    D Framax quick-acting clamp RU

    E Framax universal waling 1.50m

    F Framax wedge clamp

    A Framax hinged inside corner I

    B Framax universal fixing bolt

    C Star grip nut 15.0 G

    D Alu-Framax Xlife panel (55 or 60 cm width)

    9731-260-01

    a

    a

    70

    A

    B

    D

    F

    C

    E

    9731

    -264

    -01

    60

    AB

    D

    C

  • 7/27/2019 Doka Formwork

    29/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    29999765002 - 06/2007 The Formwork Experts

    a ... 30 cm

    90 - 180 angles, with hinged insidecorner I only

    a ... 30 cm

    The hinged corner I can be fixed at a 90 angle usinga universal fixing bolt and super-plate 15.0.

    a ... 30 cm

    A Framax hinged outside corner A

    B Framax hinged inside corner I

    C Alu-Framax Xlife panel 0.30m

    D Framax quick-acting clamp RU

    E Framax universal waling

    F Framax wedge clamp

    A Framax hinged inside corner I

    B Alu-Framax Xlife panel 0.30m

    C Framax quick-acting clamp RU

    D Framax universal waling

    E Framax wedge clamp

    A Framax hinged inside corner I

    B Framax universal fixing bolt

    C Super plate 15.0

    9731-261-01

    a

    a

    135

    F

    A

    B

    D

    C

    E

    9731-262-01

    a90

    B

    D

    C

    a

    A

    E

    9727

    -235

    -01

    A

    B

    C

    A Framax hinged inside corner I

    B Framax quick acting clamp RU

    C Framax universal walingD Framax wedge clamp

    9731-340-01

    9731-263-01

    a 180

    B

    D

    C

    a

    A

  • 7/27/2019 Doka Formwork

    30/80The Formwork Experts30 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Stop-end formworkThere are 2 possible ways of forming stop-ends: with universal panels with universal walings

    with Universal walings

    Universal walings make it possible to form stop-ends continuously across any thickness of wall.

    There are 2 possible ways offastening the univer-sal walings: with universal fixing bolts with stop-end ties

    Universal fixing bolts

    The universal walings are mounted using universal-fixing bolts and super-plates 15.0 fixed through the-

    cross boreholes in the Alu-Framax Xlife panels 0.55and 0.60m / Alu-Framax Xlife universal panels.

    Stop-end ties

    The universal walings or multi-purpose walings arefastened using Framax stop-end ties and super-plates. This enables you to form stop-ends continu-ously, even across large thicknesses of wall.

    For details regarding inter-panel connec-tions near stop-ends (for increased tensileloads), see "Inter-panel connections forincreased tensile loads".

    Universal waling:

    permitted moment: 5.2 kNm

    9731

    -357

    -01

    9731

    -347

    -01

    A

    A Only panel with cross boreholes (Alu-Framax Xlife panel0.55 / 0.60 or Alu-Framax Xlife universal panel)

    B Framax universal waling

    C Framax universal fixing bolt + Super-plate 15.0

    D Tie-rod 15.0mm

    Framax universal fixing bolt:perm. tensile force in the sleeve: 15.0 kN

    A Framax universal waling or Multi-purpose waling WS10Top50

    B Framax stop-end tie (clamping range: 9 - 13 cm)

    CSuper-plate 15.0D Tie-rod 15.0mm

    E Alu-Framax Xlife panel

    9731-278-01

    B

    D

    A

    C

    9765

    -213

    -01

    9731-276-01

    A

    D

    C

    E

    B

  • 7/27/2019 Doka Formwork

    31/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    31999765002 - 06/2007 The Formwork Experts

    Stop-ends with joint-sealing tapes

    b ... max. 20.0 cm

    with universal panelsThe Alu-Framax universal panels` continuous 5 cmhole-grid permits stop-end solutions for wall thick-nesses ofup to 45 cm.The universal panels are attached using universalfixing bolts and super-plates placed through thecross boreholes of the Alu-Framax Xlife panels 0.55and 0.60m or universal panels.

    Required numbers of universal fixing bolts + super-plates 15.0:

    Position of the stop-end ties:

    Framax stop-end ties should not be spaced anycloser than in every other panel-field, in each casehalf-way between the two cross profiles.

    In order to ensure uniform load transfer, the stop-end ties should be fitted in the middle (between 2cross-profiles) wherever possible.

    Height of panel:2.70 m

    Wall thickness Universal walings /multi-pupose walingsup to 40 cm 2 unitsup to 50 cm 3 unitsup to 60 cm 4 units

    Horizontal panels

    Width of panel Wall thickness Universal walings /multi-purpose walingsup to 0.45m

    up to 60 cm1 unit

    over 0.45m 2 units

    Framax stop-end tie:Permitted capacity: 15.0 kN

    Multi-purpose waling WS10 Top 50:

    permitted moment: 11.5 kNm

    Dimension "a"Multi-purpose waling WS10 Top50 min. 25.0 cmFramax universal waling min. 35.5 cm

    A Framax stop-end tie

    B Rod connector 15.0

    C Tie-rod 15.0mm

    D Super-plate 15.0

    E Framax universal waling or Multi-purpose waling WS10Top50

    F Alu-Framax Xlife universal panel

    G Framax universal waling

    a

    b

    TR572-200-01

    A B C

    D

    E

    F

    GA Only panel with cross boreholes (Alu-Framax Xlife panel

    0.55 / 0.60 or Alu-Framax Xlife universal panel)

