DMI light tower - operational manual

19
1 OPERATION MANUAL DMI 16-LIGHT LIGHT TOWER ALSO AVAILABLE ONLINE AT DMI-LT.COM

description

DMI Light Tower reference guide how to bulid up light towers.

Transcript of DMI light tower - operational manual

Page 1: DMI light tower - operational manual

1

OPERATION MANUAL

DMI 16-LIGHT LIGHT TOWER

ALSO AVAILABLE ONLINE AT DMI-LT.COM

Page 2: DMI light tower - operational manual

2

You have purchased a very high quality piece of equipment that should

provide years of useful life. Following the instructions below and the

manufacturer’s generator operating instructions should provide years

of safe and reliable service.

UNLOADING THE TOWER/LIFTING THE TRAILER

When unloading the tower from the trailer, make sure lifting equipment and

rigging is sufficient. Note that the weight of the unit with fuel is 14,000 lbs./6350

kg. Attach rigging to the points marked “sling here” only. Failure to do so could

cause severe damage to the unit and injury/death to bystanders.

ATTACHING LIGHT FIXTURES

The 16 light fixtures will be shipped in a separate container. Carefully unwrap and

with the use of a stable platform or ladder, bolt the fixtures securely to the mast.

Note that they can be mounted in various directions, forward or rear-facing, to

light different areas. Tighten the bolts carefully and tightly, placing an included

washer between the nut and the fixture.

Page 3: DMI light tower - operational manual

3

Next, tighten the vertical adjustment lever on each fixture by pulling down on the

lever on each side of the fixture until snug.

The tower may be towed with the fixtures attached for short distances on smooth

roads. Bumpier roads may cause damage to the fixtures and the bulbs.

Make sure 3-prong wires from lights are firmly plugged into junction boxes on

the light mast.

Page 4: DMI light tower - operational manual

4

OPERATING THE UNIT

Inspect all electrical connections and wires and cables for damage that may have

been caused in transit. Do not operate the unit if damage to wiring or electrical

components is detected. Repairs should only be attempted by qualified electrical

personnel.

Leveling- Make sure the unit is on hard, level ground with the wheels chocked

from the front and the rear. Extend outriggers fully, which will be eleven feet/3.5

meters. The pins for the middle section of the outrigger will be stowed in the

forward tool compartment at the front of the trailer. Replace pins in both

locations and lower pad with crank handle until pads are firmly on the ground.

Page 5: DMI light tower - operational manual

5

When all six pads have been lowered, make adjustments to each according to the

two horizontal leveling indicators mounted near the mast. Insure the trailer is

securely level. DANGER- FAILING TO LEVEL UNIT CORRECTLY COULD CAUSE

TIPPAGE RESULTING IN DEATH!

Always disconnect trailer from towing vehicle before use. Remove mast traveling

pin, which secures the mast in the horizontal position, located above generator.

Remove mast locking pin at base of mast. . See pin locations in picture, below.

CHOCK TRAILER WHEELS!

Page 6: DMI light tower - operational manual

6

Page 7: DMI light tower - operational manual

7

COLD WEATHER- Low-temp gear oil is available for the winch. Low temp (-60F)

Shell Tellus S4VX32 or Petro Canada Hydrex Arctic 15 hydraulic oil is available for

the hydraulic pump. If arctic operation is desired, insure unit was shipped with

low temp gear oil in the winch and low temp hydraulic oil in the hydraulic pump.

Open Louvers on Ballast Box- Louvers are designed to keep ice and mud from

entering vents in ballast box. Close units during transport but open during use to

ventilate ballast box.

Page 8: DMI light tower - operational manual

8

Start generator according to manufacturer’s instructions, attached. Do not

operate lights until boom is at desired height.

Never operate generator unless in a well ventilated

outdoor space as carbon monoxide death will occur. Carbon Monoxide is

colorless and odorless.

Page 9: DMI light tower - operational manual

9

Generator will shut off after 10 seconds if fuel level is below 15%. See engine self-

diagnostics on generator control panel.

The generator selector switch should be pre-set to “240/120v 1-Phase”

Turn main switch on generator panel to “on”.

MAST OPERATION

Plug 110 v cord from hydraulic pump into 110 outlet on generator control panel

and turn 20 amp outlet breaker to on position. This will allow the hydraulic pump

to operate. You should hear the pump activate when the power is turned on to

the receptacle. The other breakers are for use of the 220 or other 110 outlet for

Page 10: DMI light tower - operational manual

10

other applications such as tools, if desired. UNPLUG HYDRAULIC UNIT PUMP OR

TURN OFF BREAKER WHEN NOT OPERATING HYDRAULICS TO PREVENT

UNECESSARY USAGE OF HYDRAULIC MOTOR

Gently pull closest hydraulic lever (Mast Tilting Lever) towards the front of the

trailer to move mast from travelling position into its vertical position. If levers will

not activate the winch, the cap next to the levers may be removed to adjust the

lever sensitivity with an allen wrench. Always adjust lever sensitivity to lowest

pressure that will operate pump. When mast is vertical, replace mast locking pin.

Danger- Failure to replace mast locking pin could cause injury and damage to the

machine! Never try to move the tower unless mast is in horizontal and secured

position.

Page 11: DMI light tower - operational manual

11

Once mast is vertical, the top of the lights will be 25 feet or 7.6 meters off the

ground. This may be sufficient for certain lighting applications or when higher

wind conditions are present.

To Telescope the Mast- Again, make sure mast locking pin is in place, and check

cables and electric wires for fraying or signs of wear.

