DISTRICT KURUKSHETRA’S Swachh Bharat Mission – through ...

40
DISTRICT KURUKSHETRA’S Swachh Bharat Mission through Swachh Bharat Mission through Participation of women A Success story Sumedha Kataria, Deputy Commissioner Kurukshetra (Haryana)

Transcript of DISTRICT KURUKSHETRA’S Swachh Bharat Mission – through ...

DISTRICT KURUKSHETRA’S

Swachh Bharat Mission through Swachh Bharat Mission – through Participation of women

A

Success story

Sumedha Kataria,Deputy Commissioner Kurukshetrap y

(Haryana)

[k 'kkS d[kqys esa 'kkSp ds

Objectives • Improvement in the quality of life in Rural areas.• Access to toilets to all -- Assistance of

Rs 12000/Rs.12000/-• Motivate communities and Panchayati Raj

Institutions for sustainable sanitation through gawareness generation and health education.

• Develop community managed environmental sanitation systems focusing on solid and liquid sanitation systems focusing on solid and liquid waste management.

Strategy and Processes• ‘Community led’• Community led• ‘People centered’

‘Demand driven approach’ • Demand driven approach • Increased emphasis on awareness creation and

demand generation of sanitary facilities demand generation of sanitary facilities • Alternative Delivery Mechanisms; Rural Sanitary

Marts/ Production CentresMarts/ Production Centres• Involvement of PRIs, VOs, NGOs, Cooperatives,

SHGs, SHGs, • Better Access to sanitation facilities &

Behavioral change leading to improved Quality g g p Q yof Life

To make village To make village To make village To make village “Open Defecation “Open Defecation Free” is a Free” is a Free is a Free is a challenging job.challenging job.The practice of The practice of going for open going for open going for open going for open defecation has defecation has been there since been there since been there since been there since times times immemorialimmemorialimmemorial.immemorial.

W t t t f W t t t f We set target of We set target of making making DharamDharam -- kshetrakshetra Kurukshetra Kurukshetra

“open defecation free”“open defecation free”open defecation freeopen defecation free

In the year 2007In the year 2007In the year 2007 In the year 2007 there were only there were only t NGP it NGP itwo NGPs in two NGPs in the district the district Kurukshetra.Kurukshetra.

2006-07 2 GPs

2007-08 108 GPs

2008 09 8 GPs2008-09 8 GPs

2009-10 132 GPs

2010-11 50 GPs

2011-12 3 GPs

Total 303 NGP out of 382

Wall Wall Paintings gwere done at the main at the main entry point/ y pRastas of th illthe village.

T i i d CLTS T i i d CLTS Training under CLTS Training under CLTS through Feedback through Feedback FoundationFoundationgg

TriggeringTriggeringTriggeringTriggering

[kqys esa “kkSp ds txg dk Hkze.k “keZlkj ;k=k

£qys esa “kkSp ,oa efgykvksa dk vkRelEeku

vkLFkk ,oa ey ds e?; lEcU/k[kqys esa VV~Vh djus ls

xÅekrk ;fn VV~Vh

h S s h[kkrh gS rks bldk lh/kk

eryc gS fd geus lkjs

nsoh nsorkvksa dks VVVh ~

f[kyk nh

D;k gekjk /keZ gesa ;gh

f”k{kk nsrk gS \

D;k blls cM++k iki vkSj

dksbZ gks ldrk gS \

ey ls eqWag rd izlkj.k ekxZ y qg

Swachhta committees worked as Swachhta committees worked as ti t f t il t t titi t f t il t t timotivators for toilet construction.motivators for toilet construction.

Low Cost Sanitary IHHLs Kurukshetra

Low Cost Sanitary IHHLs Kurukshetra

Solid & Liquid Waste Management ActivitiesManagement Activities

MotivationMotivationMotivationMotivation

Processes : Awareness generation IEC Activitiesgeneration – IEC Activities

Community participationCommunity participationy p py p p

Swachhta Yatra Swachhta Yatra Swachhta Yatra Swachhta Yatra

Swachhta Committee (Ni i S iti ) (Nigrani Samities) constituted in each village.Every early morning and late Every early morning and late evening, members of nigrani samities with torches, whistles and sticks marched whistles and sticks marched through the village to check and stop open defecation

S h l Child b S h l Child b S hht S i ikS hht S i ikSchool Children became School Children became Swachhta SainiksSwachhta Sainiksand organised cleanliness awareness and organised cleanliness awareness ralliesrallies chanted slogans of swachhta and used chanted slogans of swachhta and used ralliesrallies, chanted slogans of swachhta and used , chanted slogans of swachhta and used ‘jai swachhta’‘jai swachhta’ as salutation.as salutation.