    B Alu-Framax Xlife universal panel

    C Framax universal fixing bolt + Super-plate 15.0

    Universal panel 0.75x0.90m 4 of eachUniversal panel 0.75x2.70m 8 of each

    9731

    -348

    -01

    A

    9731-277-01

    B

    C

    A

  • 7/27/2019 Doka Formwork

    32/80The Formwork Experts32 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Wall junctions, offsets and steps

    Connecting to existing walls

    Right-angled connections

    with Alu-Framax Xlife universal panel

    with Alu-Framax Xlife panel and pressure plate 6/15

    with Alu-Framax Xlife panel and squared timber

    In-line connections

    with Alu-Framax Xlife universal panel

    a ... max. 20.0 cm

    with Alu-Framax Xlife panel and squared timber

    A Alu-Framax Xlife universal panel

    B Tie-rod 15.0mm(on the Universal panel 2.70m, 3 form-ties are required, inthe first hole of each perforated profile)

    C Shoring

    A Alu-Framax Xlife panel

    B Pressure plate 6/15

    C Hexagon nut 15.0

    D Tie-rod 15.0mm

    E Shoring

    A Alu-Framax Xlife panel

    B Squared timber (max. 20 cm)

    C Framax universal waling (not necessary with squared tim-bers up to 5 cm wide)

    D Framax wedge clamp

    E Tie-rod 15.0mm

    F Shoring

    9731-279-01

    B

    A

    C

    9731-280-01

    B

    C

    D

    A

    E

    9731-281-01

    A

    C

    E

    B

    D

    F

    A Alu-Framax Xlife universal panel

    B Framax universal waling 1.50m

    C Tie-rod 15.0mm(on the Universal panel 2.70m, 3 form-ties are required)

    A Alu-Framax Xlife panel

    B Squared timber

    C Framax multi-function clamp

    D Tie-rod 15.0mm

    9765-207-01

    B

    A

    C

    a

    9731-282-01

    B

    D

    AC

  • 7/27/2019 Doka Formwork

    33/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    33999765002 - 06/2007 The Formwork Experts

    Corner connections

    without closure

    with closure

    Wall offsets

    one-sided wall offset up to max. 12 cm

    Note:

    Where the sections of wall are short (high longitu-

    dinal tension), shoring is necessary.

    Wall steps

    a ... 35 to 90 cm

    A Alu-Framax Xlife panel

    B Framax pressure plate 6/15

    C Hexagon nut 15.0

    D Super-plate 15.0

    E Tie-rod 15.0mm

    F Squared timber

    G Framax multi-function clamp

    H Shoring

    A Alu-Framax Xlife panel

    B Squared timber (min. 3.5 cm up to max. 20 cm)

    C Alu-Framax Xlife panel 0.30m

    D Framax universal waling(not necessary with squared tim-bers up to 5 cm wide)

    E Framax wedge clamp

    F Super-plate 15.0

    G Tie-rod 15.0mm

    H Shoring

    9765-206-01

    F

    G

    C A

    BH

    E

    D

    9731-284-01

    C

    E

    A

    H

    B D

    F G

    A Framax universal waling

    B Framax wedge clamp

    C Squared timber

    D Super-plate 15.0 + Framax universal fixing bolt 10-25cm

    E Tie-rod 15.0mm

    F Alu-Framax Xlife panel

    A Alu-Framax Xlife inside corner

    B Alu-Framax Xlife universal panel

    C Alu-Framax Xlife panel 0.55 / 0.60m

    D Framax universal corner waling

    E Framax wedge clampF Super-plate 15.0 + Framax universal fixing bolt

    G Tie-rod 15.0mm

    9731-286-01

    BD

    E

    AC F

    9731-287-01

    C

    E

    G

    A

    B

    D

    F

    a

    F

  • 7/27/2019 Doka Formwork

    34/80The Formwork Experts34 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Vertical stacking of panels

    Alu-Framax Xlife panels on theirsides

    with Framax quick acting clamp RU

    Formwork height: 300 cm

    X ... Where pouring platforms are to be used, also fit form-ties atthe top edge of the formwork.

    Formwork height: 315 and 330 cm

    If form-ties are also placed at the inter-panel join, only 4 quickacting clamps RU are needed (see height 345 and 360 cm).

    Formwork height: 345 and 360 cm

    If the panel struts are mounted to an upright panel, a universalwaling must be used.

    Positions of the connecting and tying compo-nents and other accessories needed for:

    lifting and setting down crane-handling platform loads

    pouring wind loads

    If"hybrid" gang-forms (containing both Alu-Framax Xlife + Framax Xlife panels) arelifted and reset by crane, they must be givenadditional stiffening reinforcement.

    Framax quick acting clamp RU:

    perm. tensile force: 15.0 kNperm. shear force: 4.0 kNperm. moment: 0.25 kNm

    Framax multi function clamp:

    perm. tensile force: 15.0 kNperm. shear force: 6.0 kNperm. moment: 0.45 kNmValues apply only when mounted on profile.

    Framax universal waling:

    Permitted moment (for vertical stacking of pan-els): 4.3 kNmDue to the max. tensile load of 12 kN in the walingprofile, even stiffer components such as Multi-pur-pose walings WS10 Top50 are also subject to:Permitted moment 4.3 kNm

    A Form-tie 15.0 mm + Super plate 15.0B Framax quick acting clamp RU

    C Framax multi function clamp

    D Framax universal waling

    E Framax wedge clamp

    9727-417-01

    A B C D E

    9731

    -30

    9-

    01

    30

    270

    9731

    -310

    -01

    45-60

    270

    9731

    -311

    -01

    75-90

    270

  • 7/27/2019 Doka Formwork

    35/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    35999765002 - 06/2007 The Formwork Experts

    Formwork height: 375, 390, 405, 420, 435 and450 cm

    A top horizontal panel with a width of up to 45cm needs only

    4 Quick-acting clamps RU. A top horizontal panel with a width of 75cm upward needs auniversal waling.

    Formwork height: 465, 480, 495, 510, 525 and540 cm

    A top horizontal panel with a width of up to 45cm needs only4 Quick-acting clamps RU. A top horizontal panel with a width of 75cm upward needs auniversal waling.

    with Framax multi function clamp

    Formwork height: 300 cm

    X ... Where pouring platforms are to be used, also fit form-ties atthe top edge of the formwork.

