MEMBERS OF DEEPOCEAN GROUP Diverless Brace Installation Varg A FFU seminar 26.01.2012

Transcript of Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e...

Page 1: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Diverless Brace Installation Varg AFFU seminar 26.01.2012  

Page 2: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Who am I ?

• Berit Hagland

• Project Manager  

• DeepOcean

Page 3: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

DIVERLESS BRACE INSTALLATION – VARG A Content: •Back ground•Onshore planning •Offshore operations 

Page 4: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Varg A – Monotower  wellhead platform Water depth approx. 84 meters

Page 5: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

BackgroundCrack in brace discovered by DeepOcean during the yearly inspection campaign

Page 6: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Background

Brace outer diameter – Approx. 1 m

Crack located in weld seam from 7 to 11 o’clock in complex location for ROV  and ROV tooling access

Page 7: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Study: Closed and Hinged  Clamp Evaluated

Page 8: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Length Weight in Air Weight in Water

New Brace 45 m  51 e 19 Te

Length Weight in Air Weight in Water

Old Brace 36 m 42 Te 13 Te

Page 9: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 - Preparations : Design of outriggers and SIMO analyses

Page 10: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 PreparationsSimulator training offshore lifts

Page 11: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 1 – Northern Canyon

Page 12: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 1 – Cleaning / removal of marine growth

Page 13: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 1 – Removal of 12 anodes and other obstructions

Page 14: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 1 – Photogrammetry

Page 15: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Tungsten carbide drill bit

Campaign 1 – Drilling of 4 off 90 degree holes to accomodate for lifting aids

Page 16: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 1 – Drilling of 3 holes to prevent further crack development

Page 17: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Test Phase

Page 18: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Volstad Surveyor

Page 19: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Additional project equipment

Page 20: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Volstad Surveyor

Page 21: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Lower through splash zone with holdback tugger lines to control brace

Page 22: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Continue lowering & monitoring  with ROV’s

Page 23: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Disconnect tugger winch linesReconnect as guide wires via DMA’s

Page 24: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Change from holdback wire to guide wire mode(ROV disconnects wire, passes through masterlink & connects to DMA on seabed)

Page 25: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

ROV opens clamp to position using hot stab

Page 26: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Lower brace into position close to pile sleeve guides

Page 27: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Install hang‐off rigging w/ROV operated hydraulic chain blocks 

Page 28: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Clamp fully closed in final position383mm clearance

Page 29: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Working close to plaform

Page 30: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Deployment

Page 31: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Preparations

Page 32: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Deployment

Page 33: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Opening clamps

Page 34: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Hang-off and aligning

Page 35: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Closing clamps

Page 36: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Locking clamps, aligning & levelleling

Page 37: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Torquing operations

Page 38: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Dogs engaged

Page 39: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Hanging off old brace in new brace

Page 40: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Cutting old brace

Page 41: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Lowering old brace to seabed

Page 42: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Installing plugs to keep water in brace during recovery

Page 43: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Lifting aids for old brace

Page 44: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Recovery of old brace

Page 45: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Campaign 2 – Installation of earthing clamps

Page 46: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

As-installed

Page 47: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Experience 

Technical solutions worked  planed No injuries Project performed within schedule

Key factors for success: • DeepOcean and IK was involved early in the process• Simulation of lifting operations • Offshore personnel involved in planning• Engineers involved in planning went offshore• Good communication between all Parties

Page 48: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Timeline

December 2010 August 2011

Page 49: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Companies involved

Page 50: Diverless Brace Installation Varg A · Diverless Brace Installation Varg A ... New Brace 45 m 51 e 19 Te ... Drilling of 4 off 90 degree holes to accomodate for lifting aids.

MEMBERS OF DEEPOCEAN GROUP

Thank you for your attention !