TSC BECAME THE WOMEN LED CAMPAIGN in Kurukshetra.

The women of the area took lead and formed nigrani samities.

Women - young and old became the messengers for motivating the messengers for motivating the public. They held rallies in each

illvillage.

Women became active organizers of gvarious motivational functions at village level.

S th bli t ti Soon, other public representatives i.e. Sarpanches, Members of Panchayats School Teachers all Panchayats, School Teachers-all joined in the campaign of making villages open defecation freevillages open defecation free.

After achieving highest number After achieving highest number After achieving highest number After achieving highest number of of NirmalNirmal Gram Gram PanchayatsPanchayats in in Haryana Haryana Haryana Haryana ––We took an initiative one step We took an initiative one step ppforward i.e.forward i.e.

Solid waste management Solid waste management ––Solid waste management Solid waste management ––KachreKachre se se KamaiKamai

And set up 42 units in different And set up 42 units in different Gram Gram panchayatspanchayatsp yp y

.

REFUSE MEANS MONEY REFUSE MEANS MONEY -- A A

COMMUNITY BASED COMMUNITY BASED

SOLID WASTE MANAGEMENTSOLID WASTE MANAGEMENT

PROJECT IN KURUKSHETRAPROJECT IN KURUKSHETRAPROJECT IN KURUKSHETRAPROJECT IN KURUKSHETRA

• Construction of Garbage collection shed.

• One person with Rehri deployed for garbage collection from house to house and nearby commercial units.

Weakness Weakness –– fall backfall backWeakness Weakness fall backfall backDespite such a lot of efforts Despite such a lot of efforts –– matter of great matter of great concern that with the passage of time, gram concern that with the passage of time, gram concern that with the passage of time, gram concern that with the passage of time, gram panchayatspanchayats started slipping back and started started slipping back and started defecation in open. Main reasons found are:defecation in open. Main reasons found are:--

L k f l f ll d L k f l f ll d dd1.1. Lack of regular follow up and Lack of regular follow up and disdis--functioning of functioning of NigraniNigrani SamitiesSamities

22 Lack of sustainability / exit policyLack of sustainability / exit policy2.2. Lack of sustainability / exit policyLack of sustainability / exit policy3.3. Provision of more and more incentive for Provision of more and more incentive for

construction of toilet construction of toilet –– resulted resulted construction of toilet construction of toilet resulted resulted greediness in people greediness in people ------ dumped old dumped old toilet toilet -------- intention only to have 12000/intention only to have 12000/--againagainagainagain

Way forwardWay forward

We set a target to make Kurukshetra ODF by We set a target to make Kurukshetra ODF by 11stst November 2016 campaign started a fresh November 2016 campaign started a fresh in mission mode.in mission mode.

•STEPS TAKEN TO ACHIEVE GOAL:104 Motivators identified in month of August 2016•104 Motivators identified in month of August 2016

•5 days residential CLTS training conduct from 28th

August to 2nd September 2016g p•Sensitization of Gram Panchayats and all PRI members of ZP/PS, District Officers, and Social/Religious organi ations has been done d ring CLTS trainingorganizations has been done during CLTS training.•Anganwari workers, Asha Workers also sensitized by organizing 2 camps. g g p

• Clusters distributed to 30 teams of motivators and 3 block coordinatorsblock coordinators.

• All 394 panchayats allocated to individual officers in first phase.

• An intensive campaign launched and targeted to make ODF by 1.11.2016

• During this campaign about 1000 toilets have been• During this campaign about 1000 toilets have been constructed by household on their own without incentive. Work of construction of IHHL in village is going on.

• Funds for construction of toilets in 101 AnganwariCentres sanctioned at Rs 20 20 lac under District PlanCentres sanctioned at Rs.20.20 lac under District Plan Scheme.

• Morning follow up, constitution of Nigrani Samities, Motivation of school children in morning prayer etc is our strength to achieve the goal