    Formwork height: 315 and 330 cm

    If form-ties are also placed at the inter-panel join, only 4 Multi-function clamps are needed. (see heights 345 cm and 360 cm)

    Formwork height: 345 and 360 cm

    If the panel struts are mounted to an upright panel, a universalwaling must be used.

    9731

    -312

    -01

    270

    90

    30-90

    9731

    -3

    13

    -01

    30-90

    90

    90

    270

    9731

    -301

    -01

    30

    270

    9731

    -302

    -01

    45-6

    0

    270

    9731

    -303

    -01

    75-90

    270

  • 7/27/2019 Doka Formwork

    36/80The Formwork Experts36 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Formwork height: 375, 390, 405, 420, 435 and 450cm

    Formwork height: 465, 480, 495, 510, 525 and 540cm

    Alu-Framax Xlife-panels upright

    with Framax quick acting clamp RU

    Formwork height: 360 cm

    Formwork height: 450 cm

    Universal walings are needed on every third panel (in terms ofthe width). No universal walings are needed on 0.30 m and0.45 m wide panels.

    9731

    -304

    -01

    30-90

    90

    270

    9731

    -305

    -01

    30-90

    90

    90

    270

    9731

    -314

    -01

    90

    270

    9731

    -315

    -01

    90

    90

    270

  • 7/27/2019 Doka Formwork

    37/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    37999765002 - 06/2007 The Formwork Experts

    Formwork height: 540 cm

    A universal waling is needed on every third panel. No univer-sal walings are needed on 0.30 m and 0.45 m wide panels.

    with Framax multi function clamp

    Formwork height: 360 cm

    Formwork height: 450 cm

    Universal walings are needed on every third panel (in terms ofthe width). No universal walings are needed on 0.30 m and

    0.45 m wide panels.

    Formwork height: 540 cm9731

    -3

    16

    -01

    270

    270

    9731

    -306

    -01

    270

    9

    0

    9731

    -307

    -01

    270

    90

    90

    9731

    -308

    -01

    270

    270

  • 7/27/2019 Doka Formwork

    38/80The Formwork Experts38 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Plumbing accessories

    Panel struts ensure that the formwork remains sta-ble against wind loads, and make it easier to plumband align the formwork.

    Number of panel struts on 2.70 m wide gang-form:

    *) Up to a height of 3.30 m, the spacing of the props can beextended to 4.05 m apart.

    The values given here apply up to a height of 8 m above the sur-rounding ground. For heights of more than 8 m, the correct spac-ing of the props must be calculated as required by the higherwind loads.

    Note:

    Every gang-form must be supported by at least 2panel struts.

    Example:Where the formwork height is 5.10 m, the following

    are needed for every 5.40 m wide gang-form: 2 Panel struts 540

    Connection in the waling profile

    Product features:

    Can be telescoped in 8 cm increments Fine adjustment by screw-thread All parts are captively integrated - including the

    telescopic tube (has safety stop to preventdropout)

    Important note:

    The formwork panels must be held stable inevery phase of the construction work!Please observe all applicable safety regula-tions!

    Caution!

    There is a risk of the formwork tipping overin high winds. If high wind speeds are likely, and when

    work finishes for the day or before pro-longed work-breaks, always take extraprecautions to fix the formwork in place.

    Suitable precautions:- set up the opposing formwork- place the formwork against a wall- anchor the formwork to the ground

    For more information (wind loads etc.) seethe section headed "Vertical and horizontalloads" in the Doka Calculation Guide.

    9731-358-01

    Formwork height [m]Panel strut

    340 5404.05 1 *)

    5.40 1Max. anchoring load: 13.5 kN

    Panel strut 340 Panel strut 540

    a ... 193.0 - 340.9 cmb ... 114.9 - 165.4 cm

    a ... 309.0 - 550.0 cmb ... 207.2 - 263.7 cm

    9731

    -288

    -01

    a

    b

    9731

    -289

    -01

    a

    b

    9731-290-01

  • 7/27/2019 Doka Formwork

    39/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    39999765002 - 06/2007 The Formwork Experts

    "Hotel am Blub"

    Fixing to the groundAnchor the Panel strut in such a way that it resists

    tensile and compressive forces!

    Holes in footplate of the Panel strut:

    a ... 26 mmb ... 18 mm

    Anchoring the footplate

    The Doka Express anchor can be re-used manytimes over - the only tool needed for screwing it inis a hammer.

    A Doka Express anchor 16x125mm

    B Doka coil 16mm

    Cube compressive strength of concrete:min. 25 N/mm2 or 250 kg/cm2(C20/25 grade concrete)

    Follow the Fitting Instructions!

    9727-343-01

    ba

    TR632-201-01

    A

    B

    Required load-bearing capacity of alternativedowels: min. 13.5 kNFollow the manufacturer's applicable fittinginstructions.

  • 7/27/2019 Doka Formwork

    40/80The Formwork Experts40 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Pouring platforms with single brackets

    The Framax bracket 90 can be used to assemblepouring scaffolds that can easily be mounted byhand.