If any fraying or signs of wear are detected, discontinue use and contact a

qualified repairman. Make sure unit is leveled and all outriggers are down,

including front jack stand. Lowering the front jack stand will result in smoother

winch operation, especially on descent.

Pull handle farthest from operator towards the front of the trailer. This will

tighten the two cables and pull the three boom sections upward. Raise to desired

height. Stop operation if frayed cables are observed or in the event of irregular

Page 12: DMI light tower - operational manual

12

pump operation. Do not raise boom past red “55 feet” indicator when indicator

shows on mast. That means the boom is fully extended. Attempting to over

extend the boom can result in serious unit damage and injury.

Note: The hydraulic pressure is set by the adjustment screw by the levers and

by the gold safety valves on the boom tilting piston, to intentionally only allow

the minimum pressure required to activate the piston and winch. To fully raise

the winch to 55 feet (16.8 meters) should take 5-8 minutes. If the levers do not

activate the piston and/or the winch, or the boom will not telescope to the “55

Feet” mark, the pump pressure adjustments will have to be changed.

Turn breaker for hydraulic pump off or unplug pump after unit is in

operation to avoid wear on pump.

Lower unit if windy or severe weather is forecast or if lightning is possible.

TURNING ON LIGHTS

Throw main disconnect switch to “on”.

Page 13: DMI light tower - operational manual

13

Open glass cabinet door of ballast box to access 16 individual light switches.

Turn on four circuits in sequence and wait until those four lights are fully

illuminated. Then turn on the next 4 and wait until lit, until all 16 lamps are

illuminated or until desired number of lights are in use. Turning on more than

four lights without waiting for them to fully illuminate will shut down the

Page 14: DMI light tower - operational manual

14

generator on a safety override and the starting sequence will have to be

repeated.

LOWERING MAST

Turn off individual lamp switches in glass cabinet

Plug in hydraulic pump into 110 outlet in the generator cabinet and/or turn

breaker for the outlet back on. You should be able to hear the hydraulic pump

whirring.

Push lever farthest from operator towards rear of trailer to lower mast. The lever

is adjusted to cause the winch to lower the mast very slowly. It should take 5

minutes to fully lower the mast. If cable is frayed, discontinue use and contact a

properly credentialed repair technician.

Mast is designed to be held in place by one of the two cables should one break.

However, if one does break, discontinue use immediately, move personnel away

from trailer and contact a properly trained repair technician.

Page 15: DMI light tower - operational manual

15

Mast fully lowered when all mast sections are retracted and cables on both

pulleys show slack.

Mast should lower smoothly. If for some reason the mast hangs up, contact a

repair technician. Do not continue to attempt to lower mast.

When it is desired to stow the mast, such as when towing or in severe weather,

and the mast is fully retracted, then and only then, remove the mast locking pin

(see photo on page 9) near bottom of mast. Move hydraulic lever closest to

operator towards the rear of the trailer until boom is resting in the cradle. It will

be necessary to move the electric wiring out of the cradle before fully lowering

to avoid damaging the cables.

Page 16: DMI light tower - operational manual

16

Do not attempt to continue to lower the mast once it is sitting in the cradle as

damage will occur. Replace mast travelling pin.

Page 17: DMI light tower - operational manual

17

SHUTTING UNIT OFF

Turn off main disconnect, let generator run 1 minute without a load and shut

down generator according to generator directions, attached. Never shut the

generator down with a load as damage to generator and/or ballast box may

occur.

The metal halide floodlights require 5 minutes to reach full intensity and 15

minutes to fully cool.

WHEN REFUELING GENERATOR MAKE SURE UNIT IS

OFF AND THE TWO FUEL VALVES TO AUXILLARY TANK ARE TURNED

OFF OR OVERFLOW WILL OCCUR

TOWING

Always pull trailer with a proper vehicle at a very safe speed. Never

pull faster than 50 mph/80kph, much slower when towing down a hill.

Never pull a trailer utilizing vehicle cruise control as that allows slack

and swerving to occur, especially downhill. Towing vehicle must have a

pintle ring receiver and electric trailer break connector. Always use

anti-telescoping cable to prevent boom from sliding out during

transport.

Page 18: DMI light tower - operational manual

18

WIND INSTABILITY AND DANGER OF UNIT FALLING OVER

The following is a chart of when the unit becomes aerodynamically unstable. The

data assumes the wind is coming from the most vulnerable direction, which is

calculated to be a side wind with all of the bulbs turned to face in that direction.

The danger of flying debris from the light fixtures should also be considered in

high winds and appropriate safety precautions should always be considered in

light of predicted or anticipated weather conditions. These precautions could

include:

Lowering the mast to an appropriate height for the weather condition

Stowing the mast in its travelling position

Page 19: DMI light tower - operational manual

19

Removing the fixtures from the mast and stowing it to its travelling

position.

Never erecting mast in proximity of electric wires

Tower Height in Feet Toppling Wind Speed in

miles per hour

55 Feet 70 mph

45 Feet 90 mph

35 Feet 100 mph

25 Feet 120 mph

DAILY INSPECTION

Tires are inflated to manufacturer’s recommended pressure and

lug bolts secure

All trailer running light fixtures working and undamaged

Dual safety chains securely attached to towing vehicle

Check all wiring and breakers for damage

Check all fluid levels: radiator, hydraulics, engine oils

Check cables for evidence of fraying

Make sure mast securing pin is properly installed

Check outriggers are undamaged and in the correct position with

all pins securing the jacks and outriggers.

All Rights Reserved

Copyright 2012 © DMI Pipe Fabrication, LLC d/b/a DMI-LT