DoD FEAC 1 202-546-7927 Activity and Data Modeling in Perspective Dennis E. Wisnosky Wizdom...
-
Upload
carlie-gaskell -
Category
Documents
-
view
215 -
download
0
Transcript of DoD FEAC 1 202-546-7927 Activity and Data Modeling in Perspective Dennis E. Wisnosky Wizdom...
DoD FEAC 1
Activity and Data Modeling in Perspective
Dennis E. Wisnosky
Wizdom Systems, Inc.
630.357.3000
OV-5 and OV-7
DoD FEAC 1IDEF• Created in the late ‘70s
• IDEF stands for Integrated DEFinition Language.
• Provides a common, public-domain language for modeling and describing:– Processes– Data– Requirements– Functions
• Has been used to improve hundreds of enterprises
• IDEF is a standard modeling technique for all US Government agencies, and many private companies.
DoD FEAC 1
Materials CorporatePolicies
CorporateResources Products
VisionMissionCultureCustomer
Where do the pieces fit?
How do the pieces fit?
DoD FEAC 1
Effective Engineering Requires a Blueprint
• Models are a basic necessity for building everything from houses to cars; marketing plans to financial forecasts.
• Modeling gives you a clear picture of the current situation, as well as a plan for the future.
• A model helps concepts evolve to plans and prototypes.
• Modeling a structure or solution is especially worthwhile when implementation goals are obvious and important.
DoD FEAC 1
And a Structured Approach to Enterprise Engineering,
to Knowledge Management, to Workflow ……….
Blueprints become the Change Management Architecture
www.feacinstitute.org 202-546-7927
DoD FEAC 1
Analyze Time, Costand Quality
SimulateChanges
Create A Visionof Change
Develop Prototypesand Implement Change Strategically
Target Projects forImprovement
Activity Models are a Mandatory Operational View
Model theActivities
DoD FEAC 1
IDEF is tool for......describing
...managing...and improving complex
processes and systems
To do this, we need a common framework for visualizing the
processes and the systems they support, and a
methodology for representing both.
DoD FEAC 1
A process is any set of managed,predictable behaviors.
Rapid Growth
Opportunity
Innovation
Rationalization
Competition
Consolidation
Involution
Frustration
Business Process Lifecycle
DoD FEAC 1
Process Management
The goal of process management
is to minimize costs through: • Rationalization,
• Consolidation,
• Involution,
• and to maximize the benefits of innovation, growth, and change.
DoD FEAC 1
Every Endeavor of Man and Beast has a Natural Process
Analysis
Specification
Design
Construction/IntegrationInstallation
Operation
Evolution
Entropy/Maladaption
Engineering Process
Lifecycle
DoD FEAC 1
What are the Processes Doing?
• The goal is to improve the management of both tangible and intangible assets according to a long-range plan while achieving continuous improvement. Since assets are all that an organization (and men and women) have, this is all that the goal can be.
DoD FEAC 1
IDEF (0 and 1X)Is the unified modeling methodology
that embraces management and user
concerns in systems and process
management.
DoD FEAC 1
Activity Models Data Models• Activity models are graphic
representations of functions and processes.
• Are hierarchical• Decomposed to the needed
level of detail.• Track inputs, controls,
mechanism, and outputs.• IDEF0
• Data models define the information requirements of the process.
• Used for building computer applications, databases, and repositories.
• Track flow of information through functional areas.
• IDEF1x
DoD FEAC 1IDEF Model Integration
IDEF0 Process Model
ProcessI1
I2
C1
M1
C2
O2
O1
IDEF1X EAR Model
PKEY 1
ATTR 1ATTR 2
ATTRn
I2
PKEY 1PKEY 2
ATTR6ATTR7
ATTRm
O2
IDEF1X ER Data Model
I1 I2
O1 O2
C1C2
DoD FEAC 1
Varieties of ModelsModels come in many shapes and sizes:
– Process Vs Data models
– Text Vs Graphic-based models
– High- Vs Low-level models
– Flat Vs Hierarchic models
– Degree of rigor in the modeling methodology
– Representation of additional detail: timing, data states, business rules...
DoD FEAC 1
Model Vs Reality
Models represent reality in a form that can be easily controlled, evaluated, and manipulated.
Complex, poorly understood processes become manageable when broken down into their component parts.
Models can be used for analysis of the simplest processes; or the most complex systems with lifecycle costs in the millions of dollars
www.feacinstitute.org 202-546-7927
DoD FEAC 1
Activity Modeling links the organization to its strategic goals.
• Simplification of Value-Added Activities
• Consolidation of Value-Added Activities
• Elimination of activities that do not add value
• Automated support only after basic business processes are efficient and effective.
• Provides the basis for analysis and continuous improvement.
DoD FEAC 1
Levels of Analysis•Strategic overview-- examination of the corporation as a whole, focusing on mission and long range goals and objectives.
• Mid-level analysis of management, culture, and organizations.
• Detailed look at individual processes.
All analyses are done in terms of time, cost, and quality
DoD FEAC 1
Process AnalysisIDEF models gather the data for analysis:
Cost: Activity-based costing, functional economic analysisTime: Timeline, cycle time, run time, turn-around times, sequence, hierarchy, dependencies.Quality: Quality metrics, comparisons between past, present, and future , TQM, CQI.
Redundant, over-lapping, non-value-added processes become apparent while
building the model.
DoD FEAC 1
Levels of Integrated Analysis
Strategic Overview
Logical Models of Data and Processes
Program Structure/ Core Activities
Systems Functions/ Specific Processes
System Process
DoD FEAC 1IDEF Methodology Components
• IDEF0 - Function and process modeling
Answers the question - WHAT DO I DO?
• IDEF1X - Entity-Attribute-Relationship data
modeling- Answers the question -
WHAT DO I NEED TO KNOW
TO DO WHAT I DO?
–IDEF2 - Process simulation modeling
Answers the question - WHEN DO I NEED TO KNOW
WHAT I NEED TO KNOW , TO DO WHAT I DO?
DoD FEAC 1Benefits • IDEF0 reveals redundant and non-value-
added processes.• IDEF0 documents the AS-IS-- the processes,
the relationships between them, and the logical breakdown of those functions into their sub-processes and properties for baseline evaluation and further analysis.
• IDEF0 begins the road map from the AS-IS to the TO-BE.
DoD FEAC 1Benefits (continued)
• IDEF0 provides a means for communicating and presenting results.
• IDEF0 establishes a forum and a structure for data gathering and knowledge acquisition.
• IDEF0 identifies opportunities for improvements.• IDEF0 reveals data relationships and
incongruities.• IDEF0 identifies and categorizes information
entities which form the foundation for information modeling (IDEF1x).
DoD FEAC 1
IDEF is not a substitute for...
thinking...
intelligence...
or experience,
But it can expose their absence.