    Framax bracket 90With the Framax bracket 90, pouring platforms witha platform width of 90 cm can be assembled. Thesepouring platforms can easily be mounted by hand.

    b ... 87 cmh ... 103 cm

    Deck-boards and guard-rail boards: Per 1 metrelength of platform, 0.9 m2 of deck-boards and0.6 m2 of guard-rail boards are needed (in-situ).

    Plank thicknesses for support centres of up to2.50 m: Deck-boards min. 20/5 cm Guard-rail boards min. 20/3 cm

    Fastening the deck-boards: with 5 square bolts M10x120 per bracket (not included in scope of sup-ply).

    Using scaffolding tubes

    Tools: Fork spanner 22 for mounting the couplers and scaffold-ing tubes.

    Preconditions for use:

    Only fix the pouring platform onto formwork con-structions that are sufficiently stable to transferthe expected loads.

    Shore the formwork in a windproof manner whenerecting it and when it is temporarily placed in thestanding position.

    Ensure that the formwork gang has sufficient stiff-ness.

    In Germany, please remember the following:Scaffold components made of timber must con-form - as a minimum - to grading category S10 (asper DIN 4074 Pt 1), and must bear the symbol "".

    Observe all applicable safety regulations.

    9731-359-01

    Permitted live load: 1.5 kN/m2 (150 kg/m2)

    Load Class 2 to EN 12811-1:2003Max. influence width: 2.00 m

    The brackets must be secured against acci-dental lift-out

    A Scaffold tube connector

    B Scaffolding tube 48.3mm

    C Screw-on couplers 48mm 50

    D Hexagon screw M14x70 + hexagon nut M14 (not included inscope of supply)

    9765

    -214

    -01

    b

    h

    9764-233-01

    A

    B

    D

    C

  • 7/27/2019 Doka Formwork

    41/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    41999765002 - 06/2007 The Formwork Experts

    Note:

    Where brackets need to be fixed to the middle crossprofile of upright Alu-Framax Xlife universal panels2.70m and 0.90m, this can only be done in the right-hand borehole.

    Sideguards on exposed platform-endsOn pouring platforms that do not completely encir-cle the structure, suitable sideguards must beplaced across exposed end-of-platform zones.

    with Side handrail clamping unit T

    The sideguard consists of: 1 side handrail clamping unit T 1 railing plank min. 15/3 cm (in situ)

    How to mount:

    Fasten the clamping component to the floorplanking of the pouring scaffold, using the wedge(clamping range 4 to 6 cm).

    Slot in the railing. Extend the telescopic railing to the desired length

    and secure it. Insert footguard (railing plank).

    with Handrail clamp S

    The sideguard consists of: 2 Handrail clamps S

    Possible ways of fixing Lift-out guard

    in the cross profile onupright panels

    In the cross profile onhorizontal panels

    A Framax bracket 90

    B Spring cotter

    C Wedge bolt RA 7.5

    9731

    -343

    -01

    9731

    -345

    -01

    A

    B

    9731

    -344

    -01

    9731

    -346

    -01

    B

    C

    A

    A Integrated telescopic handrail

    B Railing plank min. 15/3 cm (in situ)

    C Framax bracket 90

    A Railing plank min. 15/3 cm (in situ)

    B Handrail clamp SC Framax bracket 90

    9731

    -342

    -01

    A

    B

    C

    9731

    -341

    -01

    A

    B

    C

  • 7/27/2019 Doka Formwork

    42/80The Formwork Experts42 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    3 guardrail boards, min. 15 x 3 cm (in-situ)

    How to mount:

    Fasten the Handrail clamps tightly to the floordecking of the pouring platform (clamping range2 cm - 43 cm).

    Secure the guardrail boards to the loops on theHandrail clamp S with one 28 x 65 nail per loop.

    Opposing guard-railIf there are work platforms mounted on one side ofthe formwork only, then the integrated waling pro-file in the panels makes it possible to attachsquared timbers.

    How to mount:

    Fasten the squared timbers to the waling profileof the panels using Framax universal fixing boltsand Super-plates 15.0.

    Follow the directions in the Handrail

    clamp S Instructions for Assembly andUse!

    a ... 110 cm

    A Squared timbers 8x10x190cm (WxHxL), with drilled holeD=22mm

    B Guard-rail board

    C Framax universal fixing bolt

    D Super-plate 15.0

    9765

    -217

    -01

    a

    A

    B

    C

    D

    9765

    -217

    -02

    A

    C

    D

  • 7/27/2019 Doka Formwork

    43/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    43999765002 - 06/2007 The Formwork Experts

    Notes

  • 7/27/2019 Doka Formwork

    44/80The Formwork Experts44 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Pouring platformsIf there is a crane available on the site, it is also pos-sible to use the ready-assembled Framax pouringplatforms.

    Framax pouring platform U 1.25/2.70mPre-assembled, collapsible, ready-to-use platformwith width of 1.25 m for convenient, safe working.

    The level of the floor planking is 30 cm below thetop edge of the formwork. This means that thereis a "boundary" on the side facing the formwork.

    a ... 30 cm

    Lifting the platform onto the formwork:

    Attach a four-part lifting tackle (e.g. Doka 4-partchain 3.20m) to the pouring platform and hoist ittowards the formwork.

    Fix the pouring platform to the top of the form-work.

    Detach the four-part lifting tackle.The safety hooks latch into place automatically.

    The pouring platform is now secured against acci-

    dental lift-out.

    Preconditions for use:

    Only fix the pouring platform onto formwork con-

    structions that are sufficiently stable to transferthe expected loads.

    Shore the formwork in a windproof manner whenerecting it and when it is temporarily placed in thestanding position.

    Ensure that the formwork gang has sufficient stiff-ness.

    Observe all applicable safety regulations.

    If the formwork is lifted with the pouring

    platform still mounted to it, the platform

    must be secured so that it cannot slip toeither side. It is NOT allowed to place the formwork

    on its side while the pouring platform isstill mounted!

    In vertically stacked configurations withhorizontal panels, these must also be tiedat the top edge when used with pouringplatforms!

    For length adjustments, it may be neces-sary to place floor planking as a bridge(max. 50 cm) between two platforms.Minimum plank overlap: 25 cm.

    Permitted live load: 1.5 kN/m2 (150 kg/m2)

    Load Class 2 to EN 12811-1:2003

    9727-262-01

    2.70

    m

    1.25m

    1.00m

    Other possible areas of use for the Framaxpouring platform U: Doka framed formwork Framax Xlife Doka large-area formwork Top50 - with

    Top50 adapter for Framax pouring plat-form U

    Doka wall formwork FF20 - with FF20adapter for Framax pouring platform U

    A Safety hook

    Do a sight check to make sure that thesafety hooks have latched into place!

    9731-317-01

    a

    9731

    -318

    -01

    A

    9731

    -319

    -01

  • 7/27/2019 Doka Formwork

    45/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    45999765002 - 06/2007 The Formwork Experts

    Lifting the platform off the formwork:

    Attach a four-part lifting tackle to the pouringplatform and raise it.When the pouring platform is raised by the four-part lifting tackle on the safety hook, the platformis automatically unlocked.

    Framax pouring platform O 1.25/2.70mPre-assembled, collapsible, ready-to-use platformwith width of 1.25 m for convenient, safe working.

    The level of the planking is above the top edge ofthe formwork.

    Lifting the platform onto the formwork:

    Attach a four-part lifting tackle (e.g. Doka 4-partchain 3.20m) to the pouring platform and hoist ittowards the formwork.

    Fix the pouring platform to the top of the form-work.

    Detach the four-part lifting tackle.The safety hooks latch into place automatically.

    The pouring platform is now secured against acci-dental lift-out.

    Lifting the platform off the formwork:

    Attach a four-part lifting tackle to the pouringplatform and raise it.When the pouring platform is raised by the four-part lifting tackle on the crane suspension hook,the platform is automatically unlocked.

    Permitted live load: 1.5 kN/m2 (150 kg/m2)

    Load Class 2 to EN 12811-1:2003

    Other possible areas of use for the Framaxpouring platform O:

    Doka framed formwork Framax Xlife Doka wall formwork Top50 and FF20 -with Top50 adapter for Framax pouringplatform O

    9727-263-01

    2.70

    m1.25m

    1.00m

    9731-320-01

    A Safety hook

    Do a sight check to make sure that thecrane suspension hooks have been sunkin!

    9731-321-01

    A

    9731-322-01

  • 7/27/2019 Doka Formwork

    46/80The Formwork Experts46 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Resetting by craneSafe crane-handling of Alu-Framax Xlife is possibleusing the Doka 4-part chain 3.20m and the Framaxlifting hook. The lifting hook locks automaticallyafter being hung into place.

    Doka 4-part chain 3.20m

    Attach the Doka 4-part chain 3.20m to the Framax

    lifting hooks.Hang the remaining chain-lengths back in place.

    Framax lifting hook

    Positioning the lifting hooks

    Single panels

    Position the Framax lifting hook in the middle of theframe profile.

    Two upright panels

    Make sure that the Framax lifting hook fits tightly tothe frame profile, to prevent the hook sliding fromside to side.

    Max. load-bearing capacity (as 2-part chain):Up to spread-angle of 30 2400 kg.

    Follow the directions in the OperatingInstructions!

    Max. load- bearing capacity:

    1000 kg / Framax lifting hook(feasible formwork area with 2 lifting hooks =approx. 30 m )

    Follow the directions in the OperatingInstructions!

    BG

    -PRFZER

    T

    BAU98160

    geprfteSicherheit

    9765

    -211

    -01

    9765

    -209

    -01

  • 7/27/2019 Doka Formwork

    47/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    47999765002 - 06/2007 The Formwork Experts

    Gang-form

    Always position the Framax lifting hook over theinter-panel join (A) , to prevent the hook slidingfrom side to side.- Exception: On single panels incorporated in

    the horizontal, the lifting hook must be placedover a waling profile (B) .

    Suspend the gang-form symmetrically (centre-of-gravity position).

    Spread-angle max. 30! Before lifting: Remove any loose items from the

    formwork and platforms, or secure them firmly.

    How to operate the lifting hook

    1) Raise the handle (locking lever) as far as it will go.2) Push the lifting hook onto the frame profile as far

    as the rear stop, and close the handle (spring-loaded).

    3) When the panels are lifted by the crane, a load-dependent locking mechanism is activated.

    Striking and repositioning the panels

    Lift the gang-form to its new location.

    A As used on upright panels

    B As used on horizontal panels

    Warning!

    On single Alu-Framax Xlife panels incor-porated in the horizontal, the lifting hookmust not be placed over a cross profile.

    9765

    -208

    -01

    A B

    9765

    -221

    -01

    Do a sight-check to make sure that there isa secure form-fit between the lifting hookand the frame profile!The handle must be closed!

    Caution!

    Risk of crane overload!When stripping the formwork, never use

    the crane to break concrete cohesion!

    9727-349-01

    1 23

  • 7/27/2019 Doka Formwork

    48/80The Formwork Experts48 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Transporting, stacking and storing

    Bundling the panels1) Place sleepers (W x H approx. 8.0 x 10.0) under

    the cross-profile.2) Strap the sleepers and the bottom framed panel

    together with strapping tapes.

    3) Insert Framax stacking cones.The stacking cones secure the panels against

    slippage.

    4) Strap the whole stack together tightly with strap-ping tape.

    Transporting the panels

    Dokamatic lifting strap 13.00m

    The Lifting strap 13.00m is a practical tool for load-ing and offloading lorries (trucks), and for lifting

    and setting down stacks of panels.

    Framax transport gear

    For safe crane transport of panel stacks on buildingsites, builder's yards etc.

    The four round slings of the transport gear hold thestack together on all four sides, in such a way that itis impossible for individual panels to slip out.

    Advantages: Spring-loaded slinging hooks reach from under-

    neath into the beads of the panel frame and pre-

    Warning!

    The smooth surface of the powder-coatedpanels reduces the sticking friction. It is strictly forbidden to lift stacks of pan-

    els without inserting Framax stackingcones (2 cones per layer) first!

    Exception: Stacking cones are not requiredif the stack is lifted using the "Framax trans-port gear".

    Caution!

    Stack max. 8 panels on top of one another(results in a stack height, incl. sleepers, ofapprox. 110 cm).

    A Framax stacking cones

    B Strapping tape

    C Sleeper

    C

    A

    B

    9765-222-01

    9765

    -223

    -01

    A

    Warning! The Lifting straps 13.00 m may only be

    used as shown here if there is no risk ofthe straps sliding towards one another, orof the load being displaced.

    Max. load: 2000 kg

    Follow the directions in the OperatingInstructions!

    A Framax transport gear (consisting of 4 round slings)

    B Chain suspension gear or Doka 4-part chain 3.20m

    9765-212-01

  • 7/27/2019 Doka Formwork

    49/80

    User information Doka framed formwork Alu-Framax Xlife Wall formwork

    49999765002 - 06/2007 The Formwork Experts

    vent the transport gear accidentally detachingitself when the cable tension slackens.

    The automatic length compensation feature ofthe Framax transport gear ensures that the loadis distributed evenly.

    The Framax transport gear can easily be sus-pended and detached by just one person workingon their own.

    Doka 4-part chain 3.20m

    The Doka-4-part chain 3.20m is a multi-functionalslinging means: used with the integrated eye-hooks for hoisting

    formwork, platforms and multi-trip packagingcontainers

    The Doka 4-part chain 3.20m can be adjusted to thecentre-of-gravity position by shortening the lengthsof the individual chains.

    The load is distributed evenly across the chains(automatic load compensation).

    For further information, see the section headed"Resetting by crane".

    Doka multi-trip packaging

    Alu-Framax pallet

    The ideal pallet for Alu-Framax panels: collapsible - space-saving

    a ... 280 cmb ... 26 cm

    stackable - both when full and when collapsed hoistable - with crane and lifting-chain

    Max. capacity: 2000 kg / 4 round slings

    Max. stacking height: 8 panels (incl. sleep-ers)

    Preconditions for use:

    The bottom layer of the stack may only consist ofone panel.

    The stacks must always be of panels of equalwidth.

    The top layers may also consist of "half-width"

    panels. The important thing here is that everypanel must be held by at least two round slingsand that no "gaps" may be left open between pan-els.

    It is forbidden to transport stacks where the edgesof the panels are not all in alignment!

    Follow the directions in the OperatingInstructions!

    9731-292-01

    45

    60

    60

    60 30

    90

    Max. load-bearing capacity (as 4-part chain):Up to a spread-angle of 30: 2910 kg.Up to a spread-angle of 45: 2360 kg.Up to a spread-angle of 60: 1700 kg.

    Max. load-bearing capacity (as 2-part chain):

    Up to spread-angle of 30 2400 kg.

    Follow the directions in the OperatingInstructions!

    Max. capacity: 1200 kg

    Follow the directions in the OperatingInstructions!

    9731-293-01

    a

    b

    9765-215-01

  • 7/27/2019 Doka Formwork

    50/80The Formwork Experts50 999765002 - 06/2007

    Wall formwork User information Doka framed formwork Alu-Framax Xlife

    Doka stacking pallet 1.55x0.85m

    The ideal containers for long items: durable stackable safe to lift by crane

    The Doka stacking pallet 1.55x0.85m is used fordelivering e.g.:

    Framax outside corners 2.70m Panel struts Framax brackets 90

    The quick-fit bolt-on castor set (with rapid-actingcouplings) turns the stacking pallet into a fast andmanoeuvrable transport trolley. Its width of only86 cm makes it easy to manoeuvre through anydoorway.

    Doka accessory box

    A practical packaging unit for storage and trans-port: stackable safe to lift by crane

    The Doka accessory box is the tidy, easy-to-find

    way of storing and stacking all interconnection andform-tie components.

    Bolt-on castor set

    The quick-fit bolt-on castor set (with rapid-actingcouplings) turns the stacking pallet or accessorybox into a fast and manoeuvrable trolley. Its widthof only 86 cm makes it easy to manoeuvre throughany doorway.

    A bolt-on castor set consists of: 2 heavy duty wheels, complete (A) 2 bolt-on castors, complete (B)

    Doka multi-trip transport box 1.20x0.80m galv.

    The ideal container for all small components: durable stackable safe to lift by crane

    The multi-trip transport box is used for deliveringe.g.:

    Framax quick acting clamps RU Framax multi function clamps Framax universal walings 0.90m Framax wedge clamps Framax stop-end ties Framax universal fixing bolts

    Max. load: 1100 kg

    Follow the directions in the OperatingInstructions!

    Max. load: 1000 kg

    Follow the directions in the OperatingInstructions!

    Max. load: 1500 kg

    Follow the directions in the OperatingInstructions!

  • 7/27/2019 Doka Formwork

    51/80

    User information Doka framed formwork Alu-Framax Xlife

    51999765002 - 06/2007 The Formwork Experts

    Column formwork

    Column formwork

    The Alu-Framax Xlife universal panels permit flexi-ble accommodation to column cross-sections of upto 60 cm x 60 cm in 5 cm increments.

    However, dimensions of 30 cm and 45 cm can alsobe formed using ordinary Framax Xlife panels andFramax outside corners.

    Perm. concrete pressure: 90 kN/m2

    9731-326-01

  • 7/27/2019 Doka Formwork

    52/80The Formwork Experts52 999765002 - 06/2007

    Column formwork User information Doka framed formwork Alu-Framax Xlife

    Design of column formwork

    Erecting and striking the formwork

    Erecting:

    Position the first panel and brace it with panelstruts.

    Join the second panel to the first, and attach apanel strut.

    Plumb and align this formwork-half with thepanel struts.

    Add two more panels to close the formwork.

    Striking:

    First remove the panels that are not attached to apanel strut, and place them face-down for inter-

    mediate storage.Undo the inter-panel connections of the form-work-half.

    Undo the ground anchors of the panel struts. Place the panels face-down for intermediate stor-

    age.

    with Alu-Framax Xlife universalpanelThe practical 5 cm hole grid is ideal for forming col-umns. Cross-sections of up to 60 x 60 cm. By com-bining panels with heights of 2.70 m, 1.35 m and0.90 m, a height grid of 45 cm is possible.

    Possible cross-sections in a 5 cm increment grid

    Example: Column 20 x 50 cm

    Schedule of materials

    The arrangement of the panel struts shownabove is best for achieving exact plumbingof the column formwork.

    9731-327-01

    A Alu-Framax Xlife universal panel

    B Framax universal fixing bolt + Super-plate 15.0

    C Framax frontal triangular ledge

    Seal off the unused hole-grid holes in theform-facing of the Xlife universal panelswith Framax plugs R24.5.

    9731-206-01

    B

    A

    C

    9731-210-01

    H

    A

    B

    C D

  • 7/27/2019 Doka Formwork

    53/80

    User information Doka framed formwork Alu-Framax Xlife Column formwork

    53999765002 - 06/2007 The Formwork Experts

    Table gives number of items needed

    with Framax outside corners andAlu-Framax Xlife panelsCross-sections of30 cm and 45 cm can also beformed using Framax outside corners and Alu-Framax Xlife panels.

    Schedule of materials

    Example: Framax outside corners 2.70m with Alu-Framax Xlifepanels 0.45x2.70m

    Table gives number of items needed

    Formworkheight (H)

    Alu-Framax Xlife uni-versal panels (A) Quick

    actingclampRU (B)

    Framaxuniver-sal fix-ing bolt

    (C)

    Super-platte

    15.0 (D)2.70m 1.35m 0.90m

    0.90m 4 8 81.35m 4 8 81.80m 8 8 16 162.25m 4 4 8 16 162.70m 4 16 16

    3.15m 4 8 16 24 243.60m 4 4 8 24 244.05m 4 4 8 24 244.50m 4 8 16 32 324.95m 4 4 4 16 32 325.40m 8 8 32 32

    A Alu-Framax Xlife panel (max. 45cm)

    B Framax outside corner

    C Framax quick-acting clamp RU

    D Triangular ledge

    Panel

    height (H)

    Alu-Framax Xlifepanel (A)

    Framax outsidecorner (B)

    Quick actingclamp RU

    (C)2.70m 0.90m 2.70m 0.90m0.90m 4 4 162.70m 4 4 32

    9731-209-01

    A

    B

    C

    D

    9731-211-01

    H

    A

    B

    C

  • 7/27/2019 Doka Formwork

    54/80The Formwork Experts54 999765002 - 06/2007

    Column formwork User information Doka framed formwork Alu-Framax Xlife

    Doka column formwork platform 150/90cm

    Product description

    The main features: This pre-assembled, ready-to-use platform

    ensures convenient and safe working on columnformworks. It can be used on columns of anycross-section.- with Alu-Framax Xlife: from 25x25 to 60x60cm- with Framax Xlife: from 25x25 to 75x75cm

    The slinging points recessed into the deckingmake it a quick and easy job to lift the platform bycrane. Only one column formwork platform canbe used on each column!

    Because the platform can be re-suspended soquickly, it can "migrate" from one formwork tothe next during concreting. This means that oneplatform is sufficient to serve several column

    formworks. The practical swing-out side railings make it easy

    to get on or off the platform. Both the side rail-ings can be fixed in either the open or closedposition.

    Transporting, stacking and storingThe Doka column-formwork platforms are pre-assembled and are easy to transport and store inthe folded-down position - it is not possible forthem to slide sideways.

    a ... 183 cmb ... 225 cmc... 28.6 cmd... 24.8 cme... 53 cm

    How to erect Tip up the side railings.

    The railings are locked in place automatically. Tip up the rear railings.

    The railings are locked in place automatically.

    The column-formwork platform is now ready for

    use.Note:

    When folding the platform back down, first folddown the rear railings, and then the side ones.

    A Rear railing

    B Side railing

    C Rear hoisting point

    D Safety hook (blue) = front hoisting point

    E Extra hoisting point (red) in parked position

    Permitted live load: 1.5 kN/m2 (150 kg/m2)

    Load Class 2 to EN 12811-1:2003

    150cm90

    cm

    9719-203-01

    A

    BC

    D

    E

    Stack of7 column formwork platforms

    Single folded-down platform

    9727-387-01

    a

    b

    c

    d

    c

    c

    c

    c

    c

    c

    9727-381-01

    a

    e

  • 7/27/2019 Doka Formwork

    55/80

    User information Doka framed formwork Alu-Framax Xlife Column formwork

    55999765002 - 06/2007 The Formwork Experts

    Moving the platformAttach the crane to the locations shown.

    Hang the column formwork platform into placeon the formwork.

    After the column formwork platform has beenhung into place on the formwork, detach thefour-part lifting tackle.

    The safety hook (D) drops down into its startingposition and automatically secures the platformagainst being accidentally lifted out.

    When the platform is lifted, the lifting chain actson the safety hook (D) and the platform is auto-matically unlocked.

    Moving the formwork and the plat-form in one pieceTo save crane time, the Doka column formworkplatform can also be repositioned jointly with theformwork:

    Hang the platform into place on the formwork(proceed as in "Moving the platform").

    Move the extra crane hoisting point (E) from theparked position to the "in-use" position. Rightposition = inclined forward towards formwork.

    C Rear crane suspension point

    D Front crane suspension point

    Red extra crane suspension point in"parked" position.

    Suspending the platform exactly in positionis made much easier when guide-cables areused.

    9744-207-01

    C

    D

    C

    C

    D

    D

    9731-222-01

    9727-384-01

    D

    Always move only half of the formwork ata time!

    Max. formwork height when movedtogether with the platform: 8.10 m.

    9727-383-01

    D

    9731-329-01

    E

  • 7/27/2019 Doka Formwork

    56/80The Formwork Experts56 999765002 - 06/2007

    Column formwork User information Doka framed formwork Alu-Framax Xlife

    Fix the extra crane hoisting point with the slidebolt (F) on the underside of the platform.

    Use additional panel struts to secure the form-work-half that has no platform mounted on it.

    Attach the crane. When the formwork and plat-form are to be moved in one piece, the extracrane hoisting point (E) must be used.

    The platform can stay attached to the formwork

    throughout this entire operation.

    Separating the platform from the formwork

    Fix the slide bolt (F) back in the rear position andmove the extra crane hoisting point into the"parked" position.

    Attach the crane to the locations shown in "Mov-ing the platform".

    Ladder systemCombined with the Column formwork platform 150/90cm, the Doka Ladder system XS provides a safeand reliable way of climbing up and down columnformworks.

    Note:

    The Ladder system XS must be implemented insuch a way that all national regulations are com-plied with.

    Make sure that the slide bolt latches in inthe frontmost position.

    C Rear crane suspension point

    E Extra crane suspension point

    9731-330-01

    F

    9744-208-01

    C

    E

    C

    C

    E

    9731-223-01

    For more information, please contact yourDoka technician.

    9765-224-01

  • 7/27/2019 Doka Formwork

    57/80

    User information Doka framed formwork Alu-Framax Xlife

    57999765002 - 06/2007 The Formwork Experts

    Circular formwork

    Circular formwork

    The quick way to form "in the round" - the Framaxcircular forming plates will get your framed form-work "around" any curve!

    With the Framax circular forming plates and theAlu-Framax Xlife panels, "circular" (i.e. polygonal)structures can be formed.

    A particularly cost-cutting factor in practice is thefact that you can use your existing Alu-Framax Xlife

    panels and all accessories such as panel struts andworking platforms from the Alu-Framax Xlife range.

    This makes circular forming of curved concretestructures with Framax circular forming plates uni-versal, economical and fast.

    Perm. concrete pressure: 50 kN/m2

    9731-323-01

  • 7/27/2019 Doka Formwork

    58/80The Formwork Experts58 999765002 - 06/2007

    Circular formwork User information Doka framed formwork Alu-Framax Xlife

    Design of the circular formworkBy combining the Framax circular forming plateswith the Alu-Framax Xlife panels, round structuresof any radius can be formed.

    In the same way as with the wall formwork, all that

    is needed to connect the Framax circular formingplates to the Alu-Framax Xlife panels is the quickacting clamp RU - and a blow of the hammer.

    Framax circular forming plates

    a ... 20 cm, b ... 25 cm, c ... 30 cm

    Using the different widths of circular forming plate:

    0.20 m- Inside circular forming plate- Outside circular forming plate (for length

    adjustment) 0.25 m

    - Outside circular forming plate 0.30 m

    - Outside circular forming plate

    Minimum inside radius: 1.80 m

    A Framax circular forming plate

    B Framax steel waling RD 0.40m

    C Framax quick-acting clamp RU

    D Angle anchor plate 12/18 with Wing nut 15.0

    E Alu-Framax Xlife panel

    9731

    -324

    -01

    A

    B

    C

    E

    D

    Heights Widths

    2.70 m 0.90 m

    0.20 m

    0.25 m

    0.30 m

    9727-432-01

    a

    9727-435-01 9731-372-01

    9727-433-01

    b

    9727-434-01

    c

  • 7/27/2019 Doka Formwork

    59/80

    User information Doka framed formwork Alu-Framax Xlife Circular formwork

    59999765002 - 06/2007 The Formwork Experts

    Example of formwork

    Type of structure: Circular tank Inside radius of structure: 3.00 m Wall thickness: 0.20 m

    Simplified representation, without details of form-ties or panelstruts.

    A Framax circular forming plate 0.20m (for the inside form-work)

    B Framax circular forming plate 0.25m (for the outside form-work)

    C Framax circular forming plate 0.20m (for length adjustment,distribute evenly around circumference)

    D Framax Xlife panel 0.45m (Note: same-sized panels are al-ways used both inside and out.)

    9731-200-01